← Back
Condo, residential unit in elevator building
105 LEXINGTON AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3335030
💬 Discuss this project
1930Year Built
4Stories
R4Building Class
R6BZoning
41,402 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in elevator building · 12,500 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Floor 514p · 1 filing · 11 docs
Floor 414p · 1 filing · 11 docs
Floor 3
Floor 2
Floor 1
Site & exterior7p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP407/08/2026
105 LEXINGTON AVENUE CONDOMINIUM103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP107/08/2025
JAJ ENGINEERING PLLC101/09/2025
SJ ENGINEERING PLLC208/30/2021
STUDIO 51 ARCHITECTURE, PLLC106/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRINCE CONTRACTING & DEVEGeneral Contractor603/21/2026
AIK RENOVATION INCGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
PARK CONTRACTING GROUPGeneral Contractor107/08/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930101/09/2025
HRF SERVICES CORP5616208/30/2021
Building Lifecycle
All (62)Filed (5)Permit Issued (5)Signed Off (2)Violation (38)Inspection (2)Special Inspection (10)
09/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01252278-I1
08/26/2025
Signed off — Alteration
EXTERIOR FACADE REPAIRS AND RESTORATION
B01162176-I1
07/09/2025
Permit issued — Sidewalk Shed
B01252278-I1-SH
07/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01252278-I1
06/23/2025
Permit issued — General Construction
B01162176-I1-GC
06/10/2025
Violation issued (HPD, closed)
A
03/25/2025
Permit issued — General Construction
B01162176-I1-GC
01/09/2025
Filed — Alteration
EXTERIOR FACADE REPAIRS AND RESTORATION
B01162176-I1
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Jabour
01/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
01/02/2025
Special inspection requirement — Final
Joseph Jabour
04/10/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
04/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/23/2023
Violation issued (HPD, closed)
A
05/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/12/2022
Permit issued — Plumbing
B00531808-S2-PL
04/07/2022
Permit issued — General Construction
B00531808-I1-GC
08/30/2021
Filed — Alteration
Herewith filing associated plumbing work in conjunction with interior renovation.
B00531808-S2
08/30/2021
Filed — Alteration
Herewith filing associated plumbing work in conjunction with interior renovation.
B00531808-S1
08/09/2021
Special inspection requirement — Final
FAHAD FATEH
08/09/2021
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/03/2021
Filed — Alteration
Herewith filing associated plumbing work in conjunction with interior renovation.
B00531808-I1
06/02/2021
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/02/2021
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/02/2021
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/01/2021
Special inspection requirement — Final
FAHAD FATEH
04/09/2021
Violation issued (HPD, closed)
A
09/30/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2017
Violation issued (HPD, closed)
I
08/10/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2016
Violation issued (HPD, closed)
I
11/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2015
Violation issued (HPD, closed)
I
06/04/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/16/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2000
Violation issued (ECB, closed)
Construction
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP07/09/2025
DOB NOWGeneral ConstructionSigned-offPRINCE CONTRACTING & DEVE06/23/2025
DOB NOWGeneral ConstructionSigned-offPRINCE CONTRACTING & DEVE03/25/2025
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS04/12/2022
DOB NOWGeneral ConstructionPermit IssuedAIK RENOVATION INC04/07/2022
BISOTISSUEDOBJECT DESIGN INC11/27/2018
BISPLISSUEDPLBG P & H INC02/25/2013
BISOTISSUEDFILIP PJETERGJOKA02/12/2013
BIS—ISSUEDBAYSIDE BUILDERS INC05/16/2011
BISPLISSUEDDANIEL WEINTRAUB LIC, PLB02/20/2009
BISSPISSUEDCAPITOL FIRE SPKL CO,INC11/28/2008
BISMHISSUEDSPRING AIR HVAC INC07/02/2008
BISEQISSUEDBAYSIDE BUILDERS INC04/21/2008
BISPLISSUEDTHE PLUMBING CO INC02/05/2008
BISMHISSUEDSPRING AIR HVAC INC12/10/2007
BIS—ISSUEDBAYSIDE BUILDERS INC08/29/2007
BISSPISSUEDCAPITOL FIRE SPKL CO,INC08/20/2007
BISPLISSUEDTHE PLBG COPMPANY INC10/03/2006
BIS—ISSUEDBAYSIDE BUILDERS INC08/31/2006
BIS—ISSUEDBAYSIDE BUILDERS INC06/22/2006
1 project · most recent 08/30/2021
Water/Sanitary
FiledStatusContractorScope
08/30/2021Signed-offDONATO PLUMBING, INCWater/Sanitary
4 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025Permit IssuedRICHARD NEU—
07/18/2024CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
05/06/2022CompleteJAS ELEC'L SERVICES, INCGeneral Wiring
08/02/2021CompleteYT ELECTRIAL SERVICES INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/09/2025Tenant Protection Plan ComplianceJoseph Jabourspecial
01/02/2025Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
01/02/2025FinalJoseph Jabourprogress
08/09/2021FinalFAHAD FATEHprogress
08/09/2021Mechanical SystemsFAHAD FATEHspecial
06/02/2021Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/02/2021Interior lighting powerFAHAD FATEHenergy_progress
06/02/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/02/2021Energy Code Compliance InspectionsFAHAD FATEHprogress
06/01/2021FinalFAHAD FATEHprogress
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00531808-S1Request digital key ↗
09/01/2026B00531808-I1Request digital key ↗
09/01/2026B00531808-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
10/15/2019340645671Open ↗
06/21/2019340684263Open ↗
11/15/2018340645671Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION12
08/06/2019340684263Open ↗
11/27/2018340645671Open ↗
02/26/2013320696993Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/26/2011320270675Open ↗
▸Seals & Professional Certifications43
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
12/21/2019340645671Open ↗
12/12/2019340684263Open ↗
12/12/2019340684263Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00531808-S1Open ↗
09/01/2026B00531808-I1Open ↗
09/01/2026B00531808-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/20/2012320696993Open ↗
02/13/2008310093172Open ↗
12/10/2007310055392Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01162176-I1Open ↗
08/25/2026B00531808-I1Open ↗
08/25/2026B00531808-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01162176-I1Open ↗
09/01/2026B01162176-I1Open ↗
08/25/2026B00531808-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
12/20/2012320696993Open ↗
02/13/2008310093172Open ↗
11/23/2007310055392Open ↗
▸BISPC FULL REPORT2
02/13/2008310093172Open ↗
11/23/2007310055392Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/15/2018340645671Open ↗
10/25/2018340640916Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/21/2019340684263Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/21/2019340684263Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/21/2019340684263Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING8
11/15/2018340645671Open ↗
10/25/2018340640916Open ↗
12/20/2012320696993Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
12/16/2008310093172Open ↗
11/20/2008310055392Open ↗
11/19/2008310093172Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/16/2009310055392Open ↗
06/05/2009310055392Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/10/2013320696993Open ↗
03/22/2013320696993Open ↗
▸BISEQUIPMENT USE PERMITS1
06/09/2009310055392Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
06/21/2019340684263Open ↗
▸BISSTREET TREE CHECKLIST1
02/22/2011320270675Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
04/11/2008310121604Open ↗
02/13/2008310093172Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/22/2011320270675Open ↗
11/23/2007310055392Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/21/2019340684263Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01162176-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/21/2019340684263Open ↗
11/27/2018340645671Open ↗
11/21/2018340645671Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/06/2020340684263Open ↗
11/21/2018340645671Open ↗
11/15/2018340645671Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/21/2019340645671Open ↗
12/20/2012320696993Open ↗
▸BISTECHNICAL REPORT: ENERGY2
11/07/2011320270675Open ↗
02/22/2011320270675Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/21/2019340684263Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/06/2019340684263Open ↗
06/21/2019340684263Open ↗
11/27/2018340645671Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/09/2020340645671Open ↗
01/06/2020340684263Open ↗
12/21/2019340645671Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/20/2012320696993Open ↗
02/22/2011320270675Open ↗
04/11/2008310121604Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE2
04/29/2011320270675Open ↗
02/22/2011320270675Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
01/06/2020340684263Open ↗
12/21/2019340645671Open ↗
12/12/2019340684263Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM4
01/09/2020340645671Open ↗
01/06/2020340684263Open ↗
12/21/2019340645671Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
12/19/2012320696993Open ↗
02/22/2011320270675Open ↗
04/11/2008310121604Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
06/21/2019340684263Open ↗
11/15/2018340645671Open ↗
10/25/2018340640916Open ↗
▸BISADDITIONAL INFORMATION3
12/09/2019340645671Open ↗
11/21/2018340645671Open ↗
11/07/2011320270675Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
02/22/2011320270675Open ↗