← Back
BuildNYC
Condo, residential unit in elevator building
105 LEXINGTON AVENUE
BROOKLYN · BIN 3335030
💬 Discuss this project
1930Year Built
4Stories
R4Building Class
R6BZoning
41,402 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Condo, residential unit in elevator building · 12,500 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 514p · 1 filing · 11 docs
Floor 4Unit 4G14p · 1 filing · 11 docs
Floor 3
Floor 2
Floor 1
Site & exteriorProposed heavy duty sidewalk shed7p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HFRC-LDR Lexington1503/21/2026
105 Lexington Avenue Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf107/08/2025
Jaj Engineering101/09/2025
SJ Engineering208/30/2021
Studio 51 Architecture106/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prince Contracting & DevelopmentGeneral Contractor603/21/2026
Aik RenovationGeneral Contractor303/21/2026
Filip PjetergjokaGeneral Contractor103/21/2026
Cod MechanicalPlumbing103/21/2026
PlumbingPlumbing103/21/2026
Park Contracting GroupScaffold107/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Bayside BuildersGeneral Contractor103/21/2026
Capitol Fire SPKLFire Protection111/28/2008
Capitol Fire SprinklerFire Protection108/20/2007
Daniel Weintraub Lic, PLBPlumbing102/20/2009
Object DesignGeneral Contractor111/27/2018
Spring Air HVACGeneral Contractor207/02/2008
The Plumbing CopmpanyPlumbing110/03/2006
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jaj Engineering930101/09/2025
HRF Services5616208/30/2021
Building Lifecycle
06/15/2026
Elevator Category 1 inspection report filed
05/14/2026
Boiler inspection report filed
BNR · Payment Verification In Progress
01/16/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01252278-I1
09/04/2025
Apartment 2E sold
123 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPark Contracting Group07/09/2025
DOB NOWGeneral ConstructionSigned-offPrince Contracting & Development06/23/2025
DOB NOWGeneral ConstructionSigned-offPrince Contracting & Development03/25/2025
DOB NOWPlumbingSigned-offArcon Plumbing Solutions04/12/2022
DOB NOWGeneral ConstructionPermit IssuedAik Renovation04/07/2022
BISOTISSUEDObject Design11/27/2018
BISPLISSUEDPlumbing P & H02/25/2013
BISOTISSUEDFilip Pjetergjoka02/12/2013
BIS—ISSUEDBayside Builders05/16/2011
BISPLISSUEDDaniel Weintraub Lic, PLB02/20/2009
BISSPISSUEDCapitol Fire SPKL11/28/2008
BISMHISSUEDSpring Air HVAC07/02/2008
BISEQISSUEDBayside Builders04/21/2008
BISPLISSUEDThe Plumbing02/05/2008
BISMHISSUEDSpring Air HVAC12/10/2007
BIS—ISSUEDBayside Builders08/29/2007
BISSPISSUEDCapitol Fire SPKL08/20/2007
BISPLISSUEDThe Plumbing Copmpany10/03/2006
BIS—ISSUEDBayside Builders08/31/2006
BIS—ISSUEDBayside Builders06/22/2006
1 project · most recent 08/30/2021
Water/Sanitary
FiledStatusContractorScope
08/30/2021Signed-offDonato PlumbingWater/Sanitary
4 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025Permit IssuedRichard Neu—
07/18/2024CompleteAntonio Ceriello ElectricGeneral Wiring
05/06/2022CompleteJas Electrical ServicesGeneral Wiring
08/02/2021CompleteYT Electrial ServicesGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/09/2025Tenant Protection Plan ComplianceJoseph Jabourspecial
01/02/2025Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
01/02/2025FinalJoseph Jabourprogress
08/09/2021Mechanical SystemsFAHAD FATEHspecial
08/09/2021FinalFAHAD FATEHprogress
06/02/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/02/2021Energy Code Compliance InspectionsFAHAD FATEHprogress
06/02/2021Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/02/2021Interior lighting powerFAHAD FATEHenergy_progress
06/01/2021FinalFAHAD FATEHprogress
165 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account