← Back
BuildNYC
Walk-up cooperative
105 MORTON STREET
MANHATTAN · West Village · BIN 1083173
💬 Discuss this project
1960Year Built
5Stories
C6Building Class
C1-6AZoning
215,890 sfGross Floor Area
184Units
LL97 CoveredRent Stabilized62 Active Violations 61 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: WVH Housing · 66,825 sf lot · 3.23 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Medium duty pipe scaffold erection2p · 1 filing · 3 docs
Floor 4Medium duty pipe scaffold erection2p · 1 filing · 3 docs
Floor 3Medium duty pipe scaffold erection2p · 1 filing · 3 docs
Floor 2Unit 2A16p · 3 filings · 19 docs
Floor 1Sidewalk shed for MSS GOLDEN EAGLE CONSTRUCTION11p · 4 filings · 20 docs
Sub-Basement1p · 1 filing · 19 docs
Site & exteriorFacade repairs4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WVH Housing Corporation Co-OP607/08/2026
WVH Development203/21/2026
WVH Housing Develop.+ Find203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian Shassian PE202/10/2026
Flaquer Engineering Group209/06/2025
Gormanschweyer Architects104/04/2025
Cowley Engineering210/10/2022
Mohammad Ahead, PE104/06/2022
Green Design111/02/2020
Ashraf111/20/2019
Syed Engineering111/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting603/21/2026
Alpha Desing Plus Construction403/21/2026
Theresa Voltaggio203/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMS ContractorScaffold303/21/2026
Two-Tone ContractingGeneral Contractor307/08/2026
ACS Environmental & ConstructionGeneral Contractor206/28/2026
Kings Group NYScaffold107/08/2026
MSS Golden Eagle ConstructionScaffold107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Redline ElectricElectrical103/22/2026
Retrofit PLGB & HeatingPlumbing107/08/2026
Orbit Mechanical Solutio*specialty_contractor107/08/2026
Cityline RestorationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519109/02/2025
AK Engineering678104/04/2025
Cowley Engineering186210/10/2022
Building Lifecycle
All (72)Filed (11)Permit Issued (11)Signed Off (6)Violation (7)Inspection (5)Objection (2)Special Inspection (30)
09/16/2026
Signed off — Alteration
INTERIOR RENOVATION IN AN EXIST'G. DUPLEX APT. "GA": KITCHEN AND BATHROOMS RENOVATION, WINDOWS REPLACEMENT NEW BATHROOM, AND INSTALL 4TON MULTI-ZONE HEAT PUMP HVAC UNIT AS PER PLANS SUBMITTED, NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01279068-I1
07/24/2026
Signed off — Alteration
INTERIOR RENOVATION IN AN EXIST'G. DUPLEX APT. "GA": KITCHEN AND BATHROOMS RENOVATION, WINDOWS REPLACEMENT NEW BATHROOM, AND INSTALL 4TON MULTI-ZONE HEAT PUMP HVAC UNIT AS PER PLANS SUBMITTED, NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01279068-S2
04/27/2026
Signed off — Alteration
Renovation of an existing dwelling unit, General Construction work at kitchenette and bathroom as per plans submitted. There is no change to use, egress or occupancy.
M01131724-I1
04/06/2026
Signed off — Alteration
Removal and installation of fixtures, as per plans submitted. There is no change to use, egress or occupancy.
M01131736-I1
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
03/02/2026
Special inspection requirement — Maintenance information
Ari Kamo
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
02/10/2026
Filed — Alteration
Removal and installation of fixtures, as per plans submitted. There is no change to use, egress or occupancy.
M01131736-P1
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
01/26/2026
Special inspection requirement — Maintenance information
Ari Kamo
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
01/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Permit issued — Plumbing
M01279068-S2-PL
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2025
Permit issued — Mechanical Systems
M01279068-I1-GC
09/23/2025
Permit issued — Mechanical Systems
M01279068-I1-MS
09/18/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Admin
09/09/2025
Permit issued — Plumbing
M01131736-I1-PL
09/06/2025
Filed — Alteration
INTERIOR RENOVATION IN AN EXIST'G. DUPLEX APT. "GA": KITCHEN AND BATHROOMS RENOVATION, WINDOWS REPLACEMENT NEW BATHROOM, AND INSTALL 4TON MULTI-ZONE HEAT PUMP HVAC UNIT AS PER PLANS SUBMITTED, NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01279068-S2
09/02/2025
Filed — Alteration
INTERIOR RENOVATION IN AN EXIST'G. DUPLEX APT. "GA": KITCHEN AND BATHROOMS RENOVATION, WINDOWS REPLACEMENT NEW BATHROOM, AND INSTALL 4TON MULTI-ZONE HEAT PUMP HVAC UNIT AS PER PLANS SUBMITTED, NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01279068-I1
09/02/2025
Permit issued — General Construction
M01131724-I1-GC
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/28/2025
Special inspection requirement — Final
Marcos Perez
08/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Marcos Perez
08/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Marcos Perez
08/28/2025
Special inspection requirement — Lighting in dwelling units
Marcos Perez
08/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Marcos Perez
08/28/2025
Special inspection requirement — Fenestration air leakage
Marcos Perez
08/28/2025
Special inspection requirement — Fenestration areas
Marcos Perez
08/28/2025
Special inspection requirement — Maintenance information
Marcos Perez
08/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Marcos Perez
08/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Marcos Perez
08/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Marcos Perez
08/28/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/04/2025
Filed — Alteration
Renovation of an existing dwelling unit, General Construction work at kitchenette and bathroom as per plans submitted. There is no change to use, egress or occupancy.
M01131724-I1
04/04/2025
Filed — Alteration
Removal and installation of fixtures, as per plans submitted. There is no change to use, egress or occupancy.
M01131736-I1
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
MARGARET GORMAN
10/23/2024
Special inspection requirement — Final
MARGARET GORMAN
10/23/2024
Special inspection requirement — Lighting in dwelling units
MARGARET GORMAN
03/09/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00712002-I1
10/13/2022
Signed off — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00450845-I1
10/12/2022
Special inspection requirement — Masonry
Eric Cowley
10/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
10/10/2022
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00450845-P1
07/23/2022
Permit issued — General Construction
M00450845-I1-GC
04/08/2022
Permit issued — Sidewalk Shed
M00712002-I1-SH
04/06/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00712002-I1
08/09/2021
Permit issued — General Construction
M00450845-I1-GC
07/12/2021
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00450845-I1
11/05/2020
Permit issued — Sidewalk Shed
M00420212-I1-SH
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH Plumbing & Heating11/05/2025
DOB NOWMechanical SystemsSigned-offACS Environmental & Construction09/23/2025
DOB NOWMechanical SystemsSigned-offACS Environmental & Construction09/23/2025
DOB NOWPlumbingSigned-offRetrofit PLGB & Heating09/09/2025
DOB NOWGeneral ConstructionSigned-offOrbit Mechanical Solutio*09/02/2025
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting07/23/2022
DOB NOWSidewalk ShedSigned-offKings Group NY04/08/2022
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting08/09/2021
DOB NOWSidewalk ShedPermit IssuedMSS Golden Eagle Construction11/05/2020
DOB NOWSidewalk ShedPermit IssuedCityline Restoration11/27/2019
DOB NOWSupported ScaffoldPermit IssuedAMS Contractor11/25/2019
BISOTISSUEDTwo-Tone Contracting08/29/2016
BISEQISSUEDRock Group NY08/03/2016
BISOTISSUEDTwo-Tone Contracting07/20/2016
BISOTISSUEDTechnical Construction Service07/29/2010
1 project · most recent 09/06/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/06/2025Signed-offACS Environmental & ConstructionAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MODEL: MXZ-8C48NA 48,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric MXZ-8C48NA 54,000 BTU · Split System ×3
1 project · most recent 09/06/2025
Water/Sanitary
FiledStatusContractorScope
09/06/2025Signed-offDPH Plumbing & HeatingWater/Sanitary
4 projects · most recent 09/13/2025
General Wiring
FiledStatusContractorScope
09/13/2025CompleteRedline ElectricGeneral Wiring
08/27/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
05/31/2022Permit IssuedHigh Quality Electric of—
11/15/2019Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
03/02/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
03/02/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
03/02/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
03/02/2026Maintenance informationAri Kamoenergy_progress
03/02/2026Energy Code Compliance InspectionsAri Kamoprogress
01/26/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
01/26/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
01/26/2026Maintenance informationAri Kamoenergy_progress
01/26/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
01/26/2026Energy Code Compliance InspectionsAri Kamoprogress
08/28/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/28/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/28/2025FinalMarcos Perezprogress
08/28/2025Energy Code Compliance InspectionsMarcos Perezprogress
08/28/2025Fire-Resistance Rated ConstructionMarcos Perezprogress
08/28/2025Lighting in dwelling unitsMarcos Perezenergy_progress
08/28/2025HVAC-R and service water heating system controlsMarcos Perezenergy_progress
08/28/2025Fenestration air leakageMarcos Perezenergy_progress
08/28/2025Fenestration areasMarcos Perezenergy_progress
08/28/2025Maintenance informationMarcos Perezenergy_progress
08/28/2025HVAC-R and service water piping design and insulationMarcos Perezenergy_progress
08/28/2025Fenestration and door U-factor and product ratingsMarcos Perezenergy_progress
08/28/2025HVAC-R and service water heating equipmentMarcos Perezenergy_progress
08/28/2025Mechanical SystemsYounes Abouyaalaspecial
10/23/2024Fire-Resistant Penetrations and JointsAri Kamospecial
Latest 25 of 34.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch6
09/02/2026M00712002-I1Request digital key ↗
08/24/2026M01131724-I1Request digital key ↗
08/21/2026M01279068-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00265764-I1Request digital key ↗
08/15/2026M00420212-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00450845-P1Request digital key ↗
09/03/2026M00450845-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00266276-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
07/31/2018122721493Open ↗
08/02/2016140528436Open ↗
06/06/2016122721493Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
09/21/2016122721493Open ↗
08/02/2016140528436Open ↗
07/25/2016122721493Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature21
09/23/2026M01279068-I1Open ↗
09/23/2026M01279068-I1Open ↗
09/23/2026M01279068-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00420212-I1Open ↗
09/03/2026M00450845-I1Open ↗
09/02/2026M00712002-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/20/2018122721493Open ↗
06/06/2016122721493Open ↗
11/20/2015120293351Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01279068-I1Open ↗
09/10/2026M01131724-I1Open ↗
08/31/2026M00450845-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/02/2016140528436Open ↗
06/06/2016122721493Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/02/2016140528436Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/06/2016122721493Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/02/2016140528436Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan3
08/13/2026M00420212-I1Open ↗
08/13/2026M00266276-I1Open ↗
08/13/2026M00265764-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
08/02/2016140528436Open ↗
06/06/2016122721493Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00450845-I1Open ↗
08/13/2026M01279068-I1Open ↗
08/13/2026M01279068-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M01131724-I1Open ↗
08/13/2026M01131736-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/06/2016122721493Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/16/2010120293351Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/20/2018122721493Open ↗
06/06/2016122721493Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/20/2018122721493Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/02/2016140528436Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/20/2018122721493Open ↗
11/20/2015120293351Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/20/2018122721493Open ↗
07/31/2018122721493Open ↗
06/06/2016122721493Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
08/20/2018122721493Open ↗
07/19/2018122721493Open ↗
▸BISEFILING COVER SHEET2
06/06/2016122721493Open ↗
03/16/2010120293351Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/02/2016140528436Open ↗
▸BISADDITIONAL INFORMATION1
07/31/2018122721493Open ↗
▸Other Documents1
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
08/02/2016140528436Open ↗