← Back
BuildNYC
Elevator cooperative
1050 PARK AVENUE
MANHATTAN · BIN 1046853
💬 Discuss this project
1923Year Built
14Stories
D4Building Class
R10Zoning
150,782 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1050 Tenants CP · 13,450 sf lot · 11.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior Restoration8p · 4 filings · 20 docs
PenthouseUnit PHB, Unit PHD8p · 5 filings · 20 docs
Floor 14Unit 14C11p · 3 filings · 20 docs
Floor 13
Floor 12Unit 12DUnder Construction16p · 3 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1B12p · 3 filings · 15 docs
CellarColumn repairs9p · 3 filings · 20 docs
Site & exteriorProposed Heavy Duty Sidewalk Shed (live Load - 300 Psf)25p · 5 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1050 Tenants12603/22/2026
1050 Owners1503/21/2026
1050 Park Ave Tenants303/21/2026
PRVT103/21/2026
Inspeco103/21/2026
Kreisel Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BogenGeneral Contractor707/08/2026
A & B ContractingGeneral Contractor603/21/2026
Dynamix Scaffold GroupScaffold504/09/2026
Bar Construction ServicesGeneral Contractor507/08/2026
George BassolinoPlumbing303/21/2026
Ceprine ConstructionScaffold303/21/2026
CS BridgeScaffold307/08/2026
Arista Air Conditioningspecialty_contractor203/21/2026
Vma ElectricalElectrical203/22/2026
Phoenix Sutton STRScaffold204/09/2026
NU-Way Heating & Coolingspecialty_contractor203/21/2026
Techne & AssociatesGeneral Contractor204/09/2026
Xinos ConstructionGeneral Contractor204/09/2026
P.S. Marcato Elev. CoElectrical203/21/2026
Paul Quinn Plumbing & HeatingPlumbing207/08/2026
AM&G Waterproofingspecialty_contractor203/21/2026
Vrisi Plumbing & HeatingPlumbing107/08/2026
Power Surge ElectricalElectrical103/21/2026
Water Dynamic P & HPlumbing107/08/2026
Amsterdam ElectricElectrical103/22/2026
Century Electric CoElectrical103/22/2026
TJ Doyle Electric EntpsElectrical103/21/2026
Maitland ElectricElectrical103/21/2026
Joseph Weinstein ElectricElectrical103/22/2026
T. McCaffrey-T. McGovernElectrical103/21/2026
Power Surge ElectricalElectrical103/22/2026
Acg Electrical ContractorsElectrical103/21/2026
Amsterdam ElectricElectrical103/21/2026
Asa Building MaintenanceGeneral Contractor106/07/2026
Four Streets Cool AirGeneral Contractor107/08/2026
G.bassolino PlumbingFire Protection107/08/2026
Pipe Solutions AdvisPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Portell Architecture5332110/20/2025
Hardie & Associates, Cons3760110/20/2025
Francisco D. Perez PE3306210/20/2025
Cole Technologies/Control1290308/12/2025
KZ Engineering4665308/22/2024
Catalpa Special Inspectio2004102/02/2024
Metric Consulting and Ins1803102/02/2024
Howard L Zimmerman Architects1712211/13/2023
Obaid Mian849106/30/2023
SM Studio8173105/25/2023
GZ & NC Code Consulting P7492107/21/2022
Certified Testing Laborat396110/15/2020
Macia Inspection & Testin402209/24/2020
JJ Architecture3023109/13/2019
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 07/10/2026, status Swarmp
11/09/2026
Signed off — Alteration
M01292516-I1
10/09/2026
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH RENOVATION OF APT 12D, INCLUDING REPLACEMENT, RELOCATION, AND NEW INSTALLATION OF TOILETS, LAVS, SHOWERS, TUB, SINK, AND WASHER/DRYER, PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01293229-P1
10/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Cycle 10 facade report signed — SAFE
233 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/11/2026
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/11/2026
DOB NOWGeneral ConstructionPermit IssuedTechne & Associates01/08/2026
DOB NOWPlumbingSigned-offVrisi Plumbing & Heating01/08/2026
DOB NOWMechanical SystemsPermit IssuedTechne & Associates01/07/2026
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/27/2025
DOB NOWGeneral ConstructionSigned-offXinos Construction11/18/2024
DOB NOWGeneral ConstructionSigned-offXinos Construction11/18/2024
DOB NOWMechanical SystemsSigned-offFour Streets Cool Air10/16/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G Waterproofing08/26/2024
DOB NOWGeneral ConstructionSigned-offAsa Building Maintenance06/25/2024
DOB NOWSprinklersSigned-offG.bassolino Plumbing06/24/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G Waterproofing05/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offDynamix Scaffold Group04/02/2024
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing04/01/2024
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/23/2024
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing02/15/2024
DOB NOWMechanical SystemsSigned-offArista Air Conditioning07/19/2023
DOB NOWGeneral ConstructionSigned-offA & B Contracting07/14/2023
DOB NOWPlumbingSigned-offT & T Plumbing11/15/2022
DOB NOWPlumbingSigned-offPipe Solutions Advis08/31/2022
DOB NOWGeneral ConstructionSigned-offA & B Contracting07/29/2022
DOB NOWMechanical SystemsSigned-offBar Construction Services05/05/2022
DOB NOWSidewalk ShedSigned-offCS Bridge09/01/2021
DOB NOWPlumbingSigned-offPaul Quinn Plumbing & Heating08/04/2021
DOB NOWStructuralPermit IssuedBogen05/17/2021
DOB NOWStructuralPermit IssuedBogen05/13/2021
DOB NOWMechanical SystemsSigned-offBar Construction Services05/11/2021
DOB NOWSidewalk ShedSigned-offCeprine Construction04/20/2021
DOB NOWStructuralPermit IssuedBogen04/19/2021
DOB NOWPlumbingSigned-offPaul Quinn Plumbing & Heating02/01/2021
DOB NOWMechanical SystemsSigned-offBar Construction Services01/29/2021
DOB NOWStructuralPermit IssuedBogen12/23/2020
DOB NOWSidewalk ShedSigned-offCS Bridge09/18/2020
DOB NOWPlumbingSigned-offHydro Plumbing & Heating08/21/2020
DOB NOWMechanical SystemsSigned-offNU-Way Heating & Cooling11/29/2019
DOB NOWPlumbingSigned-offP.S.I. Mechanical10/31/2019
BISPLISSUEDKapnag Heating & Plumbing11/20/2023
BISOTISSUEDBar Construction Services03/09/2023
BISOTISSUEDBar Construction Services01/19/2023
+ 47 more permits on file
2 projects · most recent 10/09/2026
Water/Sanitary
FiledStatusContractorScope
10/09/2026Signed-offVrisi Plumbing & HeatingWater/Sanitary
06/16/2020——Water/Sanitary
17 projects · most recent 10/22/2026
General Wiring Lighting
FiledStatusContractorScope
10/22/2026Permit IssuedPower Surge ElectricalGeneral Wiring
03/11/2026CompleteRichard Neu—
01/05/2026CompleteMaitland ElectricGeneral Wiring
06/16/2025Permit IssuedTower Electric—
02/11/2025Permit IssuedAmsterdam ElectricGeneral Wiring
03/05/2024Permit IssuedHigh Quality Electric of—
11/06/2023CompleteCentury ElectricGeneral Wiring
06/28/2023CompleteThe Metro Group ElectricGeneral Wiring
09/14/2022CompleteApollo Electric NYGGeneral Wiring
08/22/2022CompleteLens Electric—
07/11/2022CompleteNion ElectricGeneral Wiring
04/27/2021CompleteBorowide Elect'l Contractors—
09/14/2020CompleteVma ElectricalGeneral Wiring
08/13/2020CompleteNash Electric Services—
08/06/2019CompleteJoseph Weinstein ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/30/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
10/01/2026Tenant Protection Plan Compliance—special
10/20/2025Energy Code Compliance InspectionsPaul Portellprogress
10/20/2025Tenant Protection Plan ComplianceFRANCISCO PEREZspecial
10/17/2025Tenant Protection Plan ComplianceFRANCISCO PEREZspecial
10/17/2025Tenant Protection Plan ComplianceFRANCISCO PEREZspecial
10/01/2025Fire-Resistant Penetrations and JointsPaul Portellspecial
10/01/2025HVAC-R and service water piping design and insulationELLIOTT HARDIEenergy_progress
10/01/2025HVAC-R and service water heating system controlsELLIOTT HARDIEenergy_progress
10/01/2025HVAC-R and service water heating equipmentELLIOTT HARDIEenergy_progress
10/01/2025Lighting in dwelling unitsPaul Portellenergy_progress
10/01/2025FinalPaul Portellprogress
09/24/2025FinalAlan Schwartzprogress
09/24/2025Mechanical SystemsELLIOTT HARDIEspecial
08/11/2025Tenant Protection Plan ComplianceGEORGE ANDERSENspecial
08/06/2025FinalRenee Beckprogress
08/06/2025Sprayed fire-resistant materialsGEORGE ANDERSENspecial
08/06/2025Structural Steel - WeldingGEORGE ANDERSENspecial
08/06/2025Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
08/06/2025Structural Steel - DetailsGEORGE ANDERSENspecial
08/06/2025Structural Stability – Alterations of existing buildingsGEORGE ANDERSENspecial
08/06/2025MasonryGEORGE ANDERSENspecial
08/06/2025Concrete - Cast-In-PlaceGEORGE ANDERSENspecial
04/21/2025Concrete - Cast-In-Place—special
04/21/2025Structural Steel - High Strength Bolting—special
04/08/2025MasonryGEORGE ANDERSENspecial
Latest 25 of 76.
1,044 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account