Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 80th Madison Condominium
45 EAST 80 STREET · BIN 1076323
💬 Discuss this project
1987Year Built
27Stories
RMBuilding Class
C5-1Zoning
101,390 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized21 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,885 sf lot · 12.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 13 docs
Floor 28Under Construction15p · 3 filings · 13 docs
Floor 27Under Construction13p · 3 filings · 13 docs
Floor 26
Floor 25
Floor 24
Floor 23Under Construction13p · 1 filing · 14 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 154p · 2 filings · 19 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 7 docs
Floor 14p · 3 filings · 17 docs
Mezzanine1p · 1 filing · 11 docs
Cellar6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROWN HARRIS STEVENS1907/29/2026
JSRE MANAGEMENT1907/08/2026
STITCHT607/08/2026
ABECO CONSTRUCTION, LLC503/22/2026
80TH AT MADISON CONDOMINIMUM2803/22/2026
80TH & MADISON CONDOR103/22/2026
OWNER OF 1053 MADISON AVE103/22/2026
STATUS CAPITAL1503/22/2026
AVC GENERAL CONTRACTING103/22/2026
GUMLEY HAFT203/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVC GENERAL CONTRACTING LGeneral Contractor603/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor507/29/2026
HUDSON PLMBING & MCH, LLCPlumbing407/08/2026
T.C. AIR CONDITIONING CORGeneral Contractor303/21/2026
ATRIUM CONSTRUCTIONS LLCGeneral Contractor307/08/2026
HLP CONTRACTING CORPGeneral Contractor303/21/2026
TRIESTE CONSTRUCTION CORPGeneral Contractor304/08/2026
FINE CRAFTSMAN GROUP LLCGeneral Contractor207/08/2026
TOMASZ PUZAElectrical203/21/2026
FOLOR INCGeneral Contractor207/08/2026
SALVATORE PALAZZOLOGeneral Contractor203/21/2026
WEISENBERG, SElectrical103/21/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
DARBY CONSTRUCTION SVC LLGeneral Contractor107/08/2026
DEMHA TILE INCGeneral Contractor104/09/2026
G.BASSOLINO PLUMBING LTDGeneral Contractor107/08/2026
MEG II DESIGN LLCGeneral Contractor107/08/2026
RCD RESTORATIONS INCGeneral Contractor104/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
ARCO PLBG HTGPlumbing103/22/2026
FLINT MECHANICAL CORPPlumbing107/08/2026
HERTLER NADILE P & H, INCPlumbing107/08/2026
IMPACT PLUMBING INCPlumbing106/28/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TOHFAZ UDDIN P.E.2001405/08/2026
ECHO DESIGN + ARCHITECTUR9129311/13/2025
HT ENGINEERING, PLLC6274111/13/2025
GEORGE J. XERAKIAS, PE1658106/25/2025
METRIC CONSULTING AND INS1803105/28/2025
GASBARRO STRUCTURAL ENGIN5919104/08/2025
JACK GREEN ASSOCIATES422404/08/2025
ROSINI ENGINEERING, PC3282203/06/2025
SPACE4ARCHITECTURE DPC5306103/05/2025
MJ ENGINEERING & DESIGN5546207/02/2024
Building Lifecycle
All (244)Filed (45)Permit Issued (36)Signed Off (21)Facade (FISP) (11)Violation (60)Inspection (24)Objection (17)Special Inspection (30)
08/14/2026
Signed off — Alteration
M00930046-I1
08/14/2026
Signed off — Alteration
REMOVE, REPLACE ,RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE RENOVATION TO APARTMENT 12A ON THE 12TH FLOOR. GENERAL CONSTRUCTION FILED UNDER ALTERATION NO M00930046-I1. . ALL AS PER PLAN
M00932428-I1
07/28/2026
Permit issued — Sidewalk Shed
M01215678-I1-SH
06/01/2026
Signed off — Alteration
SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUCTION ALTERATION # M01227462-I1. IN 15TH FLOOR UNIT 15A & 15B, WORK TO INCLUDE CAP AND REMOVAL AND NEW INSTALLATION OF PLUMBING FIXTURES.
M01227462-I1
05/29/2026
Signed off — Alteration
SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUCTION ALTERATION # M01227462-I1. IN 15TH FLOOR UNIT 15A & 15B, WORK TO INCLUDE CAP AND REMOVAL AND NEW INSTALLATION OF PLUMBING FIXTURES.
M01227462-S1
05/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD TOHFAZ UDDIN
05/08/2026
Filed — Alteration
SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUCTION ALTERATION # M01227462-I1. IN 15TH FLOOR UNIT 15A & 15B, WORK TO INCLUDE CAP AND REMOVAL AND NEW INSTALLATION OF PLUMBING FIXTURES.
M01227462-P2
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD TOHFAZ UDDIN
04/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2026
Permit issued — Plumbing
M01227462-S1-PL
04/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/13/2026
Filed — Alteration
SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUCTION ALTERATION # M01227462-I1. IN 15TH FLOOR UNIT 15A & 15B, WORK TO INCLUDE CAP AND REMOVAL AND NEW INSTALLATION OF PLUMBING FIXTURES.
M01227462-P1
03/31/2026
Permit issued — Sidewalk Shed
M01215678-I1-SH
03/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/05/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/04/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01252408-P1
03/02/2026
Permit issued — Plumbing
M01311733-S1-PL
02/17/2026
Permit issued — General Construction
M01311733-I1-GC
02/10/2026
Permit issued — Plumbing
M00932428-I1-PL
01/15/2026
Permit issued — General Construction
M00930046-I1-GC
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD TOHFAZ UDDIN
01/07/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01215678-P2
12/17/2025
Filed — Alteration
Faade Inspection / Leak Investigation
M01335884-I1
12/16/2025
Violation issued (ECB, closed)
Cranes and Derricks
12/16/2025
Violation issued (ECB, closed)
Construction
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
11/24/2025
Objection raised — Scope
11/24/2025
Objection raised — Structural
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF UNIT 23A (INSTALLATION OF MECHANICAL EQUIPMENT). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01311733-S1
11/13/2025
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF UNIT 23A (INSTALLATION OF MECHANICAL EQUIPMENT). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01311733-S2
11/12/2025
Signed off — Alteration
Modification to existing sprinkler system for renovation of retail space as per plans filed herewith. No change to use, egress or occupancy on this application.
M01185127-I1
11/07/2025
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF UNIT 23A (INSTALLATION OF MECHANICAL EQUIPMENT). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01311733-I1
11/06/2025
Permit issued — General Construction
M01227462-I1-GC
11/03/2025
Permit issued — General Construction
M01216854-I1-GC
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ajay Chopra
10/31/2025
Special inspection requirement — Mechanical Systems
HENRY TORRES
10/31/2025
Special inspection requirement — Final
Ajay Chopra
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ajay Chopra
10/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
HENRY TORRES
10/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HENRY TORRES
10/31/2025
Special inspection requirement — Final
HENRY TORRES
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ajay Chopra
10/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
HENRY TORRES
10/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ajay Chopra
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
HENRY TORRES
10/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/01/2025
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01215678-P1
09/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/11/2025
Signed off — Alteration
M01185124-I1
08/04/2025
Filed — Alteration
SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUCTION ALTERATION # M01227462-I1. IN 15TH FLOOR UNIT 15A & 15B, WORK TO INCLUDE CAP AND REMOVAL AND NEW INSTALLATION OF PLUMBING FIXTURES.
M01227462-S1
Latest 60 of 244 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC07/28/2026
DOB NOWPlumbingSigned-offPLUMB-IT MECHANICAL INC04/22/2026
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC03/31/2026
DOB NOWPlumbingPermit IssuedIMPACT PLUMBING INC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedHLP CONTRACTING CORP02/17/2026
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC02/10/2026
DOB NOWGeneral ConstructionSigned-offTRIESTE CONSTRUCTION CORP01/15/2026
DOB NOWGeneral ConstructionSigned-offDEMHA TILE INC11/06/2025
DOB NOWGeneral ConstructionPermit IssuedRCD RESTORATIONS INC11/03/2025
DOB NOWSupported ScaffoldPermit IssuedARSENAL SCAFFOLD INC07/17/2025
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC07/15/2025
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC07/14/2025
DOB NOWStructuralSigned-offATRIUM CONSTRUCTIONS LLC07/02/2025
DOB NOWMechanical SystemsSigned-offATRIUM CONSTRUCTIONS LLC07/02/2025
DOB NOWSuspended ScaffoldPermit IssuedRCD RESTORATIONS INC07/01/2025
DOB NOWPlumbingPermit IssuedP.S.I. MECHANICAL06/17/2025
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC04/23/2025
DOB NOWGeneral ConstructionSigned-offATRIUM CONSTRUCTIONS LLC04/01/2025
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC02/18/2025
DOB NOWGeneral ConstructionSigned-offTRIESTE CONSTRUCTION CORP01/23/2025
DOB NOWMechanical SystemsSigned-offFOLOR INC08/09/2024
DOB NOWGeneral ConstructionSigned-offFOLOR INC08/08/2024
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC07/10/2024
DOB NOWSuspended ScaffoldPermit IssuedJEPOL CONSTRUCTION INC03/29/2024
DOB NOWGeneral ConstructionPermit IssuedMEG II DESIGN LLC12/09/2022
DOB NOWGeneral ConstructionSigned-offFINE CRAFTSMAN GROUP LLC07/18/2022
DOB NOWMechanical SystemsSigned-offG.BASSOLINO PLUMBING LTD05/03/2022
DOB NOWGeneral ConstructionSigned-offAVC GENERAL CONTRACTING L02/23/2022
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC10/27/2021
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP10/26/2021
DOB NOWGeneral ConstructionSigned-offSALVATORE PALAZZOLO10/21/2021
DOB NOWGeneral ConstructionSigned-offFINE CRAFTSMAN GROUP LLC08/17/2021
DOB NOWMechanical SystemsSigned-offT.C. AIR CONDITIONING COR06/09/2020
DOB NOWMechanical SystemsSigned-offDARBY CONSTRUCTION SVC LL03/26/2020
DOB NOWSprinklersSigned-offUNIVERSAL FIRE SPR LLC03/20/2020
DOB NOWPlumbingSigned-offHERTLER NADILE P & H, INC11/13/2019
BISPLISSUEDCOCHRANE PLBG & HTG03/26/2021
BISMHISSUEDFINE CRAFTSMAN GROUP LLC12/23/2020
BISOTISSUEDDARBY CONSTRUCTION SVC LL02/28/2020
BISOTISSUEDABECO CONSTRUCTION LLC02/27/2020
+ 46 more permits on file
3 projects · most recent 11/13/2025
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/13/2025Permit IssuedHLP CONTRACTING CORPHeating and Air Conditioning Systems—
07/01/2024——Air Conditioning Systems
Cooling
Climatemaster TCV-060 60,000 BTU · Fan Coil Indoor ×1
09/27/2022——Heating and Air Conditioning Systems
Heat / Cool
Trane GECE0181 16,200 BTU · Wshp ×8
GECE0121 11,300 BTU · Wshp ×2
GECE0151 14,300 BTU · Wshp ×1
Bosch LV048 48,400 BTU · Wshp ×1
3 projects · most recent 11/13/2025
Water/Sanitary Gas
FiledStatusContractorScope
11/13/2025Permit IssuedIMPACT PLUMBING INCGas, Water/Sanitary
01/24/2024Signed-offGOLDS PLUMBING CORPWater/Sanitary
09/21/2022Permit IssuedP.S.I. MECHANICALGas, Water/Sanitary
16 projects · most recent 09/13/2026
General Wiring
FiledStatusContractorScope
09/13/2026CompleteBIG CITY ELECL SOLUTIONSGeneral Wiring
05/12/2026CompleteTACTICAL ELECTRIC INC—
03/16/2026CompleteTACTICAL ELECTRIC INC—
07/23/2025Permit IssuedPROFF ELECTRICAL LLC—
07/23/2025Permit IssuedPROFF ELECTRICAL LLC—
05/22/2025Permit IssuedNASH ELECTRIC SERVICES IN—
04/14/2025CompletePRUDENT ELECTRIC INCGeneral Wiring
01/02/2025Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
09/11/2024CompleteRIVERDALE ELECTRIC CORPGeneral Wiring
01/31/2024Permit IssuedTUXEDO ELEC'L CONTR'G INCGeneral Wiring
07/26/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
07/27/2020CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
06/17/2020CompleteUPDATE SYSTEMS ELECTRICALGeneral Wiring
01/10/2020Permit IssuedJ & F ELECL CONTNG INC3 meters, 3 new_meters
02/15/2019CompleteGILSTON BROTHERS ELECT'LGeneral Wiring
2 projects · most recent 03/04/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/04/2026Permit IssuedARSENAL SCAFFOLD INCScaffold
01/07/2026Permit IssuedARSENAL SCAFFOLD INCSidewalk Shed
1 project · most recent 06/25/2025
Suspended Scaffold
FiledStatusContractorScope
06/25/2025Permit IssuedRCD RESTORATIONS INCSuspended Scaffold
2 projects · most recent 12/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/17/2025———
06/25/2025Permit IssuedRCD RESTORATIONS INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
05/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/05/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/01/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
05/14/2026Fire-Resistant Penetrations and JointsMD TOHFAZ UDDINspecial
05/08/2026Fire-Resistant Penetrations and JointsMD TOHFAZ UDDINspecial
01/14/2026Fire-Resistant Penetrations and JointsMD TOHFAZ UDDINspecial
10/31/2025FinalHENRY TORRESprogress
10/31/2025HVAC-R and service water piping design and insulationAjay Chopraenergy_progress
10/31/2025Fire-Resistant Penetrations and JointsAjay Chopraspecial
10/31/2025Fire-Resistant Penetrations and JointsAjay Chopraspecial
10/31/2025FinalAjay Chopraprogress
10/31/2025HVAC-R and service water piping design and insulationHENRY TORRESenergy_progress
10/31/2025HVAC-R and service water heating system controlsHENRY TORRESenergy_progress
10/31/2025HVAC-R and service water heating equipmentHENRY TORRESenergy_progress
10/31/2025Fire-Resistant Penetrations and JointsAjay Chopraspecial
10/31/2025Mechanical SystemsHENRY TORRESspecial
10/31/2025Energy Code Compliance InspectionsHENRY TORRESprogress
07/16/2025Interior lighting powerMD TOHFAZ UDDINenergy_progress
07/16/2025Lighting in dwelling unitsMD TOHFAZ UDDINenergy_progress
06/11/2025FinalSALVATOR CARADONNAprogress
05/16/2025Fire-Resistance Rated ConstructionMD TOHFAZ UDDINprogress
05/16/2025Energy Code Compliance InspectionsMD TOHFAZ UDDINprogress
05/16/2025Fire-Resistant Penetrations and JointsMD TOHFAZ UDDINspecial
05/16/2025FinalMD TOHFAZ UDDINprogress
05/05/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/05/2025Energy Code Compliance InspectionsWilliam Struthprogress
05/05/2025Air barrier - visual inspectionWilliam Struthenergy_progress
05/05/2025MasonrySAMI HAJJAR P.Especial
Latest 25 of 91.
▾Documents — 740 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch40
09/03/2026M00499836-I1Request digital key ↗
09/03/2026M00533288-P1Request digital key ↗
09/03/2026M00533288-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00325696-I1Request digital key ↗
08/15/2026M00330729-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00250723-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00249579-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00325701-I1Request digital key ↗
▸Applications & Permits131
▸BISWORK PERMIT APPLICATION66
04/01/2021122904553Open ↗
12/23/2020123125288Open ↗
07/15/2020122904553Open ↗
Showing 3 of 66 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION64
04/09/2021123125288Open ↗
01/20/2021122904553Open ↗
02/26/2020123856194Open ↗
Showing 3 of 64 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications224
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION67
03/05/2020123856194Open ↗
02/26/2020123856194Open ↗
02/10/2020123748150Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/23/2026M01216854-I1Open ↗
09/21/2026M01185124-I1Open ↗
09/01/2026M00571811-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature42
09/05/2026M00249579-I1Open ↗
09/05/2026M00250723-I1Open ↗
09/03/2026M00499836-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026M01216854-I1Open ↗
09/23/2026M01216854-I1Open ↗
09/21/2026M01185124-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
02/26/2020123856194Open ↗
02/10/2020123748150Open ↗
05/29/2019123437398Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/26/2020123856194Open ↗
05/29/2019123437398Open ↗
05/29/2019123437398Open ↗
Showing 3 of 8 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/22/2017140726944Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/22/2017140726944Open ↗
▸Trade Schedules & Equipment35
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
01/31/2019123669967Open ↗
03/30/2018123108323Open ↗
03/28/2018123108323Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/29/2021123125288Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/29/2021123125288Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes17
03/06/2020123856194Open ↗
02/10/2020123748150Open ↗
05/29/2019123437398Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00249579-I1Open ↗
08/13/2026M00330729-I1Open ↗
08/13/2026M00325701-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
02/10/2020123748150Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/11/2018123441819Open ↗
▸Environmental & Asbestos72
▸DOB NOWDEP ACP-5: Asbestos Assessment Report36
09/05/2026M00249579-I1Open ↗
09/05/2026M00250723-I1Open ↗
09/03/2026M00499836-I1Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
02/26/2020123856194Open ↗
02/10/2020123748150Open ↗
05/29/2019123437398Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
03/05/2020123856194Open ↗
02/26/2020123856194Open ↗
02/10/2020123748150Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
06/18/2021123125288Open ↗
06/14/2021122904553Open ↗
11/12/2019123437398Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/18/2021123856194Open ↗
06/18/2021123125288Open ↗
06/14/2021122904553Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026M00571811-I1Open ↗
08/13/2026M00533288-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2021123856194Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/18/2021123856194Open ↗
09/20/2021140726944Open ↗
06/29/2021123125288Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
03/28/2019123441819Open ↗
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
11/18/2021123856194Open ↗
09/20/2021140726944Open ↗
06/29/2021123125288Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/10/2020123748150Open ↗
09/18/2018123125288Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER1
04/01/2021122904553Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership53
▸BISCOST AFFIDAVIT50
06/18/2021123125288Open ↗
01/21/2021122904553Open ↗
02/26/2020123856194Open ↗
Showing 3 of 50 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWELDERS AFFIDAVIT1
02/19/2019123669967Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2021123856194Open ↗
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET30
02/26/2020123856194Open ↗
02/10/2020123748150Open ↗
05/29/2019123437398Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION15
02/08/2021123125288Open ↗
02/10/2020123748150Open ↗
03/28/2019123441819Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM11
04/01/2021122904553Open ↗
11/12/2019123437398Open ↗
11/08/2019123437398Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/22/2017140726944Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
08/13/2026M01019162-I1Open ↗
08/13/2026M01335884-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01243153-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01243153-I1Open ↗