Elevator cooperative
106-15 QUEENS BOULEVARD
QUEENS · BIN 4052238
💬 Discuss this project
1946Year Built
6Stories
D4Building Class
R7-1Zoning
152,000 sfGross Floor Area
127Units
LL97 CoveredRent Stabilized19 Open Violations 18 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: QUEENS BOULEVARD TENANT CORP · 36,850 sf lot · 4.12 FAR built · Flood zone X
Locations of Work
Plumbing
Bulkhead1p · 1 filing · 2 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY407/08/2026
QUEENS BLVD TENANTS CORP C O C2303/22/2026
INTERSYSTEMS703/22/2026
NATIONAL CONSUMER COOP203/22/2026
RICHTER PROPERTIES203/22/2026
QNS BLVD.TENANTS CORP.103/22/2026
PRATT CONSTRUCTION603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TUSCANA RENOVATION103/21/2026
SKY MANAGEMENT GROUP603/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
SKYLINE ACCESS103/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURAL PRESERV SYSTEMGeneral Contractor203/21/2026
MOLLER, GEORGEElectrical103/21/2026
NYC IRONWORKERS LOCAL 40Electrical103/21/2026
BIG APPLE FIRE SPRKL CO IFire Protection107/08/2026
NEW YORK PLUMBING-HEATINGGeneral Contractor107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
BLAZE ELECTRIC INC.Electrical103/22/2026
NEW YORK PLBG-HTG-COOLINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VALERIO ASSOCIATES, P.C.1379103/21/2023
O'ROURKE ENGINEERING, LLC5873110/25/2022
LEVIN ENGINEERING PLLC1267204/06/2021
Building Lifecycle
All (112)Filed (9)Permit Issued (5)Signed Off (4)Facade (FISP) (23)Violation (60)Inspection (5)Special Inspection (6)
09/30/2025
Cycle 10 facade report signed — SWARMP
09/22/2025
Cycle 10 facade report submitted
08/15/2025
Cycle 10 facade inspection completed
07/10/2025
Filed — Alteration
Q01254141-I1
09/12/2024
Signed off — Alteration
Q00858687-I1
03/14/2024
Filed — Alteration
Q01019857-I1
12/01/2023
Signed off — Alteration
HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08025817-I1
12/01/2023
Signed off — Alteration
FILING HEREWITH DRAWINGS TO INSTALL NEW EXHAUST DUCTS FOR PROPOSED GAS DRYERS. THIS APPLICATION DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08025818-I1
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/09/2023
Cycle 9 facade report submitted
11/09/2023
Cycle 9 facade report signed — SAFE
11/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/19/2023
Permit issued — Mechanical Systems
Q08025818-I1-MS
09/15/2023
Cycle 9 facade inspection completed
08/14/2023
Permit issued — Plumbing
Q08025817-I1-PL
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2023
Permit issued — Structural
Q00815539-I1-GC-CX
04/27/2023
Permit issued — Sidewalk Shed
Q00858687-I1-SH
04/26/2023
Filed — Alteration
Q00858687-I1
04/05/2023
Filed — Alteration
HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08025817-P1
03/21/2023
Filed — Alteration
Q00815539-I1
01/09/2023
Cycle 9 facade report submitted
01/07/2023
Cycle 9 facade report signed — SWARMP
12/21/2022
Cycle 9 facade inspection completed
11/02/2022
Cycle 9 facade report submitted
10/31/2022
Cycle 9 facade inspection completed
10/25/2022
Filed — Alteration
HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08025817-I1
10/25/2022
Filed — Alteration
FILING HEREWITH DRAWINGS TO INSTALL NEW EXHAUST DUCTS FOR PROPOSED GAS DRYERS. THIS APPLICATION DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08025818-I1
10/21/2022
Special inspection requirement — Mechanical Systems
BRIAN O'ROURKE
10/21/2022
Special inspection requirement — Final
ROMAN MARDAREWICH
06/24/2021
Cycle 9 facade report submitted
06/09/2021
Cycle 9 facade report signed — SWARMP
05/14/2021
Signed off — Alteration
Q00464240-I1
05/11/2021
Cycle 9 facade inspection completed
04/07/2021
Special inspection requirement — Sprinkler Systems
Dmitry Levin
04/07/2021
Special inspection requirement — Energy Code Compliance
Arthur Harris
04/06/2021
Filed — Alteration
Q00464240-P1
04/05/2021
Special inspection requirement — Sprinkler Systems
Dmitry Levin
04/05/2021
Special inspection requirement — Energy Code Compliance
Arthur Harris
03/18/2021
Permit issued — Sprinklers
Q00464240-I1-EW-SP
03/03/2021
Filed — Alteration
Q00464240-I1
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2020
Violation issued (ECB, closed)
Elevators
05/23/2020
Violation issued (ECB, closed)
Elevators
11/01/2019
Violation issued (HPD, closed)
I
10/24/2018
Cycle 8 facade report submitted
10/22/2018
Cycle 8 facade report signed — SAFE
10/19/2018
Cycle 8 facade inspection completed
09/21/2017
Violation issued (HPD, closed)
B
07/20/2017
Violation issued (HPD, open)
B
07/20/2017
Violation issued (HPD, open)
B
07/13/2017
Violation issued (HPD, closed)
B
07/13/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2017
Violation issued (ECB, closed)
Construction
01/24/2017
Cycle 8 facade report submitted
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNEW YORK PLUMBING-HEATING09/19/2023
DOB NOWPlumbingSigned-offNEW YORK PLBG-HTG-COOLING08/14/2023
DOB NOWStructuralSigned-offSTRUCTURAL PRESERV SYSTEM05/03/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/27/2023
DOB NOWSprinklersSigned-offBIG APPLE FIRE SPRKL CO I03/18/2021
BISFBISSUEDSTAR INDUSTRIAL SERVICE11/03/2018
BISPLISSUEDJOSEPH FERRIGNO P&H CO11/03/2018
BISOTISSUEDPRATT CONSTRUCTION & REST05/17/2018
BISEQISSUEDINTERSYSTEM S&S CORP04/23/2018
BISOTISSUEDPRATT CONSTRUCTION & REST02/12/2018
BISEQISSUEDINTERSYSTEM S&S CORP05/10/2017
BISPLISSUEDDH EAGLE PLBG & HTG INC05/13/2014
BISOTISSUEDA & B CONTRACTING LLC05/09/2014
BISEQISSUEDINTERSYSTEMS CORPORATION02/03/2014
BISOTISSUEDPRATT CONSTRUCTION INC02/03/2014
BISOTISSUEDPRATT CONSTRUCTION INC09/23/2013
BISOTISSUEDCAPITAL RESTORATION & CON07/18/2012
BISEQISSUEDPRATT CONSTRUCTION INC02/27/2012
BISOTISSUEDCAPITAL RESTORATION & CON02/23/2012
BISEQISSUEDPRATT CONSTRUCTION INC02/23/2012
BISOTISSUEDCAPITAL RESTORATION & CON10/27/2011
BISEQISSUEDPRATT CONSTRUCTION INC10/20/2011
BISEQISSUEDPRATT CONSTRUCTION INC10/18/2011
BISOTISSUEDJUNO CONTRACTING CORP03/15/2005
BISOTISSUEDJUNO CONTRACTING CORP01/20/2005
BISPLISSUEDN.KOFSKY , INC12/17/1996
BISFBISSUEDC C CONTROLLED COMBUSTION12/17/1996
BISEQISSUEDATLANTIC SCAFFOLD06/05/1992
7 projects · most recent 05/08/2025
General Wiring Boiler Controls
FiledStatusContractorScope
05/08/2025CompleteSAFETECH ELECL CONTNG CORGeneral Wiring
11/04/2024CompletePOWER ON ELECTRICAL SERV—
01/17/2024CompleteKINGS ELECTRIC CO., INC.—
04/27/2023CompleteT & R ALARM AND ELEC'L—
04/19/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
02/12/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
11/13/2018CompleteBLAZE ELECTRIC INC.Boiler Controls
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/21/2022Mechanical SystemsBRIAN O'ROURKEspecial
10/21/2022FinalROMAN MARDAREWICHprogress
04/07/2021Sprinkler SystemsDmitry Levinspecial
04/07/2021Energy Code ComplianceArthur Harrisprogress
04/05/2021Sprinkler SystemsDmitry Levinspecial
04/05/2021Energy Code ComplianceArthur Harrisprogress
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
08/27/2026Q00464240-I1Request digital key ↗
08/27/2026Q00464240-P1Request digital key ↗
08/25/2026Q08025818-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/27/2026Q00464240-I1Request digital key ↗
08/15/2026Q00464240-P1Request digital key ↗
▸Applications & Permits30
▸BISWORK PERMIT APPLICATION18
10/30/2018440519422Open ↗
10/30/2018440519422Open ↗
06/04/2018421585886Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
09/22/2020420975546Open ↗
09/14/2020420975546Open ↗
10/30/2018440519422Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/15/2018421585886Open ↗
01/03/2018421585886Open ↗
01/26/2017420463812Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026Q08025818-I1Open ↗
08/25/2026Q08025817-I1Open ↗
08/25/2026Q00815539-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/30/2018440519422Open ↗
05/09/2017440404000Open ↗
05/15/2014420975546Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/30/2018440519422Open ↗
05/09/2017440404000Open ↗
10/03/2013440102595Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/30/2018440519422Open ↗
05/09/2017440404000Open ↗
10/03/2013440102595Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/14/2014420975546Open ↗
10/21/2011420495146Open ↗
10/20/2011420493950Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026Q00464240-I1Open ↗
08/23/2026Q08025818-I1Open ↗
08/22/2026Q00464240-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q00464240-I1Open ↗
08/23/2026Q08025818-I1Open ↗
08/22/2026Q00464240-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/21/2011420495146Open ↗
10/20/2011420493950Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
10/30/2018440519422Open ↗
06/03/2014420975546Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/10/2014420975546Open ↗
06/12/2014420975546Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/30/2018440519422Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/15/2014420975546Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
02/02/2018421585886Open ↗
01/03/2018421585886Open ↗
10/30/2018440519422Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q08025818-I1Open ↗
08/25/2026Q08025817-I1Open ↗
08/25/2026Q00815539-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/30/2018440519422Open ↗
01/03/2018421585886Open ↗
05/14/2014420975546Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/21/2011420495146Open ↗
07/28/2011420463812Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/05/2019440519422Open ↗
11/15/2018421585886Open ↗
01/03/2018421585886Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/26/2020420975546Open ↗
03/05/2019440519422Open ↗
11/15/2018421585886Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
05/09/2017440404000Open ↗
10/03/2013440102595Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/26/2020420975546Open ↗
10/30/2018440519422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/30/2018440519422Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/27/2011420463812Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/26/2020420975546Open ↗
10/30/2018440519422Open ↗
05/09/2017440404000Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS5
01/03/2018421585886Open ↗
05/15/2014420975546Open ↗
10/21/2011420495146Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/20/2020420975546Open ↗
03/05/2019440519422Open ↗
11/15/2018421585886Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
05/01/2018440404000Open ↗
03/02/2012420493950Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/05/2019440519422Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
03/05/2019440519422Open ↗
11/15/2018421585886Open ↗
10/30/2018440519422Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/26/2020420975546Open ↗
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET5
01/03/2018421585886Open ↗
05/15/2014420975546Open ↗
10/21/2011420495146Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
12/01/2017440404000Open ↗
11/24/2017440404000Open ↗
01/13/2014420463812Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
10/30/2018440519422Open ↗
05/09/2017440404000Open ↗
10/03/2013440102595Open ↗
▸BISBOROUGH INTAKE FORM1
03/05/2019440519422Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/22/2020420975546Open ↗
▸BISDHCR DOCUMENT1
10/19/2020420975546Open ↗
▸DOB NOWIRA Certification1
08/13/2026Q01254141-I1Open ↗