← Back
BuildNYC
Office, 20+ stories, with or without commercial
The Six
106 WEST 56TH STREET · BIN 1023395
💬 Discuss this project
2018Year Built
27Stories
O4Building Class
C6-6Zoning
87,573 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: No Report Filed
Office, 20+ stories, with or without commercial · Owner of record: 106 West 56th Street Property Investors III · 5,021 sf lot · 17.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofChimney support installation1p · 1 filing · 3 docs
Floor 25NewYork-Presbyterian19p · 3 filings · 11 docs
Floor 24
Floor 23
Floor 22Demolition and renovation, 22nd floor22p · 1 filing · 12 docs
Floor 21Cushman & Wakefield U.S., INC11p · 2 filings · 7 docs
Floor 20Renovation of floor 20 for build-out23p · 1 filing · 16 docs
Floor 19THE SIX mechanical systems43p · 3 filings · 20 docs
Floor 18THE SIX mechanical system30p · 3 filings · 14 docs
Floor 17THE SIX plumbing and sprinkler systems27p · 3 filings · 14 docs
Floor 16Savanna29p · 3 filings · 12 docs
Floor 15Mechanical system modification and inspection11p · 2 filings · 10 docs
Floor 14Fitzwalter Fitou19p · 1 filing · 15 docs
Floor 13THE SIX mechanical systems40p · 3 filings · 20 docs
Floor 12Sprinkler system modification for tenant build-out25p · 1 filing · 15 docs
Floor 11
Floor 10The Six plumbing and sprinkler systems53p · 3 filings · 20 docs
Floor 9NewYork-Presbyterian19p · 3 filings · 11 docs
Floor 8THE SIX mechanical systems46p · 3 filings · 20 docs
Floor 7Mechanical equipment and ductwork installation for tenant bu49p · 1 filing · 20 docs
Floor 6Mechanical system modification and inspection11p · 2 filings · 10 docs
Floor 5
Floor 4The Six Interior Renovation 4th FloorUnder Construction51p · 4 filings · 20 docs
Floor 3The Six plumbing and sprinkler work21p · 3 filings · 19 docs
Floor 2Second floor renovation and build-outUnder Construction36p · 1 filing · 20 docs
Floor 1
CellarNewYork-Presbyterian2p · 1 filing · 4 docs
BasementNewYork-Presbyterian2p · 1 filing · 4 docs
Site & exteriorChimney support installation8p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Savanna5207/08/2026
106 West 56 Street703/22/2026
The Rinaldi Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2016$48.7M—AMERICA PRESS, INC. → 106 WEST 56TH STREET PROPERTY INVESTORS III, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CGS Architecture & Design1810/06/2026
Victor Famulari Architect107/31/2026
AKF Engineers3701/28/2025
Gensler1210/11/2024
New York & Company103/18/2022
Patuxent Engineering111/06/2020
Akfengineers406/02/2020
Green Design101/31/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
George E Berger Ass5003/21/2026
Milrose Consultants4503/21/2026
AE Design Solution203/21/2026
Patuxent Engineering203/21/2026
New York & Company103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SavconGeneral Contractor3407/08/2026
L&M Interior ConstructionGeneral Contractor2607/08/2026
Everest ScaffoldingScaffold1107/08/2026
CM PlumbingPlumbing907/08/2026
New Era Mechanical ServiceFire Protection907/08/2026
Enobrac PlumbingPlumbing807/08/2026
P & D MechanicalFire Protection607/08/2026
Emg Industrial ChimneyGeneral Contractor507/08/2026
New Era Mechanical ServicesPlumbing507/08/2026
Enobrac PlumbingFire Protection507/08/2026
Manhattan D EnterprisesScaffold303/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection107/08/2026
Team ElectricElectrical103/22/2026
Fine Waterproofingspecialty_contractor109/02/2026
Right Away ElectricElectrical103/22/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Noble MechanicalPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4237110/06/2026
Building Lifecycle
All (300)Filed (75)Permit Issued (80)Signed Off (38)Violation (27)Inspection (50)Special Inspection (30)
10/06/2026
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH M01231906-I1 (GC) AND M01231906-S2 (PL/SP)
M01231906-P3
09/01/2026
Permit issued — General Construction
M01438223-I1-GC
08/13/2026
Special inspection requirement — Final
Young Suh
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/13/2026
Special inspection requirement — Lighting controls
Young Suh
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/13/2026
Special inspection requirement — Interior lighting power
Young Suh
08/13/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
08/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01438223-I1
07/29/2026
Special inspection requirement — Final
VICTOR FAMULARI
07/17/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION W/ M01195452-11 (GC) AND M01195452-S2 (PL/SP)
M01195452-S2
06/05/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. Application filed in conjunction with M01182059-I1 (GC) and M01182059-S2 (PLSP)
M01182059-S2
05/12/2026
Permit issued — Sprinklers
M01182059-S2-EW-SP
05/04/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. Application filed in conjunction with M01182059-I1 (GC) and M01182059-S2 (PLSP)
M01182059-S1
04/20/2026
Signed off — Alteration
INSTALLATION OF NON-LOAD BEARING PARTITIONAS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00997500-I1
04/14/2026
Signed off — Alteration
MODIFICATION TO PLUMBING/SPRINKLER AS PER PLANS. NO CHANGE IN USSE, EGRESS OR OCCUPANCY.
M00997513-I1
04/13/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION W/ M01195452-11 (GC) AND M01195452-S2 (PL/SP)
M01195452-S1
04/10/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. Application filed in conjunction with M01182059-I1 (GC) and M01182059-S2 (PLSP)
M01182059-I1
04/09/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION W/ M01195452-11 (GC) AND M01195452-S2 (PL/SP)
M01195452-I1
03/20/2026
Permit issued — Sprinklers
M01195452-S2-EW-SP
03/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH M01231906-I1 (GC) AND M01231906-S2 (PL/SP)
M01231906-P2
03/13/2026
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH M01231906-I1 (GC) AND M01231906-S2 (PL/SP)
M01231906-P1
03/13/2026
Special inspection requirement — Post-installed Anchors
Young Suh
03/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
03/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
03/13/2026
Special inspection requirement — Sprinkler Systems
Young Suh
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/02/2026
Special inspection requirement — Sprinkler Systems
Young Suh
03/02/2026
Special inspection requirement — Mechanical Systems
Young Suh
03/02/2026
Special inspection requirement — Post-installed Anchors
Young Suh
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/02/2026
Special inspection requirement — Final
Young Suh
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
01/21/2026
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT & ASSOCIATED DUCTWORK FOR TENANT BUILD-OUT AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION W/ M01195452-11 (GC) AND M01195452-S2 (PL/SP)
M01195452-P3
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
01/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Signed off — Alteration
MODIFICATION TO MECHANICAL SYSTEM AS PER PLANS. NO CHANGE IN USSE, EGRESS OR OCCUPANCY.
M00997508-I1
10/14/2025
Permit issued — Sprinklers
M01231906-S2-PL
10/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Permit issued — Plumbing
M01231906-S2-EW-SP
08/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2025
Signed off — Alteration
It is proposed to install plumbing fixtures and related piping and modify existing sprinkler system for tenant build-out as shown on plans. Application filed in conjunction with M01130073-I1(GC) and M01130073-S2 (MS)
M01130073-S2
08/12/2025
Signed off — Alteration
It is proposed to install plumbing fixtures and related piping and modify existing sprinkler system for tenant build-out as shown on plans. Application filed in conjunction with M01130073-I1(GC) and M01130073-S2 (MS)
M01130073-S1
08/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFine Waterproofing09/01/2026
DOB NOWSprinklersSigned-offP & D Mechanical05/12/2026
DOB NOWSprinklersSigned-offP & D Mechanical03/20/2026
DOB NOWPlumbingPermit IssuedCM Plumbing10/14/2025
DOB NOWSprinklersPermit IssuedP & D Mechanical09/03/2025
DOB NOWMechanical SystemsPermit IssuedL&M Interior Construction07/11/2025
DOB NOWGeneral ConstructionPermit IssuedL&M Interior Construction07/11/2025
DOB NOWPlumbingSigned-offCM Plumbing06/18/2025
DOB NOWSprinklersSigned-offP & D Mechanical06/18/2025
DOB NOWPlumbingSigned-offCM Plumbing06/05/2025
DOB NOWSprinklersSigned-offP & D Mechanical06/05/2025
DOB NOWSprinklersSigned-offP & D Mechanical06/05/2025
DOB NOWMechanical SystemsSigned-offL&M Interior Construction06/05/2025
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction06/05/2025
DOB NOWMechanical SystemsSigned-offL&M Interior Construction04/04/2025
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction04/04/2025
DOB NOWPlumbingSigned-offCM Plumbing04/02/2025
DOB NOWSprinklersSigned-offNew Era Mechanical Service02/05/2025
DOB NOWPlumbingSigned-offNew Era Mechanical Services02/05/2025
DOB NOWMechanical SystemsSigned-offL&M Interior Construction02/04/2025
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction01/27/2025
DOB NOWSprinklersSigned-offNew Era Mechanical Service08/19/2024
DOB NOWSprinklersSigned-offNew Era Mechanical Service08/19/2024
DOB NOWSprinklersSigned-offNew Era Mechanical Service08/19/2024
DOB NOWSprinklersSigned-offNew Era Mechanical Service08/19/2024
DOB NOWSprinklersSigned-offNew Era Mechanical Service07/25/2024
DOB NOWPlumbingSigned-offNew Era Mechanical Services07/17/2024
DOB NOWMechanical SystemsSigned-offL&M Interior Construction07/11/2024
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction05/22/2024
DOB NOWPlumbingSigned-offNew Era Mechanical Services04/03/2024
DOB NOWSprinklersSigned-offNew Era Mechanical Service04/03/2024
DOB NOWMechanical SystemsSigned-offL&M Interior Construction04/03/2024
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction04/01/2024
DOB NOWMechanical SystemsSigned-offL&M Interior Construction03/14/2024
DOB NOWSprinklersSigned-offNew Era Mechanical Service03/14/2024
DOB NOWPlumbingSigned-offNew Era Mechanical Services03/14/2024
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction03/07/2024
DOB NOWMechanical SystemsSigned-offL&M Interior Construction12/05/2023
DOB NOWGeneral ConstructionSigned-offL&M Interior Construction12/05/2023
DOB NOWPlumbingSigned-offNew Era Mechanical Services12/01/2023
+ 60 more permits on file
4 projects · most recent 01/21/2026
Heating and Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2026Signed-offL&M Interior ConstructionHeating and Air Conditioning Systems
Heat / Cool
Anemostat EZTS 600 CFM · Vav Box ×3
Airtite AR-X 1,188 BTU ×1
03/26/2025Signed-offL&M Interior ConstructionHeating and Air Conditioning Systems
Heat / Cool
Anemostat EZTS 750 CFM ×5
Airtite AR-X 118 BTU ×1
01/31/2024Signed-offSavconAssociated Ducts and Piping, Heating Systems
Heating
Anemostat EZTS 9,700 BTU · Vav Box ×9
Ducts & Piping
N/A n/a 1 CFM · Ductwork
08/10/2021Signed-offSavconAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Anemostat EZTS , AR-X 17,160 BTU · Vav Box ×5
Ventilation
Anemostat EZTS 328,800 BTU · Vav Box ×20
Ducts & Piping
N/A n/a 328,800 BTU · Ductwork ×1
5 projects · most recent 10/06/2026
Sprinkler System
FiledStatusContractorScope
10/06/2026Permit IssuedCMP PipingSprinkler System
03/26/2025Signed-offCMP PipingSprinkler System
12/06/2023Permit IssuedV'S Prime Mechanical434 heads
06/02/2020——18 heads
01/08/2020———
5 projects · most recent 10/06/2026
Water/Sanitary
FiledStatusContractorScope
10/06/2026Permit IssuedCM PlumbingWater/Sanitary
03/26/2025Signed-offCM PlumbingWater/Sanitary
12/06/2023Permit IssuedEnobrac PlumbingWater/Sanitary
06/02/2020Signed-offEnobrac PlumbingWater/Sanitary
01/08/2020Signed-offEnobrac PlumbingWater/Sanitary
19 projects · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025Permit IssuedTransform Electl Contractors IGeneral Wiring
01/07/2025CompleteMetropolis ElectricGeneral Wiring
06/10/2024CompleteMetropolis ElectricGeneral Wiring
04/04/2024CompleteMetropolis ElectricGeneral Wiring
04/04/2024CompleteMetropolis ElectricGeneral Wiring
12/08/2023CompleteMetropolis ElectricGeneral Wiring
02/21/2023CompleteMetropolis ElectricGeneral Wiring
11/16/2022Permit IssuedTeam ElectricGeneral Wiring
05/16/2022Permit IssuedTeam ElectricGeneral Wiring
09/28/2021CompleteMetropolis ElectricGeneral Wiring
06/11/2021CompleteRight Away ElectricGeneral Wiring
04/06/2021CompleteStar Electrical Contractors—
01/16/2021CompleteRight Away ElectricGeneral Wiring
06/16/2020CompleteRight Away ElectricGeneral Wiring
06/16/2020CompleteRight Away ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 50
DateTypeResultReport
08/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 50.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/13/2026FinalYoung Suhprogress
08/13/2026Interior lighting powerYoung Suhenergy_progress
08/13/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
08/13/2026Sprayed fire-resistant materialsYoung Suhspecial
08/13/2026Lighting controlsYoung Suhenergy_progress
08/13/2026Energy Code Compliance InspectionsYoung Suhprogress
07/29/2026FinalVICTOR FAMULARIprogress
03/13/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
03/13/2026Sprinkler SystemsYoung Suhspecial
03/13/2026Energy Code Compliance InspectionsYoung Suhprogress
03/13/2026Post-installed AnchorsYoung Suhspecial
03/13/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
03/13/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
03/13/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
03/02/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
03/02/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
03/02/2026Post-installed AnchorsYoung Suhspecial
03/02/2026Sprinkler SystemsYoung Suhspecial
03/02/2026Energy Code Compliance InspectionsYoung Suhprogress
03/02/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
03/02/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
03/02/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
03/02/2026Mechanical SystemsYoung Suhspecial
03/02/2026Energy Code Compliance InspectionsYoung Suhprogress
03/02/2026FinalYoung Suhprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fitzwalter FitouOfficeFloor 14
Project M00986083 Alteration · LOC Issued · 02/28/2024
NewYork-PresbyterianMedical / HealthcareFloors 9, 25
Project M08053034 Alteration · Permit Entire · 02/10/2023
SavannaOfficeFloor 16
Project M00779767 Alteration · LOC Issued · 09/14/2022
Project M00779802 Alteration · LOC Issued · 09/12/2022
Project M00779834 Alteration · LOC Issued · 09/12/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,030 on file (BIS + DOB NOW)
▸Plans & Drawings76
▸DOB NOWPlans/Sketch69
09/06/2026M00015408-I1Request digital key ↗
09/03/2026M00564330-I1Request digital key ↗
09/03/2026M00564291-I1Request digital key ↗
Showing 3 of 69 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00260940-I1Request digital key ↗
09/04/2026M00352454-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00260022-I1Request digital key ↗
09/04/2026M00352441-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00260940-I1Request digital key ↗
09/04/2026M00352454-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00423285-I1Request digital key ↗
▸Applications & Permits173
▸BISPLAN / WORK APPROVAL APPLICATION119
01/18/2022123063068Open ↗
01/15/2022123063068Open ↗
01/14/2022123063068Open ↗
Showing 3 of 119 on file for this type
▸BISWORK PERMIT APPLICATION53
10/20/2020140962778Open ↗
10/20/2020140962778Open ↗
10/05/2020140958266Open ↗
Showing 3 of 53 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/13/2020123057538Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications334
▸DOB NOWProgress Inspector Seal & Signature85
10/08/2026M01231906-P3Open ↗
10/08/2026M01231906-P3Open ↗
09/02/2026M08053065-I1Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature74
09/05/2026M00260940-I1Open ↗
09/04/2026M00352441-I1Open ↗
09/03/2026M00564291-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature62
10/08/2026M01231906-P3Open ↗
09/23/2026M00260940-I1Open ↗
09/22/2026M00779834-P1Open ↗
Showing 3 of 62 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION60
11/18/2020123866860Open ↗
Showing 1 of 60 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
10/14/2020140962778Open ↗
09/25/2020140958266Open ↗
09/25/2020140957828Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
10/14/2020140962778Open ↗
09/25/2020140958266Open ↗
09/25/2020140957828Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
09/25/2020140958266Open ↗
09/25/2020140957828Open ↗
Showing 2 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment75
▸BISEQUIPMENT USE PERMITS37
07/06/2021123057538Open ↗
01/11/2021123057538Open ↗
01/11/2021123057538Open ↗
Showing 3 of 37 on file for this type
▸BISSCHEDULE B - PLUMBING14
06/10/2021123057538Open ↗
11/16/2020123057529Open ↗
10/16/2020123057538Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
07/06/2021123057538Open ↗
01/11/2021123057538Open ↗
01/11/2021123057538Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
02/19/2025123057538Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTenant Protection Plan and Notes4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
02/19/2025123057538Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISRODENT CONTROL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/06/2021123057538Open ↗
04/28/2021123039309Open ↗
12/15/2020123057538Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/03/2026M00555703-I1Open ↗
09/03/2026M00556659-I1Open ↗
Showing 2 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/10/2020123866860Open ↗
12/10/2020140899222Open ↗
Showing 2 of 3 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
03/18/2025123057538Open ↗
04/28/2021123039309Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
06/22/2022123057538Open ↗
06/22/2022123057538Open ↗
▸Inspections & Test Reports69
▸BISTECHNICAL REPORT: RESPONSIBILITY52
08/09/2021140885549Open ↗
08/03/2021123103505Open ↗
08/03/2021123103505Open ↗
Showing 3 of 52 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
12/15/2020123057538Open ↗
10/16/2020123057538Open ↗
Showing 2 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
10/28/2025140885549Open ↗
02/27/2023123063068Open ↗
09/03/2021140861217Open ↗
Showing 3 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
12/17/2020123057538Open ↗
12/17/2020123057538Open ↗
Showing 2 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL3
09/03/2021140861217Open ↗
10/20/2020140962778Open ↗
Showing 2 of 3 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT24
08/09/2021140885549Open ↗
07/26/2021123057529Open ↗
04/28/2021123039309Open ↗
Showing 3 of 24 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/23/2023123063068Open ↗
07/14/2021123781238Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms130
▸BISADDITIONAL INFORMATION61
07/06/2021123057538Open ↗
11/19/2020140962778Open ↗
10/22/2020140962778Open ↗
Showing 3 of 61 on file for this type
▸BISBOROUGH INTAKE FORM32
11/18/2020123866860Open ↗
Showing 1 of 32 on file for this type
▸BISEFILING COVER SHEET27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
10/14/2020140962778Open ↗
09/25/2020140958266Open ↗
09/25/2020140957828Open ↗
Showing 3 of 10 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
06/11/2021140705823Open ↗
06/10/2021140957828Open ↗
06/10/2021140705814Open ↗
Showing 3 of 4 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTCO - Supporting Documents2
03/11/2021123057538Open ↗
01/08/2021123057538Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
06/23/2022123057538Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type