| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| X00918961 ↗ | 3021 KINGSBRIDGE AVENUE BRONX | Alteration | Signed-off | 08/28/2023 | 07/23/2026 | Design BAZINI ENGINEERING, P.C. | INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00931502 ↗ | 1966 NEWBOLD AVENUE BRONX | Alteration | Permit Issued | 09/20/2023 | 06/26/2026 | Design MESZAROS ENGINEERING PLLC | INSTALLATION OF NEW GAS AND DOMESTIC WATER PIPING FOR DOMESTIC HOT WATER PRODUCTION. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M00935721 ↗ | 780 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 01/26/2024 | 07/16/2025 | Design ROBERT GERMAIN JR. PE Owner ORSID NY | REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. CHANGE GRADE OF FUEL OIL FROM #4 OIL TO #2 OIL. NO C… |
| M00988469 ↗ | 701 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2024 | 01/17/2025 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW GAS PIPING AND NEW GAS METER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00868082 ↗ | 1020 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/29/2023 | 08/29/2024 | Design EN-POWER GROUP Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INSTALLATION OF ONE (1) NEW STEAM BOILER INCLUDING BURNER PILOT, HW COIL, AND SEPERATE HW HEATER WITH STORAGE. … |
| X00913223 ↗ | 3424 KOSSUTH AVENUE BRONX | Alteration | Signed-off | 08/07/2023 | 08/13/2024 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| Name | Jobs together | Most recent |
|---|---|---|
| KZ ENGINEERING, P.C | 52 | 01/09/2025 |
| NEW AGE ENGINEERING PLLC | 22 | 09/07/2024 |
| ROBERT GERMAIN JR. PE | 21 | 09/04/2025 |
| NEW YORK ENGINEERING ASSOC., P.C. | 14 | 01/02/2024 |
| BAZINI ENGINEERING, P.C. | 5 | 12/23/2025 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 3 | 06/28/2022 |
| REVANS DESIGN PE PC | 2 | 05/02/2023 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 11/14/2024 |
| AKF ENGINEERS, LLP | 1 | 06/28/2022 |
| AR Figueroa Architect LLC | 1 | 10/08/2020 |
| BUILT ENGINEERS, P. C. | 1 | 01/26/2022 |
| CFS ENGINEERING, DPC | 1 | 11/11/2020 |
| EME CONSULTING ENGINEERING GROUP | 1 | 10/11/2022 |
| EN-POWER GROUP | 1 | 08/19/2024 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 04/05/2021 |
| LAWLESS & MANGIONE | 1 | 04/06/2022 |
| MESZAROS ENGINEERING PLLC | 1 | 06/16/2025 |
| MG ENGINEERING D.P.C. | 1 | 10/18/2021 |
| OLA CONSULTING ENGINEERS, PC | 1 | 06/06/2022 |
| RLM ENGINEERING PLLC | 1 | 09/08/2022 |
| SOUTHPORT ENGINEERING ASSOCIATES | 1 | 12/22/2020 |
| Name | Jobs together | Most recent |
|---|---|---|
| THE METRO GROUP, INC | 6 | 12/23/2025 |
| ALKLEM PLUMBING INC | 3 | 09/07/2024 |
| NAT'L MECH. SVCS PLBG LLC | 3 | 09/04/2025 |
| RICHARD MORTMAN | 2 | 09/04/2025 |
| ABILENE, INC | 1 | 10/31/2019 |
| BLUEWATER PLBG& HTG INC | 1 | 10/11/2022 |
| EFFICIENT COMB&COOLING CO | 1 | 06/16/2025 |
| G.BASSOLINO PLUMBING LTD | 1 | 06/16/2025 |
| GEOMATRIX SERVICES INC | 1 | 10/11/2022 |
| M. EARLY PLBG & HTG CORP | 1 | 04/05/2021 |
| MARLANDE HEATING CORP | 1 | 08/19/2024 |
| PAULKA PLUMBING & HTG COR | 1 | 01/26/2022 |
| QWEST CONTRACTING CORP | 1 | 06/28/2022 |
| THE METRO GROUP PLBG LLC | 1 | 09/04/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| EMG INDUSTRIAL CHIMNEY INC | 23 | 01/09/2025 |
| NYCHA | 5 | 03/01/2023 |
| 251 WEST 95TH STREET OWNERS CORP. | 2 | 10/20/2023 |
| Digby Management Company, LLC | 2 | 08/30/2023 |
| EAST MIDTOWN PLAZA HOUSING COMPANY, | 2 | 06/28/2022 |
| HMC TIMES SQUARE HOTEL LP | 2 | 06/21/2022 |
| PARISH OF SAINT JOHN AND VISITATION | 2 | 12/23/2025 |
| SOLSTICE RESIDENTIAL GROUP, LLC | 2 | 05/05/2021 |
| TRIHILL MANAGEMENT | 2 | 05/21/2021 |
| WESTMINSTER MANAGEMENT | 2 | 05/03/2021 |
| 1469 LEXINGTON CO. | 1 | 10/08/2020 |
| 219 EAST 7TH STREET HDFC | 1 | 11/30/2020 |
| 235 WEST 75TH STREET SPONSOR LLC | 1 | 01/15/2024 |
| 434 EAST 58TH STREET OWNERS INC | 1 | 07/11/2023 |
| ABINGTON PROPERTIES | 1 | 10/21/2019 |
| BHS | 1 | 03/24/2022 |
| C&C APARTMENT MANAGEMENT LLC | 1 | 12/06/2017 |
| CHURCH OF THE INCARNATION | 1 | 09/20/2023 |
| CUSHMAN & WAKEFIELD | 1 | 10/18/2021 |
| EAGLE POINT PROPERTIES LLC | 1 | 07/14/2023 |
| EXTELL DEVELOPMENT | 1 | 04/04/2024 |
| GLENWOOD MANAGEMENT CORP. | 1 | 02/23/2023 |
| HOLY NAME OF JESUS-ST GREGORY THE G | 1 | 06/28/2022 |
| JKNY REALTY | 1 | 10/31/2019 |
| LADIES MILE LLC | 1 | 02/14/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| SYNERGY BUILDING CONSULTANTS | 26 | 01/09/2025 |
| NEW YORK ENGINEERING | 5 | 01/02/2024 |
| HLZAE | 2 | 06/28/2022 |
| JM ZONING, LLC. | 2 | 06/28/2022 |
| CONSTRUCTION PERMIT SERVICES | 1 | 11/14/2024 |
| CSR EXPEDITERS | 1 | 01/26/2022 |
| J.A. EXPEDITING, LLC | 1 | 08/19/2024 |
| MESZAROS ENGINEERING PLLC | 1 | 06/16/2025 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| X00918961 ↗ | 3021 KINGSBRIDGE AVENUE BRONX | Alteration | Signed-off | 08/28/2023 | 07/23/2026 | Design BAZINI ENGINEERING, P.C. | INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00931502 ↗ | 1966 NEWBOLD AVENUE BRONX | Alteration | Permit Issued | 09/20/2023 | 06/26/2026 | Design MESZAROS ENGINEERING PLLC | INSTALLATION OF NEW GAS AND DOMESTIC WATER PIPING FOR DOMESTIC HOT WATER PRODUCTION. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M00935721 ↗ | 780 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 01/26/2024 | 07/16/2025 | Design ROBERT GERMAIN JR. PE Owner ORSID NY | REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. CHANGE GRADE OF FUEL OIL FROM #4 OIL TO #2 OIL. NO C… |
| M00988469 ↗ | 701 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2024 | 01/17/2025 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW GAS PIPING AND NEW GAS METER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00868082 ↗ | 1020 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/29/2023 | 08/29/2024 | Design EN-POWER GROUP Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INSTALLATION OF ONE (1) NEW STEAM BOILER INCLUDING BURNER PILOT, HW COIL, AND SEPERATE HW HEATER WITH STORAGE. … |
| X00913223 ↗ | 3424 KOSSUTH AVENUE BRONX | Alteration | Signed-off | 08/07/2023 | 08/13/2024 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M00975324 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 01/15/2024 | 04/17/2024 | Design ROBERT GERMAIN JR. PE | EXTEND/RAISE ALL EXISTING FIREPLACE FLUES AND BOILER FLUES TO COMPLY WITH MC 801 DUE TO NEW PENTHOUSES IN CONJUNCTION WITH DOB 120841928. AL… |
| X01015944 ↗ | 813 EAST 163 STREET BRONX | Alteration | Signed-off | 03/25/2024 | 04/16/2024 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M01027221 ↗ | 36 WEST 48 STREET MANHATTAN | Alteration | Signed-off | 04/04/2024 | 04/09/2024 | Design KZ ENGINEERING, P.C Owner EXTELL DEVELOPMENT | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M01009320 ↗ | 168 EAST 7 STREET MANHATTAN | Alteration | Permit Issued | 02/28/2024 | 04/01/2024 | Design KZ ENGINEERING, P.C Owner STAR CITIES MANAGEMENT | Installation of temporary supported scaffold in conjunction with chimney repair & vents installation filed under DOB NOW #M01008543-S1 per p… |
| M00998997 ↗ | 710 BROADWAY MANHATTAN | Alteration | Signed-off | 02/14/2024 | 03/05/2024 | Design NEW AGE ENGINEERING PLLC | INSTALL FIVE NEW CHIMNEY LINERS AND TWELVE NEW CHIMNEY EXTENSIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00753774 ↗ | 207 WEST 96 STREET MANHATTAN | Alteration | Signed-off | 06/27/2022 | 02/28/2024 | Design AKF ENGINEERS, LLP Filer JM ZONING, LLC. | HEREWITH FILING MODIFICATION TO THE MECHANICAL SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01006091 ↗ | 708 BROADWAY MANHATTAN | Alteration | Signed-off | 02/16/2024 | 02/16/2024 | Design NEW AGE ENGINEERING PLLC Owner NEW YORK UNIVERSITY | INSTALL BRACKETS FOR CHIMNEY EXTENSIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M00998648 ↗ | 4 EAST 82 STREET MANHATTAN | Alteration | Signed-off | 02/07/2024 | 02/13/2024 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00994915 ↗ | 1330 1 AVENUE MANHATTAN | Alteration | Signed-off | 01/30/2024 | 02/02/2024 | Design NEW AGE ENGINEERING PLLC | INSTALL (4) DIRECT VENTS ON EXISTING GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00963835 ↗ | 425 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2023 | 01/19/2024 | Filer NEW YORK ENGINEERING | REPLACE BOILER AND GAS BURNER. |
| M00968902 ↗ | 11 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 12/20/2023 | 01/02/2024 | Design ROBERT GERMAIN JR. PE Owner NY RESIDENTIAL WORKS INC | INSTALL (1) NEW 10 GAGE STAINLESS STEEL EXTENSION/OFFSET ON ROOF IN CONJUNCTION WITH NB 101528152. NO CHANGE IN MEANS OF EGRESS, USE GROUP O… |
| M00972157 ↗ | 330 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 12/15/2023 | 12/19/2023 | Design NEW AGE ENGINEERING PLLC Owner TRI-STAR EQUITIES | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M00955822 ↗ | 50 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 12/04/2023 | 12/06/2023 | Design NEW AGE ENGINEERING PLLC Owner SIBA MGT. INC. | INSTALL NEW CHIMNEY EXTENSION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00857404 ↗ | 15 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 11/15/2023 | 11/29/2023 | Design ROBERT GERMAIN JR. PE | INSTALL NEW 10 GAGE 304 STAINLESS STEEL LINER 22 DIA IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. |
| Q00955389 ↗ | 18-05 215 STREET QUEENS | Alteration | Permit Issued | 11/09/2023 | 11/16/2023 | Design ROBERT GERMAIN JR. PE | INSTALL (1) NEW 7/10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. RECONNECT BREACHING. NO CHANGE IN MEANS OF EGRESS U… |
| M00955504 ↗ | 50 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 11/08/2023 | 11/09/2023 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M00466140 ↗ | 2541 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/10/2023 | 10/31/2023 | Design ROBERT GERMAIN JR. PE | INSTALL NEW CONICAL REDUCER ON EXISTING METAL LINER (BOILER FLUE) REMOVE & EXTEND/RELOCATE EXISTING METAL FLUE (DRY CLEANERS). REMOVE AND EX… |
| M00947472 ↗ | 326 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 10/24/2023 | 10/24/2023 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M00935291 ↗ | 79 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/17/2023 | 10/20/2023 | Design ROBERT GERMAIN JR. PE | INSTALL (1) NEW 7/10 GAGE STAINLESS STEEL LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY. |
| M00948374 ↗ | 2541 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/20/2023 | 10/20/2023 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M00925013 ↗ | 1065 3 AVENUE MANHATTAN | Alteration | Signed-off | 08/30/2023 | 09/25/2023 | Design ROBERT GERMAIN JR. PE | INSTALL (1) NEW 10 GAGE 304 STAINLESS STEEL CHIMNEY EXTENSION/OFFSET ON EXISTING TILE LINES CHIMNEY, IN CONJUNCTION WITH NB 121187599. NO C… |
| M00893440 ↗ | 209 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/04/2023 | 09/12/2023 | Design NEW AGE ENGINEERING PLLC | REFILING OF 120947191 TO REPLACE OIL BURNER ON EXISTING LOW PRESSURE BOILER WITH GAS BURNER. REFILE LOW PRESSURE BOILER INSTALLED UNDER 1001… |
| M00888335 ↗ | 414 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 08/22/2023 | 08/25/2023 | Owner PARKDALE REALTY CO Filer NEW YORK ENGINEERING | INSTALL NEW LINER IN EXISTING MASONRY CHIMNEY. |
| X00900358 ↗ | 364 EAST 151 STREET BRONX | Alteration | Permit Issued | 08/22/2023 | 08/25/2023 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER. NO CHANGE IN USE OCCUPANCY OR EGRESS. |
| M00732831 ↗ | 120 EAST 106 STREET MANHATTAN | Alteration | Signed-off | 06/30/2022 | 08/14/2023 | REPLACEMENT OF EXISTING CHIMNEY LINER | |
| M00730558 ↗ | 319 EAST 24 STREET MANHATTAN | Alteration | Signed-off | 06/21/2022 | 07/28/2023 | Filer HLZAE | INSTALL DUCTWORK FROM LAUNDRY ROOM TO PATIO AND PROVIDE NEW LINT COLLECTOR. REPLACE THE EXISTING SHED. RESOLVE VIOLATION 35250101Z. NO CHANG… |
| X00907537 ↗ | 3021 KINGSBRIDGE AVENUE BRONX | Alteration | Permit Issued | 07/27/2023 | 07/27/2023 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M00873922 ↗ | 422 EAST 73 STREET MANHATTAN | Alteration | Signed-off | 05/24/2023 | 05/25/2023 | Design NEW AGE ENGINEERING PLLC Owner SZOO E 73RD ST. LLC | INSTALL NEW EXTERIOR CHIMNEY AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00526583 ↗ | 434 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 06/11/2021 | 05/02/2023 | Design ROBERT GERMAIN JR. PE | INSTALL (13) NEW STAINLESS STEEL FIREPLACE FLUE OFFSETS/EXTENSIONS ON EXISTING BRICK CHIMNEY ON ROOF IN CONJUNCTION WITH NB 121191423. NO CH… |
| B00765585 ↗ | 255 RYERSON STREET BROOKLYN | Alteration | Signed-off | 07/22/2022 | 04/28/2023 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER AS PER PLANS. MINOR ALTERATIONS TO EXISTING MASONRY CHIMNEY BRICKWORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00703999 ↗ | 150 WEST 47 STREET MANHATTAN | Alteration | Signed-off | 10/11/2022 | 04/28/2023 | Design ROBERT GERMAIN JR. PE | INSTALL (1) NEW DLUBLEWALL CHIMNEY STACK WITH NEW CONICAL REDUCER UP ON ROOF. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY. |
| M00846811 ↗ | 35 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 03/29/2023 | 04/28/2023 | Design ROBERT GERMAIN JR. PE | (3) NEW DOUBLEWALL 304 STAINLESS STEEL OFFSET/EXTENSIONS WITH (3) NEW DRAFT INDUCERS. (2) WOOD BURNING FIREPLACE FLUES AND (1) GAS FIREPLAC… |
| X00739264 ↗ | 510 EAST 189 STREET BRONX | Alteration | Signed-off | 06/06/2022 | 04/28/2023 | Design OLA CONSULTING ENGINEERS, PC | Filing herewith for chimney liner work related to boiler replacement under job 200568457. No Change to use egress or occupancy on this appl… |
| X00851388 ↗ | 999 PELHAM PARKWAY NORTH BRONX | Alteration | Permit Issued | 04/05/2023 | 04/28/2023 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold at exterior facade of Boorman Akerly Building and Van Cleve Hall per plan submitted. Work shall… |
| Q00816088 ↗ | 31-27 49 STREET QUEENS | Alteration | Permit Issued | 03/01/2023 | 03/06/2023 | Design NEW AGE ENGINEERING PLLC Owner NYCHA | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M08016508 ↗ | 158 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 01/24/2023 | 01/27/2023 | Design REVANS DESIGN PE PC | INSTALL NEW FLUE ON EXTERIOR OF BUILDING FROM BOILER ROOM TO ROOF. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY. |
| X00814012 ↗ | 526A EAST 159 STREET BRONX | Alteration | Signed-off | 01/20/2023 | 01/27/2023 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| X00509409 ↗ | 1275 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 06/24/2021 | 01/20/2023 | Design BUILT ENGINEERS, P. C. Filer CSR EXPEDITERS | Replacement of boiler and gas-fired burner and associated breeching. |
| M07995036 ↗ | 320 EAST 46 STREET MANHATTAN | Alteration | Signed-off | 12/01/2022 | 12/02/2022 | Design BAZINI ENGINEERING, P.C. | INSTALL NEW DRAFT INDUCER AT ROOF AND REPLACE BOILER BREECHING IN CELLAR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M08007881 ↗ | 207 WEST 96 STREET MANHATTAN | Alteration | Signed-off | 10/28/2022 | 10/31/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M07996013 ↗ | 129 WEST 144 STREET MANHATTAN | Alteration | Signed-off | 09/26/2022 | 10/14/2022 | Design NEW AGE ENGINEERING PLLC Owner NYCHA | INSTALL NEW EXTERNAL CHIMNEY AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00733282 ↗ | 401 1 AVENUE MANHATTAN | Alteration | Signed-off | 06/28/2022 | 10/11/2022 | Filer HLZAE | INSTALL DUCTWORK FROM LAUNDRY ROOM TO ROOF AND PROVIDE NEW EXHAUST FAN AT THE ROOF LEVEL. DEMO THE EXISTING SHED. RESOLVE VIOLATIONS 3525010… |
| X07995976 ↗ | 1122 FINDLAY AVENUE BRONX | Alteration | Signed-off | 10/05/2022 | 10/06/2022 | Design NEW AGE ENGINEERING PLLC Owner NYCHA | INSTALL NEW CHIMNEY AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M07997674 ↗ | 129 WEST 144 STREET MANHATTAN | Alteration | Permit Issued | 09/29/2022 | 09/29/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| X07995637 ↗ | 1122 FINDLAY AVENUE BRONX | Alteration | Permit Issued | 09/28/2022 | 09/28/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with chapter 33 of NYC Building Codes, no change to use, … |
| M00756009 ↗ | 143 SULLIVAN STREET MANHATTAN | Alteration | Signed-off | 09/01/2022 | 09/19/2022 | Design REVANS DESIGN PE PC | INSTALL NEW CHIMNEY LINER WITHIN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, SUEGROUP, OR OCCUPANCY. |
| X00742410 ↗ | 2705 SCHLEY AVENUE BRONX | Alteration | Signed-off | 06/09/2022 | 08/31/2022 | Design RLM ENGINEERING PLLC Owner NYCHA | Installation of a new chimney liner from cellar to roof as per plans filed herewith. |
| M00733275 ↗ | 401 1 AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2022 | 08/25/2022 | INSTALL DUCTWORK FROM LAUNDRY ROOM TO ROOF AND PROVIDE NEW EXHAUST FAN AT THE ROOF LEVEL. DEMO THE EXISTING SHED. RESOLVE VIOLATION 35250103… | |
| X00788530 ↗ | 1759 CASTLE HILL AVENUE BRONX | Alteration | Permit Issued | 08/19/2022 | 08/22/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| X00777634 ↗ | 1759 CASTLE HILL AVENUE BRONX | Alteration | Signed-off | 08/19/2022 | 08/20/2022 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00634006 ↗ | 11 FT GEORGE HILL MANHATTAN | Alteration | Signed-off | 04/06/2022 | 08/04/2022 | Design LAWLESS & MANGIONE Owner Metro Management Dev. | Filing for Mechanical system as per plans filed here with. No change to use, occupancy or egress. |
| X00766636 ↗ | 3030 JOHNSON AVENUE BRONX | Alteration | Signed-off | 07/14/2022 | 07/27/2022 | Design NEW AGE ENGINEERING PLLC Owner ROBERT E. HILL, INC. | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00759888 ↗ | 6 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 07/06/2022 | 07/07/2022 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00758797 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/21/2022 | 06/22/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| X00653646 ↗ | 750 COURTLANDT AVENUE BRONX | Alteration | Permit Issued | 12/27/2021 | 06/13/2022 | NEW HIGH PRESSURE GAS SERVICE. SWING OVER EXISITING GAS PIPING TO NEW SERVICE. COLD WATER PIPING MODIFICATIONS IN BOILER ROOM. BACKFLOW PREV… | |
| M00741382 ↗ | 1120 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 06/02/2022 | 06/09/2022 | Design NEW AGE ENGINEERING PLLC | INSTALL EXHAUST AND FRESH AIR VENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00740363 ↗ | 320 EAST 46 STREET MANHATTAN | Alteration | Signed-off | 05/25/2022 | 05/27/2022 | Design NEW AGE ENGINEERING PLLC Owner GLENWOOD MANAGEMENT | INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M00743277 ↗ | 320 EAST 46 STREET MANHATTAN | Alteration | Permit Issued | 05/24/2022 | 05/24/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00737536 ↗ | 1980 1 AVENUE MANHATTAN | Alteration | Permit Issued | 05/18/2022 | 05/19/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00679448 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 03/18/2022 | 05/17/2022 | Design ROBERT GERMAIN JR. PE | EXTENDING (3) EXHAUST FLUES 7 GAGE 304 STAINLESS STEEL UP TO ROOF COGENERATORS FILED UNDER M00460797. NO CHANGE IN MEANS OF EGRESS, USE GROU… |
| M00681749 ↗ | 112 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 03/24/2022 | 05/17/2022 | Owner BHS Filer NEW YORK ENGINEERING | FILING TO EXTEND EXISTING CHIMNEY NEXT TO NEIGHBORING BUILDING. BRACKETS FILED UNDER SEPARATE APPLICATION. |
| M00682408 ↗ | 106 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 03/18/2022 | 05/17/2022 | Filer NEW YORK ENGINEERING | INSTALL BRACKET SUPPORTS FOR CHIMNEY EXTENSION ON NEIGHBORING BUILDING. |
| M00466132 ↗ | 2549 BROADWAY MANHATTAN | Alteration | Signed-off | 08/17/2021 | 04/20/2022 | Design ROBERT GERMAIN JR. PE | REMOVE AND EXTEND/RELOCATE (KITCHEN EXHAUST ONLY) AS PER PLANS IN CONJUNCTION WITH NEW 22 STORY NB 121207014. NO CHANGE IN MEANS OF EGRESS … |
| M00466232 ↗ | 300 WEST 100 STREET MANHATTAN | Alteration | Permit Issued | 04/22/2021 | 02/28/2022 | Design ROBERT GERMAIN JR. PE Owner MIDBORO MANAGEMENT | INSTALL (1) NEW DOUBLEWALL STACK IN REAR COURTYARD. NEW 14 GAGE BREECHING WELDED IN BOILER ROOM. NEW BOILER/BURNER UNDER SEPARATE APPLICATI… |
| M00679879 ↗ | 112 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 02/17/2022 | 02/18/2022 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| Q00630950 ↗ | 83-30 VIETOR AVENUE QUEENS | Alteration | Signed-off | 12/13/2021 | 01/06/2022 | Design ROBERT GERMAIN JR. PE | NEW 10 GAGE 304 STAINLESS STEEL LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. |
| M00617002 ↗ | 220 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 10/26/2021 | 10/28/2021 | Design ROBERT GERMAIN JR. PE | INSTALL (1) NEW 10 GAGE 304 STAINLESS STEEL LINER IN EXISTING VAN PACKER CONCRETE REFRACTORY CHIMNEY. NEW 10 GAGE EXTENSION UP BUILDING. NO … |
| M00394522 ↗ | 500 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/23/2020 | 10/14/2021 | Design MG ENGINEERING D.P.C. Owner CUSHMAN AND WAKEFIELD | Mechanical work to consist of condenser water infrastructure as indicated on plans . No change in use egress or occupancy. |
| M00588073 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 09/24/2021 | 09/29/2021 | Design ROBERT GERMAIN JR. PE | RAISE/INSTALL (5) NEW BOILER FLUE EXTENSIONS 10 GAGE 304 STAINLESS STEEL CONNECTED TO EXISTING (5) FLUES WHICH CONNECT TO COMMON BREACHING/3… |
| M00346417 ↗ | 454 WEST 41 STREET MANHATTAN | Alteration | Signed-off | 07/13/2020 | 09/10/2021 | Owner TECHNICAL OPERATIONS INC Filer JM ZONING, LLC. | FILING HEREWITH PAA TO ADD CHIMNEYS INSPECTION TO THE REQUIRED ITEMS LIST. |
| M00584767 ↗ | 220 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 09/08/2021 | 09/09/2021 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00426005 ↗ | 333 WEST 21 STREET MANHATTAN | Alteration | Signed-off | 11/23/2020 | 08/31/2021 | Design NEW AGE ENGINEERING PLLC | INSTALL NEW CHIMNEY AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M00571495 ↗ | 1056 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/11/2021 | 08/18/2021 | Design ROBERT GERMAIN JR. PE | INSTALL (1) NEW 10 GAGE STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. NEW SUPPORTS AS PER PLANS. NEW BREACHING TO LINER. NO CHANG… |
| M00490403 ↗ | 145 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 06/16/2021 | 07/29/2021 | Design ROBERT GERMAIN JR. PE | NEW CHIMNEY LINER. NEW GAS METER ROOM. BOILER AND PLUMBING FILED UNDER SEPARATE APPLICATIONS ON DOB NOW. NO CHANGE IN MEANS OF EGRESS USE GR… |
| 123890398BIS | 121 EAST 74 STREET MANHATTAN | — | ISSUED | 10/11/2019 | 07/27/2021 | — | BL, OT |
| M00525636 ↗ | 43 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 05/28/2021 | 07/14/2021 | Design ROBERT GERMAIN JR. PE Owner LADIES MILE LLC | INSTALL NEW 10 GAGE 316L STAINLESS STEEL OFFSET WITH NEW EXHAUSTO IN CONJUNCTION WITH NB 121190424. NO CHANGE IN MEANS OF EGRESS USE GROUP … |
| 123151043BIS | 142 EAST 126 STREET MANHATTAN | — | ISSUED | 10/31/2018 | 07/09/2021 | — | MH, OT |
| B00529906 ↗ | 5800 20 AVENUE BROOKLYN | Alteration | Permit Issued | 06/02/2021 | 06/02/2021 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00511618 ↗ | 510 WEST 146 STREET MANHATTAN | Alteration | Signed-off | 05/21/2021 | 06/02/2021 | Owner TRIHILL MANAGEMENT Filer NEW YORK ENGINEERING | REPLACEMENT OF EXTERIOR METAL CHIMNEY |
| M00505280 ↗ | 510 WEST 146 STREET MANHATTAN | Alteration | Signed-off | 05/10/2021 | 05/11/2021 | Design KZ ENGINEERING, P.C Owner TRIHILL MANAGEMENT | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00298534 ↗ | 153 WEST 48TH STREET MANHATTAN | Alteration | Signed-off | 10/01/2020 | 05/04/2021 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00481258 ↗ | 331 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 03/23/2021 | 03/29/2021 | Design ROBERT GERMAIN JR. PE Owner WESTMINSTER MANAGEMENT | INSTALL NEW DOUBLEWALL CHIMNEY EXTENSION. CONNECT TO EXISTING METAL CHIMNEY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. |
| M00468613 ↗ | 300 WEST 100 STREET MANHATTAN | Alteration | Permit Issued | 03/08/2021 | 03/10/2021 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00441516 ↗ | 140 E 62ND STREET MANHATTAN | Alteration | Signed-off | 12/22/2020 | 02/25/2021 | THE SCOPE OF WORK INCLUDES THE INSTALLATION OF NEW LINER FOR EXISTING BOILER AND WATER HEATER VENTING WITHIN EXISTING CHIMNEY FROM CELLAR LE… | |
| M00379099 ↗ | 1469 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 10/08/2020 | 02/24/2021 | Design AR Figueroa Architect LLC Owner 1469 LEXINGTON CO. | REPLACE EXISTING CHIMNEY (FROME CELLAR TO ROOF) FOR THE GAS DRYER |
| M00443948 ↗ | 1833 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 02/11/2021 | 02/11/2021 | Design KZ ENGINEERING, P.C Owner NYCHA | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00422987 ↗ | 219 EAST 7 STREET MANHATTAN | Alteration | Permit Issued | 12/14/2020 | 12/18/2020 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00428875 ↗ | 219 EAST 7 STREET MANHATTAN | Alteration | Signed-off | 11/30/2020 | 11/30/2020 | Owner 219 EAST 7TH STREET HDFC Filer NEW YORK ENGINEERING | INSTALL NEW CHIMNEY |
| M00431840 ↗ | 331 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 11/30/2020 | 11/30/2020 | Design KZ ENGINEERING, P.C Owner WESTMINSTER MANAGEMENT | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00415164 ↗ | 257 WEST 117 STREET MANHATTAN | Alteration | Permit Issued | 11/11/2020 | 11/13/2020 | Design CFS ENGINEERING, DPC | IT IS PROPOSED TO REPLACE EXISTING HOT WATER FLUE WITH NEW AS PER PLANS. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIO… |
| M00426031 ↗ | 844 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 11/12/2020 | 11/13/2020 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| 140974934BIS | 143 AVENUE B MANHATTAN | — | ISSUED | 11/10/2020 | 11/10/2020 | — | OT |
| B00421279 ↗ | 427 15 STREET BROOKLYN | Alteration | Permit Issued | 10/30/2020 | 11/02/2020 | Design KZ ENGINEERING, P.C | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| Q00409371 ↗ | 227-01 HILLSIDE AVENUE QUEENS | Alteration | Signed-off | 10/15/2020 | 10/15/2020 | Filer NEW YORK ENGINEERING | Install new chimney liner in existing masonry chimney. |