← Back
BuildNYC
Elevator apt, fireproof without stores
Highbridge Gardens (NYCHA)
1065 UNIVERSITY AVENUE · BIN 2093964
💬 Discuss this project
1953Year Built
14Stories
D3Building Class
R7-1Zoning
639,330 sfGross Floor Area
700Units
LL97 Covered12 Active Violations 11 unresolved · 1 paperwork only 21 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 488,828 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
BulkheadHighbridge Gardens facade repair work2p · 1 filing · 8 docs
Site & exteriorSite yard work and new fenceUnder Construction50p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority6909/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZI Engineering206/02/2026
NYCHA109/10/2025
RI Consulting Services201/14/2025
Joel Phagoo P.E311/04/2024
AK Consulting Services412/31/2019
Bitopi Consultants212/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services1203/21/2026
Joel Phagoo P.E603/21/2026
Joel Phagoo P E603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK EnterprisesScaffold1607/08/2026
Skyworx ContractingScaffold1407/08/2026
Steel ConstructionScaffold903/21/2026
Adam's European ContractingScaffold603/21/2026
J & N Construction GroupScaffold607/08/2026
J & N Construction GroupGeneral Contractor407/08/2026
C.G.S. Electrical ContractingElectrical103/21/2026
Csi Security and ElectricGeneral Contractor106/27/2026
Unisys ElectricElectrical103/21/2026
J&H Electrical ContElectrical103/22/2026
Lit Mode Electrical ContgElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106206/02/2026
Joel Phagoo, PE2416512/05/2025
Bureau Veritas Na6902109/10/2025
AK Consulting Services, I6198212/31/2019
Building Lifecycle
09/08/2026
Elevator Category 1 inspection report filed
07/14/2026
Signed off — Alteration
FACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01164252-I1
07/14/2026
Cycle 10 facade report submitted
07/14/2026
Cycle 10 facade report signed — SAFE
07/14/2026
Closed: Failure to maintain building in code compliant manner. Observed at exp 1,2,4 multiple step cracks in various locations. Spalling mortar joint…
DOB violation · closed on the city's record
162 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedCsi Security and Electric06/23/2026
DOB NOWSuspended ScaffoldSigned-offWall Contractor06/08/2026
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group04/28/2026
DOB NOWSuspended ScaffoldSigned-offJ&N Construction Group02/18/2026
DOB NOWSidewalk ShedSigned-offJ & N Construction Group11/06/2025
DOB NOWConstruction FenceSigned-offJ & N Construction Group11/06/2025
DOB NOWSuspended ScaffoldSigned-offWall Contractor05/20/2025
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group05/14/2025
DOB NOWSuspended ScaffoldSigned-offJ&N Construction Group02/03/2025
DOB NOWConstruction FenceSigned-offJ & N Construction Group11/08/2024
DOB NOWSidewalk ShedSigned-offJ & N Construction Group11/08/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises07/02/2024
DOB NOWConstruction FenceSigned-offMNK Enterprises06/28/2024
DOB NOWConstruction FenceSigned-offMNK Enterprises02/01/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/01/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises03/02/2023
DOB NOWConstruction FenceSigned-offMNK Enterprises03/01/2023
DOB NOWSidewalk ShedSigned-offSkyworx Contracting04/08/2022
DOB NOWConstruction FenceSigned-offSkyworx Contracting04/07/2022
DOB NOWConstruction FenceSigned-offSkyworx Contracting12/09/2021
DOB NOWSidewalk ShedSigned-offSkyworx Contracting12/03/2021
DOB NOWSidewalk ShedSigned-offSkyworx Contracting11/18/2020
DOB NOWConstruction FenceSigned-offSkyworx Contracting11/17/2020
DOB NOWSupported ScaffoldSigned-offSteel Construction01/02/2020
DOB NOWSidewalk ShedSigned-offSteel Construction12/31/2019
DOB NOWConstruction FenceSigned-offSteel Construction12/31/2019
DOB NOWSupported ScaffoldPermit IssuedSkyworx Contracting09/30/2019
DOB NOWSidewalk ShedSigned-offSkyworx Contracting09/24/2019
DOB NOWConstruction FenceSigned-offSkyworx Contracting09/20/2019
DOB NOWSidewalk ShedPermit IssuedAdam's European Contracting07/25/2019
DOB NOWSidewalk ShedPermit IssuedAdam's European Contracting04/13/2018
DOB NOWSidewalk ShedPermit IssuedAdam's European Contracting02/28/2018
BISEQISSUEDParsons Construction10/20/2017
BISEQISSUEDParsons Construction10/03/2016
BISEQISSUEDParsons Construction10/26/2015
BISEQISSUEDM.S.S. Construction11/18/2013
BISEQISSUEDM.S.S. Construction11/18/2013
BISEQISSUEDM.S.S. Construction11/18/2013
BISEQISSUEDZoria Housing11/23/2012
BISEQISSUEDZoria Housing03/12/2012
+ 18 more permits on file
10 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026Permit IssuedCsi Sec & ElectricGeneral Wiring
05/13/2025Permit IssuedAujla Electric—
11/15/2024CompleteAujla Electric—
10/30/2024Permit IssuedLit Mode Electrical Contg—
11/02/2023CompleteCharan Electrical Enterp'sGeneral Wiring
07/01/2022CompleteNee Electrical—
09/02/2019CompleteJ&H Electrical ContGeneral Wiring
08/22/2019CompleteAmin Electrical—
08/09/2018CompleteGilston Electrical ContractingGeneral Wiring
02/13/2018Permit IssuedKLK Electric—
1 project · most recent 09/10/2025
Steel Concrete
FiledStatusContractorScope
09/10/2025Permit IssuedCsi Security and ElectricSteel, Concrete
1 project · most recent 02/27/2018
Sidewalk Shed
FiledStatusContractorScope
02/27/2018Permit IssuedAdam's European ContractingSidewalk Shed
2 projects · most recent 12/05/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/05/2025Signed-offJ&N Construction GroupSuspended Scaffold (SC)
05/22/2025Signed-offWall ContractorSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/11/2025Post-installed AnchorsJOEL PHAGOOspecial
12/05/2025Post-installed AnchorsJOEL PHAGOOspecial
09/10/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
09/10/2025Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
09/10/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/10/2025Structural Steel - High Strength BoltingIBRAHIM MOURADspecial
09/10/2025Post-installed AnchorsIBRAHIM MOURADspecial
09/10/2025Structural Steel - DetailsIBRAHIM MOURADspecial
09/09/2025FinalIBRAHIM MOURADprogress
05/23/2025Post-installed AnchorsJOEL PHAGOOspecial
05/20/2025Post-installed AnchorsJOEL PHAGOOspecial
09/22/2019Post-installed AnchorsQAISAR KHANspecial
213 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account