| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01334037 ↗ | 450 WEST 17 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2026 | 09/29/2026 | Design BUROHAPPOLD Contractor CNY BUILDING CORP Filer JAM CONSULTANTS, INC. | New non-freeze wall hydrant in storage room 100, revised fresh air inlet, new area drains at exterior street level and stair landing at mez … |
| X08000548 ↗ | 1040 GRAND CONCOURSE BRONX | Alteration CO | Permit Issued | 10/20/2022 | 09/25/2026 | Design MARVEL ARCHITECTS Contractor CONSIGLI CONSTRUCTION CO | INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01230153 ↗ | 120 3 AVENUE BROOKLYN | Alteration | Permit Issued | 07/15/2025 | 09/24/2026 | Design LAKHANI & JORDAN Owner NYCHA Contractor MEGA TECHNICO, JV INC Filer JMV ASSOCIATES LLC | NYCHA/Wyckoff/ Bldg#3- Proposed Arch. scope filed for replacement of apt. kitchens and bathrooms, conversion of units for section 504 compl… |
| M01320837 ↗ | 79 GANSEVOORT STREET MANHATTAN | Alteration | Permit Issued | 03/14/2026 | 09/23/2026 | Design BUROHAPPOLD Contractor CNY BUILDING CORP Filer JAM CONSULTANTS, INC. | Reconfiguration of access stair connecting the Highline to Caledonia building. Stair to be demolished and replaced in same location. Work at… |
| B00458348 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 07/06/2021 | 09/23/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER-STRUCTURAL RELATED WORK IN THE CELLAR FOR CENTRAL BOILER PLANT AND DOMESTIC HOTWATER SYSTEM REPLACEMENT |
| B08012458 ↗ | 1675 BROADWAY BROOKLYN | Alteration | Permit Issued | 12/20/2022 | 09/17/2026 | Design LAKHANI & JORDAN Contractor C. D. E. AIR-CONDITIONING Filer L&J | Install new modulating Gas Burners, replace existing hot water pumps with variable speed motors & install 2-way control valves each floor. p… |
| Name | Projects together | Most recent |
|---|---|---|
| CSA GROUP NY ARCHITECTS & ENGINEERS | 59 | 03/16/2026 |
| DEWBERRY ENGINEERS INC | 58 | 08/10/2026 |
| LORING CONSULTING ENGINEERS, INC. | 34 | 05/27/2026 |
| WESLER-COHEN ASSOCIATES | 28 | 12/02/2025 |
| SHENOY ENGINEERING, P.C. | 25 | 05/06/2026 |
| RONNETTE RILEY ARCHITECT | 23 | 04/14/2025 |
| NYCHA | 22 | 08/12/2026 |
| ZI ENGINEERING, P.C | 22 | 10/17/2023 |
| SUPERSTRUCTURES ENG. + ARCH. | 21 | 03/26/2025 |
| JAROS BAUM & BOLLES | 19 | 02/03/2026 |
| YSRAEL A. SEINUK, P.C. | 19 | 08/25/2026 |
| PACE ENGINEERING P.C. | 18 | 04/22/2026 |
| AKF ENGINEERS, LLP | 14 | 12/18/2025 |
| OVE ARUP & PARTNERS PC | 14 | 09/16/2026 |
| LAKHANI & JORDAN | 11 | 07/08/2026 |
| RO ENGINEERS & ARCHITECTS, PC | 11 | 01/04/2026 |
| SILMAN | 9 | 08/26/2026 |
| DSENY ENGINEERING SERVICES, PC | 7 | 05/14/2024 |
| URBAHN ARCHITECTS | 7 | 07/08/2026 |
| AN CONSULTING ENGINEER, PLLC | 6 | 02/10/2025 |
| JFK&M CONSULTING ENGINEERS | 6 | 06/19/2026 |
| STEVEN PAUL HAMMER | 6 | 03/26/2025 |
| SYSKA HENNESSY GROUP | 6 | 12/26/2025 |
| WSP | 6 | 05/29/2026 |
| AK CONSULTING SERVICES, INC | 5 | 04/14/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| KORDUN CONSTRUCTION CORP | 141 | 08/10/2026 |
| RICHARDS PLUM & HTG CO,IN | 30 | 06/23/2025 |
| ROMA SCAFFOLDING INC | 29 | 09/23/2025 |
| D.D.S. MECH PBG&HTG CORP | 25 | 05/06/2026 |
| J & N CONSTRUCTION GROUP | 22 | 04/22/2026 |
| RAVEN CONSTRUCTION SERVIC | 21 | 10/17/2024 |
| P & K CONTRACTING INC | 20 | 01/04/2026 |
| RICHARDS P AND H CO, INC | 16 | 05/27/2026 |
| SIRINA FIRE PROT CORP | 12 | 06/13/2025 |
| ASHLAR MECHANICAL CORP | 11 | 12/18/2025 |
| CONSIGLI CONSTRUCTION CO | 11 | 04/14/2026 |
| JEMCO ELECTRICAL CONT INC | 11 | 07/30/2025 |
| SUFFOLK CONSTRUCTION COMP | 10 | 08/21/2026 |
| GILBANE BUILDING COMPANY | 9 | 08/25/2026 |
| EASTERN PLBG & MECH CONTR | 8 | 05/04/2026 |
| ALLIANCE PLUMBING CORP | 6 | 08/25/2026 |
| TAMEER INC | 6 | 03/26/2025 |
| LENDLEASE(US)CONSTRUCTION | 5 | 02/10/2022 |
| LOCUS CONSTRUCTION INC | 5 | 03/25/2026 |
| WDF INC | 5 | 11/21/2025 |
| ABCO-PEERLESS SPRKLR CORP | 4 | 08/25/2026 |
| ACCURATE MECHANICAL INC | 4 | 06/05/2024 |
| ADAM'S EUROPEAN CONTRACTI | 4 | 03/06/2025 |
| BHAGHIANA GENERAL CONSTRU | 4 | 07/08/2026 |
| CURRENT FIRE PROTECTION I | 4 | 10/23/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| NYCHA | 168 | 08/10/2026 |
| NYC Housing Authority | 80 | 08/12/2026 |
| NEW YORK CITY HOUSING AUTHORITY | 32 | 05/06/2026 |
| NYC ECONOMIC DEVELOPMENT CORP | 22 | 09/16/2026 |
| HUDSON RIVER PARK TRUST | 10 | 07/17/2026 |
| BRIDGE DEVELOPMENT PARTNERS, LLC | 8 | 12/26/2025 |
| HIGHBRIDGE FACILITIES LLC | 6 | 05/03/2024 |
| 45 JOHN STREET NY LLC | 4 | 04/12/2024 |
| BRUCKNER BOULEVARD OWNER LLC | 4 | 02/21/2024 |
| DAVID ZWIRNER | 4 | 03/04/2022 |
| THE DURST ORGANIZATION | 4 | 06/28/2023 |
| ANIBIC | 3 | 12/02/2024 |
| BELLEVUE HOSPITAL | 3 | 06/13/2025 |
| GERMAN SCHOOL BROOKLYN | 3 | 10/19/2022 |
| NYC HEALTH AND HOSPITALS | 3 | 02/03/2026 |
| 885 SECOND AVENUE LESSEE LLC | 2 | 12/14/2020 |
| BOP WEST 31ST STREET LLC | 2 | 01/08/2024 |
| DCAS | 2 | 04/09/2025 |
| MEMORIAL SLOAN KETTERING CANCER CEN | 2 | 02/10/2022 |
| MONARCH REALTY HOLDINGS, LLC | 2 | 07/07/2022 |
| MUSS DEVELOPMENT LLC | 2 | 05/29/2026 |
| NYC DEPARTMENT OF DESIGN AND CONSTR | 2 | 07/23/2025 |
| NYCDDC | 2 | 05/14/2024 |
| Park It Management | 2 | 03/25/2026 |
| 17TH AND 10TH ASSOCIATES INC | 1 | 03/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GREEN LIGHT EXPEDITING LLC | 52 | 03/16/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 45 | 08/10/2026 |
| JAM CONSULTANTS, INC. | 42 | 09/16/2026 |
| LORING CONSULTING ENGINEERS, INC, | 35 | 05/27/2026 |
| JM ZONING, LLC. | 19 | 08/26/2026 |
| GILLMAN CONSULTING INC | 18 | 12/18/2025 |
| EUROCELT EXPEDITING, INC | 16 | 04/22/2026 |
| OUTSOURCE CONSULTANTS, INC. | 14 | 07/08/2026 |
| SUPERSTRUCTURES ENG + ARCH | 14 | 03/26/2025 |
| JMV ASSOCIATES LLC | 13 | 08/13/2025 |
| LGML GROUP | 11 | 01/04/2026 |
| JENNY FLORES EXPEDITING | 10 | 12/02/2025 |
| METROPOLIS GROUP INC | 10 | 06/19/2026 |
| CONVERSANO ASSOCIATES, INC. | 8 | 07/08/2026 |
| A1 EXPEDITING SERVICE CORP. | 7 | 05/16/2024 |
| NYCHA | 6 | 08/12/2026 |
| AK CONSULTING SERVICES, INC | 5 | 04/14/2022 |
| DSENY ENGINEERING SERVICES,PC | 5 | 05/14/2024 |
| ADAM MAISER | 4 | 03/04/2022 |
| HOWARD I. SHAPIRO & ASSOCIATES | 4 | 03/27/2025 |
| RPO INC. | 4 | 05/06/2026 |
| CURRENT FIRE PROTECTION INC. | 3 | 12/26/2024 |
| EMPIRE CITY CONSULTANTS, INC. | 3 | 12/02/2024 |
| Enviornmental & Energy Solutions | 3 | 02/03/2026 |
| MUNICIPAL EXPEDITING INC | 3 | 08/25/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01334037 ↗ | 450 WEST 17 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2026 | 09/29/2026 | Design BUROHAPPOLD Contractor CNY BUILDING CORP Filer JAM CONSULTANTS, INC. | New non-freeze wall hydrant in storage room 100, revised fresh air inlet, new area drains at exterior street level and stair landing at mez … |
| X08000548 ↗ | 1040 GRAND CONCOURSE BRONX | Alteration CO | Permit Issued | 10/20/2022 | 09/25/2026 | Design MARVEL ARCHITECTS Contractor CONSIGLI CONSTRUCTION CO | INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01230153 ↗ | 120 3 AVENUE BROOKLYN | Alteration | Permit Issued | 07/15/2025 | 09/24/2026 | Design LAKHANI & JORDAN Owner NYCHA Contractor MEGA TECHNICO, JV INC Filer JMV ASSOCIATES LLC | NYCHA/Wyckoff/ Bldg#3- Proposed Arch. scope filed for replacement of apt. kitchens and bathrooms, conversion of units for section 504 compl… |
| M01320837 ↗ | 79 GANSEVOORT STREET MANHATTAN | Alteration | Permit Issued | 03/14/2026 | 09/23/2026 | Design BUROHAPPOLD Contractor CNY BUILDING CORP Filer JAM CONSULTANTS, INC. | Reconfiguration of access stair connecting the Highline to Caledonia building. Stair to be demolished and replaced in same location. Work at… |
| B00458348 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 07/06/2021 | 09/23/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER-STRUCTURAL RELATED WORK IN THE CELLAR FOR CENTRAL BOILER PLANT AND DOMESTIC HOTWATER SYSTEM REPLACEMENT |
| B08012458 ↗ | 1675 BROADWAY BROOKLYN | Alteration | Permit Issued | 12/20/2022 | 09/17/2026 | Design LAKHANI & JORDAN Contractor C. D. E. AIR-CONDITIONING Filer L&J | Install new modulating Gas Burners, replace existing hot water pumps with variable speed motors & install 2-way control valves each floor. p… |
| X08017022 ↗ | 1040 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 08/25/2023 | 09/16/2026 | Contractor TRISTATE PLBG SVCS CORP Filer JAM CONSULTANTS, INC. | PL application filed in-conjunction with alt. 1. Addition to museum. new RD & associated storm piping for renovated portion. new gas service… |
| X01004950 ↗ | 1715 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Design SUPERSTRUCTURES ENG. + ARCH. Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 10, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X01004916 ↗ | 1715 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Design STEVEN PAUL HAMMER Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 08, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X01004932 ↗ | 1715 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Design SUPERSTRUCTURES ENG. + ARCH. Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 09, Remove & replace existing domestic water supply tank, freeze protection/flow temperature maintenance system for all expos… |
| X01004958 ↗ | 1715 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Design SUPERSTRUCTURES ENG. + ARCH. Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 11, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| Q00806670 ↗ | 3-70 BEACH 75 STREET QUEENS | New Building | Permit Issued | 04/06/2023 | 09/10/2026 | Design H3 HARDY COLLABORATION Contractor E.W. HOWELL CO, LLC Filer METROPOLIS GROUP INC | INSTALLATION OF CURB CUT ON BEACH 75 STREET. |
| X01004896 ↗ | 1715 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 02/27/2024 | 09/10/2026 | Design SUPERSTRUCTURES ENG. + ARCH. Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 07, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X01004861 ↗ | 1715 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 02/27/2024 | 09/10/2026 | Design SUPERSTRUCTURES ENG. + ARCH. Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 06, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X00917750 ↗ | BIN 2130946 BRONX | New Building | Permit Issued | 01/04/2024 | 09/10/2026 | Design MARVEL Contractor ANDRON CONSTRUCTION CORP Filer JM ZONING, LLC. | INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED. |
| M00952569 ↗ | 1122 MADISON AVENUE MANHATTAN | New Building | Permit Issued | 10/31/2023 | 09/09/2026 | Owner LEGION INVESTMENT GROUP Contractor CHRISTOPHER B. MESBAH Filer DOMANI CONSULTING | Underground plumbing in conjunction with new building |
| Q08022943 ↗ | 89-19 SUTPHIN BOULEVARD QUEENS | Alteration | Permit Issued | 11/02/2022 | 09/09/2026 | Design BOLT ARCHITECTURE, PLLC Owner DCAS Contractor LITEHOUSE BUILDERS INC | Interior renovations to create new fire alarm closets for fire alarm and 2hr rated enclosures for ARCS being filed at FDNY. Remove and repla… |
| Q01215133 ↗ | 17-20 VILLAGE LANE QUEENS | Alteration | Permit Issued | 06/27/2025 | 09/08/2026 | Design PERKINS EASTMAN Contractor GILBANE BUILDING COMPANY Filer MUNICIPAL EXPEDITING INC | STRUCTURAL MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP… |
| M01339795 ↗ | 462 1 AVENUE MANHATTAN | Alteration | Permit Issued | 08/17/2026 | 09/03/2026 | Design SHANE R. HAMILTON Contractor EMPIRE GENERAL CONTRACTIN Filer JAM CONSULTANTS, INC. | Filing for the removal of existing wall mounted FCU, piping and associated controls. Relocate existing wall mounted Fan Coil unit and Insta… |
| M00223256 ↗ | 235 BOWERY MANHATTAN | Alteration | Permit Issued | 10/29/2019 | 08/26/2026 | Design OVE ARUP & PARTNERS PC Owner NEW MUSEUM Contractor SCIAME CONSTRUCTION LLC Filer JAM CONSULTANTS, INC. | STRUCTURAL REINFORCEMENT INCONJUNCTION WITH PROPOSED 7 STORY ENLARGEMENT TO EXISTING 8 STORY BUILDING FILED UNDER ALT I APPLICATION 12120511… |
| M01075484 ↗ | 506 LENOX AVENUE MANHATTAN | Alteration | Permit Issued | 10/14/2024 | 08/13/2026 | Design JAROS BAUM & BOLLES Contractor RAEL AUTOMATIC SPR.CO INC | THIS APPLICATION IS FILED FOR THE INSTALLATION OF NEW SPRINKLERS. |
| Q00510523 ↗ | 12-50 35 AVENUE QUEENS | Alteration | Permit Issued | 05/25/2021 | 08/11/2026 | Design NYCHA Owner NYC Housing Authority Contractor JEMCO ELECTRICAL CONT INC | Exhauster air fan CUE-080 1VG 119XQD for Women's, Men's and ADA Toilet |
| X00667868 ↗ | 1130 BURKE AVENUE BRONX | Alteration | Permit Issued | 04/13/2022 | 08/07/2026 | Contractor KORDUN CONSTRUCTION CORP | Installation of temporary gas lines to temporary boilers to provide heat during heating season |
| X00667362 ↗ | 3050 PARK AVENUE BRONX | Alteration | Permit Issued | 07/21/2022 | 08/07/2026 | Contractor KORDUN CONSTRUCTION CORP | Installation of temporary gas lines to temporary boilers to provide heat during heating season; jackson building 2 |
| Q00507811 ↗ | 12-50 35 AVENUE QUEENS | Alteration | Permit Issued | 04/26/2021 | 08/03/2026 | Design NYC HRA Contractor ALAFOGIANNIS PLBG & HTG | Replacement of bathroom fixtures with new fixtures in women's room and men's room. Provide new ADA bathroom. |
| X01270879 ↗ | 2811 EXTERIOR STREET BRONX | Alteration | Permit Issued | 08/25/2025 | 08/03/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| M00444734 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 07/30/2026 | Contractor RICHARDS P AND H CO, INC | Provide services for fully operational gas fired water heaters that includes the installations of gas piping, domestic hot water, drains and… |
| X00848725 ↗ | 1130 BURKE AVENUE BRONX | Alteration | Signed-off | 03/27/2023 | 07/30/2026 | Owner NYC Housing Authority Contractor RAVEN CONSTRUCTION SERVIC | SF/NYCHA EASTCHESTER HOUSES BLDG #3 SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) … |
| B01390689 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 04/29/2026 | 07/29/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | STRUCTURAL RELATED WORK IN THE CELLAR CONSISTING OF REMOVAL AND RESTORING PORTION OF EXISTING WALL, PROVIDE CONCRETE EQUIPMENT PADS FOR CEN… |
| M00640893 ↗ | 1320 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 12/08/2021 | 07/14/2026 | Design NYCHA Owner NYC Housing Authority Contractor JEMCO ELECTRICAL CONT | RENOVATON OF EXISTING LAUNDRY SPACE. |
| M01270866 ↗ | 5365 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/28/2025 | 07/09/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| M01270856 ↗ | 5210 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/25/2025 | 07/09/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| X01270877 ↗ | 2811 EXTERIOR STREET BRONX | Alteration | Permit Issued | 08/25/2025 | 07/08/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wit… |
| X01270883 ↗ | 210 WEST 230 STREET BRONX | Alteration | Permit Issued | 08/25/2025 | 07/07/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| M01270814 ↗ | 5210 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/25/2025 | 07/07/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| M00463341 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/29/2021 | 07/02/2026 | Owner NYCHA Contractor RICHARDS P AND H CO, INC | install two (2) new gas fired water heaters, piping, area drains and all related work as per plans. |
| M00616299 ↗ | 1320 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 10/22/2021 | 07/02/2026 | Design NYCHA Owner NYC Housing Authority Contractor JEMCO ELECTRICAL CONT | THE SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO THE CONSTRUCTION OF NEW REINFORCED CONCRETEPAD ON GRADE FOR NEW MECHANICAL UNIT AND PROVIDE… |
| M00464369 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 07/02/2026 | Owner NYCHA Contractor RICHARDS P AND H CO, INC | install two (2) new gas fired water heaters, piping, area drains and all related work as per plans. |
| X08009146 ↗ | 1046 GRAND CONCOURSE BRONX | Alteration CO | Permit Issued | 10/20/2022 | 07/01/2026 | Design MARVEL ARCHITECTS Contractor CONSIGLI CONSTRUCTION CO Filer JAM CONSULTANTS, INC. | Alteration type 1 filed as per plan provided. |
| M00847819 ↗ | 800 FDR DRIVE SERVICE ROAD EAST MANHATTAN | New Building | Permit Issued | 04/14/2023 | 06/26/2026 | Design BIG ARCHITECTURE DPC Contractor GILBANE BUILDING COMPANY Filer JAM CONSULTANTS, INC. | Structural work in conjunction with new building |
| X01262674 ↗ | 2945 WHITE PLAINS ROAD BRONX | Alteration | Permit Issued | 07/30/2025 | 06/25/2026 | Design NYCHA Owner NYCHA | Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change … |
| Q01080296 ↗ | 264-25 76 AVENUE QUEENS | New Building | Permit Issued | 10/17/2024 | 06/24/2026 | Design HANSEN ENGINEERING, PC Owner NORTHWELL HEALTH Contractor GILBANE BUILDING COMPANY Filer UPRIGHT EXPEDITERS, INC. | Northwell LIJ Medical Center: Water Service piping & Site Storm Drainage piping with associated installations for campus civil site work in … |
| X01264238 ↗ | 2825 OLINVILLE AVENUE BRONX | Alteration | Permit Issued | 08/04/2025 | 06/23/2026 | Design NYCHA Owner NYCHA | Application to be reviewed with the development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change … |
| X01165602 ↗ | 414 MORRIS AVENUE BRONX | Alteration | Permit Issued | 02/18/2025 | 06/23/2026 | Design PACE ENGINEERING P.C. Owner NYCHA Contractor J & N CONSTRUCTION GROUP Filer EUROCELT EXPEDITING, INC | BUILDING 8: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01284517 ↗ | 1065 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 09/10/2025 | 06/23/2026 | Design NYCHA Owner NYCHA | Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change … |
| X01165569 ↗ | 414 MORRIS AVENUE BRONX | Alteration | Permit Issued | 02/18/2025 | 06/23/2026 | Design PACE ENGINEERING P.C. Contractor J & N CONSTRUCTION GROUP | BUILDING 7: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01164845 ↗ | 414 MORRIS AVENUE BRONX | Alteration | Permit Issued | 02/19/2025 | 06/23/2026 | Design PACE ENGINEERING P.C. Owner NYCHA Contractor J & N CONSTRUCTION GROUP Filer EUROCELT EXPEDITING, INC | Building # 9: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy. |
| X01164948 ↗ | 414 MORRIS AVENUE BRONX | Alteration | Permit Issued | 02/25/2025 | 06/23/2026 | Design PACE ENGINEERING P.C. Owner NYCHA Contractor J & N CONSTRUCTION GROUP Filer EUROCELT EXPEDITING, INC | Building # 11: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy. |
| B01209484 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/19/2025 | 06/17/2026 | Design JONATHAN CICCONI Contractor THE MCKISSACH GROUP INC Filer JAM CONSULTANTS, INC. | FACADE SCOPE OF PROJECT IS LIMITED TO SELECT WINDOW, LOUVER, AND DOOR REPLACEMENT OFBUILDING A. RE-ROOFING SCOPE INCLUDES THE EXTENTS OF BUI… |
| X01074643 ↗ | 550 BALCOM AVENUE BRONX | Alteration | Permit Issued | 07/08/2024 | 06/16/2026 | Design STV INCORPORATED Owner NYCHA Contractor BHAGHIANA GENERAL CONSTRU | FILING FOR ROOF REPLACEMENT WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| B01208957 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/17/2025 | 06/16/2026 | Design OVE ARUP & PARTNERS PC Contractor THE MCKISSACH GROUP INC Filer JAM CONSULTANTS, INC. | Hereby filing Envelope repairs to Brooklyn Army Terminal Building A as per plans herewith. No change to use, egress, or occupancy- Related a… |
| M01270848 ↗ | 5210 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/25/2025 | 06/10/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| S01318083 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 02/02/2026 | 06/05/2026 | Contractor JRCRUZ CORP | CONSTRUCTION OF RETAINING WALL ALONG THE PROPOSED RIGHT-OF-WAY OF FRONT STREET. THEWALL IS DESIGNED AS A SOLDIER PILE WALL WITH A CAST-IN-P… |
| Q01270387 ↗ | 15-31 28 STREET QUEENS | Alteration | Permit Issued | 09/24/2025 | 05/28/2026 | Contractor POSILLICO CIVIL INC Filer JLS DESIGNS | SUPPORT OF EXCAVATION ONLY FOR ELECTRICAL CONDUIT TO BE FILED SEPARATELY |
| Q01352653 ↗ | 423 ABBOTT ROAD QUEENS | Alteration | Permit Issued | 01/30/2026 | 05/28/2026 | Contractor CITNALTA CONSTRUCTION | SUPPORT OF EXCAVATION FILING DONE IN CONJUNCTION TO SBS NB FILING # 20220099, WHICH INCLUDE DRILLED MINI PILES AND WOOD LAGGING. ALL AS PER … |
| B00463459 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/22/2026 | Design DEWBERRY ENGINEERS INC Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #19) AS PER THE PLANS FILED HEREWITH. |
| B00463123 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/22/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER- PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00458429 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/22/2026 | Design RONNETTE RILEY ARCHITECT Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00463467 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/22/2026 | Design DEWBERRY ENGINEERS INC Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #23) AS PER THE PLANS FILED HEREWITH. |
| B00458298 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/22/2026 | Design RONNETTE RILEY ARCHITECT Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00465165 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/22/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00458340 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/22/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | GENERAL CONSTRUCTION TO ALLOW FOR NEW HOT WATER & HEATING EQUIPMENT IN THE MER AT CELLAR PER PLANS FILED HEREWITH. RESTORATION OF EXISTING F… |
| B00463465 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/22/2026 | Design DEWBERRY ENGINEERS INC Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #22) AS PER THE PLANS FILED HEREWITH. |
| B00463464 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/22/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #21) AS PER THE PLANS FILED HEREWITH. |
| B00458360 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/22/2026 | Design RONNETTE RILEY ARCHITECT Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | GENERAL CONSTRUCTION TO ALLOW FOR NEW HOT WATER & HEATING EQUIPMENT IN THE MER AT CELLAR PER PLANS FILED HEREWITH. RESTORATION OF EXISTING F… |
| B00455359 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/22/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00463458 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 07/16/2021 | 05/22/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #18) AS PER THE PLANS FILED HEREWITH. |
| B00462715 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/21/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #8) AS PER THE PLANS FILED HEREWITH. |
| B00457350 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/21/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00456801 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/21/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00463377 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/21/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #15) AS PER THE PLANS FILED HEREWITH. |
| X08016990 ↗ | 1040 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 12/15/2022 | 05/21/2026 | Design SILMAN Contractor CONSIGLI CONSTRUCTION CO Filer JAM CONSULTANTS, INC. | Structural application filed in-conjunction with the alt. 1 appliction. |
| B00457386 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/21/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00457406 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/21/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00456662 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/21/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00455367 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 05/06/2021 | 05/21/2026 | Design RONNETTE RILEY ARCHITECT Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00462726 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2021 | 05/21/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #10) AS PER THE PLANS FILED HEREWITH. |
| B00564008 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 07/30/2021 | 05/21/2026 | Design DEWBERRY ENGINEERS INC Contractor KORDUN CONSTRUCTION CORP | MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #13) AS PER THE PLANS FILED HEREWITH. |
| M01270635 | 5210 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/25/2025 | 05/20/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wi… |
| M00472956 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2021 | 05/15/2026 | Owner NYCHA Contractor RICHARDS PLUM & HTG CO,IN | installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pu… |
| M00466452 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2021 | 05/14/2026 | Owner NYCHA Contractor RICHARDS PLUM & HTG CO,IN | installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pu… |
| Q00506158 ↗ | 12-50 35 AVENUE QUEENS | Alteration | Permit Issued | 04/26/2021 | 05/14/2026 | Design NYCHA Owner NYC Housing Authority Contractor JEMCO ELECTRICAL CONT INC Filer NYCHA | Construction of new bathroom. |
| M00466463 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 05/14/2026 | Owner NYCHA Contractor RICHARDS P AND H CO, INC | install two (2) new gas fired water heaters, piping, area drains and all related work as per plans. |
| M00459770 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 04/29/2021 | 05/14/2026 | Owner NYCHA Contractor RICHARDS PLUM & HTG CO,IN | installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pu… |
| M00464911 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 05/14/2026 | Owner NYCHA Contractor RICHARDS P AND H CO, INC | install two (2) new gas fired water heaters, piping, area drains and all related work as per plans. |
| M00464705 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2021 | 05/14/2026 | Owner NYCHA Contractor RICHARDS P AND H CO, INC | install two (2) new gas fired water heaters, piping, area drains and all related work as per plans. |
| M00472965 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 05/14/2026 | Owner NYCHA Contractor RICHARDS P AND H CO, INC | install Three (3) gas fired hot water heaters rated for 1572 GPH at 1350 CFH and 4in WC. One (1) Storage tank rated for 215 Gallons, piping,… |
| X01164915 ↗ | 414 MORRIS AVENUE BRONX | Alteration | Permit Issued | 02/25/2025 | 05/13/2026 | Design PACE ENGINEERING P.C. Owner NYCHA Contractor J & N CONSTRUCTION GROUP Filer EUROCELT EXPEDITING, INC | Building # 10: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy. |
| X01165554 ↗ | 414 MORRIS AVENUE BRONX | Alteration | Permit Issued | 02/26/2025 | 05/13/2026 | Design PACE ENGINEERING P.C. Owner NYCHA Contractor J & N CONSTRUCTION GROUP Filer EUROCELT EXPEDITING, INC | BUILDING 6: FACADE REPAIRS TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00459906 ↗ | 40 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 05/08/2026 | Contractor RICHARDS P AND H CO, INC | install two (2) new gas fired water heaters, piping, area drains and all related work as per plans. |
| B01208885 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/17/2025 | 05/08/2026 | Design SAGE AND COOMBE ARCHITECTS Contractor SUFFOLK CONSTRUCTION COMP Filer JAM CONSULTANTS, INC. | Hereby filing tenant modifications for the Cafe area as per plans herewith. |
| B01208479 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/30/2025 | 05/08/2026 | Design OVE ARUP & PARTNERS PC Contractor SUFFOLK CONSTRUCTION COMP Filer JAM CONSULTANTS, INC. | Filing Structural work for tenant improvement per plan filed herewith. Related applications B01208452, B01208456, B01208457, B01360885, and … |
| B01208483 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/17/2025 | 05/08/2026 | Design PERKINS&WILL ARCHITECTS, PC Contractor SUFFOLK CONSTRUCTION COMP Filer JAM CONSULTANTS, INC. | Hereby filing tenant modifications as per plans herewith. Proposing interior demolition of existing floors, erection of new nonbearing mult… |
| B01208789 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/30/2025 | 05/08/2026 | Design OVE ARUP & PARTNERS PC Contractor SUFFOLK CONSTRUCTION COMP Filer JAM CONSULTANTS, INC. | Hereby filing modification to existing HVAC system. - Related jobs, B01208885, B01426483, B01426503. B01426526 |
| B00458294 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 07/06/2021 | 05/05/2026 | Design DEWBERRY ENGINEERS INC Owner NYCHA Contractor KORDUN CONSTRUCTION CORP | NYCHA BOILER-STRUCTURAL RELATED WORK IN THE CELLAR FOR CENTRAL BOILER PLANT AND DOMESTIC HOTWATER SYSTEM REPLACEMENT |
| X00742716 ↗ | 1130 BURKE AVENUE BRONX | Alteration | Signed-off | 06/01/2022 | 05/04/2026 | Owner NYC Housing Authority Contractor KORDUN CONSTRUCTION CORP | install new storage tanks and heat pumps on conjunction with new geothermal hvac system eastchester building 2 |
| M01270612 ↗ | 5210 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/25/2025 | 05/04/2026 | Owner NYCHA Contractor P & K CONTRACTING INC Filer LGML GROUP | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement wit… |
| X00742771 ↗ | 1130 BURKE AVENUE BRONX | Alteration | Signed-off | 06/01/2022 | 05/04/2026 | Owner NYC Housing Authority Contractor KORDUN CONSTRUCTION CORP | install plumbing related to new geothermal hvac system eastchester building 4 |
| M00276483 ↗ | 2230 8 AVENUE MANHATTAN | Alteration | Permit Issued | 12/19/2019 | 05/04/2026 | Design ALAN R SCHWARTZ PE CONS ENG Contractor F.S. WORKS INC Filer JM ZONING, LLC. | Sprinkler work filed in conjunction with Alt-1 application #121206630 |
| X00742797 ↗ | 1130 BURKE AVENUE BRONX | Alteration | Signed-off | 06/01/2022 | 05/04/2026 | Owner NYC Housing Authority Contractor KORDUN CONSTRUCTION CORP | plumbing work in conjunction with install of new geothermal hvac system eastchester building5 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 09/09/2026 | Final | 2801 RANDALL AVENUE | IBRAHIM MOURAD | progress |
| 09/09/2026 | Final | 2801 RANDALL AVENUE | IBRAHIM MOURAD | progress |
| 09/09/2026 | Fire-Resistance Rated Construction | 2801 RANDALL AVENUE | IBRAHIM MOURAD | progress |
| 09/09/2026 | Fire-Resistance Rated Construction | 2801 RANDALL AVENUE | IBRAHIM MOURAD | progress |
| 09/09/2026 | Energy Code Compliance Inspections | 2801 RANDALL AVENUE | IBRAHIM MOURAD | progress |
| 09/09/2026 | Energy Code Compliance Inspections | 2801 RANDALL AVENUE | IBRAHIM MOURAD | progress |
| 09/09/2026 | Tenant Protection Plan Compliance | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Tenant Protection Plan Compliance | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Post-installed Anchors | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Post-installed Anchors | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Structural Stability – Alterations of existing buildings | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Structural Stability – Alterations of existing buildings | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Fire-Resistant Penetrations and Joints | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Fire-Resistant Penetrations and Joints | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Masonry | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 09/09/2026 | Masonry | 2801 RANDALL AVENUE | IBRAHIM MOURAD | special |
| 08/26/2026 | Tenant Protection Plan Compliance | 17-20 VILLAGE LANE | — | special |
| 08/26/2026 | Sprinkler Systems | 17-20 VILLAGE LANE | IBRAHIM MOURAD | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | special |
| 08/18/2026 | High-Pressure Fuel-Gas Piping (Welding) | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | special |
| 08/18/2026 | Energy Code Compliance Inspections | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | progress |
| 08/18/2026 | Maintenance information | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | energy_progress |
| 08/18/2026 | HVAC-R and service water heating system controls | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | energy_progress |
| 08/18/2026 | Electrical motors and elevators | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | energy_progress |
| 08/18/2026 | HVAC-R and service water heating equipment | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | energy_progress |
| 08/18/2026 | HVAC-R and service water piping design and insulation | 40 AMSTERDAM AVENUE | IBRAHIM MOURAD | energy_progress |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | 1040 GRAND CONCOURSE | IBRAHIM MOURAD | special |
| 08/12/2026 | Sprinkler Systems | 17-20 VILLAGE LANE | IBRAHIM MOURAD | special |
| 08/12/2026 | Tenant Protection Plan Compliance | 17-20 VILLAGE LANE | — | special |
| 08/07/2026 | Post-installed Anchors | 2945 WHITE PLAINS ROAD | IBRAHIM MOURAD | special |
| 08/07/2026 | Structural Steel - Details | 2945 WHITE PLAINS ROAD | IBRAHIM MOURAD | special |
| 08/07/2026 | Concrete - Cast-In-Place | 2945 WHITE PLAINS ROAD | IBRAHIM MOURAD | special |
| 08/07/2026 | Final | 2945 WHITE PLAINS ROAD | IBRAHIM MOURAD | progress |
| 08/06/2026 | Metering | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Lighting controls | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Fenestration air leakage | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Fenestration areas | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Air barrier - visual inspection | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Insulation placement and R values | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Interior lighting power | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Fenestration and door U-factor and product ratings | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Exterior lighting power | WEST 57 STREET | IBRAHIM MOURAD | energy_progress |
| 08/06/2026 | Energy Code Compliance Inspections | WEST 57 STREET | IBRAHIM MOURAD | progress |
| 08/06/2026 | Lowest Floor Elevation | WEST 57 STREET | IBRAHIM MOURAD | progress |
| 08/06/2026 | Fire-Resistance Rated Construction | WEST 57 STREET | IBRAHIM MOURAD | progress |
| 08/06/2026 | Fire-Resistant Penetrations and Joints | WEST 57 STREET | IBRAHIM MOURAD | special |
| 08/05/2026 | Fire-Resistant Penetrations and Joints | 300 MORRIS AVENUE | IBRAHIM MOURAD | special |
| 08/05/2026 | Tenant Protection Plan Compliance | 300 MORRIS AVENUE | IBRAHIM MOURAD | special |
| 08/05/2026 | Energy Code Compliance Inspections | 300 MORRIS AVENUE | IBRAHIM MOURAD | progress |
| 08/05/2026 | Vestibules | 300 MORRIS AVENUE | IBRAHIM MOURAD | energy_progress |