Elevator cooperative
1067 5 AVENUE
MANHATTAN · BIN 1046926
💬 Discuss this project
1917Year Built
13Stories
D4Building Class
R10Zoning
50,700 sfGross Floor Area
14Units
LL97 CoveredRent Stabilized7 Open Violations 5 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1067 FIFTH AVENUE CORP · 6,040 sf lot · 8.39 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Roof1p · 1 filing · 4 docs
Floor 101p · 1 filing · 10 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1067 FIFTH AVENUE1503/22/2026
DOUGLAS ELLIMAN PROPERTY MANAGEM703/22/2026
1067 5TH AVE1903/22/2026
720 PARK AVE CORP103/21/2026
1067FIFTHAVENUECORPC ODEPM403/21/2026
1067 5 AVE403/21/2026
PHOENIX203/21/2026
1067 FIFTH AVENUE CORP C O DOUGL303/21/2026
BROWN HARRIS STEVENS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor2103/21/2026
FOLOR INCGeneral Contractor507/08/2026
ACCESS PLUMBING CORPPlumbing207/08/2026
FIREQUEST CORPFire Protection107/08/2026
DEMARI SERVICES INCGeneral Contractor107/08/2026
DIMOS PAPADIMASElectrical103/21/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
JOSEPH ADAMOElectrical103/21/2026
MICHAEL MINIEROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803104/24/2023
MIRELLA BOSELLI R.A.6330410/14/2021
TSF ENGINEERING, PC1274210/14/2021
KATZ ENGINEERING238106/17/2021
NEW YORK ENGINEERING ASSO851205/18/2021
G&G SPRINKLER SERVICES LL2782112/07/2020
Building Lifecycle
All (113)Filed (17)Permit Issued (16)Signed Off (8)Facade (FISP) (12)Violation (46)Inspection (2)Special Inspection (12)
06/04/2025
Violation issued (HPD, closed)
A
04/12/2024
Permit issued — Suspended Scaffold
M01028275-I1-SC
04/11/2024
Filed — Alteration
Renewal of SR23/1230
M01028275-I1
04/01/2024
Violation issued (HPD, closed)
A
02/12/2024
Violation issued (HPD, open)
C
02/12/2024
Violation issued (HPD, open)
C
02/12/2024
Violation issued (HPD, open)
C
02/12/2024
Violation issued (HPD, closed)
C
02/12/2024
Violation issued (HPD, closed)
C
02/12/2024
Violation issued (HPD, closed)
C
02/12/2024
Violation issued (HPD, open)
B
06/15/2023
Permit issued — General Construction
M00843820-I1-GC
06/01/2023
Permit issued — Sidewalk Shed
M00872425-I1-SH
05/25/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00872425-I1
04/24/2023
Filed — Alteration
M00843820-I1
08/15/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00404398-I1
08/09/2022
Signed off — Alteration
M00404429-I1
05/19/2022
Signed off — Alteration
GENERAL CONSTRUCTION WORK
M00526130-I1
04/21/2022
Signed off — Alteration
plumbing modification
M00526240-I1
04/14/2022
Cycle 9 facade report signed — SWARMP
02/03/2022
Cycle 9 facade report submitted
02/01/2022
Permit issued — Sidewalk Shed
M00404398-I1-SH
01/28/2022
Cycle 9 facade inspection completed
01/25/2022
Permit issued — Supported Scaffold
M00404429-I1-SF
12/21/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/14/2021
Signed off — Alteration
Install new plumbing fixtures and replace existing fixtures with new in existing 10th floor apartment as per plan. No change to use, egress or occupancy under this application.
M00427089-I1
12/14/2021
Signed off — Alteration
Install new split system HVAC in existing apartment as per plan with associated duct work. No change to use, egress or occupancy under this application.
M00449314-I1
10/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2021
Special inspection requirement — Mechanical Systems
Nicholas Tucci
10/27/2021
Special inspection requirement — Final
Anthony Caserma
10/19/2021
Permit issued — Plumbing
M00526240-I1-PL
10/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mirella Boselli
10/14/2021
Filed — Alteration
Install new split system HVAC in existing apartment as per plan with associated duct work. No change to use, egress or occupancy under this application.
M00449314-P1
10/14/2021
Filed — Alteration
Install new plumbing fixtures and replace existing fixtures with new in existing 10th floor apartment as per plan. No change to use, egress or occupancy under this application.
M00427089-P3
10/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mirella Boselli
09/16/2021
Permit issued — General Construction
M00526130-I1-GC
09/02/2021
Signed off — Alteration
FILING FOR SPRINKLER HEADS
M00423056-I1
09/02/2021
Signed off — Alteration
FILING FOR SPRINKLER HEADS
M00423056-S1
09/01/2021
Permit issued — Mechanical Systems
M00449314-I1-MS
08/24/2021
Filed — Alteration
Install new plumbing fixtures and replace existing fixtures with new in existing 10th floor apartment as per plan. No change to use, egress or occupancy under this application.
M00427089-P2
08/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mirella Boselli
06/17/2021
Filed — Alteration
GENERAL CONSTRUCTION WORK
M00526130-I1
06/17/2021
Filed — Alteration
plumbing modification
M00526240-I1
05/18/2021
Filed — Alteration
FILING FOR SPRINKLER HEADS
M00423056-P1
05/04/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
05/04/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
05/04/2021
Special inspection requirement — Final
LOUIS ARENA
03/18/2021
Permit issued — Sidewalk Shed
M00404398-I1-SH
03/18/2021
Permit issued — Supported Scaffold
M00404429-I1-SF
02/11/2021
Filed — Alteration
Install new plumbing fixtures and replace existing fixtures with new in existing 10th floor apartment as per plan. No change to use, egress or occupancy under this application.
M00427089-P1
01/20/2021
Permit issued — Mechanical Systems
M00423056-S1-MS
01/13/2021
Filed — Alteration
Install new split system HVAC in existing apartment as per plan with associated duct work. No change to use, egress or occupancy under this application.
M00449314-I1
01/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mirella Boselli
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2020
Permit issued — Plumbing
M00423056-I1-PL
12/18/2020
Permit issued — Sprinklers
M00423056-S2-EW-SP
12/07/2020
Filed — Alteration
FILING FOR SPRINKLER HEADS
M00423056-S2
12/05/2020
Permit issued — Plumbing
M00427089-I1-PL
12/02/2020
Filed — Alteration
FILING FOR SPRINKLER HEADS
M00423056-S1
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC04/12/2024
DOB NOWGeneral ConstructionPermit IssuedDEMARI SERVICES INC06/15/2023
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I06/01/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I02/01/2022
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I01/25/2022
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I10/19/2021
DOB NOWGeneral ConstructionSigned-offFOLOR INC09/16/2021
DOB NOWMechanical SystemsSigned-offFOLOR INC09/01/2021
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I03/18/2021
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I03/18/2021
DOB NOWMechanical SystemsSigned-offFOLOR INC01/20/2021
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP12/21/2020
DOB NOWSprinklersSigned-offFIREQUEST CORP12/18/2020
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP12/05/2020
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I10/02/2020
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I10/01/2020
BISOTISSUEDFOLOR INC05/13/2021
BISOTISSUEDFOLOR INC11/23/2020
BISOTISSUEDDEMARI SERVICES INC11/20/2020
BISOTISSUEDFOLOR INC08/27/2020
BISPLISSUEDPRIMO PLBG & HVAC CORP11/17/2017
BISOTISSUEDZEN RESTORATION INC11/13/2017
BISOTISSUEDZEN RESTORATION INC11/13/2017
BISMHISSUEDZEN RESTORATION INC11/13/2017
BISOTISSUEDZEN RESTORATION INC11/10/2016
BISOTISSUEDZEN RESTORATION INC11/07/2016
BISMHISSUEDZEN RESTORATION INC11/03/2016
BISOTISSUEDART-B CONSTRUCTION CORP08/22/2016
BISPLISSUEDPRIMO PLBG & HVAC CORP07/20/2016
BISEQISSUEDPHOENIX SUTT. STREET INC06/06/2016
BISEQISSUEDZEN RESTORATION INC05/27/2016
BISOTISSUEDZEN RESTORATION INC05/13/2016
BISOTISSUEDZEN RESTORATION INC05/13/2016
BISMHISSUEDZEN RESTORATION INC05/13/2016
BISOTISSUEDART-B CONSTRUCTION CORP05/04/2016
BISEQISSUEDBILLY ENTERPRISES INC03/29/2016
BISEQISSUEDBILLY ENTERPRISES INC03/28/2016
BISPLISSUEDGOLDS PLUMBING CORP03/14/2012
BISFBISSUEDC C CONTROLLED COMBUSTION12/07/2011
BISMHISSUEDJ & J JOHNSON GENERAL CON04/14/2011
+ 26 more permits on file
1 project · most recent 05/18/2021
FiledStatusContractorScope
05/18/2021Signed-offFIREQUEST CORP—
3 projects · most recent 05/05/2023
General Wiring
FiledStatusContractorScope
05/05/2023Permit IssuedMEGA ELEC'L CONTR'G, INC—
09/30/2020CompletePOLYHASE ELECL SOL INCGeneral Wiring
09/23/2020CompleteMEGA ELEC'L CONTR'G, INC—
1 project · most recent 05/25/2023
Sidewalk Shed
FiledStatusContractorScope
05/25/2023Permit IssuedEMPIRE NY INSTALLATIONS ISidewalk Shed
1 project · most recent 04/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/11/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/21/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/27/2021Mechanical SystemsNicholas Tuccispecial
10/27/2021FinalAnthony Casermaprogress
10/18/2021Fire-Resistant Penetrations and JointsMirella Bosellispecial
10/11/2021Fire-Resistant Penetrations and JointsMirella Bosellispecial
08/19/2021Fire-Resistant Penetrations and JointsMirella Bosellispecial
05/04/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
05/04/2021Mechanical SystemsLOUIS ARENAspecial
05/04/2021FinalLOUIS ARENAprogress
01/12/2021Fire-Resistant Penetrations and JointsMirella Bosellispecial
11/03/2020Energy Code Compliance InspectionsLOUIS ARENAprogress
09/25/2020FinalPaul Perdekprogress
09/25/2020FinalPaul Perdekprogress
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch5
09/03/2026M00526240-I1Request digital key ↗
09/03/2026M00526130-I1Request digital key ↗
08/31/2026M00843820-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00423056-I1Request digital key ↗
09/04/2026M00427089-I1Request digital key ↗
08/15/2026M00427089-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/04/2026M00423056-S1Request digital key ↗
09/04/2026M00449314-I1Request digital key ↗
09/04/2026M00449314-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00404398-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00404429-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00423056-S2Request digital key ↗
▸Applications & Permits72
▸BISWORK PERMIT APPLICATION30
05/14/2021140939849Open ↗
11/23/2020140939849Open ↗
11/20/2020140907730Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
01/08/2021140939849Open ↗
08/18/2020140939849Open ↗
08/03/2020140907730Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit12
09/04/2026M00449314-P1Open ↗
09/04/2026M00449314-I1Open ↗
09/03/2026M00526240-I1Open ↗
Showing 3 of 12 on file for this type
▸BISLL114/19 PERMIT RESTRICTION2
11/13/2020140907730Open ↗
11/12/2020140939849Open ↗
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
02/16/2018122510862Open ↗
02/16/2018122510862Open ↗
02/16/2018122510862Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/04/2026M00404398-I1Open ↗
09/04/2026M00404429-I1Open ↗
09/04/2026M00423056-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026M00404398-I1Open ↗
08/28/2026M00423056-I1Open ↗
08/27/2026M00423056-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026M00427089-P3Open ↗
08/27/2026M00427089-I1Open ↗
08/27/2026M00423056-P1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/02/2016140501874Open ↗
05/26/2016140501295Open ↗
03/25/2016140473912Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/02/2016140501874Open ↗
05/26/2016140501295Open ↗
03/25/2016140473912Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/08/2011120917375Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/02/2016140501874Open ↗
05/26/2016140501295Open ↗
03/25/2016140473912Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
12/08/2011120917375Open ↗
12/08/2011120917375Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/18/2020140939849Open ↗
07/29/2020140907730Open ↗
06/05/2020140906973Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE8
01/04/2013120442440Open ↗
06/11/2012120442440Open ↗
04/04/2012120442440Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
03/25/2011120442440Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS2
03/30/2011120138270Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/30/2016122510862Open ↗
11/19/2015122510862Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/30/2011120138270Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/08/2011120917375Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan10
09/04/2026M00404398-I1Open ↗
09/04/2026M00404429-I1Open ↗
08/13/2026M00423056-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES7
06/02/2016140501874Open ↗
05/26/2016140501295Open ↗
03/25/2016140473912Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/04/2026M00423056-S1Open ↗
09/04/2026M00423056-I1Open ↗
09/04/2026M00423056-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/18/2020140939849Open ↗
08/11/2020140906973Open ↗
07/29/2020140907730Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
12/08/2011120917375Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/25/2016122510862Open ↗
11/08/2012121132513Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00526240-I1Open ↗
08/13/2026M00526130-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/25/2021140907730Open ↗
11/20/2020140907730Open ↗
10/08/2020140907730Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/15/2017122265280Open ↗
02/10/2015122265280Open ↗
07/03/2012121132513Open ↗
▸BISNYCECC EXEMPTION2
09/25/2020140939849Open ↗
08/11/2020140906973Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/25/2021140907730Open ↗
05/15/2017122265280Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00526130-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00526130-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY12
10/25/2021140907730Open ↗
10/18/2021140906973Open ↗
11/20/2020140907730Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
04/03/2018120917375Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/02/2016140501874Open ↗
▸Approvals, Objections & Sign-offs32
▸BISLANDMARKS APPROVAL17
02/09/2021140939849Open ↗
10/19/2020140939849Open ↗
10/08/2020140907730Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
10/25/2021140907730Open ↗
04/03/2018120917375Open ↗
02/16/2018122510862Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
12/08/2011120917375Open ↗
Showing 1 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/03/2018120917375Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT20
10/25/2021140907730Open ↗
07/23/2021140906973Open ↗
08/18/2020140939849Open ↗
Showing 3 of 20 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/11/2020140906973Open ↗
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET10
11/19/2015122510862Open ↗
11/19/2015122510862Open ↗
11/19/2015122510862Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION7
10/19/2020140939849Open ↗
05/17/2017122510862Open ↗
12/16/2016122510862Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
08/18/2020140939849Open ↗
07/29/2020140907730Open ↗
06/05/2020140906973Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
04/20/2021140939849Open ↗
04/03/2018120917375Open ↗
02/16/2018122510862Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/30/2011120138270Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01028275-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01028275-I1Open ↗