| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00885886 ↗ | 54 NOLL STREET BROOKLYN | Alteration | Signed-off | 06/08/2023 | 06/16/2023 | Design CARL GUINTA ASSOCIATES Owner ATLAS CAPITAL GROUP LLC Contractor METRO MECHANICAL GROUP IN Filer D AND L EXPEDITING | Alter existing sprinkler system to conform to new Foodtown Supermarket |
| M00239030 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2019 | 06/15/2023 | Design WSP Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | SPRINKLER ALTERATIONS AT CELLAR AND 1ST FLOOR AS INDICATED ON DRAWINGS. |
| M00830204 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 03/31/2023 | 04/20/2023 | Owner CBRE INC Contractor UNITY CONSTRUCTION GROUP | Plumbing and sprinkler alterations on the 1st floor for interior non-structural demolition and whitebox fit-out; related work as per plans. … |
| M00817183 ↗ | 60 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 02/14/2023 | 04/14/2023 | Design CARL GUINTA ASSOCIATES Owner RANDOLPH ASSOCIATES Contractor CAPITOL FIRE SPRINKLER CO Filer RONALD OGUR P.C. | Remove existing piping and heads and install new piping and heads from existing riser for revised interior partition layout. No change in u… |
| M00818787 ↗ | 1 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/29/2023 | 03/30/2023 | Design LEVIN ENGINEERING PLLC Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A SPRINKLER SYSTEM ON THE FIRST FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. |
| M00692410 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 04/07/2022 | 03/02/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 39th floor (Turnkey-Blue Torch) as indicated on drawings |
| Name | Projects together | Most recent |
|---|---|---|
| GOLDMAN COPELAND ASSOCIATES | 61 | 02/15/2023 |
| CARL GUINTA ASSOCIATES | 12 | 08/01/2023 |
| WSP | 10 | 03/06/2023 |
| MG ENGINEERING D.P.C. | 6 | 04/10/2023 |
| KABACK ENTERPRISES | 4 | 08/29/2022 |
| LEVIN ENGINEERING PLLC | 4 | 03/29/2023 |
| AMA CONSULTING ENGINEERS, PC | 3 | 04/20/2022 |
| EMTG CONSULTANTS INC | 3 | 04/14/2022 |
| MICHAEL LI, PE | 3 | 08/09/2023 |
| ROBERT DERECTOR ASSOCIATES | 3 | 09/28/2022 |
| NEW YORK ENGINEERING ASSOC., P.C. | 2 | 05/18/2021 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 01/09/2020 |
| ADVANCED CONSULTING ENGINEERS | 1 | 10/26/2019 |
| CAPITOL FIRE SPRINKLER CO. | 1 | 02/22/2022 |
| CFS ENGINEERING, DPC | 1 | 03/12/2020 |
| FOGARTY FINGER ARCHITECTURE PLLC | 1 | 04/10/2023 |
| HIGHLAND ASSOCIATES | 1 | 08/25/2021 |
| HNY CONSULTING ENGINEERS LLC | 1 | 03/24/2021 |
| JAC ENGINEERING DPC | 1 | 07/23/2021 |
| JFK&M CONSULTING ENGINEERS | 1 | 08/21/2020 |
| KMB DESIGN GROUP, LLC | 1 | 01/13/2021 |
| KOHLER RONAN, LLC | 1 | 02/06/2020 |
| OPERA STUDIO ARCHITECTURE, LLC | 1 | 05/30/2023 |
| RAND ENGINEERING & ARCHITECTURE | 1 | 11/24/2021 |
| WB ENGINEERS & CONSULTANTS PLLC | 1 | 11/22/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| SIRINA FIRE PROT CORP | 25 | 03/29/2023 |
| ABCO PEERLESS SPRINKLER C | 22 | 12/28/2022 |
| PAR FIRE PROTECTION LLC | 20 | 03/06/2023 |
| AGRESSIVE FIRE PROT LLC | 10 | 01/04/2023 |
| A + SPRINKLER CORP | 4 | 08/09/2023 |
| METRO MECHANICAL GROUP IN | 4 | 06/08/2023 |
| PACE PLUMBING CORP | 4 | 03/18/2022 |
| CAPITOL FIRE SPRINKLER CO | 3 | 08/01/2023 |
| FULL CAPACITY FIRE CORP | 3 | 05/30/2023 |
| ACCURATE MECHANICAL INC | 2 | 10/01/2020 |
| ALLSTATE SPRINKLER CORP | 2 | 07/29/2022 |
| PSI PARTNERS, LLC | 2 | 06/06/2022 |
| UPRIGHT FIRE PROTCTN LLC | 2 | 12/02/2019 |
| ACCESS PLUMBING CORP | 1 | 05/18/2021 |
| APPROVED PLUMBING AND FIR | 1 | 08/12/2020 |
| ASHLAR MECHANICAL CORP | 1 | 10/29/2019 |
| DEMAR PLUMBING CORP | 1 | 05/08/2017 |
| DENKO MECHANICAL INC | 1 | 11/22/2019 |
| ENOBRAC PLUMBING, INC | 1 | 04/11/2022 |
| FIREQUEST CORP | 1 | 05/18/2021 |
| FIVE BORO ASSOCIATES INC | 1 | 04/20/2022 |
| FOLOR INC | 1 | 05/18/2021 |
| METRO FIRE CONTROL LLC | 1 | 12/06/2019 |
| METRO FIRE PROTECTION INC | 1 | 02/03/2022 |
| MILLER PLUMBING & HTG INC | 1 | 08/21/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| VORNADO REALTY TRUST | 78 | 05/30/2023 |
| SILVERSTEIN PROPERTIES INC. | 4 | 10/26/2020 |
| CBRE | 2 | 04/10/2023 |
| NEDERLANDER PRODUCING COMPANY | 2 | 12/02/2019 |
| 122 EAST 42ND ST., LLC. | 1 | 02/27/2020 |
| ASB REAL ESTATE INVESTMENTS | 1 | 11/22/2019 |
| ATLAS CAPITAL GROUP LLC | 1 | 06/08/2023 |
| AURORA CAPITAL ASSOCIATES | 1 | 10/23/2019 |
| CUSHMAN & WAKEFIELD | 1 | 03/12/2020 |
| KATO KAGAKU CO LTC | 1 | 01/27/2020 |
| MAROB MANAGEMENT CORP | 1 | 05/08/2017 |
| RANDOLPH ASSOCIATES | 1 | 08/01/2023 |
| RENAISSANCE PROPERTIES CORP. | 1 | 07/24/2020 |
| SECOND AVE SOLOW DEV CORP | 1 | 08/09/2023 |
| SJ SHAMIE REALTY LLC. | 1 | 10/21/2020 |
| SL GREEN REALTY CORP | 1 | 08/29/2022 |
| VORNADO OFFICE MANAGEMENT | 1 | 03/02/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| ARCHETYPE CONSULTANTS, INC. | 35 | 05/30/2023 |
| RIGHT WAY SERVICES NYC, INC. | 3 | 08/09/2023 |
| D AND L EXPEDITING | 1 | 06/08/2023 |
| GEORGE E. BERGER & ASS. LLC | 1 | 05/08/2017 |
| RONALD OGUR P.C. | 1 | 08/01/2023 |
| UNITED FIRE PROTECTION CORP. | 1 | 07/23/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00885886 ↗ | 54 NOLL STREET BROOKLYN | Alteration | Signed-off | 06/08/2023 | 06/16/2023 | Design CARL GUINTA ASSOCIATES Owner ATLAS CAPITAL GROUP LLC Contractor METRO MECHANICAL GROUP IN Filer D AND L EXPEDITING | Alter existing sprinkler system to conform to new Foodtown Supermarket |
| M00239030 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2019 | 06/15/2023 | Design WSP Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | SPRINKLER ALTERATIONS AT CELLAR AND 1ST FLOOR AS INDICATED ON DRAWINGS. |
| M00830204 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 03/31/2023 | 04/20/2023 | Owner CBRE INC Contractor UNITY CONSTRUCTION GROUP | Plumbing and sprinkler alterations on the 1st floor for interior non-structural demolition and whitebox fit-out; related work as per plans. … |
| M00817183 ↗ | 60 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 02/14/2023 | 04/14/2023 | Design CARL GUINTA ASSOCIATES Owner RANDOLPH ASSOCIATES Contractor CAPITOL FIRE SPRINKLER CO Filer RONALD OGUR P.C. | Remove existing piping and heads and install new piping and heads from existing riser for revised interior partition layout. No change in u… |
| M00818787 ↗ | 1 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/29/2023 | 03/30/2023 | Design LEVIN ENGINEERING PLLC Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A SPRINKLER SYSTEM ON THE FIRST FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. |
| M00692410 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 04/07/2022 | 03/02/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 39th floor (Turnkey-Blue Torch) as indicated on drawings |
| M00737640 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 06/06/2022 | 03/02/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor MORA FIRE PROTECTION LLC | Sprinkler work on the 33rd floor (Hillpath Capital) as indicated on drawings |
| M00760849 ↗ | 909 3 AVENUE MANHATTAN | Alteration | Signed-off | 11/02/2022 | 01/27/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Remove sprinkler heads and related piping in ATS room on the 5th floor as indicated on drawings |
| M08038647 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 01/04/2023 | 01/10/2023 | Design GOLDMAN COPELAND ASSOCIATES Contractor AGGRESSIVE FIRE PROT LLC | Sprinkler work on the 21st floor (BA Torrey) as indicated on drawings |
| S08047866 ↗ | 965 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 12/09/2022 | 12/13/2022 | Design CARL GUINTA ASSOCIATES Contractor METRO MECHANICAL GROUP IN | Existing sprinkler heads to be replaced with new heads installed in compliance with NFPA-13. As per plans filed herewith. No change of use, … |
| M00782665 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 10/27/2022 | Design WSP Owner VORNADO REALTY TRUST Contractor FULL CAPACITY FIRE CORP | Installation of new sprinkler heads and relocated sprinkler heads on the 26th floor as indicated on drawings. |
| M00777466 ↗ | 1 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/28/2022 | 10/17/2022 | Design ROBERT DERECTOR ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Remove sprinkler heads and piping, install temporary sprinkler protection at core on 14th floor. |
| M00787701 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/23/2022 | 09/24/2022 | Design WSP Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | sprinkler changes (Highpost Capital) on the 24th floor (25th floor Marketing) as indicated on drawings. |
| M00775728 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 09/23/2022 | Design ROBERT DERECTOR ASSOCIATES Owner VORNADO REALTY TRUST Contractor FULL CAPACITY FIRE CORP | Sprinkler work on part of 8th floor (UTA) as indicated on drawings. |
| M00785940 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 09/19/2022 | 09/22/2022 | Design MICHAEL LI, PE Contractor A + SPRINKLER CORP | FILING FOR REMOVAL OF EXISTING HEADS AND INSTALLING TEMP LOOP AT 19TH FLR AS PER PLANS FILEDHEREWITH . NO CHANGE TO USE EGRESS OR OCCUPANCY |
| M00785914 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/19/2022 | — | Design MICHAEL LI, PE | — |
| M00770257 ↗ | 100 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 09/02/2022 | 09/13/2022 | Design GOLDMAN COPELAND ASSOCIATES Contractor AGGRESSIVE FIRE PROT LLC | Removal of sprinkler heads and installation of temporary sprinkler loop on the9th floor (Whitebox - suite 911 Former Gerson & Gerson) as ind… |
| M00769976 ↗ | 220 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 08/29/2022 | 08/30/2022 | Design KABACK ENTERPRISES Owner SL GREEN REALTY CORP Contractor AGGRESSIVE FIRE PROT LLC | FILING FOR SPRINKLER MODIFICATION AT 1ST FLOOR ** CLUB CHAMPION GOLF** AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY |
| M00737606 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 06/02/2022 | 08/29/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor MORA FIRE PROTECTION LLC | Sprinkler work on the 33rd floor (prebuild) as indicated on drawings |
| M00781602 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 07/29/2022 | 08/10/2022 | Design WSP Owner VORNADO REALTY TRUST Contractor ALLSTATE SPRINKLER LLC | Removal of sprinkler heads and installation of temporary sprinkler loop on the 3rd and 4th floors as indicated on drawings. |
| M00704646 ↗ | 9 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 05/06/2022 | 08/03/2022 | Design MICHAEL LI, PE Contractor A + SPRINKLER CORP | FILING FOR REMOVAL OF EXISTING HEADS AND INSTALLING TEMP LOOP AT 20TH FLR AS PER PLANS FILED HEREWITH . NO CHANGE TO USE EGRESS OR OCCUPANCY |
| M00687282 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/21/2022 | 07/28/2022 | Design WSP Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 26th floor (LLW Brasil Warrant) as indicated on drawings. |
| M00741135 ↗ | 100 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 06/23/2022 | 07/28/2022 | Design GOLDMAN COPELAND ASSOCIATES Contractor AGGRESSIVE FIRE PROT LLC | Removal of sprinkler heads and installation of temporary sprinkler loop on the 10th floor (Suite 1012 - former KMA Whitehall space) as indic… |
| M00759769 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 07/15/2022 | 07/20/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 16th floor (prebuild space) as indicated on drawings. No change in use egress or occupancy. |
| M00715183 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 06/07/2022 | 07/15/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 18th floor (prebuild) as indicated on drawings |
| M00715258 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 06/06/2022 | 07/15/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 33rd floor (prebuild) as indicated on drawings |
| M00713691 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/20/2022 | 06/10/2022 | Design AMA CONSULTING ENGINEERS, PC Owner VORNADO REALTY TRUST Contractor FIVE BORO ASSOCIATES INC | Sprinkler changes on the 28th floor as indicated on drawings. |
| M00737560 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Filed — no permit on record | 06/02/2022 | — | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | — |
| B00697735 ↗ | 38 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 04/14/2022 | 05/05/2022 | Design EMTG CONSULTANTS INC Contractor A + SPRINKLER CORP | Sprinkler work on the cellar and 1st floor as indicated on drawings. |
| M00703888 ↗ | 48 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 04/11/2022 | 04/25/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ENOBRAC PLUMBING, INC | Sprinkler changes on the 9th, 10th, 11th, 15th floors and penthouse as indicated on drawings. |
| M00687670 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/18/2022 | 03/22/2022 | Design WSP Owner VORNADO REALTY TRUST Contractor MANENGEERING BUREAU, INC | Removal of sprinkler heads and installation of temporary sprinkler loop on the 27th floor as indicated on drawings. |
| M00239832 ↗ | 568 BROADWAY MANHATTAN | Alteration | Signed-off | 10/23/2019 | 03/10/2022 | Design ROBERT DERECTOR ASSOCIATES Contractor ACCURATE MECHANICAL INC | SPRINKLER ALTERATIONS AT 7TH FLOOR SPACE (YOU & MR JONES) AS INDICATED ON DRAWINGS. |
| M00676025 ↗ | 60 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 02/22/2022 | 02/23/2022 | Design CAPITOL FIRE SPRINKLER CO. Contractor CAPITOL FIRE SPRINKLER CO | Install a temporary sprinkler system with 6 upright sprinkler heads on the 10th floor to allow for cut/cap of existing sprinkler system. New… |
| M00651501 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/20/2022 | 01/28/2022 | Design WSP Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Installation of temporary sprinkler loop on the 11th and 12th floors as indicated on drawings. |
| M00618074 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 01/14/2022 | 01/26/2022 | Design GOLDMAN COPELAND ASSOCIATES Contractor LAWRENCE J. LEVINE | Sprinkler work on the 25th floor (Thames Capital) as indicated on drawings |
| M00613329 ↗ | 1290 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 01/06/2022 | 01/07/2022 | Design LEVIN ENGINEERING PLLC Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | INSTALLATION OF (4) SPRINKLERS HEADS ON THE THIRD FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. |
| M00615382 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/09/2021 | 12/13/2021 | Design WSP Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Removal of sprinkler heads and installation of temporary sprinkler loop on the 18th floor as indicated on drawings. |
| M00258639 ↗ | 1515 BROADWAY MANHATTAN | Alteration | Signed-off | 12/02/2019 | 12/07/2021 | Design CARL GUINTA ASSOCIATES Contractor H.J. FLOOD INC. Filer NYCCODE LLC | MODIFICATION OF THE EXISTING SPRINKLER AND STANDPIPE COMBINED SYSTEM IN THE BUILDING. APPLICATION IS RE-FILE TO SUPERSEDE EXPIRED APPROVED A… |
| M00634112 ↗ | 1290 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/03/2021 | 12/03/2021 | Design LEVIN ENGINEERING PLLC Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | INSTALLATION OF A TEMPORARY FIRE SPRINKLER PROTECTION SYSTEM ON THE 1ST FLOOR AT THE CHASE BANK AS PER PLANS SUBMITTED HEREWITH, NO CHANGE I… |
| M00633823 ↗ | 11 EAST 57 STREET MANHATTAN | Alteration | Filed — no permit on record | 11/24/2021 | — | — | |
| M00589228 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2021 | 11/16/2021 | Design AMA CONSULTING ENGINEERS, PC Owner VORNADO REALTY TRUST Contractor AGGRESSIVE FIRE PROT LLC | Sprinkler wok on part of the 24th floor as indicated on drawings. |
| X00620082 ↗ | 5188 BROADWAY MANHATTAN | Alteration | Signed-off | 10/29/2021 | 11/03/2021 | Design CARL GUINTA ASSOCIATES Contractor METRO MECHANICAL GROUP IN | T-Mobile - Modification of existing wet pipe sprinkler system as per plans. No change in use, egress or occupancy. |
| M00598322 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 10/05/2021 | 10/14/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 23rd floor (Michelle Gerson) as indicated on drawings |
| M00586187 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 09/23/2021 | 10/13/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 35th and 36th floor (restrooms) as indicated on drawings |
| M00580852 ↗ | 100 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 09/30/2021 | 10/08/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler changes on the 11th floor as indicated on drawings. |
| M00577894 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 08/25/2021 | 09/01/2021 | Design HIGHLAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | SPRINKLER CHANGES ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. |
| M00449150 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/15/2021 | 07/26/2021 | Design GOLDMAN COPELAND ASSOCIATES Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 36thfloor (prebuild space) as indicated on drawings |
| M00487244 ↗ | 510 WEST 22ND STREET MANHATTAN | Alteration | Signed-off | 06/04/2021 | 07/22/2021 | Design WSP Owner VORNADO REALTY TRUST Contractor METRO FIRE PROTECTION INC | Sprinkler alterations on the 6th floor; related work as per plans. |
| M00547388 ↗ | 48 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 06/30/2021 | 07/02/2021 | Owner VORNADO REALTY TRUST Contractor FULL CAPACITY FIRE CORP | Sprinkler changes on the 9th, 10th, 11th, 15th & penthouse floors as indicated on drawings. |
| M00448570 ↗ | 909 3 AVENUE MANHATTAN | Alteration | Signed-off | 01/25/2021 | 06/27/2021 | Design JAC ENGINEERING DPC Owner VORNADO REALTY TRUST Contractor UNITED FIRE PROT CORP | Conversion of Preaction Sprinkler to Wet Sprinkler System. No change in use, egress, or occupancy. |
| M00480057 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/04/2021 | 06/16/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor TRISTATE PLBG SVCS CORP | Sprinkler work on the 8th floor (Howard Greenberg Gallery) as indicated on drawings |
| M00483294 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/03/2021 | 06/11/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ALLSTATE SPRINKLER LLC | Sprinkler work on the 25th floor (prebuild space) as indicated on drawings |
| M00263310 ↗ | 1290 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 01/09/2020 | 06/10/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor S.B.A. PLUMBING CORP | removal of one (1) fire hose cabinet and related piping on the 32nd floor |
| M00432999 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/07/2021 | 05/25/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 46th floor (Valley National) as indicated on drawings. |
| M00512106 ↗ | 510 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 05/25/2021 | — | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | — |
| M00501087 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/11/2021 | 05/13/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 32nd floor (Buchbinder) as indicated on drawings |
| M00333317 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 09/01/2020 | 04/15/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 3rd floor (Cosentino showroom) as indicated on drawings |
| M00321801 ↗ | 250 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 03/12/2020 | 03/29/2021 | Design CFS ENGINEERING, DPC Owner CUSHMAN & WAKEFIELD Contractor CAPITOL FIRE SPRINKLER CO | SPRINKLER ALTERATIONS AT 6TH FLOOR (PEGASUS MARITIME) AS INDICATED ON DRAWINGS. |
| M00338354 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/26/2021 | 03/19/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | SPRINKLER ALTERATIONS AT CELLAR AND 1ST FLOOR (WHITEBOX RETAIL) AS INDICATED ON DRAWINGS. |
| M00473198 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 03/03/2021 | 03/10/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 9th floor (Bilotta Downsize) as indicated on drawings |
| M00449344 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2021 | 02/25/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 7th floor (prebuild space) as indicated on drawings. |
| M00449567 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2021 | 02/25/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor MANENGEERING BUREAU, INC | Sprinkler work on the 11th floor (prebuild space) as indicated on drawings |
| M00431445 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/16/2021 | 02/24/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 25th floor (Presidio) as indicated on drawings |
| M00231180 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2019 | 02/23/2021 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Removal of existing sprinkler heads and installation of temporary core sprinkler protection at the 1st floor; related work as per plans. |
| M00442518 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/27/2021 | 02/17/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 13th floor as indicated on drawings. |
| M00426848 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2021 | 02/10/2021 | Design WSP Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 21st floor (pre-build & bathrooms) as indicated on drawings. |
| M00348280 ↗ | 510 WEST 22ND STREET MANHATTAN | Alteration | Signed-off | 08/21/2020 | 01/23/2021 | Design JFK&M CONSULTING ENGINEERS Owner VORNADO REALTY TRUST Contractor MILLER PLUMBING & HTG INC | Sprinkler alterations at 1st floor tenant space; related work as per plans. |
| M00423056 ↗ | 1067 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/19/2020 | 01/20/2021 | Contractor ACCESS PLUMBING CORP Filer NEW YORK ENGINEERING | FILING WASHING MACHINES IN RESPONSE TO VIOLATION NO'S 039029579K, 039029581J, 039029580H AND 039029582L. |
| M00401258 ↗ | 510 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/09/2020 | 12/15/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Installation of temporary sprinkler loop on the 5th floor as indicated on drawings. No change to use, egress or occupancy. |
| M00396639 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 11/03/2020 | 11/30/2020 | Design HNY CONSULTING ENGINEERS LLC Owner VORNADO REALTY TRUST Contractor A + SPRINKLER CORP | SPRINKLER CHANGES ON THE 1ST FLOOR (JUICE PRESS) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00402239 ↗ | 114 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 10/21/2020 | 10/22/2020 | Design CARL GUINTA ASSOCIATES Owner SJ SHAMIE REALTY LLC. Contractor PASQUALE QUARATINO INC | Sprinkler changes on the 6th floor as indicated on drawings. No change in use, egress or occupancy. This work will supercede work filed un… |
| M00404098 ↗ | 333 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 10/01/2020 | 10/02/2020 | Design CARL GUINTA ASSOCIATES Contractor ACCURATE MECHANICAL INC Filer D AND L EXPEDITING | Install sprinkler heads to comply with local law 26/04 to be fully sprinkled as per plans |
| M00349441 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 08/19/2020 | 09/09/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 41st floor (Sassicaia) as indicated on drawings |
| M00351893 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 08/17/2020 | 09/03/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 53rd floor (MGG Investment) as indicated on drawings |
| M00187488 ↗ | 1290 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/26/2019 | 08/26/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | sprinkler work on part of the 34th floor (prebuild) as indicated on drawings |
| M00378147 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 08/03/2020 | 08/19/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor LAWRENCE J. LEVINE | Sprinkler work on the 11th & 12th floors (former Sitaris Gym) as indicated on drawings. |
| B00377440 ↗ | 3041 BRIGHTON 2 STREET BROOKLYN | Alteration | Signed-off | 08/12/2020 | 08/13/2020 | Contractor ARCO PLBG AND HTG INC | REPLACE SPRINKLER BOOSTER AND JOCKEY PUMP IN KIND. |
| M00373295 ↗ | 909 3 AVENUE MANHATTAN | Alteration | Signed-off | 08/07/2020 | 08/11/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 20th floor (restroom) as indicated on drawings |
| M00327365 ↗ | 120 WALL STREET MANHATTAN | Alteration | Signed-off | 07/15/2020 | 07/16/2020 | Design MG ENGINEERING D.P.C. Contractor AGGRESSIVE FIRE PROT LLC | Removal of sprinkler heads and installation of temporary sprinkler loop on the 16th floor as indicated on drawings. Addition of sprinkler f… |
| M00302490 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2020 | 06/18/2020 | Design MG ENGINEERING D.P.C. Owner CBRE INC Contractor AGGRESSIVE FIRE PROT LLC | SPRINKLER WORK AT 1ST FLOOR (26TH STREET LOBBY) AS INDICATED ON DRAWINGS. |
| M00307871 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 03/06/2020 | 06/15/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 15th floor (Trenchant Funds) as indicated on drawings |
| M00323630 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 04/24/2020 | 06/11/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 50th floor (Hartford Fire Insurance) as indicated on drawings |
| M00319277 ↗ | 393 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/27/2020 | 06/05/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Removal of sprinkler heads and installation of temporary sprinkler loop on the 11th , 12th and 14th floor as indicated on drawings. |
| M00319259 ↗ | 393 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/05/2020 | 06/02/2020 | Design GOLDMAN COPELAND ASSOCIATES Contractor ABCO-PEERLESS SPRKLR CORP | Removal of sprinkler heads and installation of temporary sprinkler loop on the 8th floor as indicated on drawings. |
| M00339680 ↗ | 393 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/19/2020 | 06/02/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Removal of sprinkler heads and installation of temporary sprinkler loop on the 9th and 10th floor as indicated on drawings |
| M00205239 ↗ | 120 BROADWAY MANHATTAN | Alteration | Signed-off | 08/22/2019 | 03/27/2020 | Design KABACK ENTERPRISES Contractor AGGRESSIVE FIRE PROT LLC | SPRINKLER WORK AT Sub-cellar # 2 [131 heads] AND 41ST Floor [77 heads] AS PER PLANS FILED HEREWITH |
| M00303922 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 03/09/2020 | 03/19/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor MANENGEERING BUREAU, INC | Sprinkler work on part of the 20th floor (Ratio Advisors) as indicated on drawings. |
| M00322906 ↗ | 510 WEST 22ND STREET MANHATTAN | Alteration | Signed-off | 03/03/2020 | 03/18/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | SPRINKLER ALTERATIONS AT 1ST FLOOR (WARNER MEDIA) AS INDICATED ON DRAWINGS. |
| M00228634 ↗ | 1 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/04/2020 | 03/12/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | INSTALLATION OF TEMPORARY SPRINKLER LOOP ON THE 9TH AND 12TH FLOORS AS INDICATED ON DRAWINGS. |
| M00325946 ↗ | 62 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 03/10/2020 | 03/12/2020 | Design CARL GUINTA ASSOCIATES Contractor METRO MECHANICAL GROUP IN Filer D AND L EXPEDITING | Alter the existing wet pipe sprinkler system as shown on plans. |
| M00216952 ↗ | 529 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/26/2019 | 03/11/2020 | Design KABACK ENTERPRISES Contractor AGGRESSIVE FIRE PROT LLC | LOCAL LAW 26 COMPLIANCE SPRINKLER WORK- THROUGH OUT NUMEROUS |
| M00289543 ↗ | 7 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 01/27/2020 | 03/09/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor LAWRENCE J. LEVINE | Sprinkler work on the 42nd floor (bathrooms/corridor) as indicated on drawings |
| M00292590 ↗ | 374 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/27/2020 | 03/06/2020 | Design EMTG CONSULTANTS INC Owner 122 EAST 42ND ST., LLC. Contractor LAWRENCE J. LEVINE | Sprinkler work on the 1st floor as indicated on drawings |
| M00287992 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/23/2020 | 03/05/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 19th floor (fit-out) as indicated on drawings |
| M00302977 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/18/2020 | 03/05/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Sprinkler changes on the 24th floor (prebuilt) as indicated on drawings. |
| M00232115 ↗ | 72 GREENE STREET MANHATTAN | Alteration | Signed-off | 11/22/2019 | 02/11/2020 | Contractor S. TIEGER PLBG. CO., INC | Sprinkler alterations for tenant fit-out on the 4th floor; related work as per plans. |
| M00268341 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/17/2020 | 02/11/2020 | Design GOLDMAN COPELAND ASSOCIATES Contractor SIRINA FIRE PROT CORP | Sprinkler work on the 21st floor (NCFTA office) as indicated on drawings. |
| M00278241 ↗ | 1290 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 01/13/2020 | 02/10/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Contractor SIRINA FIRE PROT CORP | Removal of sprinkler heads; install temporary sprinkler loop on the 30th floor as indicated on drawings |
| M00287722 ↗ | 7 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 01/28/2020 | 02/04/2020 | Design MG ENGINEERING D.P.C. Contractor LAWRENCE J. LEVINE | removal of sprinkler heads and install temporary sprinkler loop |
| M00275714 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 01/09/2020 | 01/17/2020 | Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP | SPRINKLER WORK AT 9TH FLOOR (UNITED TALENT AGENCY) AS INDICATED ON DRAWINGS. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/03/2023 | Sprinkler Systems | 60 EAST 56 STREET | CARL GUINTA | special |
| 05/16/2023 | Sprinkler Systems | 48 WEST 57 STREET | CARL GUINTA | special |
| 04/05/2023 | Fire-Resistant Penetrations and Joints | 275 7 AVENUE | Alan Marcus | special |
| 04/05/2023 | Post-installed Anchors | 275 7 AVENUE | Alan Marcus | special |
| 03/31/2023 | Sprinkler Systems | 275 7 AVENUE | CARL GUINTA | special |
| 03/06/2023 | Sprinkler Systems | 650 MADISON AVENUE | CARL GUINTA | special |
| 03/03/2023 | Sprinkler Systems | 650 MADISON AVENUE | CARL GUINTA | special |
| 01/25/2023 | Sprinkler Systems | 1 PARK AVENUE | CARL GUINTA | special |
| 12/15/2022 | Sprinkler Systems | 250 WEST 34 STREET | CARL GUINTA | special |
| 11/09/2022 | Sprinkler Systems | 150 EAST 58 STREET | CARL GUINTA | special |
| 09/21/2022 | Sprinkler Systems | 650 MADISON AVENUE | CARL GUINTA | special |
| 08/02/2022 | Sprinkler Systems | 9 WEST 57 STREET | CARL GUINTA | special |
| 08/02/2022 | Sprinkler Systems | 9 WEST 57 STREET | CARL GUINTA | special |
| 07/27/2022 | Sprinkler Systems | 650 MADISON AVENUE | CARL GUINTA | special |
| 07/15/2022 | Sprinkler Systems | 888 7 AVENUE | CARL GUINTA | special |
| 05/25/2022 | Sprinkler Systems | 1290 AVENUE OF THE AMER | CARL GUINTA | special |
| 05/18/2022 | Sprinkler Systems | 100 WEST 33 STREET | CARL GUINTA | special |
| 05/13/2022 | Sprinkler Systems | 150 EAST 58 STREET | CARL GUINTA | special |
| 05/13/2022 | Sprinkler Systems | 150 EAST 58 STREET | CARL GUINTA | special |
| 05/13/2022 | Sprinkler Systems | 150 EAST 58 STREET | CARL GUINTA | special |
| 05/10/2022 | Sprinkler Systems | 597 MADISON AVENUE | CARL GUINTA | special |
| 04/12/2022 | Sprinkler Systems | 597 MADISON AVENUE | CARL GUINTA | special |
| 04/08/2022 | Sprinkler Systems | 250 WEST 34 STREET | CARL GUINTA | special |
| 04/08/2022 | Fire-Resistant Penetrations and Joints | 250 WEST 34 STREET | Alan Marcus | special |
| 04/08/2022 | Sprinkler Systems | 250 WEST 34 STREET | CARL GUINTA | special |
| 04/06/2022 | Sprinkler Systems | 90 PARK AVENUE | CARL GUINTA | special |
| 03/23/2022 | Sprinkler Systems | 9 WEST 57 STREET | CARL GUINTA | special |
| 03/22/2022 | Sprinkler Systems | 48 WEST 57 STREET | CARL GUINTA | special |
| 03/22/2022 | Sprinkler Systems | 1290 AVENUE OF THE AMER | CARL GUINTA | special |
| 03/14/2022 | Sprinkler Systems | 38 FLATBUSH AVENUE | CARL GUINTA | special |
| 02/04/2022 | Sprinkler Systems | 510 WEST 22ND STREET | CARL GUINTA | special |
| 12/21/2021 | Sprinkler Systems | 650 MADISON AVENUE | CARL GUINTA | special |
| 12/16/2021 | Sprinkler Systems | 510 WEST 22ND STREET | CARL GUINTA | special |
| 10/20/2021 | Sprinkler Systems | 650 MADISON AVENUE | CARL GUINTA | special |
| 09/22/2021 | Sprinkler Systems | 150 EAST 58 STREET | CARL GUINTA | special |
| 08/31/2021 | Sprinkler Systems | 250 WEST 34 STREET | CARL GUINTA | special |
| 08/20/2021 | Sprinkler Systems | 100 WEST 33 STREET | CARL GUINTA | special |
| 08/17/2021 | Sprinkler Systems | 151 EAST 58 STREET | CARL GUINTA | special |
| 04/28/2021 | Sprinkler Systems | 510 5 AVENUE | CARL GUINTA | special |
| 03/26/2021 | Sprinkler Systems | 330 WEST 34 STREET | CARL GUINTA | special |
| 03/19/2021 | Sprinkler Systems | 330 WEST 34 STREET | CARL GUINTA | special |
| 03/09/2021 | Sprinkler Systems | 350 PARK AVENUE | CARL GUINTA | special |
| 03/03/2021 | Sprinkler Systems | 597 MADISON AVENUE | CARL GUINTA | special |
| 02/25/2021 | Fire-Resistant Penetrations and Joints | 150 EAST 58 STREET | Alan Marcus | special |
| 02/19/2021 | Sprinkler Systems | 150 EAST 58 STREET | CARL GUINTA | special |
| 01/14/2021 | Sprinkler Systems | 133 KENT AVENUE | CARL GUINTA | special |
| 01/12/2021 | Sprinkler Systems | 133 KENT AVENUE | CARL GUINTA | special |
| 01/07/2021 | Sprinkler Systems | 597 MADISON AVENUE | CARL GUINTA | special |
| 01/07/2021 | Sprinkler Systems | 597 MADISON AVENUE | CARL GUINTA | special |
| 11/25/2020 | Sprinkler Systems | 250 WEST 34 STREET | CARL GUINTA | special |