Three families
1068 HANCOCK STREET
BROOKLYN · BIN 3078199
💬 Discuss this project
1915Year Built
2Stories
C0Building Class
R6Zoning
2,880 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 1068 HANCOCK ST LLC · 2,000 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1068 HANCOCK ST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2024$1.5M—— → —$522/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEEL CORE ENGINEERING PLLC102/24/2025
PHILIP TOSCANO ARCHITECTS201/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONTRACTING NYC LLCGeneral Contractor507/08/2026
MT ENERGY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474302/24/2025
Building Lifecycle
All (31)Filed (3)Permit Issued (4)Signed Off (3)Violation (2)Inspection (4)Objection (6)Special Inspection (9)
08/03/2026
Signed off — Alteration
Application filed for installation of two VRF systems, kitchen and toilet exhaust with associate ducts and piping. No change to use, egress nor occupancy
B01157093-S1
01/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/21/2026
Violation issued (HPD, open)
C
01/21/2026
Violation issued (HPD, open)
C
09/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2025
Signed off — Alteration
Application filed for installation of two VRF systems, kitchen and toilet exhaust with associate ducts and piping. No change to use, egress nor occupancy
B01157093-S2
08/19/2025
Signed off — Alteration
Application filed for installation of two VRF systems, kitchen and toilet exhaust with associate ducts and piping. No change to use, egress nor occupancy
B01157093-I1
08/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/14/2025
Permit issued — Mechanical Systems
B01157093-S2-MS
03/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2025
Permit issued — Mechanical Systems
B01157093-S2-MS
02/24/2025
Filed — Alteration
Application filed for installation of two VRF systems, kitchen and toilet exhaust with associate ducts and piping. No change to use, egress nor occupancy
B01157093-S2
02/24/2025
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
02/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
02/20/2025
Special inspection requirement — Final
CHRISTINA TOSCANO
02/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
PHILIP TOSCANO
02/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
02/20/2025
Special inspection requirement — Maintenance information
PHILIP TOSCANO
02/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
PHILIP TOSCANO
02/20/2025
Special inspection requirement — Mechanical Systems
PHILIP TOSCANO
02/20/2025
Special inspection requirement — Permanent certificate
PHILIP TOSCANO
01/28/2025
Permit issued — Plumbing
B01157093-S1-PL
01/14/2025
Permit issued — General Construction
B01157093-I1-GC
01/10/2025
Filed — Alteration
Application filed for installation of two VRF systems, kitchen and toilet exhaust with associate ducts and piping. No change to use, egress nor occupancy
B01157093-S1
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/30/2024
Objection resolved — Addressed
12/24/2024
Objection raised — Scope
12/24/2024
Objection raised — Scope
12/24/2024
Objection raised — Fire_Protection
12/19/2024
Filed — Alteration
Application filed for installation of two VRF systems, kitchen and toilet exhaust with associate ducts and piping. No change to use, egress nor occupancy
B01157093-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCONTRACTING NYC LLC07/14/2025
DOB NOWMechanical SystemsSigned-offCONTRACTING NYC LLC03/05/2025
DOB NOWPlumbingSigned-offMT ENERGY INC01/28/2025
DOB NOWGeneral ConstructionSigned-offCONTRACTING NYC LLC01/14/2025
1 project · most recent 02/24/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/24/2025Signed-offCONTRACTING NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric FCU-2.1, FCU-2.2, FCU-1.3, FCU-1.4 = MSZ-GS09NA 9,000 BTU · Fan Coil Indoor ×4
CU-1 & CU-2 = MXZ-SM42NAMHZ 42,000 BTU · Heat Pump Outdoor ×2
FCU-2.4 & FCU-2.5 = MSZ-GS06NA 6,000 BTU · Fan Coil Indoor ×2
FUC-1.1 & FCU-1.2 = MSZ-GS12NA 12,000 BTU · Fan Coil Indoor ×2
FCU-2.3 = MSZ-GS15NA 15,000 BTU · Fan Coil Indoor ×1
1 project · most recent 02/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/24/2025Signed-offMT ENERGY INCGas, Water/Sanitary
1 project · most recent 02/04/2025
General Wiring
FiledStatusContractorScope
02/04/2025Permit IssuedMOHAB ELECT'L CONTR'G CORGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/24/2025Energy Code Compliance InspectionsPHILIP TOSCANOprogress
02/20/2025Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
02/20/2025FinalCHRISTINA TOSCANOprogress
02/20/2025HVAC-R and service water heating equipmentPHILIP TOSCANOenergy_progress
02/20/2025HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
02/20/2025Maintenance informationPHILIP TOSCANOenergy_progress
02/20/2025HVAC-R and service water heating system controlsPHILIP TOSCANOenergy_progress
02/20/2025Mechanical SystemsPHILIP TOSCANOspecial
02/20/2025Permanent certificatePHILIP TOSCANOenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026B01157093-I1Request digital key ↗
08/22/2026B01157093-S2Request digital key ↗
08/22/2026B01157093-S1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026B01157093-S2Open ↗
08/29/2026B01157093-S2Open ↗
08/29/2026B01157093-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B01157093-I1Open ↗
08/13/2026B01157093-S2Open ↗
08/13/2026B01157093-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01157093-S2Open ↗
08/29/2026B01157093-S2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B01157093-S1Open ↗
08/13/2026B01157093-S2Open ↗
08/13/2026B01157093-I1Open ↗