| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01410384 ↗ | 245 EAST 35 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 09/17/2026 | JOB FILED TO REPLACE EXISTING LOBBY SPLIT SYSTEM AIR CONDITIONING UNITS WITH NEW HEAT PUMP AND CEILING MOUNTED AIR CONDITIONER. NO CHANGE TO… |
| B01227819 ↗ | 19 4 PLACE BROOKLYN | Alteration | Permit Issued | 06/18/2025 | 09/10/2026 | INTERIOR ALTERATION TO EXISTING DWELLING UNIT AT FIRST AND SECOND FLOOR.WORK INCLUDES MINOR PLUMBING AND GAS WORK. NO CHANGE TO USE, EGRESS,… |
| M01451337 ↗ | 747 3 AVENUE MANHATTAN | Alteration | Permit Issued | 08/29/2026 | 09/02/2026 | APPLICATION FILED TO RENOVATE OFFICES SPACES AT FLOORS 8 & 23. WOIRK INCLUDES DEMOLITION OF EXISTING PARTITIONS AND CONSTRUCTION OF NEW INTE… |
| M00808220 ↗ | 2363 7 AVENUE MANHATTAN | Alteration | Permit Issued | 01/12/2023 | 08/19/2026 | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH JOB #:B00808220-I1. REPLACING ONE LAV, ONE WC. INSTALLING NEW: ONE LAV, O… |
| M01419029 ↗ | 270 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/03/2026 | 08/18/2026 | PLUMBING WORK TO REPLACE FIXTURES IN APARTMENT #29 AT SIXTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| B00815485 ↗ | 147 5 AVENUE BROOKLYN | Alteration CO | Permit Issued | 03/17/2023 | 08/12/2026 | TO CHANGE THE 1ST FL. FROM A DAY CARE USE TO EATING AND DRINKING ESTABLISHMENT. INCLUDE INT. RENOVATION @ 1ST FL STORE, REPLACE STOREFRONT, … |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01410384 ↗ | 245 EAST 35 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 09/17/2026 | JOB FILED TO REPLACE EXISTING LOBBY SPLIT SYSTEM AIR CONDITIONING UNITS WITH NEW HEAT PUMP AND CEILING MOUNTED AIR CONDITIONER. NO CHANGE TO… |
| B01227819 ↗ | 19 4 PLACE BROOKLYN | Alteration | Permit Issued | 06/18/2025 | 09/10/2026 | INTERIOR ALTERATION TO EXISTING DWELLING UNIT AT FIRST AND SECOND FLOOR.WORK INCLUDES MINOR PLUMBING AND GAS WORK. NO CHANGE TO USE, EGRESS,… |
| M01451337 ↗ | 747 3 AVENUE MANHATTAN | Alteration | Permit Issued | 08/29/2026 | 09/02/2026 | APPLICATION FILED TO RENOVATE OFFICES SPACES AT FLOORS 8 & 23. WOIRK INCLUDES DEMOLITION OF EXISTING PARTITIONS AND CONSTRUCTION OF NEW INTE… |
| M00808220 ↗ | 2363 7 AVENUE MANHATTAN | Alteration | Permit Issued | 01/12/2023 | 08/19/2026 | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH JOB #:B00808220-I1. REPLACING ONE LAV, ONE WC. INSTALLING NEW: ONE LAV, O… |
| M01419029 ↗ | 270 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/03/2026 | 08/18/2026 | PLUMBING WORK TO REPLACE FIXTURES IN APARTMENT #29 AT SIXTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| B00815485 ↗ | 147 5 AVENUE BROOKLYN | Alteration CO | Permit Issued | 03/17/2023 | 08/12/2026 | TO CHANGE THE 1ST FL. FROM A DAY CARE USE TO EATING AND DRINKING ESTABLISHMENT. INCLUDE INT. RENOVATION @ 1ST FL STORE, REPLACE STOREFRONT, … |
| B01404518 ↗ | 218 LEWIS AVENUE BROOKLYN | Alteration | Permit Issued | 06/18/2026 | 08/07/2026 | APPLICATION FILED FOR PARTIAL DEMOLITION WITH WORK TO INCLUDE THE REPLACEMENT OF EXISTING TERMITE DAMAGED WOOD JOISTS, REMOVE & RE-INSTALL K… |
| M00962128 ↗ | 714 11 AVENUE MANHATTAN | Alteration | Permit Issued | 11/15/2023 | 08/06/2026 | SUBSTANTIAL REHABILITAION OF ALL RESIDENTIAL PORTIONSAT FLOORS 002-005, CELLAR AND ROOF. WORK TO INCLUDE 75% OF DHCR BUILDING SYSTEMS. NO CH… |
| B01388043 ↗ | 330 LEONARD STREET BROOKLYN | Alteration | Permit Issued | 05/04/2026 | 08/05/2026 | APPLICATION FILED TO RENOVATE EXISTING DWELLING UNIT AT SECOND FLOOR. WORK INCLUDES PARTITION WORK, NEW DOORS, LIGHTING & FINISHES THROUGHOU… |
| B01420966 ↗ | 242 RICHARDSON STREET BROOKLYN | Alteration | Permit Issued | 06/24/2026 | 07/22/2026 | APPLICATION FILED TO DISMISS VIOLATION #39156437R. WORK CONSISTS OF INSTALLATION OF FIREPROOFING GYPSUM WALLBOARD & INSULATION AT WALLS, CEI… |
| M01397049 ↗ | 115 WEST WASHINGTON PLCE MANHATTAN | Alteration CO | Filed — no permit on record | 06/03/2026 | — | — |
| M01331386 ↗ | 703 WEST 171 STREET MANHATTAN | Alteration | Permit Issued | 01/19/2026 | 05/11/2026 | JOB FILED FOR PLUMBING WORK IN CONJUNCTION WITH GC APPLICATION FOR MEDICAL OFFICE AT FIRST FLOOR. WORK INCLUDES INSTALLATION OF FIVE (5) NEW… |
| M00923824 ↗ | 616 9 AVENUE MANHATTAN | Alteration CO | Permit Issued | 11/16/2023 | 04/13/2026 | REPLACE EXISTING ROOFTOP CONDENSING UNIT WITH TWO (2) NEW ROOFTOP CONDENSING UNITS BY MITSUBISHI |
| M00532447 ↗ | 316 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 07/12/2021 | 03/10/2026 | SUBSEQUENT FILING FOR REMOVAL OF AND INSTALLATION OF NEW PLUMBING FIXTURES IN APT #2W IN CONJUNCTION WITH ALT-GC FILED UNDER DOC-I1- OF THIS… |
| M00783119 ↗ | 3841 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/15/2022 | 12/22/2025 | PLUMBING WORK IN CONJUNCTION WITH GC ALTERATIONS IN APT #2C & #4C ON FLOORS 002 & 004 FILED UNDER DOC #I1 OF THIS APPLICATION. NO CHANGE TO… |
| X01114229 ↗ | 1053 BOYNTON AVENUE BRONX | Alteration | Signed-off | 10/16/2024 | 12/11/2025 | Subsequent filing in conjunction with job #X01114229-I1. Scope to include repairing of fire damaged roof joists. Miscellaneous Facade repair… |
| B01145439 ↗ | 258 HENRY STREET BROOKLYN | Alteration CO | Permit Issued | 01/16/2025 | 12/02/2025 | APPLICATION FILED TO AMEND EXTG. C OF O TO CONVERT DOCTORS OFFICE TO DWELLING. WORK INCLUDE REMOVAL OF NON LOAD BEARING PARTITIONS, NEW PAR… |
| B01252677 ↗ | 20 MC KIBBIN COURT BROOKLYN | Alteration | Signed-off | 07/24/2025 | 11/21/2025 | Application filed to modify plumbing system with removal and installation of plumbing fixtures to resolve ECB violation#: 35482430M & 370326… |
| B01315117 ↗ | 264 6 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 11/18/2025 | — | — |
| Q01309334 ↗ | 139-55 35 AVENUE QUEENS | Alteration CO | Filed — no permit on record | 11/03/2025 | — | — |
| B01271009 ↗ | 8200 BAY PARKWAY BROOKLYN | Alteration | Signed-off | 08/18/2025 | 10/30/2025 | Subsequent application filed for installation of 56 sprinkler heads including pipe hangers through out daycare. Application filed in conjunc… |
| B00851185 ↗ | 107 DUPONT STREET BROOKLYN | Alteration | Signed-off | 06/19/2023 | 10/15/2025 | PLUMBING WORK IN CONJUNCTION WITH ALTERATION AT 2ND FLOOR DWELLING UNIT FILED UNDER DOC-I1 OF THIS APPLICATION. SCOPE INCLUDES REPLACEMENT … |
| B01236340 ↗ | 500 STAGG STREET BROOKLYN | Alteration | Permit Issued | 07/01/2025 | 10/14/2025 | MINOR RENOVATIONS OF EXISTING MANUFACTURING AREA B & C AS PER CONSTRUCTION DOCUMENTS SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00637345 ↗ | 62-29 82 PLACE QUEENS | Alteration | Permit Issued | 02/01/2022 | 09/25/2025 | APPLICATION FILED TO INSTALL DRYWELL IN THE OPEN SPACE IN CONJUNCTION WITH JOB#: 401626843 |
| M00700955 ↗ | 1392 ST NICHOLAS AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2022 | 08/15/2025 | WHITE-BOX ALTERATION OF PORTION OF COMMERCIAL SPACE TO INCLUDE NEW PARTITIONS AND DOORS, NEW DEMISING WALL, AND NEW ADA TOILET ROOM. NO FIN… |
| B01065331 ↗ | 568 MESEROLE STREET BROOKLYN | Alteration CO | Permit Issued | 08/05/2024 | 08/14/2025 | Provide new wet fire sprinkler system for spraybooth/ducts per NYC BC 2022 & NFPA 13-2016 modified by appendix Q. Provide alteration to exis… |
| B01163818 ↗ | 418 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 02/11/2025 | 08/07/2025 | INSTALL NEW PLUMBING FIXTURES ,(1)LAV.,(1) W/C,.(1) TUB,RELOCATE (1) LAV ,(1)W/C,&(1)NEW SHOWER,(1)SINK&(1)NEW DISHWASHER AND (1) NEW ELECTR… |
| B01157093 ↗ | 1068 HANCOCK STREET BROOKLYN | Alteration | Signed-off | 12/19/2024 | 07/14/2025 | APPLICATION FILED FOR INTERIOR ALTERATION OF EXISTNG 2 DWELLING UNITS, FIRST & SECOND FLOORS. WORK INCLUDES DEMOLITION OF NON-LOAD BEARING P… |
| X01231908 ↗ | 261 EAST BURNSIDE AVENUE BRONX | Alteration CO | Filed — no permit on record | 06/06/2025 | — | — |
| B00930007 ↗ | 942 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 12/07/2023 | 05/22/2025 | CONVERT EXISTING DAYCARE AT FIRST FLOOR TO RETAIL SPACE. MINOR ALTERATION WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. |
| Q01158184 ↗ | 50-09 2 STREET QUEENS | Alteration | Signed-off | 01/22/2025 | 05/02/2025 | MINOR PLUMBING WORK IN CONJUNCTION WITH AN EXISTING DAYCARE EXPANSION AT FIRST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B01192571 ↗ | 210 FROST STREET BROOKLYN | Alteration | Signed-off | 03/27/2025 | 04/08/2025 | Application filed to remove first floor window and replace with door and install new non-combustible exterior stair and landing. No change t… |
| B00848195 ↗ | 49 WITHERS STREET BROOKLYN | Alteration | Permit Issued | 04/06/2023 | 03/11/2025 | Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in… |
| B00541066 ↗ | 8867 17 AVENUE BROOKLYN | Alteration | Permit Issued | 06/17/2021 | 02/27/2025 | EXTEND EXISTING REAR ROOF BALCONY IN EFFORTS TO RESCIND VIOLATION NUMBER 35507610H. NO CHANGE IN USE, EGRESS, BULK, AND/OR OCCUPANCY. |
| Q00760932 ↗ | 36-25 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 07/14/2022 | 02/13/2025 | REPLACEMENT OF GAS DRYERS IN EXISTING TENANT LAUNDRY ROOM LISTED ON CO#402289769F. NEW MECHANICAL EXHAUST AND FRESH AIR INTAKE. NO CHANGE … |
| B01061924 ↗ | 43 POWERS STREET BROOKLYN | Alteration | Signed-off | 09/24/2024 | 01/31/2025 | WOOD ROOF TO BE RAISED AND HIGHER WALLS OF EXISTING THIRD FLOOR, TO INCREASE THE FLOOR AREA OF EXISTING TWO FAMILY DWELLING. NO CHANGE TO U… |
| B00962823 ↗ | 212 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 12/20/2023 | 01/30/2025 | FILING APPLICATION IN CONJUNCTION WITH ALT 1 #320982852 - TO REGISTER OF FIRST MULTIPLE DWELLING BOILER. NO WORK TO BE PREFORMED UNDER THI… |
| B01161308 ↗ | 331 EAST 88 STREET BROOKLYN | Alteration | Signed-off | 01/06/2025 | 01/24/2025 | Application filed replace ex. gas manifold and branch piping to 1 existing and 5 new suspended gas heaters for multi-tenant warehouse. No ch… |
| M01106912 ↗ | 744 9 AVENUE MANHATTAN | Alteration | Permit Issued | 09/10/2024 | 12/20/2024 | SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUNCTION WITH GC APPLICATION # M01106912-I1. WORK INCLUDE RELOCATE, REPLACE AND INSTALL KITCH… |
| B01114349 ↗ | 365 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 09/26/2024 | 12/09/2024 | NEW PLUMBING FIXTURES(1) LAV.,(1) TUB,(1)W/C,(1) SINK,&(1) DISHWASHER |
| M00269763 ↗ | 133 WEST 71 STREET MANHATTAN | Alteration | Permit Issued | 12/16/2019 | 12/06/2024 | PROPOSED ACCESSORY TENANT LAUNDRY AT CELLAR FLOOR. SCOPE TO INCLUDE MINOR INTERIOR RENOVATION. ALSO FILING TO ADDRESS VIOLATIONS. NO CHANGE … |
| M01090197 ↗ | 1781 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 10/08/2024 | 11/25/2024 | MISCELLANEOUS FLOOR REPAIRS AT LIVING ROOM IN APARTMENT 6K IN ORDER TO CURE VIOLATION # 34937701R. |
| B00891032 ↗ | 611 MANHATTAN AVENUE BROOKLYN | Alteration | Signed-off | 06/27/2023 | 11/13/2024 | Application filed to install one VRF system for space conditioning with work to relocate existing toilet fan, install electric ovens. Job fi… |
| Q01071362 ↗ | 37-08 103 STREET QUEENS | Alteration | Signed-off | 07/30/2024 | 11/06/2024 | NEW EXTERIOR ADA RAMP - ACCESSIBILITY |
| M00575846 ↗ | 370 MANHATTAN AVENUE MANHATTAN | Alteration CO | Permit Issued | 02/03/2022 | 10/25/2024 | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH RENOVATIONS AT CELLAR AND FLOORS 004 THRU 006. OBTAIN NEW CERTIFICATE OF OCCUPANCY U… |
| B01074199 ↗ | 43 POWERS STREET BROOKLYN | Alteration | Signed-off | 07/12/2024 | 10/24/2024 | REPAIR EXISTING UNCONDITIONED STORAGE SHED IN REAR YARD, WORK INCLUDES ROOFING, PATCH SLAB, AND CEMENT BOARDS INTERIOR FINISHES, NO CHANGE… |
| Q00545023 ↗ | 84-09 35 AVENUE QUEENS | Alteration CO | Permit Issued | 09/27/2021 | 10/01/2024 | INTERIOR ALTERATIONS TO SPLIT APT# 1E INTO TWO (2) CLASS ADWELLING UNITS AT FLOOR 001. SCOPE INCLUDES NEW PARTITIONS, NEW LIGHTING, AND NEW… |
| B08010228 ↗ | 400 RUGBY ROAD BROOKLYN | Alteration | Permit Issued | 10/18/2022 | 09/30/2024 | SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUNCTION WITH GC APPLICATION# B08010228-I1. WORK TO INCLUDE REPLACMENT OF EXISTING BATHROOM & KI… |
| B00978958 ↗ | 88 SOUTH 4 STREET BROOKLYN | Alteration | Signed-off | 01/31/2024 | 09/10/2024 | FACADE REPAIRS AT FRONT FACADE ON S4TH STREET SIDE ONLY AS PER PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B00959009 ↗ | 921 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 11/15/2023 | 08/19/2024 | Plumbing work filed to relocate existing gas meter & replace a portion of exiting gas piping from lot line to relocated gas meter & from rel… |
| B00832553 ↗ | 271 CORNELIA STREET BROOKLYN | Alteration | Signed-off | 02/27/2023 | 08/06/2024 | Subsequent application filed in conjunction with gc for plumbing work. No change to work, egress nor occupancy. |
| M00731591 ↗ | 200 WEST 119 STREET MANHATTAN | Alteration | Signed-off | 05/19/2022 | 08/05/2024 | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALTERATION OF EXISTING DWELLING UNIT IN CELLAR. SCOPE INCLUDES REPLACEMENT/RELOCATI… |
| B01029612 ↗ | 5616 5 AVENUE BROOKLYN | Alteration | Signed-off | 04/25/2024 | 07/24/2024 | INSTALL 1ST FLOOR KITCHEN HOOD, FAN AND RELATED DUCTWORK.. NO CHANGE IN USE , EGRESS, OR OCCUPANCY UNDER THIS APPALICATION. |
| M01045564 ↗ | 208 SPRING STREET MANHATTAN | Alteration | Signed-off | 06/03/2024 | 07/02/2024 | REPLACE BOILER AND BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. GAS PLUMBING WORK FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN US… |
| B00827561 ↗ | 1508 EAST 17 STREET BROOKLYN | Alteration | Signed-off | 02/16/2023 | 06/10/2024 | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH BUILDING RENOVATION JOB #: B00827561-I1. RELOCATING BOTH EXISTING KITCHEN… |
| B00694777 ↗ | 247 NASSAU AVENUE BROOKLYN | Alteration CO | Permit Issued | 05/19/2022 | 06/07/2024 | Subsequent application filed for plumbing and sprinkler work in conjunction with A1 |
| B00880275 ↗ | 155 QUINCY STREET BROOKLYN | Alteration | Signed-off | 05/31/2023 | 05/21/2024 | Application filed to install cellar temp. shoring to facilitate partial demolition while replacing existing 1st flr. floor joist at cellar. … |
| Q08027314 ↗ | 17-48 TROUTMAN STREET QUEENS | Alteration | Signed-off | 12/12/2022 | 05/21/2024 | Install 5 new sprinkler heads off the domestic main and cap one existing. One sprinkler head to remain in existing boiler room for a total … |
| B00969225 ↗ | 1801 DORCHESTER ROAD BROOKLYN | Alteration | Signed-off | 12/01/2023 | 05/07/2024 | RENOVATE EXISTING LAUNDRY ROOM. SCOPE INCLUDES NEW FLOOR, CEILING FINISHES AND NEW MECHANICAL EXHAUST FOR GAS DRYERS. PLUMBING FILED AS A S… |
| X00971480 ↗ | 495 CLAREMONT PARKWAY BRONX | Alteration | Signed-off | 01/19/2024 | 03/05/2024 | PLUMBING WORK IN CONJUNCTION WITH FIRE DAMAGE IN REAR DWELLINGS. PLUMBING WORK LIMITED TO REPLACEMENT OF FIXTURES IN APTS 3D & 4D ON FLOORS… |
| B00609563 ↗ | 138 5 AVENUE BROOKLYN | Alteration | Signed-off | 11/15/2021 | 02/26/2024 | THE NEW KITCHEN HOOD AND CONNECTION TO THE EXISTING EXHAUST HOOD SYSTEM |
| B07995959 ↗ | 100 OCEAN PARKWAY BROOKLYN | Alteration | Permit Issued | 12/08/2022 | 02/23/2024 | MINOR INTERIOR RENOVATION OF EXISTING ACCESSORY TENNANT LAUDRY AT GROUND FLOOR. SCOPE INCLUDES NEW MECHANICAL EXHAUST TO EXTERIOR. NO CHAN… |
| B00866668 ↗ | 20 MONROE PLACE BROOKLYN | Alteration CO | Permit Issued | 08/23/2023 | 01/04/2024 | APPLICATION FILED TO AMEND EXISTING CO TO CHANGE BASEMENT THROUGH SECOND FLOOR TRIPLEX TO BASEMENT AND 1st FLOOR DUPLEX AND SECOND FLOOR SI… |
| B00955376 ↗ | 275 4 AVENUE BROOKLYN | Alteration | Signed-off | 11/06/2023 | 12/20/2023 | PLUMBING WORK IN CONJUNCTION WITH INTERIOR BUILD-OUT OF PHYSICAL THERAPY SPACE. SCOPE INCLUDES NEW ADA BATHROOM. NO CHANGE TO USE, EGRESS,… |
| B00521232 ↗ | 589 METROPOLITAN AVENUE BROOKLYN | Alteration | Signed-off | 05/26/2021 | 11/08/2023 | APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH HORIZONTAL ENLARGEMENT AS PER PLAN. NO CHANGE TO USE, EGRESS NOR OCCUPANCY. |
| Q00931892 ↗ | 150-65 116 AVENUE QUEENS | Alteration | Signed-off | 10/04/2023 | 11/03/2023 | RENOVATION OF EXISTING DETACHED 1-STY MASONRY GARAGE IN ORDER TO DISMISS VIOLATION# 39076069M. SCOPE INCLUDES REPLACEMENT OF GARAGE ROOF, IN… |
| M00781717 ↗ | 112 WEST 138 STREET MANHATTAN | Alteration | Permit Issued | 08/09/2022 | 10/25/2023 | RENOVATE EXISTING APT.3F,3RD FLOOR,WORK TO INCLUDE NEW KITCHEN AND BATH ROOM FINISHES,NO CHANGE TO EGRESS NOR OCCUPANCY |
| B00884139 ↗ | 224 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 06/18/2023 | 10/19/2023 | Application filed to reconfigure apartments 2L and 2R with work to include relocation of apartment demising wall, apartment entrance door an… |
| M08055422 ↗ | 208 SPRING STREET MANHATTAN | Alteration | Permit Issued | 02/09/2023 | 10/02/2023 | FILING FOR GAS TEST AT FIRST FLOOR AND CELLAR EATING AND DRINKING ESTABLISHMENT IN ORDER TO UNLOCK GAS METER AND RESTORE GAS SERVICE. NO CHA… |
| B08042090 ↗ | 100 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 12/08/2022 | 09/25/2023 | RENOVATION OF EXISTING ACCESSORY TENANT LAUNDRY ROOMS AT GROUND FLOOR. SCOPE TO INCLUDE INSTALLATION OF (2) NEW SPRINKLER HEADS, (2) NEW FLO… |
| M00924439 ↗ | 106 CONVENT AVENUE MANHATTAN | Alteration | Filed — no permit on record | 09/25/2023 | — | — |
| B00791838 ↗ | 1151 EAST 10 STREET BROOKLYN | Alteration | Signed-off | 08/18/2022 | 09/20/2023 | WORK TO INCLUDE NEW PARTITONS, REPLACEMENT WINDOWS & DOORS, NEW SUB & FINISHED FLOOR & CEILING, MISC. CABINETRY & COUNTERS, NEW MOISTURE BA… |
| B00521216 ↗ | 589 METROPOLITAN AVENUE BROOKLYN | Alteration | Signed-off | 05/26/2021 | 09/14/2023 | APPLICATION FILED TO REMOVE ALL NON-LOAD BEARING PARTITONS FROM CELLAR, FIRST & SECOND FLOORS. NO CHANGE TO USE EGRESS NOR OCCUPANCY |
| Q08052388 ↗ | 65-48 GRAND AVENUE QUEENS | Alteration | Signed-off | 02/24/2023 | 09/01/2023 | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATION JOB #: Q08052388-I1. REPLACING THREE LAV, THREE WC, … |
| B00896340 ↗ | 150 HICKS STREET BROOKLYN | Alteration | Signed-off | 07/10/2023 | 08/22/2023 | Application filed for plumbing work in conjunction with OT apartment renovation filed and permitted under job# 321959387. Work too include r… |
| Q00903422 ↗ | 97-17 37 AVENUE QUEENS | Alteration | Permit Issued | 07/21/2023 | 08/18/2023 | INTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT AT FIRST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| X00610498 ↗ | 95 WEST 195 STREET BRONX | Alteration | Signed-off | 10/18/2021 | 08/18/2023 | FILING TO DISMISS WWP VIOLATIONS 39032187Z; 35526096H; 35530152P; 35534039L LINKED TO APARTMENT 2A. INTERIOR RENOVATION CONSISTING IN PLUMBI… |
| B00854929 ↗ | 77 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 04/04/2023 | 08/03/2023 | FILING FOR PLUMBING WORK IN CONJUNCTION WITH APPROVED D.O.B.# B00854929-I1 |
| B00814907 ↗ | 267 MANHATTAN AVENUE BROOKLYN | Alteration | Signed-off | 02/14/2023 | 08/02/2023 | INTERIOR ALTERATIONS OF EXISTING DWELLING UNIT AT FIRST FLOOR. SCOPE INCLUDES MINOR DEMO, NEW PARTITIONS, DOORS, WINDOWS & NEW FINISHES. PLU… |
| B00886005 ↗ | 1801 DORCHESTER ROAD BROOKLYN | Alteration | Filed — no permit on record | 08/01/2023 | — | — |
| B00880312 ↗ | 39 TURNER PLACE BROOKLYN | Alteration | Signed-off | 07/03/2023 | 07/25/2023 | MISC. WHITE BOX RENOVATION OF SIX (6) EXISTING STORE(S) ON FIRST FLOOR, DEMOLITION OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND FINISHES… |
| Q00813470 ↗ | 48-81 MASPETH AVENUE QUEENS | Alteration CO | Permit Issued | 01/23/2023 | 07/06/2023 | APPLICATION FILED TO CONVERT EXISTING OFFICES TO SALES OFFICES FOR AUTO VEHICLES OPEN OR ENCLOSED AND ACCESSORY USES. WORK TO INCLUDE MISC.… |
| B00873199 ↗ | 356 ST JOHNS PLACE BROOKLYN | Alteration | Permit Issued | 05/23/2023 | 07/05/2023 | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATION JOB # B00873199-I1. SCOPE TO INCLUDE REPLACEMENT OF… |
| X00581323 ↗ | 95 WEST 195 STREET BRONX | Alteration | Signed-off | 09/27/2021 | 06/29/2023 | SUBSEQUENT FILING IN CONJUNCTION WITH LEGALIZATION WORK FILED UNDER DOC-#I1 FOR APT#2A AT 2ND FLOOR. ALL GC WORK AND JOBS COSTS SHOWN AND I… |
| B08036576 ↗ | 928 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 11/10/2022 | 06/27/2023 | Application filed to renovate existing commercial store with work to include removal of ex. partition, new partitions, bar, exterior door wi… |
| B08013431 ↗ | 513 CHAUNCEY STREET BROOKLYN | Alteration | Signed-off | 01/18/2023 | 06/06/2023 | PROPOSED MECHANICAL SYSTEMS FILED IN CONJUNCTION WITH ALT 1 APPLICATION #B07995063-I1 CONVERTING EXISTING THREE(3) DWELLING UNITS TO SIX(6)… |
| B08049217 ↗ | 183 CONGRESS STREET BROOKLYN | Alteration | Signed-off | 12/31/2022 | 05/16/2023 | Application filed for PL work in apt. 3F, 3rd flr to cap & remove existing lav, wc, tub & res. sink & install new lav, wc, tub, res. sink & … |
| B08020685 ↗ | 77 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 12/22/2022 | 05/03/2023 | FILING SUBSEQUENT FOR PLUMBING IN CONJUNCTION WITH THE APPROVED ALT.2 ,JOB NO.B08020685-I APARTMENT RENOVATIONS (4A),4TH FLOOR,WORK TO INCL… |
| X00845117 ↗ | 162 WEST 165 STREET BRONX | Alteration | Signed-off | 03/31/2023 | 05/03/2023 | APPLICATION FILED FOR APARTMENT RENOVATION IN APTS#4C & 5C, 4TH & 5TH FLOOR, DUE TO FIRE AND WATER DAMAGE AND REMOVE DOB VIOLATION #VIO23-00… |
| X00822818 ↗ | 95 WEST 195 STREET BRONX | Alteration | Filed — no permit on record | 05/02/2023 | — | — |
| M00646950 ↗ | 337 WEST 21 STREET MANHATTAN | Alteration | Signed-off | 05/18/2022 | 05/01/2023 | ELECTRICAL UPGRADE OF EXISTING BUILDING. RELOCATE ELECTRICAL METER ROOM IN CELLAR. MINOR CARPENTRY WORK & FIRESTOPPING ALL APTS. ELECTRIC… |
| B00813375 ↗ | 709 HUMBOLDT STREET BROOKLYN | Alteration | Signed-off | 01/18/2023 | 04/13/2023 | Application filed to install new exterior non-combustible stair and modify existing first floor window to create new door opening and instal… |
| B00768008 ↗ | 201 NASSAU AVENUE BROOKLYN | Alteration | Signed-off | 07/06/2022 | 04/10/2023 | Renovation of existing residential building portion with work to include new accessory stair (at cellar to first), partitions, finished floo… |
| B00819526 ↗ | 320 LINCOLN PLACE BROOKLYN | Alteration | Signed-off | 02/01/2023 | 04/04/2023 | INTERIOR ALTERATIONS TO DUPLEX APARTMENT E & 1E. SCOPE INCLUDES PARTIAL DEMOLITION OF NON-LOAD BEARING PARTITIONS, INSTALLMENT OF NEW METAL… |
| M00741158 ↗ | 884 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 05/19/2022 | 04/04/2023 | INSTALLATION OF NEW ADA COMPLAINT RAMP AT MAIN BUILDING ENTRY. NO CHANGE TO BUILDING ENVELOPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER T… |
| B00840124 ↗ | 418 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 03/14/2023 | 03/29/2023 | MINOR PLUMBING WORK IN CONJUNCTION WITH DOC-I1 OF THIS FILING TO SPLIT AN EXISTING BATHROOM INTO TWO (2) IN APT #5C AT FLOOR 005. SCOPE LIM… |
| Q00634587 ↗ | 2218 HARMAN STREET QUEENS | Alteration CO | Permit Issued | 12/16/2021 | 03/29/2023 | EXISTING TWO FAMILY TO BE HORIZONTALLY ENLARGED ABOVE NEW GARAGE (SEE COMMENTS). INCORPORATE APPROVED NB PLANS#420361977 AND ALL REQUIRED T… |
| M08016197 ↗ | 605 WEST 141 STREET MANHATTAN | Alteration | Permit Issued | 12/23/2022 | 03/21/2023 | SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUNCTION WITH GC APPLICATION# M08016197-I1. WORK TO INCLUDE THE CAP & REMOVAL OF BATHROOM FIXTU… |
| B00537283 ↗ | 31 ORIENT AVENUE BROOKLYN | Alteration | Permit Issued | 06/23/2021 | 03/06/2023 | APPLICATION FILED TO INSTALL TEMPORARY WOOD CROSS BRACE SHORING IN SUPPORT OF PARTIAL DEMOLITION WORK FILED UNDER GUT/REHAB JOB # B00537283.… |
| B00764504 ↗ | 224 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 07/08/2022 | 02/14/2023 | Application filed to relocate demising wall of apartment 3l. Work to include demolition of non-load bearing partitions, miscellaneous partit… |
| Name | Jobs together | Most recent |
|---|---|---|
| STEEL CORE ENGINEERING PLLC | 7 | 06/15/2026 |
| CHANDA ENGINEERING CONSULTANT PC | 5 | 06/25/2024 |
| A&M CONSULTING | 4 | 04/25/2023 |
| AK ENGINEERING, PC | 4 | 02/02/2022 |
| SPARK ENGINEERING | 2 | 06/19/2025 |
| GREGORY V. PEROTTO, P.E. | 1 | 06/03/2024 |
| IAN M PENDLETON | 1 | 12/09/2024 |
| JBM AND ASSOCIATES | 1 | 03/13/2025 |
| KELLEY DESIGN | 1 | 09/01/2023 |
| L & C ASSOCIATES | 1 | 01/18/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| R&R CONTRACTING MGMT CORP | 12 | 01/13/2023 |
| ALL PRO PLBG & HTG INC | 7 | 07/20/2023 |
| ZCB RENOVATION CORP | 7 | 12/23/2025 |
| BOXWOOD CONSTRUCTION LLC | 6 | 01/27/2026 |
| ARANDA PLBG & HTG CORP | 5 | 11/09/2023 |
| CARDER CONSTRUCTION CORP | 5 | 06/04/2026 |
| FRANK TROMBETTA & SONS CO | 5 | 12/23/2025 |
| FREDD & H CONSTRUCION COR | 5 | 02/01/2023 |
| INTEGRAL CONSTRUCTION ONE | 5 | 12/24/2025 |
| ADAM B. CONTTRACTING INC | 4 | 06/18/2024 |
| B-EZ PLUMBING & HTG CORP | 4 | 07/30/2024 |
| BEST NY CONTRACTING INC | 4 | 10/08/2024 |
| CONTRACTING NYC LLC | 4 | 06/18/2026 |
| MODERN SERVICES SOLUTIONS | 4 | 12/10/2019 |
| RUIZ HOME REMODELING & DE | 4 | 02/20/2024 |
| SIGNORE & SONS PLBG CORP | 4 | 03/29/2024 |
| ZONE PLUMBING & HEATING C | 4 | 06/18/2025 |
| ADVANCED P,MECH & SPRK CO | 3 | 02/20/2024 |
| BEACH LANE MANAGEMENT INC | 3 | 07/13/2022 |
| CAPE PLUMBING INC | 3 | 08/25/2023 |
| HAY MECHANICAL SOLUTIONS | 3 | 07/13/2022 |
| JOHN HLAD P & H CO., INC | 3 | 03/27/2025 |
| PHILIP TOSCANO | 3 | 01/23/2023 |
| S & J INDUSTRIAL CORP | 3 | 08/03/2023 |
| SAMUEL & SONS P & H INC | 3 | 07/20/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| ORENCOGROUP | 17 | 01/13/2023 |
| BLANK PROPERTY GROUP | 10 | 06/18/2024 |
| SUCCESSFUL MANAGEMENT CORP | 9 | 07/20/2023 |
| CYA MANAGEMENT | 8 | 05/31/2024 |
| OAK TREE MANAGEMENT | 7 | 07/09/2026 |
| HART ST APARTMENTS LLC | 6 | 09/04/2024 |
| JLP METRO MANAGEMENT INC. | 5 | 11/23/2022 |
| MANAGEMENT | 5 | 06/04/2026 |
| BEACH LANE MANAGEMENT | 4 | 07/13/2022 |
| EMPIRE TRANSIT MIX INC | 4 | 01/27/2026 |
| MGIK Management | 4 | 02/20/2024 |
| RUMAL REALTY CO;INC. | 3 | 04/25/2023 |
| WESTLEIGH CO. LLC | 3 | 10/26/2022 |
| YANKEE MANAGEMENT COMPANY INC. | 3 | 03/27/2025 |
| 111 WOODBINE QOZB PARTNERS, LLC | 1 | 01/18/2023 |
| 18 KESE LLC | 1 | 06/09/2022 |
| 184 ASSOCIATES LLC C/O ABS P | 1 | 03/05/2020 |
| 31 CAPITAL LLC | 1 | 08/19/2022 |
| ADAM AMERICA REAL ESTATE | 1 | 11/06/2023 |
| ALEXANDER WOLF & CO. | 1 | 06/10/2026 |
| BUILTDIFFERENTBK@GMAIL.COM | 1 | 05/02/2023 |
| CHESS BUILDERS LLC | 1 | 08/12/2025 |
| CITIAPTS | 1 | 06/01/2022 |
| DAFNONAS ESTATES LTD | 1 | 06/25/2024 |
| FIFTH AVE COMMITTEE INC | 1 | 07/23/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| DANA TREZZA | 130 | 08/27/2026 |
| STEVEN B. RABINOFF ARCHITECT | 1 | 09/01/2023 |
| T SQUARE GROUP, LLC | 1 | 07/08/2022 |
| THE PEROTTO GROUP | 1 | 06/03/2024 |
| WM ARCH CORP | 1 | 01/18/2023 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/31/2026 | Fire-Resistant Penetrations and Joints | 747 3 AVENUE | PHILIP TOSCANO | special |
| 08/28/2026 | Fire-Resistant Penetrations and Joints | 747 3 AVENUE | PHILIP TOSCANO | special |
| 08/28/2026 | Energy Code Compliance Inspections | 747 3 AVENUE | PHILIP TOSCANO | progress |
| 08/28/2026 | Fire-Resistance Rated Construction | 747 3 AVENUE | PHILIP TOSCANO | progress |
| 08/28/2026 | Interior lighting power | 747 3 AVENUE | PHILIP TOSCANO | energy_progress |
| 08/28/2026 | Lighting controls | 747 3 AVENUE | PHILIP TOSCANO | energy_progress |
| 08/26/2026 | Final | 747 3 AVENUE | CHRISTINA TOSCANO | progress |
| 08/11/2026 | HVAC-R and service water piping design and insulation | 115 WEST WASHINGTON PLCE | PHILIP TOSCANO | energy_progress |
| 08/05/2026 | Energy Code Compliance Inspections | 270 AVENUE OF THE AMER | PHILIP TOSCANO | progress |
| 08/05/2026 | Tenant Protection Plan Compliance | 270 AVENUE OF THE AMER | Nazzareno Callipo | special |
| 08/05/2026 | Fire-Resistant Penetrations and Joints | 270 AVENUE OF THE AMER | PHILIP TOSCANO | special |
| 08/04/2026 | HVAC-R and service water heating system controls | 714 11 AVENUE | PHILIP TOSCANO | energy_progress |
| 08/04/2026 | HVAC-R and service water heating equipment | 714 11 AVENUE | PHILIP TOSCANO | energy_progress |
| 08/04/2026 | Maintenance information | 714 11 AVENUE | PHILIP TOSCANO | energy_progress |
| 08/04/2026 | HVAC-R and service water piping design and insulation | 714 11 AVENUE | PHILIP TOSCANO | energy_progress |
| 08/04/2026 | Heating Systems | 714 11 AVENUE | PHILIP TOSCANO | special |
| 08/03/2026 | Tenant Protection Plan Compliance | 147 5 AVENUE | — | special |
| 08/03/2026 | Sprinkler Systems | 147 5 AVENUE | PHILIP TOSCANO | special |
| 08/03/2026 | Energy Code Compliance Inspections | 147 5 AVENUE | PHILIP TOSCANO | progress |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | 264 6 AVENUE | PHILIP TOSCANO | special |
| 07/31/2026 | Tenant Protection Plan Compliance | 264 6 AVENUE | — | special |
| 07/31/2026 | Fire-Resistance Rated Construction | 264 6 AVENUE | PHILIP TOSCANO | progress |
| 07/31/2026 | Insulation placement and R values | 264 6 AVENUE | PHILIP TOSCANO | energy_progress |
| 07/31/2026 | Fenestration and door U-factor and product ratings | 264 6 AVENUE | PHILIP TOSCANO | energy_progress |
| 07/31/2026 | Lighting in dwelling units | 264 6 AVENUE | PHILIP TOSCANO | energy_progress |
| 07/28/2026 | Energy Code Compliance Inspections | 115 WEST WASHINGTON PLCE | PHILIP TOSCANO | progress |
| 07/28/2026 | Tenant Protection Plan Compliance | 115 WEST WASHINGTON PLCE | — | special |
| 07/28/2026 | Fire-Resistant Penetrations and Joints | 115 WEST WASHINGTON PLCE | PHILIP TOSCANO | special |
| 07/23/2026 | Tenant Protection Plan Compliance | 147 5 AVENUE | — | special |
| 07/22/2026 | Energy Code Compliance Inspections | 270 AVENUE OF THE AMER | PHILIP TOSCANO | progress |
| 07/22/2026 | Tenant Protection Plan Compliance | 270 AVENUE OF THE AMER | Nazzareno Callipo | special |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | 270 AVENUE OF THE AMER | PHILIP TOSCANO | special |
| 07/09/2026 | Sprinkler Systems | 147 5 AVENUE | PHILIP TOSCANO | special |
| 07/09/2026 | Energy Code Compliance Inspections | 147 5 AVENUE | PHILIP TOSCANO | progress |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | 139-55 35 AVENUE | PHILIP TOSCANO | special |
| 07/06/2026 | Tenant Protection Plan Compliance | 139-55 35 AVENUE | — | special |
| 07/06/2026 | Energy Code Compliance Inspections | 139-55 35 AVENUE | PHILIP TOSCANO | progress |
| 07/06/2026 | HVAC-R and service water piping design and insulation | 139-55 35 AVENUE | PHILIP TOSCANO | energy_progress |
| 06/09/2026 | Sprinkler Systems | 139-55 35 AVENUE | PHILIP TOSCANO | special |
| 06/08/2026 | Tenant Protection Plan Compliance | 245 EAST 35 STREET | ARIEL GOLSHAN | special |
| 06/08/2026 | Energy Code Compliance Inspections | 245 EAST 35 STREET | PHILIP TOSCANO | progress |
| 06/08/2026 | HVAC-R and service water piping design and insulation | 245 EAST 35 STREET | PHILIP TOSCANO | energy_progress |
| 06/08/2026 | HVAC-R and service water heating system controls | 245 EAST 35 STREET | PHILIP TOSCANO | energy_progress |
| 06/08/2026 | HVAC-R and service water heating equipment | 245 EAST 35 STREET | PHILIP TOSCANO | energy_progress |
| 06/01/2026 | Final | 245 EAST 35 STREET | CHRISTINA TOSCANO | progress |
| 06/01/2026 | Mechanical Systems | 245 EAST 35 STREET | PHILIP TOSCANO | special |
| 06/01/2026 | Fenestration air leakage | 258 HENRY STREET | PHILIP TOSCANO | energy_progress |
| 06/01/2026 | Lighting controls | 258 HENRY STREET | PHILIP TOSCANO | energy_progress |
| 06/01/2026 | Exterior lighting power | 258 HENRY STREET | PHILIP TOSCANO | energy_progress |
| 06/01/2026 | Interior lighting power | 258 HENRY STREET | PHILIP TOSCANO | energy_progress |