Zoned residential, not Manhattan
107 SOUTH 3 STREET
BROOKLYN · Williamsburg · BIN 3063105
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: 107 SOUTH 3RD LLC · 2,250 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof97p · 2 filings · 20 docs
Penthouse113p · 1 filing · 20 docs
Floor 4112p · 1 filing · 20 docs
Floor 3109p · 1 filing · 20 docs
Floor 2109p · 1 filing · 20 docs
Floor 1118p · 2 filings · 20 docs
Cellar124p · 1 filing · 20 docs
Site & exterior13p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
107 S 3RD4907/08/2026
NEW AMERICAN CONSTRUCTION INC1407/08/2026
HPD504/09/2026
WATERFRONT PROPERTY MANAGEMENT403/22/2026
HOUSING PRESERVATION DEVELOPME203/21/2026
CS MANAGEMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/01/2023$12K—— → —— not available
12/21/2021$1.4M—C & YSW LLC → 107 SOUTH 3RD STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT1701/22/2026
MJE PROFESSIONAL SERVICES306/05/2024
KNF SERVICES CROP107/20/2021
HIRANI ENGINEERING AND LAND SURVEYI107/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
BMG GROUP USA1103/21/2026
ADVANCED BUILDERS SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION BUILD USA INCGeneral Contractor1407/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor907/08/2026
GRANITE ENVIRONMENT, LLCGeneral Contractor303/21/2026
WATERFRONT PROPERTY MGMTGeneral Contractor303/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616201/22/2026
ENGINEERING CONSULTING SE20501211/04/2025
Building Lifecycle
All (154)Filed (22)Permit Issued (19)Signed Off (15)Violation (56)Inspection (12)Special Inspection (30)
03/31/2026
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-I1
01/27/2026
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S1
01/22/2026
Filed — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-P7
01/14/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
01/14/2026
Special inspection requirement — Final
FAHAD FATEH
01/14/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
01/14/2026
Special inspection requirement — Footing and Foundation
FAHAD FATEH
01/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
12/05/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S4
12/05/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S5
11/14/2025
Special inspection requirement — Metering
PAUL MARINO
11/14/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
11/14/2025
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
11/14/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/14/2025
Special inspection requirement — Air barrier — testing
PAUL MARINO
11/14/2025
Special inspection requirement — Lighting controls
PAUL MARINO
11/14/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
11/14/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
11/14/2025
Special inspection requirement — Insulation placement and R values
PAUL MARINO
11/14/2025
Special inspection requirement — Exterior lighting power
PAUL MARINO
11/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
11/14/2025
Special inspection requirement — Interior lighting power
PAUL MARINO
11/14/2025
Special inspection requirement — Maintenance information
PAUL MARINO
11/14/2025
Special inspection requirement — Protection of exposed foundation insulation
PAUL MARINO
11/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
11/04/2025
Filed — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-P6
11/04/2025
Special inspection requirement — Air barrier — testing
PAUL MARINO
11/04/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/04/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/04/2025
Special inspection requirement — Maintenance information
PAUL MARINO
11/04/2025
Special inspection requirement — Metering
PAUL MARINO
11/04/2025
Special inspection requirement — Lighting controls
PAUL MARINO
11/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
11/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
11/04/2025
Special inspection requirement — Interior lighting power
PAUL MARINO
10/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2025
Permit issued — Sprinklers
B00739268-S4-EW-SP
09/05/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/22/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S6
08/22/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S7
08/22/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S3
08/21/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S2
08/06/2025
Filed — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-P5
07/03/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S8
07/03/2025
Signed off — New Building
Sprinkler application filed subsequent to NB GC, job number: B00739268-I1.
B00739268-S9
06/20/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
B01030417-I1
06/20/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01030413-I1
06/20/2025
Signed off — Alteration
B01030411-I1
06/05/2025
Violation issued (ECB, closed)
Construction
06/05/2025
Violation issued (ECB, closed)
Construction
05/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2025
Permit issued — Supported Scaffold
B01030413-I1-SF
05/07/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL09/05/2025
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION05/15/2025
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION05/02/2025
DOB NOWGeneral ConstructionPermit IssuedPRECISION BUILD USA INC03/21/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS08/19/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/19/2024
DOB NOWGeneral ConstructionPermit IssuedPRECISION BUILD USA INC08/01/2024
DOB NOWSupport of ExcavationSigned-offPRECISION BUILD USA INC07/16/2024
DOB NOWStructuralSigned-offPRECISION BUILD USA INC07/16/2024
DOB NOWMechanical SystemsSigned-offPRECISION BUILD USA INC07/16/2024
DOB NOWFoundationSigned-offPRECISION BUILD USA INC07/10/2024
DOB NOWFoundationSigned-offPRECISION BUILD USA INC06/28/2024
DOB NOWConstruction FenceSigned-offPRECISION BUILD USA INC06/26/2024
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION06/13/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION05/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMERICAN CONSTRUCTION05/31/2024
DOB NOWEarth WorkPermit IssuedWATERFRONT PROPERTY MGMT06/15/2022
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR08/13/2021
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC07/06/2021
BIS—ISSUEDGRANITE ENVIRONMENT, LLC08/20/2021
BISEQISSUEDGRANITE ENVIRONMENT, LLC08/13/2021
1 project · most recent 01/22/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/22/2026Permit IssuedPRECISION BUILD USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin Daikin - 3MXM24AVJU9 18,000 BTU · Condensing Unit ×4
Daikin - 4MXM36AVJU9 36,000 BTU · Condensing Unit ×4
Daikin - 2MXM18AVJU9 Daikin - RFK18BVJU9 18,000 BTU · Vrf Outdoor ×1
7 projects · most recent 12/08/2025
General Wiring
FiledStatusContractorScope
12/08/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
07/11/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
06/07/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
06/07/2024CompleteHIVOLTS ELECTRICAL INC—
04/22/2024CompleteRICHARD NEU—
06/15/2022CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/10/2021CompleteK.N.C ELECTRIC INC—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/05/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
01/14/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
01/14/2026Subgrade InspectionsFAHAD FATEHspecial
01/14/2026Subsurface Investigations (Borings/Test Pits)Daniel Bossspecial
01/14/2026FinalFAHAD FATEHprogress
01/14/2026Footing and FoundationFAHAD FATEHprogress
11/14/2025Maintenance informationPAUL MARINOenergy_progress
11/14/2025Exterior lighting powerPAUL MARINOenergy_progress
11/14/2025Interior lighting powerPAUL MARINOenergy_progress
11/14/2025Fenestration areasPAUL MARINOenergy_progress
11/14/2025Lighting controlsPAUL MARINOenergy_progress
11/14/2025Insulation placement and R valuesPAUL MARINOenergy_progress
11/14/2025Fenestration air leakagePAUL MARINOenergy_progress
11/14/2025MeteringPAUL MARINOenergy_progress
11/14/2025Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/14/2025Energy Code Compliance InspectionsPAUL MARINOprogress
11/14/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/14/2025Protection of exposed foundation insulationPAUL MARINOenergy_progress
11/14/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
11/14/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
11/14/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
11/14/2025Air barrier — testing PAUL MARINOenergy_progress
11/04/2025Lighting controlsPAUL MARINOenergy_progress
11/04/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/04/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
11/04/2025Air barrier — testing PAUL MARINOenergy_progress
Latest 25 of 101.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00520823-I1Request digital key ↗
09/01/2026B00549041-I1Request digital key ↗
08/26/2026B00739268-S2Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
12/22/2025340889774Open ↗
12/08/2025340889774Open ↗
11/13/2025340799648Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
08/16/2021322035579Open ↗
08/16/2021322035579Open ↗
05/19/2021340799648Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/01/2023340889774Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00739268-P6Open ↗
08/13/2026B00739268-P5Open ↗
08/13/2026B00739268-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00739268-P6Open ↗
08/13/2026B00739268-P5Open ↗
08/13/2026B00739268-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00739268-I1Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00520823-I1Open ↗
09/01/2026B00549041-I1Open ↗
08/26/2026B00739268-S4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026B00739268-P6Open ↗
09/01/2026B00739268-P6Open ↗
09/01/2026B00739268-P6Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B00739268-P6Open ↗
09/01/2026B00739268-S7Open ↗
09/01/2026B00739268-S7Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/01/2023340889774Open ↗
12/23/2020340799648Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/23/2020340799648Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/01/2023340889774Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/16/2021322035579Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/23/2020340799648Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00739268-P6Open ↗
08/13/2026B00739268-P5Open ↗
08/13/2026B00739268-I1Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist3
08/26/2026B00739268-I1Open ↗
08/26/2026B00739268-P6Open ↗
08/26/2026B00739268-P5Open ↗
▸BISSTREET TREE CHECKLIST2
12/09/2025340889774Open ↗
06/01/2023340889774Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/09/2025340889774Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/16/2021322035579Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/16/2021322035579Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00739268-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00739268-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00739268-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/23/2020340799648Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00739268-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/13/2026B00739268-S7Open ↗
08/13/2026B00739268-S1Open ↗
08/13/2026B00739268-P7Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/23/2021340799648Open ↗
12/23/2020340799648Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00739268-S7Open ↗
08/13/2026B00739268-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00739268-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/08/2025340889774Open ↗
06/01/2023340889774Open ↗
▸Cost, Insurance & Ownership3
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/16/2021322035579Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/16/2021322035579Open ↗
▸BISCOST AFFIDAVIT1
12/23/2020340799648Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
12/29/2025340889774Open ↗
12/09/2025340889774Open ↗
06/06/2023340889774Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/01/2023340889774Open ↗
12/23/2020340799648Open ↗
▸BISBOROUGH INTAKE FORM2
08/16/2021322035579Open ↗
08/10/2021322035579Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/01/2023340889774Open ↗
▸BISEFILING COVER SHEET1
05/28/2021322035579Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026B00739268-P5Open ↗
08/13/2026B00739268-I1Open ↗
08/13/2026B00739268-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00739268-P5Open ↗
08/13/2026B00739268-P6Open ↗
08/13/2026B00739268-I1Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00739268-S7Open ↗
08/13/2026B00739268-S8Open ↗
08/13/2026B00739268-S1Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026B00739268-I1Open ↗
08/26/2026B00739268-P6Open ↗
08/26/2026B00739268-P5Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00739268-I1Open ↗