| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01154661 ↗ | 141 ROSS STREET BROOKLYN | Alteration CO | Permit Issued | 03/05/2025 | 09/25/2026 | Design BAOBAB ARCHITECTS P.C. | Structural application filed subsequent to Alt-CO; job number: B01154661-I1. |
| M01263698 ↗ | 29 WEST 138 STREET MANHATTAN | Alteration | Permit Issued | 03/27/2026 | 09/22/2026 | Design KMA DESIGNS LLC Owner KINGS GROUP NY CORP Filer KMA DESIGNS LLC | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC |
| B01264556 ↗ | 87 FRANKLIN AVENUE BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 08/10/2026 | Design ADROIT ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01331724 ↗ | 735 DEKALB AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/15/2025 | 08/07/2026 | Design MOHAMMAD AHEAD, PE Filer BAC Developers Group | UNDERPINNING FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01331724-I1. |
| B01200766 ↗ | 499 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 05/14/2025 | 07/28/2026 | Design R & O ENGINEERING Filer BAC Developers Group | STRUCTURE FILED IN CONJUNCTION WITH ALT CO #321426097. VERTICAL 3 STORY ENLARGMENT TO EXISTING 3 STORY BUILDING, STRUCTURAL STEEL AND COLD-F… |
| B00641426 ↗ | 159 SUYDAM STREET BROOKLYN | Alteration | Permit Issued | 12/08/2021 | 06/11/2026 | Design ALBERTO ROMAN Filer XPDITE GROUP LLC (104) | INSTALL CONSTRUCTION FENCE AS PER PLAN, IN CONJUNCTION WITH ALTERATION B000562093. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| VASILIOS ARTEMIOU PE | 8 | 08/06/2026 |
| R & O ENGINEERING | 7 | 08/06/2026 |
| SOUTH BAY ENGINEERING PLLC | 7 | 04/09/2025 |
| STUDIO GALLOS | 7 | 08/12/2026 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 6 | 08/12/2026 |
| MOHAMMAD AHEAD, PE | 5 | 07/02/2026 |
| ELEVATED ENGINEERING NYC | 4 | 11/04/2024 |
| LEVIN ENGINEERING PLLC | 4 | 11/04/2024 |
| ADVANCED ENGINEERING & INSPECT. PLL | 3 | 08/12/2026 |
| BAOBAB ARCHITECTS P.C. | 3 | 08/06/2026 |
| NY BUILDING ASSOCIATES INC | 3 | 04/14/2021 |
| ALBERTO ROMAN | 2 | 04/16/2024 |
| BEST ENGINEERING TECHNOLOGY DESIGN | 2 | 09/15/2021 |
| EDWARD C. HICKS RA | 2 | 04/16/2024 |
| JAY ARCHITECT & ENGINEERING DPC | 2 | 07/17/2023 |
| REVAP CONSULTING ENGINEERS LLC | 2 | 05/10/2023 |
| 360 ENGINEERING P.C. | 1 | 06/21/2022 |
| ADROIT ENGINEERING PLLC | 1 | 08/07/2025 |
| AG ENGINEERING PLLC | 1 | 02/07/2024 |
| AL FFRED ARCHITECTURE PLLC | 1 | 09/22/2022 |
| ALFRED MIERZEJEWSKI ARCHITECT | 1 | 09/22/2022 |
| AMR OUDA | 1 | 07/17/2023 |
| BUILD SCAPE ENGINEERING, PLLC | 1 | 09/26/2025 |
| CHARLES MALLEA ARCHITECT PLLC | 1 | 05/27/2026 |
| CHOSEN MEP, CORP. | 1 | 12/15/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| A M B MECHANICAL INC | 7 | 08/12/2026 |
| QUALITY PIPING, INC | 7 | 08/12/2026 |
| ARDSLEY CONSTRUCTION SERV | 4 | 04/16/2024 |
| JSB WORKS INC | 3 | 12/12/2023 |
| MJH CONSTRUCTION CORP | 3 | 07/19/2021 |
| ALL STAR 1 LLC | 2 | 03/17/2021 |
| CREATIVE PLUMBING IN | 1 | 04/11/2025 |
| DYNAMIC PLBG & SPRKLR COR | 1 | 01/22/2026 |
| DYNAMIC PLBNG & SPRKR COR | 1 | 01/22/2026 |
| HIL GROUP LLC | 1 | 06/09/2026 |
| KINGS GROUP NY CORP | 1 | 06/24/2026 |
| MHR LALIA CONSTRUCTION CO | 1 | 04/10/2026 |
| PRECISION BUILD USA INC | 1 | 01/22/2026 |
| RNS CONSTRUCTION CORP | 1 | 11/10/2020 |
| TWO-TONE CONTRACTING CORP | 1 | 06/24/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| WATERFRONT PROPERTY MANAGEMENT | 38 | 08/12/2026 |
| STATEVIEW MANAGEMENT | 3 | 04/11/2025 |
| 107 S 3RD LLC | 1 | 01/22/2026 |
| EVEREST BUILDING CONSULTING LLC | 1 | 04/16/2024 |
| KINGS GROUP NY CORP | 1 | 06/24/2026 |
| MAXWELL-KATES, INC. | 1 | 06/24/2026 |
| MLS SERVICE GROUP INC | 1 | 07/30/2024 |
| NY CREATIVE DEVELOPERS INC | 1 | 06/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ADVANCED BUILDERS SERVICES | 24 | 08/12/2026 |
| BAC Developers Group | 4 | 07/14/2026 |
| EXPEDITING PLUS INC. | 4 | 07/11/2023 |
| EZFILINGNYCORP | 4 | 07/02/2026 |
| XPDITE GROUP LLC (104) | 4 | 06/18/2026 |
| KMA DESIGNS LLC | 1 | 06/24/2026 |
| LEVIN ENGINEERING PLLC | 1 | 07/26/2023 |
| MLS SERVICE GROUP INC | 1 | 04/11/2025 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 06/24/2026 |
| NYC DESIGN FILE | 1 | 01/22/2026 |
| PAKNIA ENGINEERING & ARCHITECTURE, | 1 | 03/27/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01154661 ↗ | 141 ROSS STREET BROOKLYN | Alteration CO | Permit Issued | 03/05/2025 | 09/25/2026 | Design BAOBAB ARCHITECTS P.C. | Structural application filed subsequent to Alt-CO; job number: B01154661-I1. |
| M01263698 ↗ | 29 WEST 138 STREET MANHATTAN | Alteration | Permit Issued | 03/27/2026 | 09/22/2026 | Design KMA DESIGNS LLC Owner KINGS GROUP NY CORP Filer KMA DESIGNS LLC | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC |
| B01264556 ↗ | 87 FRANKLIN AVENUE BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 08/10/2026 | Design ADROIT ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01331724 ↗ | 735 DEKALB AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/15/2025 | 08/07/2026 | Design MOHAMMAD AHEAD, PE Filer BAC Developers Group | UNDERPINNING FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01331724-I1. |
| B01200766 ↗ | 499 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 05/14/2025 | 07/28/2026 | Design R & O ENGINEERING Filer BAC Developers Group | STRUCTURE FILED IN CONJUNCTION WITH ALT CO #321426097. VERTICAL 3 STORY ENLARGMENT TO EXISTING 3 STORY BUILDING, STRUCTURAL STEEL AND COLD-F… |
| B00641426 ↗ | 159 SUYDAM STREET BROOKLYN | Alteration | Permit Issued | 12/08/2021 | 06/11/2026 | Design ALBERTO ROMAN Filer XPDITE GROUP LLC (104) | INSTALL CONSTRUCTION FENCE AS PER PLAN, IN CONJUNCTION WITH ALTERATION B000562093. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01231399 ↗ | 80 VERNON AVENUE BROOKLYN | Alteration | Signed-off | 06/03/2025 | 05/15/2026 | Design MOHAMMAD AHEAD, PE Filer XPDITE GROUP LLC (104) | CURB CUT APPLICATION FILED IN CONJUNCTION TO NB APPLICATION # B01179777-I1 |
| B00706654 ↗ | 899 FULTON STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 04/15/2022 | 05/08/2026 | Design STUDIO GALLOS | Structural application filed subsequent to Alt-CO NB, job number: B00706654-I1. |
| B01179777 ↗ | 80 VERNON AVENUE BROOKLYN | New Building | Permit Issued | 02/19/2025 | 05/01/2026 | Filer XPDITE GROUP LLC (104) | UNDERPINNING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION |
| B01205322 ↗ | 82 VERNON AVENUE BROOKLYN | Alteration | Signed-off | 04/09/2025 | 04/23/2026 | Design SOUTH BAY ENGINEERING PLLC | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01190253 ↗ | 499 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 03/06/2025 | 04/16/2026 | Design VASILIOS ARTEMIOU PE Filer BAC Developers Group | SPRINKLER SYSTEM FILED IN CONJUNCTION WITH ALT 1 JOB NUMBER 321426097. |
| B01205318 ↗ | 80 VERNON AVENUE BROOKLYN | Alteration | Signed-off | 04/09/2025 | 04/10/2026 | Design SOUTH BAY ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01069188 ↗ | 642 MYRTLE AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/18/2024 | 02/17/2026 | Design VASILIOS ARTEMIOU PE | Support of Excavation application filed subsequent to Alt-CO NB, job number: B01069188-I1. |
| B01154668 ↗ | 141 ROSS STREET BROOKLYN | Alteration | Permit Issued | 12/19/2024 | 01/26/2026 | Design BAOBAB ARCHITECTS P.C. | Fence application filed in conjunction with Alt-CO; job number: B01154661-I1. |
| B01209048 ↗ | 691 BROADWAY BROOKLYN | New Building | Permit Issued | 04/10/2025 | 01/22/2026 | Support of Excavation application filed subsequent to NB GC, job number: B01209048-I1. | |
| B01288506 ↗ | 255 18 STREET BROOKLYN | Alteration | Signed-off | 09/26/2025 | 12/10/2025 | Installation of steel dunnage beams on bulkhead roof filed to cure violation: #39155892Y. No change to use, occupancy or egress. | |
| B01259468 ↗ | 255 18 STREET BROOKLYN | Alteration | Permit Issued | 07/29/2025 | 12/09/2025 | Design PAKNIA ENGINEERING, PC | Addition of protective guards/railing at roof. No change to use, egress, occupancy, bulk or yards under this application. |
| B00715010 ↗ | 899 FULTON STREET BROOKLYN | Alteration | Signed-off | 04/14/2022 | 11/24/2025 | Foundation / Earthwork application filed subsequent to Alt-CO NB, job number: B00706654-I1. | |
| B00739268 ↗ | 107 SOUTH 3 STREET BROOKLYN | New Building | Permit Issued | 05/18/2022 | 09/05/2025 | Design NIKOLAI KATZ ARCHITECT Owner 107 S 3RD LLC Filer NYC DESIGN FILE | Structural application filed subsequent to NB GC, job number: B00739268-I1. |
| B00425348 ↗ | 499 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 11/10/2020 | 07/18/2025 | Design BAOBAB ARCHITECTS P.C. Filer JAM CONSULTANTS, INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION TYPE TWO APPLICATION B00316001. NO CHANGE IN EGRESS, USE OR OCCU… |
| B00898077 ↗ | 18 COOK STREET BROOKLYN | Alteration | Signed-off | 07/11/2023 | 07/07/2025 | Design SOUTH BAY ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00898083 ↗ | 20 COOK STREET BROOKLYN | Alteration | Signed-off | 07/11/2023 | 07/07/2025 | Design SOUTH BAY ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00898090 ↗ | 691 BROADWAY BROOKLYN | Alteration | Signed-off | 07/11/2023 | 07/07/2025 | Design SOUTH BAY ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00898093 ↗ | 693 BROADWAY BROOKLYN | Alteration | Signed-off | 07/11/2023 | 07/07/2025 | Design SOUTH BAY ENGINEERING PLLC | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00898097 ↗ | 697 BROADWAY | Alteration | Signed-off | 07/11/2023 | 07/07/2025 | Design SOUTH BAY ENGINEERING PLLC Filer EXPEDITING PLUS INC. | PROPOSED CONSTRUCTION FENCE, NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00910091 ↗ | 906 KENT AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/07/2023 | 05/19/2025 | Structural application filed subsequent to Alt-CO NB, job number: B00910091-I1. | |
| 321426097BIS | 499 MARCY AVENUE BROOKLYN | — | ISSUED | 11/25/2019 | 05/08/2025 | — | EQ |
| B01073468 ↗ | 119 ROGERS AVENUE BROOKLYN | Alteration | Permit Issued | 07/02/2024 | 03/20/2025 | Design CNY ENGINEERING P.C Owner STATEVIEW MANAGEMENT Filer MLS SERVICE GROUP INC | INTERIOR RENOVATION TO LEGALIZE PARTITION WALL ON THE CELLAR FLOOR,NEW PAINTING AND FLOORING FROM 1ST TO 3RD FLOOR PER PLAN IN ORDER TO REMO… |
| B00956495 ↗ | 590 MYRTLE AVENUE BROOKLYN | Alteration | Permit Issued | 11/01/2023 | 02/14/2025 | Design MOHAMMAD AHEAD, PE Filer EZFILINGNYCORP | HEREWITH FILING FOR EXTENSION OF EXISTING BALCONIES AT FLOORS 002-005. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B01175592 ↗ | 170 53 STREET BROOKLYN | Alteration | Signed-off | 02/04/2025 | 02/05/2025 | Filer EZFILINGNYCORP | HEREWITH FILING FOR AN INTERIOR RENOVATION FOR FLOOR # 002. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| Q00685987 ↗ | 1876 HARMAN STREET QUEENS | Alteration | Permit Issued | 04/27/2022 | 11/20/2024 | Mechanical work type filed in conjunction with Alt2 job #421406963 | |
| 322037274BIS | 27 WOLCOTT STREET BROOKLYN | — | ISSUED | 09/29/2023 | 11/08/2024 | — | OT |
| B00635897 ↗ | 91 GERRY STREET BROOKLYN | New Building | Permit Issued | 12/01/2021 | 09/27/2024 | Design STUDIO GALLOS | Support of Excavation application filed subsequent to NB, job number: B00635897-I1. |
| B00976780 ↗ | 607 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 12/20/2023 | 05/28/2024 | Design MOHAMMAD AHEAD, PE Owner MLS SERVICE GROUP INC Filer EZFILINGNYCORP | HEREWITH FILING FOR THE LEGALIZATION OF STEEL AND CONCRETE BALCONY AT THE SECOND FLOOR OF EXPOSURE 4. FILING FOR THE NEW EXTERIOR OPENING ON… |
| B00636529 ↗ | 93 GERRY STREET BROOKLYN | New Building | Permit Issued | 12/03/2021 | 04/12/2024 | Design STUDIO GALLOS | Support of Excavation application filed subsequent to NB, job number: B00636529-I1. |
| B00998316 ↗ | 27 WOLCOTT STREET BROOKLYN | Alteration | Permit Issued | 02/01/2024 | 03/28/2024 | Design R & O ENGINEERING | Structural application filed in conjunction with Alt II, job number: 322037274. |
| B00389905 ↗ | 255 18 STREET BROOKLYN | Alteration | Signed-off | 11/04/2020 | 03/07/2024 | Design LEVIN ENGINEERING PLLC Filer LEVIN ENGINEERING PLLC | Mechanical application filed in conjunction with Alt I, job number: 322066072. |
| B00847437 ↗ | 11 ARION PLACE BROOKLYN | Alteration | Signed-off | 03/23/2023 | 03/06/2024 | Temporary block staircase A exist door on ground floor and rotate illuminated sign for a short duration until ADA ramp installed along expos… | |
| B00768943 ↗ | 11 ARION PLACE BROOKLYN | Alteration CO | Permit Issued | 09/21/2022 | 03/04/2024 | Design STUDIO GALLOS | Support of Excavation application filed subsequent to Alt-CO, job number: B00768943-I1. |
| B01001636 ↗ | 1098 BUSHWICK AVE BROOKLYN | Alteration | Signed-off | 02/07/2024 | 02/16/2024 | Design AG ENGINEERING PLLC | Mechanical application hereby filed for replacement of existing boiler with hot water baseboard with electrical baseboard heating, as per pl… |
| B00992504 ↗ | 699 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 01/23/2024 | 01/25/2024 | Design SELF EMPLOYED | Mechanical application hereby filed for replacement of existing boiler with hot water baseboard with electrical baseboard heating, as per pl… |
| B00448924 ↗ | 159 SUYDAM STREET BROOKLYN | Alteration | Permit Issued | 01/07/2021 | 07/24/2023 | Design EDWARD C. HICKS RA Filer XPDITE GROUP LLC (104) | APPLICATION FILED HEREWITH TO PROPOSE MINOR FACADE WORK TO ANEXISTING 7 FAMILY DWELLING 4 STORY. NO CHANGE IN USE, EGRESS ANDBULK. |
| 321561234BIS | 4024 12 AVENUE BROOKLYN | — | ISSUED | 04/26/2018 | 07/06/2023 | — | EQ |
| B00870217 ↗ | 255 18 STREET BROOKLYN | Alteration | Signed-off | 05/10/2023 | 06/13/2023 | FN application filed in conjunction with Alt I, job number: 322066072. | |
| B00826319 ↗ | 11 ARION PLACE BROOKLYN | Alteration | Signed-off | 02/14/2023 | 05/18/2023 | Design EDWARD C. HICKS RA | ALTERATION TYPE II FOR THE INTERIOR DEMOLITION OF ERECTED PARTITIONS AND MEZZANINE IN AN EXISTING DWELLING UNIT 209 OF A 66 D.U. RESIDENTIAL… |
| 321359766BIS | 597 MARCY AVENUE BROOKLYN | — | ISSUED | 10/03/2017 | 02/02/2023 | — | EQ, PL |
| B08051919 ↗ | 597 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 12/15/2022 | 02/01/2023 | Design CHOSEN MEP, CORP. Filer BAC Developers Group | Filing herewith for mechanical & SSDS system in conjunction with NB Job Number 321359766. |
| B08014727 ↗ | 1085 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 10/24/2022 | 01/05/2023 | Design STUDIO GALLOS | GC application hereby filed to add a laundry room on the first and third floors. No change in use, occupancy or egress under this applicatio… |
| B00757667 ↗ | 107 STOCKTON STREET BROOKLYN | Alteration | Permit Issued | 06/21/2022 | 11/23/2022 | Design 360 ENGINEERING P.C. Owner STATEVIEW MANAGEMENT Filer EZFILINGNYCORP | job filled with installing a new balcony at exp 1 in order to correct violation number 35409613y there will beno change in use egress or occ… |
| 321598231BIS | 590 MYRTLE AVENUE BROOKLYN | — | ISSUED | 11/05/2021 | 11/15/2022 | — | — |
| B00589041 ↗ | 317 FRANKLIN AVENUE BROOKLYN | Alteration | Signed-off | 09/09/2021 | 11/09/2022 | Installation of a temporary construction fence. | |
| B00589058 ↗ | 317 FRANKLIN AVENUE BROOKLYN | New Building | Permit Issued | 10/05/2021 | 11/09/2022 | Design ELEVATED ENGINEERING NYC | Support of Excavation work-type filed subsequent to NB application, job number: B00589058-I1. |
| B00607943 ↗ | 1555 FULTON STREET BROOKLYN | Alteration | Signed-off | 10/13/2021 | 07/22/2022 | Design STUDIO GALLOS | Application filed for horizontal enlargement on the 7th floor to comply with BC 1208 and MDL 31 as per proposed plans. |
| B00500262 ↗ | 253 MCGUINNESS BOULEVARD BROOKLYN | Alteration | Signed-off | 04/14/2021 | 03/03/2022 | Design NY BUILDING ASSOCIATES INC | Construction fence filed in conjunction with NB #321598455 & ALT1 #321598464 |
| 322099028BIS | 317 FRANKLIN AVENUE BROOKLYN | — | ISSUED | 01/10/2022 | 01/10/2022 | — | — |
| 322099019BIS | 317 REAR FRANKLIN AVENUE BROOKLYN | — | ISSUED | 12/29/2021 | 12/29/2021 | — | — |
| B00463958 ↗ | 979 LAFAYETTE AVENUE BROOKLYN | Alteration | Signed-off | 02/05/2021 | 11/23/2021 | Owner STATEVIEW MANAGEMENT | EXISTING THREE FAMILY INTERIOR RENOVATION |
| B00488081 ↗ | 590 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 04/27/2021 | 11/08/2021 | Design LEVIN ENGINEERING PLLC | Mechanical specifications and work types filed in conjunction with NB job number: 321598231 |
| B00386783 ↗ | 590 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2020 | 10/30/2021 | Installation of a temporary construction fence. | |
| B00484713 ↗ | 590 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 03/15/2021 | 10/30/2021 | SOE filed in conjunction with NB job number: 321598231 | |
| B00487243 ↗ | 590 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 03/17/2021 | 10/30/2021 | Foundation work filed in conjunction with NB job number: 321598231 | |
| B00487152 ↗ | 590 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 03/17/2021 | 10/29/2021 | Structural work filed in conjunction with NB job number: 321598231 | |
| 321747053BIS | 255 18 STREET BROOKLYN | — | ISSUED | 07/20/2021 | 07/20/2021 | — | OT |
| B00472835 ↗ | 979 LAFAYETTE AVENUE BROOKLYN | Alteration | Signed-off | 02/24/2021 | 06/02/2021 | INTERIOR NON STRUCTURAL DEMOLITION. REMOVE INTERIOR PARTITION WALLS, SHEETROCKS, DOORS, CEILING SHEET ROCKS. | |
| 322040279BIS | 1085 WILLOUGHBY AVENUE BROOKLYN | — | ISSUED | 12/01/2020 | 12/01/2020 | — | OT |
| 321620803BIS | 255 18 STREET BROOKLYN | — | ISSUED | 01/03/2018 | 11/12/2020 | — | OT, PL |
| 321622204BIS | 27 DWIGHT STREET BROOKLYN | — | ISSUED | 11/01/2017 | 06/25/2020 | — | MH, OT, PL |
| 321475355BIS | 794 ROGERS AVENUE BROOKLYN | — | ISSUED | 01/27/2020 | 06/08/2020 | — | PL |
| B00345463 ↗ | 794 ROGERS AVENUE BROOKLYN | Alteration | Signed-off | 04/30/2020 | 05/05/2020 | PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | |
| 321649588BIS | 4024 12 AVENUE BROOKLYN | — | ISSUED | 04/26/2018 | 04/21/2020 | — | EQ |
| B00302651 ↗ | 123 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 02/03/2020 | 02/14/2020 | Design NY BUILDING ASSOCIATES INC | CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB APPLICATION #321836082 |
| B00307509 ↗ | 119 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 02/03/2020 | 02/14/2020 | Design NY BUILDING ASSOCIATES INC | CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB APPLICATION #321836046 |
| B00116929 ↗ | 123 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 01/09/2019 | 01/24/2020 | Design RICHARD WAINER | Temporary construction fence filed in conjunction with #322023172 |
| 321836037BIS | 115 CLIFTON PLACE BROOKLYN | — | RE-ISSUED | 11/04/2019 | 01/23/2020 | — | PL |
| 321836046BIS | 119 CLIFTON PLACE BROOKLYN | — | ISSUED | 07/25/2019 | 01/23/2020 | — | PL |
| 321836082BIS | 123 CLIFTON PLACE BROOKLYN | — | ISSUED | 07/25/2019 | 01/23/2020 | — | PL |
| B00236027 ↗ | 644 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 10/10/2019 | 11/25/2019 | Design JEFFREY KAMEN ARCHITECT | Mechanical filed in conjunction with Alt 1 job number 320971105. |
| 340683433BIS | 1555 FULTON STREET BROOKLYN | — | ISSUED | 09/24/2019 | 09/24/2019 | — | MH |
| 322023172BIS | 123 CLIFTON PLACE BROOKLYN | — | ISSUED | 06/11/2019 | 06/11/2019 | — | — |
| 320971105BIS | 644 MYRTLE AVENUE BROOKLYN | — | ISSUED | 06/15/2015 | 05/22/2019 | — | EQ, PL |
| 321364661BIS | TROUTMAN STREET BROOKLYN | — | ISSUED | 03/02/2018 | 02/15/2019 | — | EQ, PL |
| 321620796BIS | 255 18 STREET BROOKLYN | — | ISSUED | 12/28/2017 | 01/18/2019 | — | OT, PL |
| 321364625BIS | 33 TROUTMAN STREET BROOKLYN | — | ISSUED | 03/02/2018 | 11/13/2018 | — | EQ, PL |
| 321242204BIS | 1555 FULTON STREET BROOKLYN | — | ISSUED | 08/29/2017 | 08/21/2018 | — | EQ, PL |
| 321293104BIS | 149 SKILLMAN STREET BROOKLYN | — | ISSUED | 12/23/2015 | 07/17/2018 | — | OT |
| 321275687BIS | 238 PULASKI STREET BROOKLYN | — | RE-ISSUED | 12/16/2016 | 05/24/2018 | — | EQ, PL |
| 321574783BIS | 269 MESEROLE STREET BROOKLYN | — | ISSUED | 05/17/2017 | 05/24/2018 | — | EQ |
| 321293630BIS | 269 MESEROLE STREET BROOKLYN | — | ISSUED | 04/25/2017 | 05/23/2018 | — | PL |
| 321581132BIS | 269 MESEROLE STREET BROOKLYN | — | ISSUED | 11/01/2017 | 05/23/2018 | — | OT |
| 321703796BIS | 33 TROUTMAN STREET BROOKLYN | — | ISSUED | 03/07/2018 | 03/07/2018 | — | — |
| 321779198BIS | 74 BLEECKER STREET BROOKLYN | — | ISSUED | 02/23/2018 | 02/23/2018 | — | MH |
| 321063914BIS | 1460 FULTON STREET BROOKLYN | — | ISSUED | 06/11/2015 | 11/27/2017 | — | EQ, PL |
| 320971114BIS | 74 BLEECKER STREET BROOKLYN | — | ISSUED | 07/19/2016 | 08/04/2017 | — | EQ, PL |
| 321042377BIS | 1409 FULTON STREET BROOKLYN | — | ISSUED | 06/10/2015 | 07/20/2017 | — | EQ, PL |
| 321215902BIS | 597 MARCY AVENUE BROOKLYN | — | ISSUED | 12/09/2014 | 07/13/2017 | — | EQ |
| 321165305BIS | 834 QUINCY STREET BROOKLYN | — | ISSUED | 06/28/2016 | 02/02/2017 | — | EQ, PL |
| 321486361BIS | 238 PULASKI STREET BROOKLYN | — | ISSUED | 11/28/2016 | 11/28/2016 | — | EQ |
| 421233178BIS | 432 STOCKHOLM ST QUEENS | — | ISSUED | 07/15/2016 | 09/19/2016 | — | EQ, PL |
| 321309605BIS | 368 THROOP AVENUE BROOKLYN | — | ISSUED | 09/06/2016 | 09/06/2016 | — | OT |
| 421332052BIS | 18-63 BLEECKER STREET QUEENS | — | ISSUED | 06/03/2016 | 08/12/2016 | — | OT, PL |