← Back
BuildNYC
Three families
1072 DEKALB AVENUE
BROOKLYN · BIN 3043273
💬 Discuss this project
1931Year Built
3Stories
C0Building Class
R6BZoning
2,340 sfGross Floor Area
3Units
64 Active Violations 4 old, status unconfirmed ▸FDNY Report ↗
Three families · Owner of record: Chen Linda · 1,950 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical work3p · 1 filing · 6 docs
Floor 1Mechanical work10p · 4 filings · 20 docs
CellarGeneral Construction11p · 4 filings · 20 docs
Filed — no permit issuedAlteration Type 19p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chen Linda103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/21/2021$910K—DEKALB PLAZA 1072 LTD → CHEN LINDA LLC$389/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jimenez Building Consulting1010/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL Skyline2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Winway DevelopmentGeneral Contractor507/08/2026
Watson's Plumbing, Heating, & BuildingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yang Engineering8376310/25/2022
SD Testing & Inspection S7010406/28/2022
Building Lifecycle
All (109)Filed (10)Permit Issued (5)Violation (60)Inspection (4)Special Inspection (30)
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2022
Permit issued — Mechanical Systems
B08023383-I1-MS
10/25/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CEL. FLOOR. PLUMBING WORK AS PER PLAN. DIRECTLY REPLACE HOT WATER HEATER WITH NEW. REMEDY TO CURE ECB VIOLATION: #34822387H. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00628791-P1
10/25/2022
Special inspection requirement — Maintenance information
Jian Yang
10/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
10/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
10/25/2022
Special inspection requirement — Maintenance information
Jian Yang
10/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
10/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
10/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
10/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
10/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
10/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
10/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
10/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
10/19/2022
Filed — Alteration
MECHANICAL WORK AS PER PLAN & IN CONJUNCTION WITH GC # B00645376 NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY
B08023383-I1
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
10/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
10/19/2022
Special inspection requirement — Maintenance information
Jian Yang
10/18/2022
Special inspection requirement — Mechanical Systems
Jian Yang
10/18/2022
Special inspection requirement — Final
Jian Yang
09/02/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/27/2022
Permit issued — Plumbing
B00650172-I1-PL
06/29/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
06/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
06/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
06/29/2022
Special inspection requirement — Maintenance information
XIUCHENG LI
06/28/2022
Filed — Alteration
APPLICATION FILED HEREWITH PLUMBING WORK IN CONJUNCTION WITH B00645376 FOR A COMMERCIAL KITCHEN WITH EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00650172-P2
06/17/2022
Filed — Alteration
APPLICATION FILED HEREWITH PLUMBING WORK IN CONJUNCTION WITH B00645376 FOR A COMMERCIAL KITCHEN WITH EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00650172-P1
06/01/2022
Filed — Alteration
APPLICATION FILED HEREWITH PLUMBING WORK IN CONJUNCTION WITH B00645376 FOR A COMMERCIAL KITCHEN WITH EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00650172-I1
04/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
04/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/12/2022
Special inspection requirement — Masonry
XIUCHENG LI
04/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
04/12/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
04/12/2022
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
04/11/2022
Filed — Alteration
PROPOSED TO REMOVE ILLEGAL EXTENSION AT 1ST FLOOR. RESTORE TO PRIOR LEGAL CONDITIONS. REMEDY TO CURE ECB VIOLATIONS: #34553920Y. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00632885-P1
01/13/2022
Permit issued — General Construction
B00645376-I1-GC
12/29/2021
Permit issued — Plumbing
B00628791-I1-PL
12/29/2021
Permit issued — General Construction
B00632885-I1-GC
12/23/2021
Filed — Alteration CO
B00650969-I1
12/09/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CEL. FLOOR. PLUMBING WORK AS PER PLAN. DIRECTLY REPLACE HOT WATER HEATER WITH NEW. REMEDY TO CURE ECB VIOLATION: #34822387H. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00628791-I1
12/09/2021
Filed — Alteration
B00645376-I1
11/20/2021
Filed — Alteration
PROPOSED TO REMOVE ILLEGAL EXTENSION AT 1ST FLOOR. RESTORE TO PRIOR LEGAL CONDITIONS. REMEDY TO CURE ECB VIOLATIONS: #34553920Y. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00632885-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2019
Violation issued (HPD, open)
C
08/30/2019
Violation issued (HPD, open)
A
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2017
Violation issued (ECB, open)
Boilers
10/01/2015
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
01/24/2013
Violation issued (HPD, closed)
C
01/24/2013
Violation issued (HPD, open)
B
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedWinway Development10/26/2022
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building07/27/2022
DOB NOWGeneral ConstructionPermit IssuedWinway Development01/13/2022
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building12/29/2021
DOB NOWGeneral ConstructionPermit IssuedWinway Development12/29/2021
1 project · most recent 10/19/2022
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScope
10/19/2022Permit IssuedWinway DevelopmentAssociated Ducts and Piping, Ventilation Systems
2 projects · most recent 10/25/2022
Gas Water/Sanitary
FiledStatusContractorScope
10/25/2022Permit IssuedWatson's Plumbing, Heating, & BuildingGas
06/28/2022Signed-offWatson's Plumbing, Heating, & BuildingGas, Water/Sanitary
2 projects · most recent 03/05/2023
General Wiring
FiledStatusContractorScope
03/05/2023CompleteA.C. Morgan ElectricGeneral Wiring
12/03/2018Permit IssuedL J Electrical Service3 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/02/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/25/2022Maintenance informationJian Yangenergy_progress
10/25/2022Fire-Resistant Penetrations and JointsJian Yangspecial
10/25/2022Energy Code Compliance InspectionsJian Yangprogress
10/25/2022Maintenance informationJian Yangenergy_progress
10/25/2022HVAC-R and service water heating equipmentJian Yangenergy_progress
10/25/2022HVAC-R and service water piping design and insulationJian Yangenergy_progress
10/25/2022HVAC-R and service water heating system controlsJian Yangenergy_progress
10/25/2022Fire-Resistant Penetrations and JointsJian Yangspecial
10/25/2022Energy Code Compliance InspectionsJian Yangprogress
10/25/2022HVAC-R and service water piping design and insulationJian Yangenergy_progress
10/25/2022HVAC-R and service water heating system controlsJian Yangenergy_progress
10/25/2022HVAC-R and service water heating equipmentJian Yangenergy_progress
10/19/2022Fire-Resistant Penetrations and JointsJian Yangspecial
10/19/2022Energy Code Compliance InspectionsJian Yangprogress
10/19/2022Maintenance informationJian Yangenergy_progress
10/18/2022Mechanical SystemsJian Yangspecial
10/18/2022FinalJian Yangprogress
06/29/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
06/29/2022HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
06/29/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/29/2022HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
06/29/2022HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
06/29/2022Maintenance informationXIUCHENG LIenergy_progress
04/12/2022Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
04/12/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
Latest 25 of 37.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00645376-I1Request digital key ↗
08/31/2026B00650969-I1Request digital key ↗
08/30/2026B00632885-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature20
08/29/2026B00632885-I1Open ↗
08/29/2026B00632885-I1Open ↗
08/29/2026B00632885-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026B00645376-I1Open ↗
08/31/2026B00650969-I1Open ↗
08/30/2026B00632885-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026B00632885-I1Open ↗
08/29/2026B00632885-I1Open ↗
08/29/2026B00632885-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPC FULL REPORT1
09/13/2007310017521Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/13/2007310017521Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/31/2026B00650969-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/31/2026B00645376-I1Open ↗
08/31/2026B00650969-I1Open ↗
08/30/2026B00632885-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/13/2007310017521Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
09/13/2007310017521Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/31/2026B00650969-I1Open ↗