← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Downing
108 DOWNING STREET · BIN 3426850
💬 Discuss this project
2020Year Built
8Stories
RMBuilding Class
R7AZoning
46,230 sfGross Floor Area
53Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: FULTON STAR, LLC · 9,857 sf lot · 4.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof12p · 1 filing · 20 docs
Floor 118p · 2 filings · 20 docs
Cellar21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP2007/08/2026
VENTURE 1232307/08/2026
CORE SCAFFOLD SYSTEMS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2603/21/2026
JM ZONING, LLC.403/21/2026
SIGNS CAD403/21/2026
WILLIAM VITACCO ASSOCIATES503/21/2026
EA DESIGN GROUP603/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOUCHSTONE HOMES LLCGeneral Contractor1307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1307/08/2026
CLS PROJECT SOLUTIONS INCGeneral Contractor403/21/2026
VILLAGE P H NYPlumbing403/22/2026
BENJAMIN DREBINElectrical303/21/2026
ACCURATE ELECL CORP 002950General Contractor303/22/2026
JEM CONTRACTING CORPGeneral Contractor203/21/2026
M F ELEC'L SVC CO., INCElectrical203/22/2026
SIGNS CADScaffold207/08/2026
CBG BUILDERS INCGeneral Contractor107/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
REEM PLBG & HTG CORPPlumbing107/08/2026
M F ELECL SVC CO INC 000907General Contractor103/22/2026
VILLAGE P & H NY INCFire Protection107/08/2026
REEM PLBG & HTG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678303/25/2025
SOCOTEC ENGINEERING4983509/19/2024
AR-TECH ENGINEERING, P.C.6659310/06/2021
Building Lifecycle
All (173)Filed (26)Permit Issued (26)Signed Off (14)Violation (34)Inspection (9)Objection (34)Special Inspection (30)
09/12/2025
Signed off — Alteration
B01085701-I1
09/12/2025
Signed off — Alteration
ERECT AN ILLUMINATED CHANNEL LETTER SIGN-B ON RACEWAY. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01085780-I1
09/10/2025
Signed off — Alteration
LIMITED INTERIOR RENOVATION FOR RETAIL TENANT UNIT B - NON-STRUCTURAL PARTITIONS, FINISHES & LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01116763-S1
07/09/2025
Signed off — Alteration
LIMITED INTERIOR RENOVATION FOR RETAIL TENANT UNIT B - NON-STRUCTURAL PARTITIONS, FINISHES & LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01116763-I1
05/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2025
Special inspection requirement — Sprinkler Systems
Ari Kamo
03/25/2025
Filed — Alteration
LIMITED INTERIOR RENOVATION FOR RETAIL TENANT UNIT B - NON-STRUCTURAL PARTITIONS, FINISHES & LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01116763-P1
03/18/2025
Special inspection requirement — Sprinkler Systems
Ari Kamo
01/15/2025
Signed off — Alteration
Modification of plumbing system as shown on plans
B01023275-S2
01/15/2025
Signed off — Alteration
Modification of plumbing system as shown on plans
B01023275-S3
12/18/2024
Permit issued — Sprinklers
B01116763-S1-EW-SP
12/16/2024
Signed off — Alteration
Modification of plumbing system as shown on plans
B01023275-I1
12/16/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/19/2024
Filed — Alteration
LIMITED INTERIOR RENOVATION FOR RETAIL TENANT UNIT B - NON-STRUCTURAL PARTITIONS, FINISHES & LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01116763-S1
10/17/2024
Permit issued — General Construction
B01116763-I1-GC
10/01/2024
Filed — Alteration
LIMITED INTERIOR RENOVATION FOR RETAIL TENANT UNIT B - NON-STRUCTURAL PARTITIONS, FINISHES & LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01116763-I1
10/01/2024
Special inspection requirement — Metering
Ari Kamo
10/01/2024
Special inspection requirement — Lighting controls
Ari Kamo
10/01/2024
Special inspection requirement — Interior lighting power
Ari Kamo
09/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2024
Special inspection requirement — Final
Tom Abraham
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
09/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
09/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
09/19/2024
Filed — Alteration
Modification of plumbing system as shown on plans
B01023275-P2
08/30/2024
Signed off — Alteration
B01079627-I1
07/29/2024
Filed — Alteration
ERECT AN ILLUMINATED CHANNEL LETTER SIGN-B ON RACEWAY. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01085780-I1
07/29/2024
Permit issued — Sign
B01085780-I1-SG
07/29/2024
Permit issued — Sign
B01085701-I1-SG
07/26/2024
Filed — Alteration
B01085701-I1
07/24/2024
Special inspection requirement — Final
Ryan Hung
07/23/2024
Permit issued — Suspended Scaffold
B01079627-I1-SC
07/22/2024
Filed — Alteration
B01079627-I1
07/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/30/2024
Permit issued — Plumbing
B01023275-S2-PL
05/20/2024
Permit issued — Sprinklers
B01023275-S3-EW-SP
05/17/2024
Permit issued — Mechanical Systems
B01023275-S1-MS
05/08/2024
Filed — Alteration
Modification of plumbing system as shown on plans
B01023275-S2
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2024
Permit issued — General Construction
B01023275-I1-GC
04/16/2024
Filed — Alteration
Modification of plumbing system as shown on plans
B01023275-S3
04/16/2024
Filed — Alteration
Modification of plumbing system as shown on plans
B01023275-S1
04/12/2024
Filed — Alteration
Modification of plumbing system as shown on plans
B01023275-I1
04/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC12/18/2024
DOB NOWGeneral ConstructionSigned-offCBG BUILDERS INC10/17/2024
DOB NOWSignSigned-offSIGNS CAD CORP07/29/2024
DOB NOWSignSigned-offSIGNS CAD CORP07/29/2024
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC07/23/2024
DOB NOWPlumbingSigned-offREEM PLUMBING & HEATING C05/30/2024
DOB NOWSprinklersSigned-offREEM PLBG & HTG CORP05/20/2024
DOB NOWMechanical SystemsPermit IssuedCLS PROJECT SOLUTIONS INC05/17/2024
DOB NOWGeneral ConstructionSigned-offCLS PROJECT SOLUTIONS INC04/26/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC09/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/18/2022
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC04/06/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/18/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offJEM CONTRACTING CORP11/16/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/21/2021
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC05/06/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/15/2021
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC02/18/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/10/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC12/01/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC08/24/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC05/18/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC05/04/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC02/14/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC08/14/2019
BIS—ISSUEDTOUCHSTONE HOMES LLC04/06/2023
BISPLISSUEDMAGIC MECHANICAL INC11/08/2022
BIS—ISSUEDTOUCHSTONE HOMES LLC09/22/2022
BIS—ISSUEDTOUCHSTONE HOMES LLC06/01/2022
BIS—RE-ISSUEDTOUCHSTONE HOMES LLC05/11/2022
BISSPISSUEDMAGIC MECHANICAL INC03/10/2022
BIS—ISSUEDTOUCHSTONE HOMES LLC02/16/2022
BISSDISSUEDMAGIC MECHANICAL INC02/10/2022
BIS—ISSUEDTOUCHSTONE HOMES LLC01/25/2022
BISPLISSUEDMAGIC MECHANICAL INC11/08/2021
BIS—ISSUEDTOUCHSTONE HOMES LLC08/05/2021
BIS—ISSUEDTOUCHSTONE HOMES LLC04/16/2021
BISSPISSUEDMAGIC MECHANICAL INC02/24/2021
BIS—ISSUEDTOUCHSTONE HOMES LLC02/18/2021
+ 7 more permits on file
1 project · most recent 09/19/2024
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2024Permit IssuedCLS PROJECT SOLUTIONS INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-A12NKA7 12,000 BTU · Vrf Outdoor ×2
Heat / Cool
Mitsubishi Electric PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×4
PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×2
PEFY-P54NMAU-E4 54,000 BTU · Vrf Indoor ×2
PKA-A12LA.TH 12,000 BTU · Vrf Indoor ×2
PKFY-P06NLMU-E.TH 6,000 BTU · Vrf Indoor ×2
PLFY-P18NFMU-E 18,000 BTU · Vrf Indoor ×2
PURY-EP240TNU-A1 224,000 BTU · Vrf Outdoor ×2
Ventilation
Accurex XMSX-P115-H12-MF 2,160 CFM · Makeup Air ×2
1 project · most recent 09/19/2024
Sprinkler System
FiledStatusContractorScope
09/19/2024Signed-offREEM PLBG & HTG CORPSprinkler System
1 project · most recent 09/19/2024
Water/Sanitary
FiledStatusContractorScope
09/19/2024Signed-offREEM PLUMBING & HEATING CWater/Sanitary
11 projects · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025CompleteM F ELEC'L SVC CO., INCGeneral Wiring
11/14/2024CompleteACCURATE ELEC'L CORP.General Wiring
08/19/2024CompleteSIGNS CAD CORP—
08/19/2024CompleteSIGNS CAD CORP—
06/18/2024Permit IssuedFIVE BOROUGH ELECTRIC INCGeneral Wiring
06/07/2024CompleteM F ELEC'L SVC CO., INC55 meters, 1 new_meters
11/17/2023CompleteM F ELEC'L SVC CO., INCGeneral Wiring
03/23/2023CompleteJAM ELECTRICAL CORP—
07/29/2022CompleteSOLAS ELECTRICAL CORP—
02/17/2021CompleteM F ELEC'L SVC CO., INC—
12/10/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
03/26/2025Sprinkler SystemsAri Kamospecial
03/18/2025Sprinkler SystemsAri Kamospecial
10/01/2024MeteringAri Kamoenergy_progress
10/01/2024Lighting controlsAri Kamoenergy_progress
10/01/2024Interior lighting powerAri Kamoenergy_progress
09/24/2024FinalTom Abrahamprogress
09/24/2024Fire-Resistant Penetrations and JointsAri Kamospecial
09/24/2024Tenant Protection Plan ComplianceAri Kamospecial
09/20/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
09/20/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
09/20/2024Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
09/20/2024Shutoff dampersALEXIS SCHLESSINGERMANenergy_progress
09/20/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/20/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
09/20/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
09/20/2024Mechanical SystemsALEXIS SCHLESSINGERMANspecial
09/20/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
09/20/2024FinalALEXIS SCHLESSINGERMANprogress
09/20/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/24/2024FinalRyan Hungprogress
04/03/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/03/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/03/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/03/2024Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
04/03/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
Latest 25 of 36.
▾Documents — 354 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch20
09/01/2026B00499094-P2Request digital key ↗
09/01/2026B00499094-P1Request digital key ↗
09/01/2026B00499087-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/02/2026B00437202-P3Request digital key ↗
09/02/2026B00437202-I1Request digital key ↗
09/02/2026B00437202-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00193592-I1Request digital key ↗
09/02/2026B00193592-P1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION36
07/18/2024321385880Open ↗
07/25/2023321385880Open ↗
07/24/2023321385880Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION15
04/10/2023321385880Open ↗
09/27/2022321385880Open ↗
06/09/2022321385880Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
10/03/2019340660467Open ↗
▸Zoning, Tax Lot & Property Records13
▸BISADDRESS: NEW HOUSE NUMBER APPROVED4
09/22/2022321601361Open ↗
Showing 1 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
09/22/2022321601361Open ↗
09/27/2019340660467Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
09/22/2022321601361Open ↗
01/29/2020321385880Open ↗
▸BISVERIFY TAX LOT1
08/21/2024321385880Open ↗
▸BISZONING DIAGRAM1
05/22/2019321385880Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
09/22/2022321601361Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/29/2020321385880Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/02/2026B00437202-I1Open ↗
09/02/2026B00437202-P1Open ↗
09/02/2026B00437202-P3Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
04/06/2021321385880Open ↗
04/06/2021321385880Open ↗
03/30/2021321385880Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/28/2026B01023275-S1Open ↗
09/28/2026B01023275-S1Open ↗
08/25/2026B01116763-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/28/2026B01023275-S1Open ↗
09/28/2026B01023275-S1Open ↗
08/26/2026B01085780-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING8
05/22/2023321385880Open ↗
01/10/2023340666808Open ↗
01/06/2023340666808Open ↗
Showing 3 of 8 on file for this type
▸BISSTANDPIPE SYSTEMS2
04/03/2023340675656Open ↗
04/03/2023340666808Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/23/2022321385880Open ↗
▸BISSPRINKLER SYSTEMS1
04/03/2023340666808Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
09/05/2024321385880Open ↗
10/03/2019340660467Open ↗
09/27/2019340660467Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
10/03/2019340660467Open ↗
▸BISSTREET TREE SIGNOFF1
09/05/2024321385880Open ↗
▸Environmental & Asbestos20
▸DOB NOWOER: Notice to Proceed9
09/02/2026B00437202-I1Open ↗
09/02/2026B00437202-P1Open ↗
09/02/2026B00437202-P3Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
03/05/2024340660467Open ↗
03/09/2023340675656Open ↗
03/09/2023340666808Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B01023275-S2Open ↗
08/13/2026B01023275-S1Open ↗
08/13/2026B01023275-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
09/27/2019340660467Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/11/2023321385880Open ↗
01/30/2020321385880Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
06/17/2021321385880Open ↗
04/06/2021321385880Open ↗
04/06/2021321385880Open ↗
Showing 3 of 6 on file for this type
▸BISFENESTRATION AREAS1
11/23/2022321385880Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/23/2022321385880Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/23/2022321385880Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/23/2022321385880Open ↗
▸BISELECTRIC MOTORS1
11/23/2022321385880Open ↗
▸BISLIGHTING CONTROLS1
11/23/2022321385880Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/10/2023321385880Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/23/2022321385880Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/25/2026B01023275-S1Open ↗
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY19
04/06/2023321385880Open ↗
04/03/2023340675656Open ↗
04/03/2023340666808Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
07/14/2021321385880Open ↗
03/30/2021321385880Open ↗
08/28/2020321385880Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION4
01/05/2021321385880Open ↗
12/30/2020321385880Open ↗
05/14/2019321385880Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/09/2022321385880Open ↗
02/05/2020321385880Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/25/2022321385880Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/25/2022321385880Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
11/23/2022321385880Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE7
07/18/2024321385880Open ↗
07/24/2023321385880Open ↗
03/11/2020321385880Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/01/2023340666808Open ↗
04/04/2023340675656Open ↗
02/21/2023321955032Open ↗
▸BISSUPERSEDING LETTER3
09/27/2022321385880Open ↗
08/09/2021321385880Open ↗
04/19/2021321385880Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/22/2022321601361Open ↗
Showing 1 of 2 on file for this type
▸BISBSA/CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE4
01/26/2022321385880Open ↗
07/14/2021321385880Open ↗
04/19/2021321385880Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/14/2023340675656Open ↗
01/27/2023321955032Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION33
12/22/2023321385880Open ↗
06/12/2023321385880Open ↗
01/12/2023340666808Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
06/09/2022321385880Open ↗
02/19/2022321385880Open ↗
08/09/2021321385880Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents14
▸BISPLOT DIAGRAM3
09/22/2022321601361Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/14/2021321385880Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVESTIBULES1
11/23/2022321385880Open ↗
▸BISMAINTENANCE INFORMATION1
11/23/2022321385880Open ↗
▸BISTCO - Supporting Documents1
09/19/2024321385880Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/23/2022321385880Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/27/2019340660467Open ↗
▸BISHPD: COMPLETION NOTICE1
09/19/2024321385880Open ↗
▸DOB NOWCalculations1
08/13/2026B01079627-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01079627-I1Open ↗