← Back
BuildNYC
Two stories - detached, small or mid-size
108 JACKIE ROBINSON PARKWAY
BROOKLYN · Cypress Hills · BIN 3086108
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3-1Zoning
1,200 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,468 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2014$360K—Private party → Private party$300/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Garcia-Quismondo, Luismiguel RA305/22/2024
CES Engineering204/18/2024
Gilsanz Murray Steficek204/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1403/21/2026
Building Lifecycle
06/20/2024
Objection resolved — Addressed
06/13/2024
Objection resolved — Addressed
06/13/2024
Objection resolved — Resolved
06/12/2024
Objection resolved — Resolved
05/30/2024
Objection raised — Mechanical
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 05/22/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
05/22/2024——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 05/22/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/22/2024——Gas, Storm, Water/Sanitary
1 project · most recent 05/22/2024
Steel Concrete
FiledStatusContractorScope
05/22/2024——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/30/2024Permanent certificate—energy_progress
04/30/2024HVAC-R and service water piping design and insulation—energy_progress
04/30/2024HVAC-R and service water heating system controls—energy_progress
04/30/2024Maintenance information—energy_progress
04/30/2024HVAC-R and service water heating equipment—energy_progress
04/11/2024Fire-Resistant Penetrations and Joints—special
04/01/2024Footing and Foundation—progress
04/01/2024Concrete - Cast-In-Place—special
04/01/2024Post-installed Anchors—special
04/01/2024Structural Steel - Details—special
04/01/2024Structural Steel - High Strength Bolting—special
04/01/2024Structural Steel - Welding—special
04/01/2024Structural Stability – Alterations of existing buildings—special
04/01/2024Structural Wood Frame—progress
04/01/2024Final—progress
04/01/2024Structural Stability – Alterations of existing buildings—special
04/01/2024Final—progress
12/01/2023Energy Code Compliance Inspections—progress
12/01/2023Fire-Resistant Penetrations and Joints—special
12/01/2023Insulation placement and R values—energy_progress
12/01/2023Protection of exposed foundation insulation—energy_progress
12/01/2023Fenestration areas—energy_progress
12/01/2023Interior lighting power—energy_progress
12/01/2023Fenestration air leakage—energy_progress
12/01/2023Air barrier - visual inspection—energy_progress
Latest 25 of 29.
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account