← Back
General warehouse
109-01 14 AVENUE
QUEENS · College Point · BIN 4531778
💬 Discuss this project
1942Year Built
3Stories
E1Building Class
M2-1Zoning
148,650 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: EDGEWATER INDUSTRIAL PARK LLC · 266,463 sf lot · 0.56 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 7 filings · 20 docs
Floor 31p · 1 filing · 2 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHARTER COMMUNICATIONS707/08/2026
EDGEWATER INDUSTRIAL PARK LLC503/21/2026
STEEL EQUITIES303/21/2026
NYPD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIRO STUDIO LLC506/24/2025
NEW YORK ENGINEERING ASSOC., P.C.406/24/2025
APT ENGINEERING309/29/2023
MFS CONSULTING ENGINEERS & SURVEYOR207/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI DIO ARCHITECTURE, PC603/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
JMV ASSOCIATES LLC203/21/2026
PEREXPERTS GMAIL COM403/21/2026
NEW YORK ENGINEERING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACTIVE AIR SYSTEMS INCGeneral Contractor408/14/2026
AINSWORTH INCGeneral Contractor307/08/2026
BP MECHANICAL CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851206/24/2025
PIRO STUDIO LLC7503406/24/2025
AMARACON TESTING & INSPEC5842111/03/2022
MAASARANI ENGINEERING, IN6458111/12/2019
Building Lifecycle
All (66)Filed (14)Permit Issued (8)Signed Off (5)Violation (3)Objection (10)Special Inspection (26)
08/13/2026
Permit issued — Mechanical Systems
Q01232659-I1-MS
04/10/2026
Violation issued (FDNY_ORDER, closed)
03/31/2026
Signed off — Alteration
Installation of (1) 8 ton air-cooled split system with ACCU on 2nd floor roof. AHU installed in the 1st floor IT room.
Q01227789-I1
02/20/2026
Permit issued — Mechanical Systems
Q01227789-I1-MS
10/20/2025
Signed off — Alteration
Installation of (1) 12 1/2 ton & (1) 4 ton air cooled package units on the roof set upon existing steel dunnage.
Q01234638-I1
10/16/2025
Permit issued — Mechanical Systems
Q01234638-I1-MS
07/18/2025
Permit issued — Mechanical Systems
Q01232659-I1-MS
06/24/2025
Filed — Alteration
Installation of (1) 8 ton air-cooled split system with ACCU on 2nd floor roof. AHU installed in the 1st floor IT room.
Q01227789-I1
06/24/2025
Filed — Alteration
Installation of (1) 12 1/2 ton & (1) 4 ton air cooled package units on the roof set upon existing steel dunnage.
Q01234638-I1
06/24/2025
Filed — Alteration
DIRECT REPLACEMENT OF TWO HVAC UNITS.
Q01232659-I1
06/24/2025
Filed — Alteration
DIRECT REPLACEMENT OF TWO HVAC UNITS.
Q01232659-S1
06/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
06/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
06/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
06/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
06/08/2025
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
06/02/2025
Special inspection requirement — Final
PIETRO ROSATO
06/02/2025
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
05/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
05/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
05/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
05/19/2025
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
05/19/2025
Special inspection requirement — Final
PIETRO ROSATO
05/15/2024
Permit issued — Mechanical Systems
Q01002480-I1-MS
03/04/2024
Filed — Alteration
Q01003535-I1
03/04/2024
Filed — Alteration
Q01002480-I1
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/09/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/21/2023
Signed off — Alteration
Q00953157-I1
12/19/2023
Permit issued — Mechanical Systems
Q00953157-I1-MS
12/04/2023
Filed — Alteration
Q00953157-I1
10/23/2023
Objection resolved — Resolved
10/05/2023
Objection raised — Fire_Protection
10/05/2023
Objection raised — Other
10/05/2023
Objection raised — Zoning
09/29/2023
Filed — Alteration
Modification of existing VERIZON site on the roof. Installation of (2) microwave dishes.
Q00924283-I1
07/18/2023
Filed — Alteration
Q00822813-I1
07/18/2023
Filed — Alteration
Q00822813-S1
11/15/2022
Objection raised — Admin
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Scope
11/15/2022
Objection resolved — Addressed
11/15/2022
Objection raised — Fire_Protection
11/15/2022
Objection resolved — Addressed
11/03/2022
Filed — Alteration
Q08006324-I1
11/03/2022
Filed — Alteration
Replacement of existing diesel generator. Generator replacement filed under Q08006324.
Q08026366-I1
10/24/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
09/19/2022
Special inspection requirement — Mechanical Systems
CONNIE PISANI
09/19/2022
Special inspection requirement — Final
01/12/2022
Signed off — Alteration
INSTALLATION OF 1 ROOF TOP UNITREPLACEMENT ON EXACT SAME EXISTING STEEL DUNNAGE & ROOF CURBS.
Q00554170-I1
12/29/2021
Filed — Alteration
INSTALLATION OF 1 ROOF TOP UNITREPLACEMENT ON EXACT SAME EXISTING STEEL DUNNAGE & ROOF CURBS.
Q00554170-I1
12/29/2021
Permit issued — Mechanical Systems
Q00554170-I1-MS
10/21/2021
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
10/21/2021
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
10/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
07/08/2021
Special inspection requirement — Final
PIETRO ROSATO
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedACTIVE AIR SYSTEMS INC08/13/2026
DOB NOWMechanical SystemsSigned-offAINSWORTH INC02/20/2026
DOB NOWMechanical SystemsSigned-offAINSWORTH INC10/16/2025
DOB NOWMechanical SystemsPermit IssuedACTIVE AIR SYSTEMS INC07/18/2025
DOB NOWMechanical SystemsPermit IssuedACTIVE AIR SYSTEMS INC05/15/2024
DOB NOWMechanical SystemsSigned-offAINSWORTH INC12/19/2023
DOB NOWMechanical SystemsSigned-offBP MECHANICAL CORP12/29/2021
DOB NOWMechanical SystemsSigned-offBP MECHANICAL CORP11/15/2019
BISOTISSUEDCEL TECH ELECTRIC INC03/09/2018
BISOTISSUEDCEL TECH ELECTRIC INC10/06/2017
BISOTISSUEDALL PRO WIRELESS11/14/2016
BISOTISSUEDTELCOM ENGINEERING GP INC08/22/2016
1 project · most recent 06/24/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2025Permit IssuedACTIVE AIR SYSTEMS INCAir Conditioning Systems, Heating Systems
Cooling
Trane YSJ120A3S0H09 120,000 BTU · Chiller ×1
YSJ240A3S0H02 240,000 BTU · Chiller ×1
Heating
Trane YSJ120A3S0H09 240,000 BTU · Chiller ×1
YSJ240A3S0H02 400,000 BTU · Chiller ×1
2 projects · most recent 12/31/2025
HVAC Wiring
FiledStatusContractorScope
12/31/2025Permit IssuedSTELLMANN ELECTRICAL CORPHVAC Wiring
09/22/2019CompleteACCURATE ELEC'L CORP.—
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/08/2025HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
06/08/2025HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
06/08/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/08/2025HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
06/08/2025Energy Code Compliance InspectionsPIETRO ROSATOprogress
06/02/2025FinalPIETRO ROSATOprogress
06/02/2025Mechanical SystemsPIETRO ROSATOspecial
05/29/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
05/27/2025HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
05/27/2025HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
05/27/2025HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
05/27/2025Energy Code Compliance InspectionsPIETRO ROSATOprogress
05/27/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
05/19/2025Mechanical SystemsPIETRO ROSATOspecial
05/19/2025FinalPIETRO ROSATOprogress
02/09/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/09/2024Maintenance informationLOUIS ARENAenergy_progress
02/09/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/24/2022Fuel-Oil Storage and Fuel-Oil Piping Systems—special
09/19/2022Mechanical SystemsCONNIE PISANIspecial
09/19/2022Final—progress
10/21/2021HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
10/21/2021HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
10/21/2021HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
07/08/2021FinalPIETRO ROSATOprogress
Latest 25 of 26.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
08/26/2026Q00554170-I1Request digital key ↗
08/25/2026Q08006324-I1Request digital key ↗
08/24/2026Q00822813-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00254097-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
03/14/2018421224703Open ↗
10/19/2017421224703Open ↗
11/15/2016421224703Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
11/10/2018421687641Open ↗
10/17/2015421224703Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026Q01234638-I1Open ↗
09/23/2026Q01234638-I1Open ↗
09/23/2026Q01234638-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026Q00822813-S1Open ↗
08/24/2026Q00822813-I1Open ↗
08/23/2026Q00953157-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01234638-I1Open ↗
09/23/2026Q01234638-I1Open ↗
09/02/2026Q08006324-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/22/2019421224703Open ↗
01/22/2019421224703Open ↗
08/31/2016421224703Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/10/2018421687641Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/10/2018421687641Open ↗
10/17/2015421224703Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00822813-S1Open ↗
08/24/2026Q00822813-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/22/2019421224703Open ↗
11/10/2018421687641Open ↗
10/17/2015421224703Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/22/2019421224703Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00554170-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/19/2017421224703Open ↗
09/01/2016421224703Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/24/2026Q00822813-S1Open ↗
08/24/2026Q00822813-I1Open ↗
▸BISSUPERSEDING LETTER1
11/15/2016421224703Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/22/2019421224703Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/10/2018421687641Open ↗
10/17/2015421224703Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/10/2018421687641Open ↗
10/17/2015421224703Open ↗