← Back
Special Inspection Agency
MAASARANI ENGINEERING, IN
Special Inspection Agency
MANHATTAN · 14QUEENS · 3BRONX · 1
14 buildings
29
Total Filings
18
Projects on File
14
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month18 projects all-time
0246Sep '19 · 3Oct '19 · 5Nov '19 · 3Dec '19 · 2Mar '20 · 2Sep '20 · 1Dec '20 · 1Feb '21 · 1Sep '19Nov '19Jan '20Mar '20May '20Jul '20Sep '20Nov '20Jan '21Feb '21
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off1689%
Filed only211%
By project type
Alteration18
Most active buildings
All buildings →
227 WEST 17 STREETMANHATTAN · latest 03/05/2021
2 projects
102 MADISON AVENUEMANHATTAN · latest 10/24/2019
2 projects
2039 BROADWAYMANHATTAN · latest 12/20/2020
2 projects
29 EAST 64 STREETMANHATTAN · latest 04/15/2021
2 projects
460 GREENWICH STREETMANHATTAN · latest 08/24/2022
1 projects
201 MULBERRY STREETMANHATTAN · latest 01/09/2020
1 projects
Key relationships
Everyone →
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00343127 ↗460 GREENWICH STREET
MANHATTAN
AlterationSigned-off12/14/202008/24/2022REMOVE EXIS. GAS PIPING TO EXIS. BOILER & WATER HEATER. INSTALL NEW GAS PIPING TO NEW WATER HEATER & BOILER. REMOVE EXIS. GAS PIPING TO EXIS…
M00209372 ↗29 EAST 64 STREET
MANHATTAN
AlterationSigned-off09/26/201904/15/2021Proposed installation of (3) split systems: (2) 1-1/2 Tons systems, (1) 1- 1/2 Tons system, new wall openings, minor plumbing, new duct wo…
M00214386 ↗29 EAST 64 STREET
MANHATTAN
AlterationSigned-off10/11/201903/11/2021PROPOSED INTERIOR RENOVATION TO INCLUDE: CABINET REPLACEMENT, NON-LOAD BEARING PARTITIONS NEW A/C OPENING, REPLACEMENT OF PLUMBING FIXTURES …
M00286543 ↗227 WEST 17 STREET
MANHATTAN
AlterationSigned-off03/03/202003/05/2021new HVAC system
X00468147 ↗3233 WHITE PLAINS ROAD
BRONX
AlterationFiled — no permit on record02/23/2021——
M00380297 ↗1277 3 AVENUE
MANHATTAN
AlterationSigned-off09/22/202012/23/2020herewith file mechanical plans for ductwork only floors cellar through 4th floor roof.
Counts cover all 18 projects (18 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PIRO STUDIO LLC1109/18/2023
MAASARANI ENGINEERING, INC.402/23/2021
HUNT ARCHITECTS202/05/2021
KENDALL ENGINEERING PC110/18/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BP MECHANICAL CORP307/08/2020
PALONE BROTHERS AIR CONDI302/11/2020
ALL PRO PLBG & HTG INC102/05/2021
ALLSTATE SPRINKLER CORP112/26/2019
BUCKMILLER AUTO SPKLR COR110/18/2021
DEMAR MECHANICAL INC109/18/2023
DEMAR PLUMBING CORP109/18/2023
FELIX REMODELING INC110/22/2019
GUSTAV RESTORATION LLC109/22/2020
PERFECTAIRE CO INC111/16/2020
R.J.C. MECHANICAL CORP110/18/2021
REYES ENTERPRISE, INC112/06/2019
STANLEY LEWIS CONTR, CORP108/18/2021
STYLE RENOVATIONS AND DEC106/17/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
227 WEST 17TH CORP210/18/2021
A. RUTH & SONS202/11/2020
Charter Communications211/17/2019
SHERMAN SQUARE REALTY CORP.202/05/2021
200 WEST 108 STREET HOUSING CORP.102/23/2021
205 MULBERRY RETAIL LLC112/26/2019
CHARTER COMMUNICATION107/08/2020
EMPIRE MANAGEMENT102/10/2020
FRANCOBUILDING MAINTENANCE INC.109/22/2020
MAROB MANAGEMENT CORP109/18/2023
REYES ENTERPRISE, INC.112/06/2019
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JANCO BUILDING CONSULTANTS, LLC.102/23/2021
18 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 18Signed off 16Filed only 2
18 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00343127 ↗460 GREENWICH STREET
MANHATTAN
AlterationSigned-off12/14/202008/24/2022REMOVE EXIS. GAS PIPING TO EXIS. BOILER & WATER HEATER. INSTALL NEW GAS PIPING TO NEW WATER HEATER & BOILER. REMOVE EXIS. GAS PIPING TO EXIS…
M00209372 ↗29 EAST 64 STREET
MANHATTAN
AlterationSigned-off09/26/201904/15/2021Proposed installation of (3) split systems: (2) 1-1/2 Tons systems, (1) 1- 1/2 Tons system, new wall openings, minor plumbing, new duct wo…
M00214386 ↗29 EAST 64 STREET
MANHATTAN
AlterationSigned-off10/11/201903/11/2021PROPOSED INTERIOR RENOVATION TO INCLUDE: CABINET REPLACEMENT, NON-LOAD BEARING PARTITIONS NEW A/C OPENING, REPLACEMENT OF PLUMBING FIXTURES …
M00286543 ↗227 WEST 17 STREET
MANHATTAN
AlterationSigned-off03/03/202003/05/2021new HVAC system
X00468147 ↗3233 WHITE PLAINS ROAD
BRONX
AlterationFiled — no permit on record02/23/2021——
M00380297 ↗1277 3 AVENUE
MANHATTAN
AlterationSigned-off09/22/202012/23/2020herewith file mechanical plans for ductwork only floors cellar through 4th floor roof.
M00220961 ↗2039 BROADWAY
MANHATTAN
AlterationSigned-off10/22/201912/20/2020Plumbing changes in Apt. 39G & 39H.
M00218946 ↗2039 BROADWAY
MANHATTAN
AlterationSigned-off10/22/201908/03/2020Remove & cap vent in bathroom in Apt. 39H.
M00286537 ↗227 WEST 17 STREET
MANHATTAN
AlterationSigned-off03/02/202007/06/2020plumbing work and modifications to sprinkler system
M00278374 ↗201 MULBERRY STREET
MANHATTAN
AlterationSigned-off12/26/201901/09/2020store tenant sprinkler modification to existing system
M00272849 ↗44 EAST 67 STREET
MANHATTAN
AlterationSigned-off12/06/201912/17/2019HEREWITH FILE APPLICATION TO INSTALL TWO (2) THRU WALL AC UNITS (COOLING ONLY); NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00254272 ↗25-20 BOROUGH PLACE
QUEENS
AlterationSigned-off11/17/201911/19/2019Replacement of one (1) ton roof top unit on exact same existing steel dunnage and roof curbs. no change in use egress or occupancy.
Q00254097 ↗109-01 14 AVENUE
QUEENS
AlterationSigned-off11/12/201911/15/2019Replacement of 3 roof top units on the exact same existing steel dunnage and roof curbs. No change in use, egress , occupancy.
Q00253915 ↗41-61 KISSENA BOULEVARD
QUEENS
AlterationSigned-off11/08/201911/12/2019REPLACEMENT OF 8 ROOF TOP UNIT ON EXACT SAME EXISTING STEEL DUNNAGE & ROOF CURBS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00227239 ↗1178 MADISON AVENUE
MANHATTAN
AlterationFiled — no permit on record10/24/2019——
M00246024 ↗102 MADISON AVENUE
MANHATTAN
AlterationSigned-off10/23/201910/24/2019INSTALLATION: (2) 4.5 TON SPLIT SYSTEM , (2) 10 TON SPLIT SYSTEM. ALL AHU'S LOCATED ON THE 8TH FLOOR, MECHANICAL ROOM & ACCU'S THE ROOF ABOV…
M00203760 ↗226 EAST 54 STREET
MANHATTAN
AlterationSigned-off09/23/201909/27/2019INSTALLATION: (2) 4.5 TON SPLIT SYSTEMS ACCU-1 & 2 & AHU- 1 & 2 ON 1st. FOOR. INSTALLATION: (2) 3.5 TON SPLIT SYSTEMS ACCU-3 & 4 AHU-…
M00206028 ↗102 MADISON AVENUE
MANHATTAN
AlterationSigned-off09/26/201909/27/2019INSTALLATION: 5 TON PACKAGE SYSTEM AC-1 LOCATED IN 6TH FLOOR OFFICES MECHANICAL ROOM.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
460 GREENWICH STREET ↗209/18/2023
29 EAST 64 STREET ↗205/11/2021
3233 WHITE PLAINS ROAD ↗102/23/2021
2039 BROADWAY ↗402/05/2021
227 WEST 17 STREET ↗601/26/2021
1277 3 AVENUE ↗109/22/2020
41-61 KISSENA BOULEVARD ↗207/08/2020
102 MADISON AVENUE ↗302/11/2020
226 EAST 54 STREET ↗302/10/2020
201 MULBERRY STREET ↗112/26/2019
44 EAST 67 STREET ↗112/06/2019
25-20 BOROUGH PLACE ↗111/17/2019
109-01 14 AVENUE ↗111/12/2019
1178 MADISON AVENUE ↗110/24/2019
▾Special Inspection Requirements — 118
DateRequirementBuildingInspectorRole
08/15/2022Fire-Resistant Penetrations and Joints460 GREENWICH STREETMOHAMED MAASARANIspecial
08/15/2022Energy Code Compliance Inspections460 GREENWICH STREETMOHAMED MAASARANIprogress
08/15/2022HVAC and service water heating equipment 460 GREENWICH STREETMOHAMED MAASARANIenergy_progress
05/04/2021HVAC and service water heating equipment 29 EAST 64 STREETMOHAMED MAASARANIenergy_progress
05/04/2021HVAC and service water heating system controls 29 EAST 64 STREETMOHAMED MAASARANIenergy_progress
05/04/2021HVAC insulation and sealing 29 EAST 64 STREETMOHAMED MAASARANIenergy_progress
05/04/2021Energy Code Compliance Inspections29 EAST 64 STREETMOHAMED MAASARANIprogress
05/04/2021Fire-Resistant Penetrations and Joints29 EAST 64 STREETMOHAMED MAASARANIspecial
04/28/2021HVAC and service water heating equipment 29 EAST 64 STREETMOHAMED MAASARANIenergy_progress
04/28/2021Final29 EAST 64 STREETMOHAMED MAASARANIprogress
04/28/2021Mechanical Systems29 EAST 64 STREETMOHAMED MAASARANIspecial
04/28/2021Fire-Resistant Penetrations and Joints29 EAST 64 STREETMOHAMED MAASARANIspecial
04/28/2021HVAC insulation and sealing 29 EAST 64 STREETMOHAMED MAASARANIenergy_progress
04/28/2021HVAC and service water heating system controls 29 EAST 64 STREETMOHAMED MAASARANIenergy_progress
02/12/2021HVAC insulation and sealing 2039 BROADWAYLinna Huntenergy_progress
02/12/2021Energy Code Compliance Inspections2039 BROADWAYMOHAMED MAASARANIprogress
02/12/2021Fire-Resistant Penetrations and Joints2039 BROADWAYMOHAMED MAASARANIspecial
02/03/2021HVAC insulation and sealing 2039 BROADWAYLinna Huntenergy_progress
02/03/2021Energy Code Compliance Inspections2039 BROADWAYMOHAMED MAASARANIprogress
02/03/2021Fire-Resistant Penetrations and Joints2039 BROADWAYMOHAMED MAASARANIspecial
01/26/2021Fire-Resistant Penetrations and Joints227 WEST 17 STREETMOHAMED MAASARANIspecial
01/26/2021Sprinkler Systems227 WEST 17 STREETMOHAMED MAASARANIspecial
11/20/2020HVAC and service water heating equipment 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
11/20/2020HVAC and service water heating equipment 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
11/20/2020Fire-Resistant Penetrations and Joints227 WEST 17 STREETMOHAMED MAASARANIspecial
11/20/2020Fire-Resistant Penetrations and Joints227 WEST 17 STREETMOHAMED MAASARANIspecial
11/20/2020Energy Code Compliance Inspections227 WEST 17 STREETMOHAMED MAASARANIprogress
11/20/2020Energy Code Compliance Inspections227 WEST 17 STREETMOHAMED MAASARANIprogress
11/20/2020Final227 WEST 17 STREETMOHAMED MAASARANIprogress
11/20/2020Final227 WEST 17 STREETMOHAMED MAASARANIprogress
11/20/2020HVAC insulation and sealing 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
11/20/2020HVAC insulation and sealing 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
11/20/2020HVAC and service water heating system controls 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
11/20/2020HVAC and service water heating system controls 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
11/20/2020Mechanical Systems227 WEST 17 STREETMOHAMED MAASARANIspecial
11/20/2020Mechanical Systems227 WEST 17 STREETMOHAMED MAASARANIspecial
10/29/2020HVAC and service water heating equipment 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
10/29/2020HVAC and service water heating equipment 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
10/29/2020HVAC insulation and sealing 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
10/29/2020HVAC insulation and sealing 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
10/29/2020HVAC and service water heating system controls 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
10/29/2020HVAC and service water heating system controls 227 WEST 17 STREETMOHAMED MAASARANIenergy_progress
10/29/2020Final227 WEST 17 STREETMOHAMED MAASARANIprogress
10/29/2020Final227 WEST 17 STREETMOHAMED MAASARANIprogress
10/29/2020Energy Code Compliance Inspections227 WEST 17 STREETMOHAMED MAASARANIprogress
10/29/2020Energy Code Compliance Inspections227 WEST 17 STREETMOHAMED MAASARANIprogress
10/29/2020Mechanical Systems227 WEST 17 STREETMOHAMED MAASARANIspecial
10/29/2020Mechanical Systems227 WEST 17 STREETMOHAMED MAASARANIspecial
10/29/2020Fire-Resistant Penetrations and Joints227 WEST 17 STREETMOHAMED MAASARANIspecial
10/29/2020Fire-Resistant Penetrations and Joints227 WEST 17 STREETMOHAMED MAASARANIspecial
Latest 50 of 118.
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch - Mechanical Systems20
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing17
09/05/2026M00220961-P2 · 2039 BROADWAYRequest digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
Showing 3 of 7 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
09/05/2026M00272849-I1 · 44 EAST 67 STREETOpen ↗
Showing 1 of 11 on file for this type
▸Seals & Professional Certifications163
▸DOB NOWProgress Inspector Seal & Signature84
09/18/2026M00209372-P1 · 29 EAST 64 STREETOpen ↗
09/18/2026M00209372-P1 · 29 EAST 64 STREETOpen ↗
09/18/2026M00209372-P1 · 29 EAST 64 STREETOpen ↗
Showing 3 of 84 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/18/2026M00209372-P1 · 29 EAST 64 STREETOpen ↗
09/18/2026M00209372-P1 · 29 EAST 64 STREETOpen ↗
09/14/2026M00286543-I1 · 227 WEST 17 STREETOpen ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/05/2026M00206028-I1 · 102 MADISON AVENUEOpen ↗
09/05/2026M00218946-I1 · 2039 BROADWAYOpen ↗
09/05/2026M00220961-P4 · 2039 BROADWAYOpen ↗
Showing 3 of 36 on file for this type
▸Safety & Tenant Protection26
▸DOB NOWTenant Protection Plan26
09/05/2026M00220961-P4 · 2039 BROADWAYOpen ↗
09/05/2026M00220961-P2 · 2039 BROADWAYOpen ↗
09/05/2026M00272849-I1 · 44 EAST 67 STREETOpen ↗
Showing 3 of 26 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/05/2026M00220961-P4 · 2039 BROADWAYOpen ↗
09/05/2026M00220961-P2 · 2039 BROADWAYOpen ↗
09/05/2026M00272849-I1 · 44 EAST 67 STREETOpen ↗
Showing 3 of 25 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00380297-I1 · 1277 3 AVENUEOpen ↗
Showing 1 of 2 on file for this type
▸Other Documents1
▸DOB NOWDHCR Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type