← Back
Two family converted from one family
109-17 124 STREET
QUEENS · BIN 4249715
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-2Zoning
1,770 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: D&S NY PROPERTIES LLC · 3,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 1 filing · 20 docs
Floor 214p · 2 filings · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2021$505K—— → —$285/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT609/11/2025
TOM PETERSEN ARCHITECT, LLC107/07/2025
AGT ARCHITECTURE P.C.203/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor303/21/2026
LONG ISLAND POWER SOLUTIOGeneral Contractor107/08/2026
PROTON CCM LLCGeneral Contractor104/09/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854107/07/2025
FANG ARCHITECT5513403/10/2025
TRIANGLE INSPECTION & TES7495203/10/2025
Building Lifecycle
All (61)Filed (9)Permit Issued (5)Signed Off (4)Inspection (9)Objection (4)Special Inspection (30)
11/04/2025
Signed off — Alteration CO
INSTALL (1) 8.0' WIDE NEW CURB CUT.
Q00868450-S1
11/03/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/03/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/12/2025
Signed off — Alteration
Q01252144-I1
09/11/2025
Filed — Alteration CO
INSTALL (1) 8.0' WIDE NEW CURB CUT.
Q00868450-P3
07/14/2025
Permit issued — Solar
Q01252144-I1-SL
07/07/2025
Filed — Alteration
Q01252144-I1
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
07/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
07/07/2025
Special inspection requirement — Final
TOM PETERSEN
07/07/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
06/02/2025
Filed — Alteration CO
INSTALL (1) 8.0' WIDE NEW CURB CUT.
Q00868450-P2
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/16/2025
Signed off — Alteration
FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00883635-I1
04/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/20/2025
Special inspection requirement — Final
DEZHANG FANG
03/20/2025
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
03/20/2025
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
03/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
03/20/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/20/2025
Special inspection requirement — Footing and Foundation
DEZHANG FANG
03/20/2025
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
03/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
03/20/2025
Special inspection requirement — Fenestration areas
DEZHANG FANG
03/20/2025
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
03/20/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
03/20/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
03/20/2025
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
03/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
03/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
03/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
03/11/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/11/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
03/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/10/2025
Filed — Alteration
FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00883635-P1
03/10/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
02/27/2025
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH JOB #Q00868450.
Q00919219-I1
02/03/2025
Permit issued — Curb Cut
Q00868450-S1-CC
01/30/2025
Filed — Alteration CO
INSTALL (1) 8.0' WIDE NEW CURB CUT.
Q00868450-P1
09/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/03/2024
Permit issued — Plumbing
Q00883635-I1-PL
04/19/2024
Permit issued — General Construction
Q00868450-I1-GC-CX
08/28/2023
Objection resolved — Addressed
08/26/2023
Objection raised — Inspections
08/25/2023
Permit issued — Construction Fence
Q00919219-I1-FN
08/25/2023
Objection resolved — Addressed
08/23/2023
Objection raised — Scope
08/15/2023
Filed — Alteration CO
INSTALL (1) 8.0' WIDE NEW CURB CUT.
Q00868450-S1
08/15/2023
Filed — Alteration
FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00883635-I1
08/14/2023
Filed — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH JOB #Q00868450.
Q00919219-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offLONG ISLAND POWER SOLUTIO07/14/2025
DOB NOWCurb CutSigned-offPROTON CCM LLC02/03/2025
DOB NOWPlumbingSigned-offS & L PLUMBING INC09/03/2024
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP04/19/2024
DOB NOWConstruction FenceSigned-offKLE CONSTRUCTION INC08/25/2023
2 projects · most recent 06/30/2025
General Wiring
FiledStatusContractorScope
06/30/2025CompleteCATIZONE ELECTRICAL INC—
01/13/2025CompleteDEMPSEY ELECTRIC LLCGeneral Wiring
1 project · most recent 09/11/2025
Wood
FiledStatusContractorScope
09/11/2025Signed-offPROTON CCM LLCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/03/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
09/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
07/07/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
07/07/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
07/07/2025Energy Code Compliance InspectionsTOM PETERSENprogress
07/07/2025FinalTOM PETERSENprogress
07/07/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
03/20/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
03/20/2025FinalDEZHANG FANGprogress
03/20/2025Structural Wood FrameDEZHANG FANGprogress
03/20/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
03/20/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
03/20/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
03/20/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/20/2025Footing and FoundationDEZHANG FANGprogress
03/20/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
03/20/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
03/20/2025Fenestration areasDEZHANG FANGenergy_progress
03/20/2025Air barrier - visual inspectionDEZHANG FANGenergy_progress
03/20/2025Maintenance informationDEZHANG FANGenergy_progress
03/20/2025Interior lighting powerDEZHANG FANGenergy_progress
03/20/2025Fenestration air leakageDEZHANG FANGenergy_progress
03/20/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
03/11/2025HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
03/11/2025HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
03/11/2025HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
03/11/2025Maintenance informationDEZHANG FANGenergy_progress
Latest 25 of 53.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026Q00919219-I1Request digital key ↗
08/24/2026Q00868450-P2Request digital key ↗
08/24/2026Q00868450-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00868450-I1Open ↗
08/13/2026Q00868450-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00868450-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/20/2026Q00868450-P1Open ↗
09/20/2026Q00868450-P1Open ↗
09/06/2026Q00868450-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026Q00868450-P3Open ↗
08/24/2026Q00868450-P2Open ↗
08/24/2026Q00868450-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/20/2026Q00868450-P1Open ↗
09/06/2026Q00868450-I1Open ↗
09/02/2026Q00883635-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00868450-I1Open ↗
08/13/2026Q00868450-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00868450-P3Open ↗
08/24/2026Q00868450-P2Open ↗
08/24/2026Q00868450-P1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01252144-I1Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00868450-P1Open ↗
08/13/2026Q00868450-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00868450-P1Open ↗
08/13/2026Q00868450-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00868450-P1Open ↗
08/24/2026Q00868450-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00868450-P1Open ↗
08/13/2026Q00868450-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00868450-I1Open ↗