| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01231925 ↗ | 49-12 167 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 06/30/2025 | 09/08/2026 | Design FANG ARCHITECT Owner GLORY PROPERTY GROUP LLC Filer FANG ARCHITECT | INSTALL TEMPORARY CONSTRUCTION FENCE. |
| Q01381898 ↗ | 37-35 29 STREET QUEENS | New Building | Permit Issued | 05/12/2026 | 09/08/2026 | Design INOA ARCHITECTURE INC. PC | PROPOSED INSTALLATION OF CONSTRUCTION FENCE AS REQUIRED DURING CONSTRUCTION AS PER DRAWINGS IN CONNECTION WITH JOB #Q01381898-I1. NO CHANGE … |
| M00552264 ↗ | 287 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 08/09/2021 | 08/28/2026 | Design PRUDIGM ENGINEERING LLC | Installation of new mechanical air conditioning and heating system with new duck work in the cellar .No change in use egress or Occupancy. |
| Q01201006 ↗ | 46-32 192 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/28/2025 | 08/19/2026 | Design FANG ARCHITECT Owner 4632 PROPERTY LLC Filer FANG ARCHITECT | VERTICAL AND HORIZONTAL EXTENSION FOR AN EXISTING DETACHED HOUSE AND CONVERT 1 FAMILY TO 2-FAMILY HOUSE. TO OBTAIN NEW C OF O. |
| B01374099 ↗ | 93 MONROE STREET BROOKLYN | Alteration | Signed-off | 03/20/2026 | 06/24/2026 | Design PETER CHO ARCHITECTS, PLLC Owner MNB Developers Filer WM ARCH CORP | EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1 ST, 2ND & 3RD FLOOR. JOB FILED TO RELATED TO ALT2APPLICATION # B01374099… |
| B01374138 ↗ | 720A QUINCY STREET BROOKLYN | Alteration | Signed-off | 03/20/2026 | 06/24/2026 | Design PETER CHO ARCHITECTS, PLLC Owner MNB Developers Filer WM ARCH CORP | EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1 ST, 2ND & 3RD FLOOR. JOB FILED TO RELATED TO ALT2APPLICATION # B01374138… |
| Name | Projects together | Most recent |
|---|---|---|
| CQ&J CORPORATION | 8 | 08/07/2026 |
| FANG ARCHITECT | 7 | 08/04/2026 |
| AGT ARCHITECTURE P.C. | 3 | 08/04/2026 |
| PETER CHO ARCHITECTS, PLLC | 3 | 07/15/2026 |
| H2 CONSULTING PE PC | 2 | 05/13/2026 |
| RICHARD H BALSER, P.E. | 2 | 07/16/2025 |
| SUNG HO SHIN ARCHITECT, PC | 2 | 12/17/2024 |
| TYLin | 2 | 10/02/2025 |
| A & T ENGINEERING, P.C. | 1 | 10/30/2024 |
| ALAN YANG ARCHITECTURE | 1 | 03/24/2025 |
| CLIP ARCHITECTS | 1 | 04/04/2025 |
| INOA ARCHITECTURE INC. PC | 1 | 08/10/2026 |
| JD Design Associates Inc | 1 | 02/24/2026 |
| KIEFER & SCHUSTER ENGINEERING PLLC | 1 | 04/24/2023 |
| LORING CONSULTING ENGINEERS, INC. | 1 | 10/02/2025 |
| PRUDIGM ENGINEERING LLC | 1 | 08/09/2021 |
| SPAGNOLO GROUP ARCHITECTURE | 1 | 10/02/2025 |
| TIMES BUILDINGS PC | 1 | 07/25/2023 |
| ZHENG ENGINEERING PLLC | 1 | 03/15/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| TRI CITY MECHANICAL GROUP | 6 | 07/15/2026 |
| AMERICAN STANDARD P&H COR | 2 | 05/27/2026 |
| L&L CONSTRUCTION DEVELOP | 2 | 09/11/2025 |
| A&H EXPRESS PLBG&HTG CORP | 1 | 07/16/2025 |
| ADNET ENTERPRISES LLC | 1 | 08/07/2026 |
| CATMAN PLUMBING INC | 1 | 11/25/2024 |
| CROWN PLUMBING INC | 1 | 02/24/2026 |
| DYNASTY CONTRACTING LLC | 1 | 07/25/2023 |
| HP SERVICES INC | 1 | 10/30/2024 |
| JABBIE INDUSTRIES INCORP* | 1 | 08/10/2026 |
| LOXTON INC | 1 | 10/30/2024 |
| NTF MANAGEMENT INC | 1 | 07/16/2025 |
| S & L PLUMBING INC | 1 | 05/13/2026 |
| SAFETY FIRE SPRINKLER COR | 1 | 10/02/2025 |
| TRI STATE PLBG & HTG INC | 1 | 05/27/2026 |
| XH&RC PLBG AND HTG INC | 1 | 10/30/2024 |
| ZR WHITESTONE INC | 1 | 10/30/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| MNB Developers | 5 | 07/15/2026 |
| BLUESTAR PROPERTIES INC | 2 | 07/16/2025 |
| CLINY | 2 | 10/02/2025 |
| 4632 PROPERTY LLC | 1 | 05/27/2026 |
| BLDG MANAGEMENT CO., INC. | 1 | 04/08/2026 |
| GLORY PROPERTY GROUP LLC | 1 | 08/04/2026 |
| HAPER LLC | 1 | 07/18/2024 |
| Jade York Development LLC | 1 | 08/10/2026 |
| K.G. Properties, LLC | 1 | 05/21/2025 |
| LINS NODDLES 24 INC | 1 | 02/24/2026 |
| SHS UPPER CITY NY III LLC | 1 | 08/09/2021 |
| WZ MANAGMENT GROUP LLC | 1 | 12/17/2024 |
| XI YING FU REALITY LLC | 1 | 03/15/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| WM ARCH CORP | 9 | 08/07/2026 |
| FANG ARCHITECT | 2 | 08/04/2026 |
| H2 CONSULTING PE PC | 2 | 05/13/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 07/16/2025 |
| ADAM MAISER | 1 | 06/22/2023 |
| BMB BUILDING CONSULTING INC. | 1 | 08/10/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 08/09/2021 |
| JD DESIGN ASSOCIATES INC | 1 | 02/24/2026 |
| LOXTON INC | 1 | 10/30/2024 |
| METROPOLIS GROUP INC | 1 | 10/02/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01231925 ↗ | 49-12 167 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 06/30/2025 | 09/08/2026 | Design FANG ARCHITECT Owner GLORY PROPERTY GROUP LLC Filer FANG ARCHITECT | INSTALL TEMPORARY CONSTRUCTION FENCE. |
| Q01381898 ↗ | 37-35 29 STREET QUEENS | New Building | Permit Issued | 05/12/2026 | 09/08/2026 | Design INOA ARCHITECTURE INC. PC | PROPOSED INSTALLATION OF CONSTRUCTION FENCE AS REQUIRED DURING CONSTRUCTION AS PER DRAWINGS IN CONNECTION WITH JOB #Q01381898-I1. NO CHANGE … |
| M00552264 ↗ | 287 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 08/09/2021 | 08/28/2026 | Design PRUDIGM ENGINEERING LLC | Installation of new mechanical air conditioning and heating system with new duck work in the cellar .No change in use egress or Occupancy. |
| Q01201006 ↗ | 46-32 192 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/28/2025 | 08/19/2026 | Design FANG ARCHITECT Owner 4632 PROPERTY LLC Filer FANG ARCHITECT | VERTICAL AND HORIZONTAL EXTENSION FOR AN EXISTING DETACHED HOUSE AND CONVERT 1 FAMILY TO 2-FAMILY HOUSE. TO OBTAIN NEW C OF O. |
| B01374099 ↗ | 93 MONROE STREET BROOKLYN | Alteration | Signed-off | 03/20/2026 | 06/24/2026 | Design PETER CHO ARCHITECTS, PLLC Owner MNB Developers Filer WM ARCH CORP | EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1 ST, 2ND & 3RD FLOOR. JOB FILED TO RELATED TO ALT2APPLICATION # B01374099… |
| B01374138 ↗ | 720A QUINCY STREET BROOKLYN | Alteration | Signed-off | 03/20/2026 | 06/24/2026 | Design PETER CHO ARCHITECTS, PLLC Owner MNB Developers Filer WM ARCH CORP | EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1 ST, 2ND & 3RD FLOOR. JOB FILED TO RELATED TO ALT2APPLICATION # B01374138… |
| M01382809 ↗ | 137 4 AVENUE MANHATTAN | Alteration | Permit Issued | 04/08/2026 | 04/27/2026 | Design CQ&J CORPORATION Owner BLDG Management Co. Filer WM ARCH CORP | AN EXISTING COMMERCIAL SPACE USED AS STORE WITH INTERIOR RENOVATION ON 1ST FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL… |
| Q01031082 ↗ | 151-14 10 AVENUE QUEENS | Alteration CO | Permit Issued | 04/15/2024 | 04/16/2026 | Design H2 CONSULTING PE PC Filer H2 CONSULTING PE PC | REMOVE PARTITIONS AND ROOF. INSTALL STEEL COLUMNS, BEAMS, PARTITION AND ADD 2ND STORY FOR AN EXISTING ONE FAMILY HOUSE. OBTAIN NEW CERTIFICA… |
| Q01051937 ↗ | 47-29 163 STREET QUEENS | Alteration | Permit Issued | 05/18/2024 | 04/15/2026 | Design ALAN YANG ARCHITECTURE | Open Excavation and foundation work for the new addition at the back of the existing house |
| B01376332 | 227 WYCKOFF STREET BROOKLYN | Alteration | Permit Issued | 03/24/2026 | 03/30/2026 | Design CQ&J CORPORATION Owner MNB Developers Filer WM ARCH CORP | INTERIOR DEMOLITION ON EXISTING TWO (2)-FAMILY, TWO (2) STORY BRICK RESIDENTIAL BUILDING WITH BASEMENTAND CELLAR.NO CHANGE OF BUILDING BULK,… |
| Q01229354 ↗ | 123-25 82 AVENUE QUEENS | Alteration | Permit Issued | 05/21/2025 | 03/26/2026 | Design CQ&J CORPORATION Owner K.G. Properties, LLC Filer WM ARCH CORP | An existing mixed used building with exterior work at a store front on partial of 1ST floor and to resolve violations # 39138287L. No change… |
| B01368117 ↗ | 253 MONROE STREET BROOKLYN | Alteration | Permit Issued | 03/16/2026 | 03/17/2026 | Design CQ&J CORPORATION Owner MNB Developers Filer WM ARCH CORP | PARTIAL DEMOLITION ON EXISTING TWO-FAMILY FOUR-STORY FRAME RESIDENTIAL BUILDING WITH BASMENT & CELLAR.NO CHANGE OF BUILDING BULK,OCCUPANCY O… |
| B01352468 ↗ | 426 MAC DONOUGH STREET BROOKLYN | Alteration | Permit Issued | 02/22/2026 | 02/24/2026 | Design CQ&J CORPORATION Owner MNB Developers Filer WM ARCH CORP | EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT,1ST AND 2ND FLOOR.JOB FILED TO RELATED TO ALT 2 APPLICATION #B01352468-I1.N… |
| B01352596 ↗ | 246 HANCOCK STREET BROOKLYN | Alteration | Permit Issued | 02/11/2026 | 02/23/2026 | Design CQ&J CORPORATION | INTERIOR DEMOLITION ON EXISTING THREE (3) STORY WITH CELLAR, TWO (2) FAMILY RESIDENTIAL BUILDING. NO EXTERIOR WORK,NO CHANGE OF BUILDING BU… |
| B01353268 ↗ | 176 MACON STREET BROOKLYN | Alteration | Permit Issued | 02/11/2026 | 02/17/2026 | Design CQ&J CORPORATION | INTERIOR DEMOLITION ON EXISTING TWO (2)-FAMILY, THREE (3) STORY BRICK RESIDENTIAL BUILDING WITH BASEMENTAND CELLAR.NO CHANGE OF BUILDING BUL… |
| M01351509 ↗ | 225 1 AVENUE MANHATTAN | Alteration | Permit Issued | 02/09/2026 | 02/17/2026 | Design PETER CHO ARCHITECTS, PLLC | AN EXISTING COMMERICAL SPACE WITH PLUMBING WORK ON 1ST FLOOR ONLY.THIS APPLICATION RELATED TO DOB ALT 2 JOB #M01351509-I1.NO CHANGE IN USE,E… |
| B00788055 ↗ | 829 MARCY AVENUE BROOKLYN | Alteration | Permit Issued | 09/13/2022 | 02/11/2026 | Design CQ&J CORPORATION Filer WM ARCH CORP | INTERIOR RENOVATION IN EXISTING 3-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH BASEMENTAND CALLER. NO CHANGE ON USE, MEANS OF EGRESS OR OCCUPAN… |
| B01318343 ↗ | 5815 8 AVENUE BROOKLYN | Alteration | Signed-off | 11/25/2025 | 01/16/2026 | Design JD Design Associates Inc Owner LINS NODDLES 24 INC Filer JD DESIGN ASSOCIATES INC | MECHANICAL WORK FOR EXISTING COMMERCIAL SPACE ON 1ST FLOOR. INSTALL KITCHEN HOOD SYSTEM IN COMMERCIAL KITCHEN, NO CHANGE IN USE, EGRESS OR O… |
| M01274069 ↗ | 287 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/30/2025 | 01/14/2026 | Owner CLINY Filer METROPOLIS GROUP INC | STRUCTURAL WORK ON 9TH FLOOR AND 9TH FLOOR MEZZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 320202197BIS | 39 HERKIMER PLACE BROOKLYN | — | ISSUED | 04/06/2015 | 11/12/2025 | — | PL |
| 420663482BIS | 143-23 ASH AVENUE QUEENS | — | ISSUED | 10/16/2019 | 10/22/2025 | — | EQ, PL |
| M01197833 ↗ | 203 GRAND STREET MANHATTAN | Alteration | Permit Issued | 04/03/2025 | 05/30/2025 | Design CLIP ARCHITECTS Filer WM ARCH CORP | INTERIOR RENOVATION ON AN EXISTING MIXED USED BUILDING AT A COMMERCIAL STORE ON PARTIAL 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01209200 ↗ | 219 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 04/15/2025 | 04/28/2025 | Design RICHARD H BALSER, P.E. Owner BLUESTAR PROPERTIES INC | PLUMBING WORK TO APARTMENTS 1(1st floor) and 1C (2nd floor) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00868450 ↗ | 109-17 124 STREET QUEENS | Alteration CO | Permit Issued | 05/08/2023 | 02/03/2025 | Design FANG ARCHITECT | INSTALL (1) 8.0' WIDE NEW CURB CUT. |
| M01149524 ↗ | 314 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 12/19/2024 | 01/28/2025 | Design RICHARD H BALSER, P.E. Owner BLUESTAR PROPERTIES INC | GENERAL CONSTRUCTION TO APARTMENT 5 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01046033 ↗ | 151-14 10 AVENUE QUEENS | Alteration | Signed-off | 12/06/2024 | 01/03/2025 | Design H2 CONSULTING PE PC Filer H2 CONSULTING PE PC | ERECT FOUNDATION, ADD 2ND FLOOR AND ROOF FOR AN EXISTING ONE FAMILY HOUSE IN CONJUNCTION WITH Q01031082. |
| Q01095750 ↗ | 38-05 MAIN STREET QUEENS | Alteration | Signed-off | 08/22/2024 | 09/20/2024 | Design SUNG HO SHIN ARCHITECT, PC Owner WZ MANAGMENT GROUP LLC | INTERIOR RENOVATION IN EXISTING RETAIL STORE INCLUDING NEW STOREFRONT, NEW CEILING TILES, NON-FULL HEIGHT DIVIDER PARTITIONS, SLATED WALL PA… |
| Q01109781 ↗ | 38-05 MAIN STREET QUEENS | Alteration | Signed-off | 09/13/2024 | 09/20/2024 | Design SUNG HO SHIN ARCHITECT, PC | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE |
| B00881090 ↗ | 2210 CHURCH AVENUE BROOKLYN | Alteration | Signed-off | 06/15/2023 | 06/21/2024 | Design FANG ARCHITECT Filer FANG ARCHITECT | EXISTING FIRE DAMAGED COMMERCIAL BUILDING TO BE RENOVATED AND REPAIRED. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY. |
| Q00486309 ↗ | 147-07 46TH AVENUE QUEENS | New Building | Permit Issued | 04/26/2021 | 05/10/2024 | Design A & T ENGINEERING, P.C. Filer LOXTON INC | Propose shoring for 2 story with cellar building in conjunction with new building application. |
| B00979719 ↗ | 1409 FOSTER AVENUE BROOKLYN | Alteration CO | Permit Issued | 01/08/2024 | 04/16/2024 | Design FANG ARCHITECT | FILED PLUMBING WORK FOR A MEDICAL OFFICE ON 1ST FLOOR AND CELLAR. |
| 321970088BIS | 181 ATLANTIC AVENUE BROOKLYN | — | ISSUED | 01/25/2024 | 01/25/2024 | — | — |
| B00908417 ↗ | 181 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 07/25/2023 | 01/16/2024 | Design TIMES BUILDINGS PC | file temporary construction fence. |
| Q00915743 ↗ | 40-28 UTOPIA PARKWAY QUEENS | Alteration CO | Permit Issued | 08/08/2023 | 12/11/2023 | Design FANG ARCHITECT Owner HAPER LLC | VERTICAL ENLARGEMENT TO EXISTNG HOUSE AND CONVERT 1 FAMILY TO 2 FAMILIES. TO OBTAIN NEW C OF O |
| Q00944784 ↗ | 40-28 UTOPIA PARKWAY QUEENS | Alteration | Signed-off | 10/09/2023 | 10/12/2023 | Design FANG ARCHITECT | INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 JOB #Q00915743. |
| M00861566 ↗ | 224 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 04/24/2023 | 06/30/2023 | PROPOSE FACADE REPAIR FOR EXISTING EXTERIOR WALLS, AND WATERPROOFING SECTIONS AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. | |
| M00872235 ↗ | 287 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 06/02/2023 | 06/27/2023 | Design TYLin Owner CLINY Filer ADAM MAISER | Structural renovation at existing commercial space on floor 009. There is to be no change of use, occupancy, or egress. |
| B00841633 ↗ | 1104 AVENUE U BROOKLYN | Alteration | Signed-off | 03/15/2023 | 03/17/2023 | Design ZHENG ENGINEERING PLLC Owner XI YING FU REALITY LLC | INTERIOR ALTERATION OF AN EXISTING COMMERCIAL RETAIL SPACE ON THE 1st FLOOR INTO A PHARMACY RETAIL SPACE, EXISTING USE GROUP 6. REPLACEMENT … |
| Building | Filings | Most Recent |
|---|---|---|
| 37-35 29 STREET ↗ | 1 | 09/09/2026 |
| 49-12 167 STREET ↗ | 1 | 09/09/2026 |
| 287 PARK AVENUE SOUTH ↗ | 5 | 08/30/2026 |
| 46-32 192 STREET ↗ | 2 | 08/20/2026 |
| 137 4 AVENUE ↗ | 1 | 07/08/2026 |
| 47-29 163 STREET ↗ | 11 | 07/08/2026 |
| 93 MONROE STREET ↗ | 2 | 07/08/2026 |
| 181 ATLANTIC AVENUE ↗ | 1 | 07/08/2026 |
| 38-05 MAIN STREET ↗ | 4 | 07/08/2026 |
| 219 EAST 10 STREET ↗ | 1 | 07/08/2026 |
| 147-07 46TH AVENUE ↗ | 1 | 07/08/2026 |
| 1104 AVENUE U ↗ | 1 | 07/08/2026 |
| 2210 CHURCH AVENUE ↗ | 2 | 07/08/2026 |
| 253 MONROE STREET ↗ | 1 | 07/08/2026 |
| 203 GRAND STREET ↗ | 1 | 07/08/2026 |
| 720A QUINCY STREET ↗ | 2 | 06/27/2026 |
| 5815 8 AVENUE ↗ | 2 | 04/09/2026 |
| 227 WYCKOFF STREET ↗ | 1 | 04/09/2026 |
| 123-25 82 AVENUE ↗ | 1 | 04/09/2026 |
| 246 HANCOCK STREET ↗ | 1 | 04/09/2026 |
| 426 MAC DONOUGH STREET ↗ | 1 | 04/09/2026 |
| 829 MARCY AVENUE ↗ | 1 | 04/09/2026 |
| 225 1 AVENUE ↗ | 1 | 04/09/2026 |
| 176 MACON STREET ↗ | 1 | 04/09/2026 |
| 151-14 10 AVENUE ↗ | 2 | 04/09/2026 |
| 109-17 124 STREET ↗ | 1 | 04/09/2026 |
| 314 EAST 9 STREET ↗ | 3 | 03/21/2026 |
| 1409 FOSTER AVENUE ↗ | 3 | 03/21/2026 |
| 224 WEST 30 STREET ↗ | 3 | 03/21/2026 |
| 40-28 UTOPIA PARKWAY ↗ | 6 | 03/21/2026 |