11-01 43RD AVENUE · BIN 4005284
💬 Discuss this project
2008Year Built
11Stories
HBBuilding Class
M1-5AZoning
31,520 sfGross Floor Area
1Units
LL97 Covered13 Active Violations ▸FISP: SWARMP
Boutique hotel: 10-100 rooms, luxury, full-service · Owner of record: Z Hotel Lic Principal · 16,000 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofABC Field Operations, Z Hotel26p · 9 filings · 20 docs
Floor 2Taconic Capital4p · 1 filing · 8 docs
Floor 1ABC Field Operations, Z Hotel86p · 7 filings · 20 docs
CellarABC Field Operations, Z Hotel77p · 4 filings · 20 docs
Site & exteriorHKdEL LI PRIN IPAL LL19p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
43-45 11th Street Realty4303/21/2026
RCJ Constructions1003/22/2026
Zhotel707/08/2026
Henery Limousine703/21/2026
11-01 48th Ave103/21/2026
PH Lic Partners103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2025$25.5M—Z Hotel Lic Principal → PH Lic Partners$809/sf building
05/11/2021$38.4M—1101-43 AVE ACQUISITION LLC → Z HOTEL LIC NOMINEE LLC$1,218/sf building
07/31/2018$32.2M—1101 43RD AVENUE MEZZ LLC → 1101-43 AVE ACQUISITION LLC$1,023/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vibrancy Consulting103/21/2026
Shalat Architects602/25/2026
LWL Associates302/03/2026
McHenery Testing Lab111/17/2025
Always Fast Services111/15/2025
Black Sheep Engineering Group111/06/2024
MG Engineering307/03/2024
Wexler Associates206/24/2024
Corgan101/31/2024
Jis Consulting110/24/2022
Newtec Engineering202/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting303/21/2026
Self Employed103/21/2026
Milrose Consultants1203/21/2026
Shalat Architects P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM Construction ManagementGeneral Contractor507/08/2026
Park Contracting GroupScaffold303/21/2026
Lab Plumbing & Heating CoPlumbing307/08/2026
Denair HVACspecialty_contractor207/08/2026
RM Electric CoElectrical203/22/2026
RM Electric CoElectrical203/21/2026
James E FitzgeraldGeneral Contractor207/08/2026
Chards Division ItGeneral Contractor203/21/2026
HI-Build ConstructionScaffold107/08/2026
A Plus PlumbingPlumbing107/08/2026
Cogen Electrical ServicesElectrical103/22/2026
PSI PartnersFire Protection107/08/2026
Stat ElectricElectrical103/21/2026
Nash Electric ServicesElectrical103/21/2026
HI-Build ConstructionGeneral Contractor107/08/2026
RM Electric CoGeneral Contractor103/22/2026
CS BridgeScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Butterfield & O'Connor4189103/21/2026
TSF Engineering1274302/25/2026
Shalat Architects2036602/25/2026
Prime Zone Building Consulting9474102/03/2026
Andrew Goodrich, P.E., PL965201/08/2025
Milrose Consultants2003607/03/2024
Obaid Mian849202/21/2020
Building Lifecycle
All (155)Filed (22)Permit Issued (15)Signed Off (13)Facade (FISP) (3)Violation (60)Inspection (7)Objection (5)Special Inspection (30)
09/14/2026
Signed off — Alteration
Q01316025-I1
09/01/2026
Signed off — Alteration
MINOR REPAIRS ON EXISTING FACADE. NO CHANGE IN OCCUPANCY OR EGRESS.
Q01364790-I1
07/28/2026
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01320511-I1
05/14/2026
Permit issued — General Construction
Q01364790-I1-GC
05/11/2026
Violation issued (HPD, open)
A
05/07/2026
Objection resolved — Resolved
04/19/2026
Objection resolved — Addressed
04/14/2026
Objection raised — Admin
04/14/2026
Objection raised — Cost
03/21/2026
Filed — Alteration
MINOR REPAIRS ON EXISTING FACADE. NO CHANGE IN OCCUPANCY OR EGRESS.
Q01364790-I1
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN T. O'CONNOR
03/02/2026
Signed off — Alteration
REMOVAL OF EXISTING WATER CLOSET AND LAVATORY IN CELLAR. INSTALLATION OF NEW EMPLOYEE SHOWER IN CELLAR. INSTALLATION OF NEW SLOP SINK AND EMERGENCY EYE WASH STATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Q01054055-S1
03/02/2026
Special inspection requirement — Final
SHAFIQUE ISLAM
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
02/26/2026
Special inspection requirement — Final
Nicholas Tucci
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Shalat
02/26/2026
Special inspection requirement — Mechanical Systems
Nicholas Tucci
02/25/2026
Filed — Alteration
REMOVAL OF EXISTING WATER CLOSET AND LAVATORY IN CELLAR. INSTALLATION OF NEW EMPLOYEE SHOWER IN CELLAR. INSTALLATION OF NEW SLOP SINK AND EMERGENCY EYE WASH STATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Q01054055-P4
02/20/2026
Special inspection requirement — Mechanical Systems
Nicholas Tucci
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
02/20/2026
Special inspection requirement — Final
Nicholas Tucci
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Shalat
02/03/2026
Filed — Alteration
PROVIDE NEW MECHANICAL SYSTEM ON ROOF ONLY OF EXISTING 11 STORY COMMERCIAL BUILDING IN CONJUNCTION WITH ALT-2 APPLICATION #Q01000197. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Q01320783-I1
11/21/2025
Violation issued (HPD, open)
I
11/18/2025
Permit issued — Supported Scaffold
Q01320511-I1-SF
11/18/2025
Special inspection requirement — Final
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
11/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
11/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
11/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
11/18/2025
Special inspection requirement — Mechanical Systems
JICHEN SUN
11/18/2025
Special inspection requirement — Heating Systems
JICHEN SUN
11/17/2025
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01320511-I1
11/17/2025
Permit issued — Sidewalk Shed
Q01316025-I1-SH
11/15/2025
Filed — Alteration
Q01316025-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/2025
Signed off — Alteration
Q01136459-I1
06/16/2025
Violation issued (HPD, open)
A
06/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2025
Signed off — Alteration
REMOVAL OF EXISTING WATER CLOSET AND LAVATORY IN CELLAR. INSTALLATION OF NEW EMPLOYEE SHOWER IN CELLAR. INSTALLATION OF NEW SLOP SINK AND EMERGENCY EYE WASH STATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Q01054055-I1
01/30/2025
Signed off — Alteration
REPLACE AWNING ON THE ROOF OF EXISTING BUILDING AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Q01000197-I1
01/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/10/2025
Special inspection requirement — Post-installed Anchors
ANDREW GOODRICH
01/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANDREW GOODRICH
01/08/2025
Filed — Alteration
REPLACE AWNING ON THE ROOF OF EXISTING BUILDING AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Q01000197-P1
01/08/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANDREW GOODRICH
12/16/2024
Special inspection requirement — Post-installed Anchors
ANDREW GOODRICH
11/29/2024
Violation issued (HPD, open)
I
11/25/2024
Special inspection requirement — Final
Edward Shalat
11/25/2024
Special inspection requirement — Lighting controls
Edward Shalat
11/25/2024
Special inspection requirement — Interior lighting power
Edward Shalat
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Shalat
11/22/2024
Filed — Alteration
REMOVAL OF EXISTING WATER CLOSET AND LAVATORY IN CELLAR. INSTALLATION OF NEW EMPLOYEE SHOWER IN CELLAR. INSTALLATION OF NEW SLOP SINK AND EMERGENCY EYE WASH STATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Q01054055-P1
11/22/2024
Filed — Alteration
REMOVAL OF EXISTING WATER CLOSET AND LAVATORY IN CELLAR. INSTALLATION OF NEW EMPLOYEE SHOWER IN CELLAR. INSTALLATION OF NEW SLOP SINK AND EMERGENCY EYE WASH STATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Q01054055-P2
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHI-Build Construction05/14/2026
DOB NOWSupported ScaffoldSigned-offHI-Build Construction11/18/2025
DOB NOWSidewalk ShedSigned-offPark Contracting Group11/17/2025
DOB NOWGeneral ConstructionSigned-offChards Division It11/10/2024
DOB NOWSidewalk ShedSigned-offCS Bridge11/07/2024
DOB NOWPlumbingPermit IssuedLab Plumbing & Heating Co07/31/2024
DOB NOWStructuralSigned-offJRM Construction Management06/27/2024
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald06/21/2024
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald06/18/2024
DOB NOWPlumbingSigned-offA Plus Plumbing04/05/2024
DOB NOWSprinklersSigned-offMora Fire Protection04/02/2024
DOB NOWMechanical SystemsSigned-offJRM Construction Management03/14/2024
DOB NOWGeneral ConstructionSigned-offJRM Construction Management03/14/2024
DOB NOWMechanical SystemsSigned-offDenair HVAC02/24/2020
DOB NOWMechanical SystemsSigned-offDenair HVAC11/14/2019
BISFPISSUEDFire Command Co01/23/2019
BISOTISSUEDBrick by Brick Construction05/05/2017
BISFPISSUEDMaster Fire Systems01/04/2012
BIS—ISSUEDA.M.A. Holdings10/07/2011
BISOTISSUED11-01 43rd Avenue Realty05/12/2011
BISPLISSUEDCopper Plumbing & Heating04/26/2011
BISFPISSUEDMaster Fire Systems12/23/2010
BISFSISSUEDPeter Agliardo Contractor10/12/2010
BISOTISSUEDMJM Construction Services09/21/2010
BIS—ISSUEDMJM Construction Services07/30/2010
BISSPISSUEDCma Plumbing & Heating06/10/2010
BISSDISSUEDCma Plumbing & Heating06/10/2010
BISEQISSUEDPerimeter Bridge & Scaffo03/12/2010
BISPLISSUEDCopper Plumbing & Heating03/04/2010
BISSDISSUEDCma Plumbing & Heating08/14/2009
BISEQISSUEDMJM Construction Services08/10/2009
BIS—ISSUEDMJM Construction Services07/29/2009
BISEQISSUEDMJM Construction Services07/28/2009
BISEQISSUEDPerimeter Bridge & Scaffo06/10/2009
BISEQISSUEDMJM Construction Services05/21/2009
BISSPISSUEDCma Plumbing & Heating04/22/2009
BISPLISSUEDCopper Plumbing & Heating02/05/2009
BIS—ISSUEDMJM Construction Services12/10/2008
BIS—ISSUEDM & O Iron Works02/07/2008
BISEQISSUEDM & O Iron Works02/06/2008
+ 6 more permits on file
2 projects · most recent 02/25/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/25/2026Signed-offJames E FitzgeraldAir Conditioning Systems
Cooling
Daikin EVAPORATOR MODEL NUMBER: RXF09AXVJU CONDENSER MODEL NUMBER: RXSQ24TBVJUA 2 tons · Fan Coil Indoor ×1
02/03/2026——Air Conditioning Systems, Heating Systems—
1 project · most recent 02/25/2026
Water/Sanitary
FiledStatusContractorScope
02/25/2026Permit IssuedLab Plumbing & Heating CoWater/Sanitary
6 projects · most recent 05/20/2026
General Wiring Lighting
FiledStatusContractorScope
05/20/2026CompleteBigman BrothersGeneral Wiring, Lighting
11/17/2025Permit IssuedRichard Neu—
04/02/2025CompleteRM Electric CoGeneral Wiring
11/14/2024CompleteNash Electric Services—
06/21/2024CompleteCogen Electrical ServicesGeneral Wiring
01/10/2024CompleteRM Electric Co2 meters
1 project · most recent 11/17/2025
Scaffold
FiledStatusContractorScope
11/17/2025Signed-offHI-Build ConstructionScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
03/18/2026Tenant Protection Plan ComplianceBRIAN T. O'CONNORspecial
03/02/2026FinalSHAFIQUE ISLAMprogress
02/26/2026Energy Code Compliance InspectionsNicholas Tucciprogress
02/26/2026FinalNicholas Tucciprogress
02/26/2026Fire-Resistant Penetrations and JointsEdward Shalatspecial
02/26/2026Mechanical SystemsNicholas Tuccispecial
02/20/2026Mechanical SystemsNicholas Tuccispecial
02/20/2026Energy Code Compliance InspectionsNicholas Tucciprogress
02/20/2026FinalNicholas Tucciprogress
02/20/2026Fire-Resistant Penetrations and JointsEdward Shalatspecial
11/18/2025Final—progress
11/18/2025Energy Code Compliance InspectionsJICHEN SUNprogress
11/18/2025HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
11/18/2025HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
11/18/2025HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
11/18/2025Mechanical SystemsJICHEN SUNspecial
11/18/2025Heating SystemsJICHEN SUNspecial
01/10/2025Post-installed AnchorsANDREW GOODRICHspecial
01/10/2025Structural Stability – Alterations of existing buildingsANDREW GOODRICHspecial
12/16/2024Structural Stability – Alterations of existing buildingsANDREW GOODRICHspecial
12/16/2024Post-installed AnchorsANDREW GOODRICHspecial
11/25/2024FinalEdward Shalatprogress
11/25/2024Lighting controlsEdward Shalatenergy_progress
11/25/2024Interior lighting powerEdward Shalatenergy_progress
11/25/2024Fire-Resistant Penetrations and JointsEdward Shalatspecial
Latest 25 of 50.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
ABC Field OperationsOfficeCellar, Floor 1, Roof
Project Q01054055 Alteration · Permit Entire · 06/03/2024
Z HotelHotel / LodgingFloor 1, Roof
Project Q00226450 Alteration · LOC Issued · 11/12/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 297 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch18
08/23/2026Q00992918-I1Request digital key ↗
08/23/2026Q00992973-P1Request digital key ↗
08/23/2026Q00992973-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00226450-I1Request digital key ↗
08/28/2026Q00299436-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026Q08019744-I1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION19
01/22/2019440529643Open ↗
05/12/2017421480230Open ↗
01/05/2012420519861Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION18
01/22/2019440529643Open ↗
05/12/2017421480230Open ↗
01/05/2012420519861Open ↗
Showing 3 of 18 on file for this type
▸BISPLACE OF ASSEMBLY1
06/04/2019421419183Open ↗
▸Seals & Professional Certifications112
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
06/04/2019421419183Open ↗
06/04/2019421419183Open ↗
05/15/2019440529643Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/28/2026Q00299436-I1Open ↗
08/25/2026Q08019744-I1Open ↗
08/23/2026Q00992918-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026Q01364790-I1Open ↗
08/31/2026Q08019744-I1Open ↗
08/28/2026Q01054055-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026Q01364790-I1Open ↗
08/29/2026Q00992973-P1Open ↗
08/28/2026Q01054055-P4Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
01/05/2012420519861Open ↗
10/11/2011420489705Open ↗
12/08/2010420294657Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/12/2017421480230Open ↗
01/05/2012420519861Open ↗
10/11/2011420489705Open ↗
Showing 3 of 9 on file for this type
▸BISPC FULL REPORT2
01/29/2008410058690Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/22/2019440529643Open ↗
05/12/2017421480230Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/22/2019440529643Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/22/2019440529643Open ↗
▸Trade Schedules & Equipment24
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT9
02/03/2011420253530Open ↗
01/26/2011420253530Open ↗
01/21/2011420253530Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
05/25/2011420058056Open ↗
04/27/2011420058056Open ↗
02/24/2011420058056Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/25/2011420058056Open ↗
05/20/2011420294657Open ↗
04/25/2011420294657Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
05/25/2011420058056Open ↗
04/27/2011420058056Open ↗
▸BISSTANDPIPE INSP REPORT : FP-842
05/25/2011420058056Open ↗
04/27/2011420058056Open ↗
▸BISSCHEDULE B - PLUMBING2
12/09/2010420058056Open ↗
08/04/2009420058056Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
12/08/2010420294657Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/12/2017421480230Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
12/08/2010420294657Open ↗
11/12/2009420103845Open ↗
08/04/2009420058056Open ↗
▸BISTenant Protection Plan and Notes1
05/12/2017421480230Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/18/2011420058056Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/23/2026Q00992918-I1Open ↗
08/23/2026Q00992973-I1Open ↗
08/23/2026Q00992973-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
12/08/2010420294657Open ↗
11/19/2010420027660Open ↗
09/17/2010420253530Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/15/2010420296995Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/12/2017421480230Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/12/2017421480230Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/22/2019440529643Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/04/2019421419183Open ↗
▸Approvals, Objections & Sign-offs37
▸BISADMINISTRATIVE OBJECTIONS12
01/05/2012420519861Open ↗
10/11/2011420489705Open ↗
12/15/2010420296995Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
01/13/2020421419183Open ↗
06/10/2019421419183Open ↗
06/04/2019421419183Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
05/15/2019440529643Open ↗
05/26/2011420058056Open ↗
05/09/2011420296995Open ↗
Showing 3 of 12 on file for this type
▸BISSHED LETTER1
05/13/2010420027660Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
05/15/2019440529643Open ↗
01/22/2019440529643Open ↗
05/12/2017421480230Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET11
05/12/2017421480230Open ↗
01/05/2012420519861Open ↗
10/11/2011420489705Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION2
06/29/2010420027660Open ↗
06/25/2010420027660Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/22/2019440529643Open ↗
▸Other Documents5
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
05/09/2011420296995Open ↗
04/27/2011420058056Open ↗
05/15/2019440529643Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-862
05/25/2011420058056Open ↗
04/27/2011420058056Open ↗