| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01342129 ↗ | 185 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 01/23/2026 | 09/08/2026 | Owner FIRSTSERVICE RESIDENTIAL | Split AC Installation as per plans. No change to use, egress, or occupancy. |
| M01402551 ↗ | 259 EAST 7 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/30/2026 | Design MARCY ENGINEERING, PLLC | Installation of (1) ceiling ducted packaged heat pump unit to serve building lobby. |
| B01402352 ↗ | 208 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 06/04/2026 | 06/10/2026 | Design MARCY ENGINEERING, PLLC Owner PINTCHIK | Replacing existing split heat pump system serving sales area on ground floor. |
| M01313498 ↗ | 228 WEST 71 STREET MANHATTAN | Alteration | Signed-off | 12/30/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC | New heat pump installation to include: (1) 5-Ton 1-to-1 ducted AHU to replace existing split system. (1) 3-Ton multi-zone system with (3) 1-… |
| M01320386 ↗ | 500 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 12/16/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC | Replacement of (2) ducted heat pump systems. (1) for the Gym, (1) for the Lobby |
| M01324960 ↗ | 400 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 12/12/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC Owner EQUITY RESIDENTIAL | Installation of (2) new ducted split heat pump systems to replace indoor packaged air cooled units for existing retail space (Step Soul Spa)… |
| Name | Projects together | Most recent |
|---|---|---|
| MARCY ENGINEERING, PLLC | 5 | 06/12/2026 |
| NEWTEC ENGINEERING | 4 | 08/05/2025 |
| VENTROP ENGINEERING CONSULTING GROU | 3 | 11/04/2020 |
| ALL CITY ENGINEERING, P.C. | 1 | 04/20/2023 |
| ARCHITECTURAL AND ENGINEERING SERVI | 1 | 06/17/2025 |
| AUTOMATED DESIGN ENGINEERING, PLLC | 1 | 06/17/2025 |
| BBR ENGINEERING | 1 | 06/17/2025 |
| CASCO | 1 | 06/17/2025 |
| CITY BUILDING NY ARCHITECT P.C. | 1 | 03/19/2024 |
| EJC ENGINEERING, PLLC | 1 | 01/17/2020 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 07/18/2025 |
| HIGHLAND ASSOCIATES | 1 | 06/09/2020 |
| KHACHATURIAN ENGINEERING ASSOCIATES | 1 | 11/20/2019 |
| LORING CONSULTING ENGINEERS, INC. | 1 | 01/08/2020 |
| PIRO STUDIO LLC | 1 | 01/24/2022 |
| Stone Engineering & Architecture | 1 | 01/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| A & M WARSHAW PLBG & HTG | 1 | 06/17/2025 |
| DGC CAPITAL CONTRACTING C | 1 | 06/17/2025 |
| PLUMBING WORKS CORP | 1 | 06/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| EQUITY RESIDENTIAL | 4 | 06/12/2026 |
| 41 GREAT JONES HOLDING, LLC | 1 | 06/17/2025 |
| FirstService Residential | 1 | 01/23/2026 |
| INSERRA SUPERMARKETS,INC. | 1 | 07/18/2025 |
| JOSEPH P. DAY REALTY | 1 | 06/09/2020 |
| PINTCHIK | 1 | 06/04/2026 |
| THE DERMOT COMPANY | 1 | 08/05/2025 |
| THE MOINIAN GROUP | 1 | 11/20/2019 |
| ZHOTEL | 1 | 11/12/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| GERALD J. CALIENDO R.A., P.C. | 1 | 06/17/2025 |
| MARIN ARCHITECTS, P.C. | 1 | 07/18/2025 |
| STONE ENGINEERING & ARCHITECTURE DP | 1 | 01/23/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01342129 ↗ | 185 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 01/23/2026 | 09/08/2026 | Owner FIRSTSERVICE RESIDENTIAL | Split AC Installation as per plans. No change to use, egress, or occupancy. |
| M01402551 ↗ | 259 EAST 7 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/30/2026 | Design MARCY ENGINEERING, PLLC | Installation of (1) ceiling ducted packaged heat pump unit to serve building lobby. |
| B01402352 ↗ | 208 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 06/04/2026 | 06/10/2026 | Design MARCY ENGINEERING, PLLC Owner PINTCHIK | Replacing existing split heat pump system serving sales area on ground floor. |
| M01313498 ↗ | 228 WEST 71 STREET MANHATTAN | Alteration | Signed-off | 12/30/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC | New heat pump installation to include: (1) 5-Ton 1-to-1 ducted AHU to replace existing split system. (1) 3-Ton multi-zone system with (3) 1-… |
| M01320386 ↗ | 500 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 12/16/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC | Replacement of (2) ducted heat pump systems. (1) for the Gym, (1) for the Lobby |
| M01324960 ↗ | 400 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 12/12/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC Owner EQUITY RESIDENTIAL | Installation of (2) new ducted split heat pump systems to replace indoor packaged air cooled units for existing retail space (Step Soul Spa)… |
| B01222344 ↗ | 236 LIVINGSTON STREET BROOKLYN | Alteration | Signed-off | 08/05/2025 | 09/17/2025 | Design NEWTEC ENGINEERING Owner DERMOT COMPANY | Replacement of air conditioning unit. No change in use egress and occupancy. |
| M01199973 ↗ | 831 8 AVENUE MANHATTAN | Alteration | Permit Issued | 05/30/2025 | 07/16/2025 | Design NEWTEC ENGINEERING Owner EQUITY RESIDENTIAL | Replacement of roof mounted air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy. |
| B01049519 ↗ | 523 FULTON STREET BROOKLYN | Alteration | Permit Issued | 07/03/2024 | 04/14/2025 | Filer MARIN ARCHITECTS, P.C. | Filed herewith for mechanical work including commercial kitchen rangehood ventilation system for Fresh Grocer, as shown on plans. No change … |
| S01022806 ↗ | 85 BRICKTOWN WAY STATEN ISLAND | Alteration | Signed-off | 03/28/2024 | 08/09/2024 | STRUCTURAL MODIFICATIONS AS REQUIRED TO EXISTING BUILDING. AND TO OBTAIN A LETTER OF COMPLETEION. NO CHANGE TO USE OCCUPANCY OR EGRESS. | |
| B00990531 ↗ | 586 5 AVENUE BROOKLYN | Alteration | Signed-off | 01/26/2024 | 03/18/2024 | Remedy ECB violation # 39103235J. To file MS work type. Install new gas HVAC unit at 1st floor. No change in use, egress, or occupancy unde… | |
| 123860152BIS | 446 WEST 14 STREET MANHATTAN | — | ISSUED | 04/06/2023 | 09/21/2023 | — | MH, OT, PL |
| M00842940 ↗ | 95 SOUTH STREET MANHATTAN | Alteration | Signed-off | 04/20/2023 | 05/31/2023 | Design ALL CITY ENGINEERING, P.C. | Modify mechanical works and associated piping as shown on drawings filed herewith. No change in use, egress or occupancy. |
| M00664695 ↗ | 831 8 AVENUE MANHATTAN | Alteration | Signed-off | 01/24/2022 | 02/22/2023 | Design PIRO STUDIO LLC | Replacement of (1) 10 ton air cooled split system on modified existing roof curb and supports. |
| M00422512 ↗ | 831 8 AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2020 | 11/16/2020 | Owner EQUITY RESIDENTIAL Filer ROBERT S. SCHNITZER | Herewith filing replacement of existing condensing units with two (2) new condensing units on the 2nd floor setback roof. |
| M00336331 ↗ | 10 EAST 40 STREET MANHATTAN | Alteration | Permit Issued | 06/09/2020 | 07/09/2020 | Design HIGHLAND ASSOCIATES | Mechanical work as shown on plans. |
| B00297740 ↗ | 111 LAWRENCE STREET BROOKLYN | Alteration | Signed-off | 01/17/2020 | 06/11/2020 | Design EJC ENGINEERING, PLLC | REMOVE EXISTING DRY COOLER, AND INSTALL NEW SAME TONNAGE DRY COOLER WITH PIPING SYSTEM ON 3RD AND 4TH FLOOR. NO CHANGE OF USE, OCCUPANCY, OR… |
| B00236119 ↗ | 44 COURT STREET BROOKLYN | Alteration | Signed-off | 01/08/2020 | 05/12/2020 | PPNY - Mechanical modifications as per plans filed herewith. No change in use egress or occupancy. | |
| B00275726 ↗ | 53 NORTH 3 STREET BROOKLYN | Alteration | Signed-off | 01/27/2020 | 02/24/2020 | Application being filed to obtain Certificate of Compliance for rooftop units shown in schedule with plan filed herewith. Equipment original… | |
| Q00299436 ↗ | 11-01 43 AVENUE QUEENS | Alteration | Signed-off | 02/21/2020 | 02/24/2020 | Design NEWTEC ENGINEERING | INSTALLATION OF (2) 5 TON SPLIT AIR CONDITIONING UNITS ON THE FIRST FLOOR & ROOF. |
| M00273708 ↗ | 400 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 12/04/2019 | 01/17/2020 | Owner EQUITY RESIDENTIAL Filer ROBERT S. SCHNITZER | This application is being filed to obtain Certificate of Compliance for the rooftop units shown in the schedule with plan filed herewith. Eq… |
| M00256991 ↗ | 531 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/20/2019 | 12/12/2019 | Owner THE MOINIAN GROUP Filer VALERIO ARCHITECTS | REUSE EXISTING MECHANICAL EQUIPMENT WITH NEW MECHANICAL DUCTWORK. |
| Q00226450 ↗ | 11-01 43 AVENUE QUEENS | Alteration | Signed-off | 11/12/2019 | 11/14/2019 | Design NEWTEC ENGINEERING Owner ZHOTEL | INSTALLATION OF AIR CONDITIONING UNITS ON THE ROOF AND 1ST FLOOR. |
| 122929091BIS | 750 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 04/10/2017 | 04/10/2017 | — | MH |
| 122630313BIS | 28 WEST 12 STREET MANHATTAN | — | ISSUED | 08/23/2016 | 08/23/2016 | — | MH |
| 122385347BIS | 303 EAST 83 STREET MANHATTAN | — | ISSUED | 07/23/2015 | 07/23/2015 | — | MH |
| 121947723BIS | 266 MADISON AVENUE MANHATTAN | — | ISSUED | 04/14/2014 | 04/14/2014 | — | MH |
| 121625795BIS | 5 DEY STREET MANHATTAN | — | ISSUED | 11/14/2013 | 01/31/2014 | — | MH, PL |
| 121137108BIS | 41 WEST 86 STREET MANHATTAN | — | ISSUED | 07/13/2012 | 07/13/2012 | — | MH |
| 120407746BIS | 228 WEST 71 STREET MANHATTAN | — | ISSUED | 07/22/2010 | 07/22/2010 | — | MH |
| Building | Filings | Most Recent |
|---|---|---|
| 185 WEST END AVENUE ↗ | 1 | 09/09/2026 |
| 208 FLATBUSH AVENUE ↗ | 1 | 07/08/2026 |
| 586 5 AVENUE ↗ | 1 | 07/08/2026 |
| 95 SOUTH STREET ↗ | 1 | 07/08/2026 |
| 53 NORTH 3 STREET ↗ | 1 | 07/08/2026 |
| 11-01 43 AVENUE ↗ | 2 | 07/08/2026 |
| 523 FULTON STREET ↗ | 1 | 07/08/2026 |
| 400 WEST 37 STREET ↗ | 2 | 07/08/2026 |
| 531 5 AVENUE ↗ | 1 | 07/08/2026 |
| 85 BRICKTOWN WAY ↗ | 1 | 07/08/2026 |
| 259 EAST 7 STREET ↗ | 1 | 07/02/2026 |
| 500 WEST 23 STREET ↗ | 1 | 04/09/2026 |
| 228 WEST 71 STREET ↗ | 1 | 04/09/2026 |
| 236 LIVINGSTON STREET ↗ | 1 | 04/09/2026 |
| 831 8 AVENUE ↗ | 7 | 04/09/2026 |
| 44 COURT STREET ↗ | 3 | 03/21/2026 |
| 111 LAWRENCE STREET ↗ | 6 | 03/21/2026 |
| 10 EAST 40 STREET ↗ | 3 | 03/21/2026 |