← Back
Elevator apt, semi-fireproof without stores
Astoria West Phase Two
11-12 30 DRIVE · BIN 4623158
💬 Discuss this project
2021Year Built
8Stories
D1Building Class
R7AZoning
182,602 sfGross Floor Area
266Units
Rent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: ASTORIA WEST, LLC · 43,403 sf lot · 4.21 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Roof5p · 2 filings · 20 docs
Floor 81p · 1 filing · 9 docs
Floor 71p · 1 filing · 9 docs
Floor 62p · 1 filing · 9 docs
Floor 52p · 1 filing · 9 docs
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPE ADVISORS3307/08/2026
ANY YAPI CME NY LLC103/22/2026
ANT YAPI CMC NY LLC403/22/2026
BRYAN'S QUALITY PLUS LLC103/22/2026
VERNON REALTY203/22/2026
11-12 30TH DRIVE1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1603/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARSENAL SCAFFOLD INCGeneral Contractor1407/08/2026
MEDCO PLUMBING INC.Fire Protection407/08/2026
L S SIGNScaffold207/08/2026
DAND, RICHARDFire Protection103/21/2026
ANT YAPI CIVIC NY LLCGeneral Contractor107/08/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
DEMENUS MANFREDGeneral Contractor103/21/2026
MEDCO PLUMBINGGeneral Contractor103/21/2026
STELLMAR PLBG & MECH.CORPPlumbing107/08/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688612/23/2021
Building Lifecycle
All (91)Filed (14)Permit Issued (17)Signed Off (9)Violation (30)Inspection (3)Objection (4)Special Inspection (14)
05/29/2026
Violation issued (ECB, open)
Construction
05/29/2026
Violation issued (ECB, open)
Construction
04/03/2025
Violation issued (HPD, closed)
A
04/18/2024
Violation issued (HPD, closed)
A
10/09/2023
Violation issued (HPD, open)
A
03/06/2023
Signed off — Alteration
Q08030787-I1
03/06/2023
Signed off — Alteration
Q08030788-I1
02/10/2023
Permit issued — Sign
Q08030788-I1-SG
02/10/2023
Permit issued — Sign
Q08030787-I1-SG
02/07/2023
Violation issued (ECB, closed)
Construction
02/07/2023
Violation issued (ECB, closed)
Quality of Life
02/01/2023
Signed off — Alteration
Filing for temporary use permit for a temporary leasing office on the 1st floor and model units on the 2nd,3rd,4th,5th and 6th floors pursuant to section AC28-111 and Buildings Bulletin 2010-002. There is no construction work filed.
Q00648233-I1
01/17/2023
Filed — Alteration
Q08030787-I1
01/17/2023
Filed — Alteration
Q08030788-I1
01/17/2023
Special inspection requirement — Final
MOHAMMAD AHEAD
01/17/2023
Special inspection requirement — Final
MOHAMMAD AHEAD
11/15/2022
Violation issued (HPD, closed)
I
11/02/2022
Signed off — Alteration
INSTALLATION OF 3 NEW BOILER IN CONJUNCTION WITH NB # 420664481
Q00342312-I1
10/17/2022
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEMS IN CONJUNCTION WITH NEW BUILDING # 420664481
Q00294085-I1
08/10/2022
Filed — No Work
Q00787492-I1
08/02/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY AIR-PRESSURIZED DRY STANDPIPE SYSTEM IN CONJUNCTION WITH NB # 420664481.
Q00287554-I1
05/24/2022
Signed off — Alteration
Q00428048-I1
04/27/2022
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00327123-I1
04/27/2022
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00345135-I1
03/27/2022
Violation issued (ECB, closed)
Construction
03/22/2022
Permit issued — Supported Scaffold
Q00428048-I1-SF
03/22/2022
Permit issued — Construction Fence
Q00345135-I1-FN
03/02/2022
Permit issued — Sidewalk Shed
Q00327123-I1-SH
01/20/2022
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
01/12/2022
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
01/12/2022
Special inspection requirement — Standpipe Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/29/2021
Permit issued — General Construction
Q00648233-I1-GC
12/23/2021
Filed — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEMS IN CONJUNCTION WITH NEW BUILDING # 420664481
Q00294085-P1
12/15/2021
Filed — Alteration
Filing for temporary use permit for a temporary leasing office on the 1st floor and model units on the 2nd,3rd,4th,5th and 6th floors pursuant to section AC28-111 and Buildings Bulletin 2010-002. There is no construction work filed.
Q00648233-I1
12/15/2021
Special inspection requirement — Final
CHRISTOPHER FOGARTY
12/10/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/07/2021
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/07/2021
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/07/2021
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
12/07/2021
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2021
Filed — Alteration
INSTALLATION OF 3 NEW BOILER IN CONJUNCTION WITH NB # 420664481
Q00342312-P2
12/03/2021
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2021
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2021
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/03/2021
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
11/12/2021
Filed — Alteration
INSTALLATION OF 3 NEW BOILER IN CONJUNCTION WITH NB # 420664481
Q00342312-P1
11/05/2021
Permit issued — Boiler Equipment
Q00342312-I1-BE
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2021
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/07/2021
Permit issued — Standpipe
Q00294085-I1-EW-SD
06/17/2021
Violation issued (ECB, closed)
Unknown
06/11/2021
Violation issued (ECB, closed)
Unknown
06/11/2021
Violation issued (ECB, closed)
Construction
05/18/2021
Permit issued — Standpipe
Q00287554-I1-EW-SD
05/13/2021
Violation issued (ECB, closed)
Site Safety
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offWEINFELD, ELLIOT02/10/2023
DOB NOWSignSigned-offWEINFELD, ELLIOT02/10/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/22/2022
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/22/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/02/2022
DOB NOWGeneral ConstructionSigned-offANT YAPI CIVIC NY LLC12/29/2021
DOB NOWBoiler EquipmentSigned-offSTELLMAR PLBG & MECH.CORP11/05/2021
DOB NOWStandpipeSigned-offMEDCO PLUMBING INC.07/07/2021
DOB NOWStandpipeSigned-offMEDCO PLUMBING INC.05/18/2021
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/04/2021
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/03/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/03/2021
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC11/24/2020
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC05/05/2020
DOB NOWStandpipeSigned-offMEDCO PLUMBING INC.04/23/2020
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/06/2020
DOB NOWStandpipeSigned-offMEDCO PLUMBING INC.02/05/2020
BIS—ISSUEDANT YAPI CIVIC NY LLC09/28/2022
BISPLISSUEDMEDCO PLUMBING INC03/07/2022
BISEQISSUEDANT YAPI CIVIC NY LLC01/07/2022
BISPLISSUEDMEDCO PLUMBING INC12/03/2021
BIS—ISSUEDANT YAPI CIVIC NY LLC10/18/2021
BISPLISSUEDMEDCO PLUMBING INC03/09/2021
BISEQISSUEDANT YAPI CIVIC NY LLC02/04/2021
BIS—ISSUEDANT YAPI CIVIC NY LLC02/04/2021
BISEQISSUEDARSENAL SCAFFOLD INC12/18/2020
BISPLISSUEDMEDCO PLUMBING INC12/05/2020
BISEQISSUEDARSENAL SCAFFOLD INC11/23/2020
BIS—ISSUEDANT YAPI CIVIC NY LLC10/23/2020
BIS—ISSUEDANT YAPI NEW YORK LLC06/08/2020
BISPLISSUEDMEDCO PLUMBING INC03/13/2020
BIS—ISSUEDANT YAPI NEW YORK LLC12/11/2019
BISOTISSUEDANT YAPI NEW YORK LLC10/02/2019
BISEQISSUEDANT YAPI NEW YORK LLC09/23/2019
BISEQISSUEDCELTIC SERVICES NYC INC06/06/2018
BISEQISSUEDASTORIA LIC DEVELOPMENT07/13/2017
BISEQISSUEDROCK GROUP NY CORP03/08/2016
BISEQISSUEDROCK GROUP NY CORP03/08/2016
BISOTISSUEDFERCO ENG06/19/2007
BISPLISSUEDJUDAH PLBG.&HTG.INC.12/03/1999
+ 6 more permits on file
9 projects · most recent 10/07/2022
General Wiring
FiledStatusContractorScope
10/07/2022CompleteSKF ELECTRICAL CORP—
04/29/2022CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
04/15/2022CompleteSKF ELECTRICAL CORPGeneral Wiring
01/14/2021CompleteR.C.M. ELECTRIC CORP.—
01/14/2021CompleteR.C.M. ELECTRIC CORP.—
01/14/2021CompleteR.C.M. ELECTRIC CORP.—
11/10/2020CompleteNASH ELECTRIC SERVICES IN—
05/06/2020CompleteFSM ELECTRICAL CORPORATIO—
03/02/2020CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/20/2022Pass-Final SD - Up to 9 Requested FloorsPassView ↗
12/10/2021Pass-Final Boiler Equipment InspectionPassView ↗
07/09/2021Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/17/2023FinalMOHAMMAD AHEADprogress
01/17/2023FinalMOHAMMAD AHEADprogress
01/12/2022Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
01/12/2022Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/15/2021FinalCHRISTOPHER FOGARTYprogress
12/07/2021HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/07/2021Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/07/2021HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/07/2021Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2021Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/03/2021HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2021Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/03/2021HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
11/13/2020FinalKarol Zdancewiczprogress
▾Documents — 416 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/28/2026Q00342312-P2Request digital key ↗
08/28/2026Q00342312-I1Request digital key ↗
08/15/2026Q00342312-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/26/2026Q00294085-I1Request digital key ↗
08/15/2026Q00294085-P1Request digital key ↗
08/15/2026Q00287554-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
08/26/2026Q00648233-I1Request digital key ↗
08/25/2026Q08030788-I1Request digital key ↗
08/25/2026Q08030787-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00327123-I1Request digital key ↗
08/15/2026Q00327123-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026Q00294085-I1Request digital key ↗
08/26/2026Q00294085-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00345135-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/27/2026Q00428048-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/26/2026Q00787492-I1Request digital key ↗
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION70
04/29/2025401034135Open ↗
01/18/2024440708398Open ↗
01/04/2024401034135Open ↗
Showing 3 of 70 on file for this type
▸BISWORK PERMIT APPLICATION21
10/21/2021420664481Open ↗
10/20/2021420664481Open ↗
04/01/2021420664481Open ↗
Showing 3 of 21 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation5
09/04/2020440554393Open ↗
09/01/2020440554393Open ↗
Showing 2 of 5 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM3
10/06/2021420664481Open ↗
Showing 1 of 3 on file for this type
▸BISFLOOD ZONE COMPLIANCE2
12/18/2023420664481Open ↗
10/05/2022440657184Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
11/29/2023420664481Open ↗
11/29/2023420664481Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/23/2023420664481Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00287554-I1Open ↗
08/28/2026Q00327123-I1Open ↗
08/28/2026Q00327123-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026Q00648233-I1Open ↗
09/02/2026Q08030788-I1Open ↗
09/02/2026Q00342312-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
06/27/2022420664481Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
03/15/2022440708398Open ↗
12/16/2020440657184Open ↗
11/09/2020440645697Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
03/15/2022440708398Open ↗
12/16/2020440657184Open ↗
11/09/2020440645697Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
03/15/2022440708398Open ↗
12/16/2020440657184Open ↗
11/09/2020440645697Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q00342312-P2Open ↗
09/01/2026Q00294085-I1Open ↗
09/01/2026Q00294085-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING7
10/11/2022420664481Open ↗
10/11/2022420664481Open ↗
10/29/2021420664481Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
08/01/2022420664481Open ↗
08/01/2022420664481Open ↗
04/05/2022420664481Open ↗
▸BISEQUIPMENT USE PERMITS2
08/16/2022420664481Open ↗
06/24/2022420664481Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/18/2022420664481Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
05/23/2023420664481Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/18/2022420664481Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST5
09/01/2020440554393Open ↗
Showing 1 of 5 on file for this type
▸Environmental & Asbestos8
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
01/02/2024421913754Open ↗
12/26/2023420664481Open ↗
11/01/2023421529082Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
03/18/2022420664481Open ↗
▸BIS* DUCT LEAKAGE TESTING1
03/18/2022420664481Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/18/2022420664481Open ↗
▸BISFENESTRATION AREAS1
03/18/2022420664481Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00342312-I1Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY14
03/14/2022440645697Open ↗
03/14/2022440645697Open ↗
02/25/2022420664481Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
02/21/2022421913754Open ↗
02/21/2022421913754Open ↗
▸BISDEEP FOUNDATIONS / PILES2
02/21/2022420664481Open ↗
02/21/2022421913754Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/29/2023420664481Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/18/2022420664481Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/18/2022420664481Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/18/2022420664481Open ↗
▸BISMECHANICAL SYSTEMS1
03/18/2022420664481Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs33
▸BISSCHEDULE A - OCCUPANCY / USE16
10/04/2023420664481Open ↗
10/02/2023420664481Open ↗
10/04/2022420664481Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
04/01/2021420664481Open ↗
04/01/2021420664481Open ↗
04/01/2021421529082Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/23/2025440645697Open ↗
01/03/2024421913754Open ↗
11/03/2023421529082Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
10/05/2022440657184Open ↗
02/21/2022421913754Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE4
11/19/2020420664481Open ↗
Showing 1 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
04/01/2021420664481Open ↗
Showing 1 of 3 on file for this type
▸BISCOST AFFIDAVIT1
03/15/2022440708398Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/02/2024421913754Open ↗
▸Filing & Intake Forms53
▸BISADDITIONAL INFORMATION30
01/22/2024420664481Open ↗
01/22/2024420664481Open ↗
01/22/2024420664481Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM9
10/21/2021420664481Open ↗
10/20/2021420664481Open ↗
04/01/2021420664481Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
03/15/2022440708398Open ↗
12/16/2020440657184Open ↗
11/09/2020440645697Open ↗
Showing 3 of 6 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
01/22/2024420664481Open ↗
01/22/2024420664481Open ↗
01/22/2024420664481Open ↗
Showing 3 of 13 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHUTOFF DAMPERS1
03/18/2022420664481Open ↗
▸BISLOWEST FLOOR ELEVATION1
03/18/2022420664481Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUNDERPINNING1
03/24/2022420664481Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
01/04/2023420664481Open ↗