← Back
Factory, industrial, miscellaneous
11-58 BORDEN AVENUE
QUEENS · Long Island City-Hunters Point · BIN 4000210
💬 Discuss this project
1916Year Built
7Stories
F9Building Class
M3-2Zoning
136,500 sfGross Floor Area
10Units
LL97 Covered13 Open Violations 4 unresolved · 9 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Factory, industrial, miscellaneous · Owner of record: 51-02 21ST REALTY, LLC · 28,368 sf lot · 4.81 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof26p · 6 filings · 20 docs
Floor 76p · 1 filing · 7 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorUnder Construction9p · 3 filings · 8 docs
Filed — no permit issued10p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
51-02 21ST REALTY, LLC1503/22/2026
INTERSYSTEM INSTALLATION CORP1307/08/2026
AMJ REALTY1003/21/2026
51-02 21 ST REALTYLLC504/09/2026
INTERSYSTEMS203/21/2026
PDS 9TH STREET203/21/2026
51-02 21ST STREET REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC105/20/2025
HAMANN ENGINEERING, PLLC104/23/2025
TECTONIC ENGINEERING512/11/2023
S ARCHITECTURE PC109/14/2023
ASHRAF CORP112/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC303/21/2026
POI LENG ONG103/21/2026
CCM CONSULTING GROUP, INC.503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEMS INSTAL S&SGeneral Contractor707/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor603/21/2026
RAMAPO COMMUNICATION CORPGeneral Contractor603/21/2026
OVERLAND CONTRACTING INCGeneral Contractor607/08/2026
S.B.A. PLUMBING CORPPlumbing207/08/2026
SANDHA GENERAL CONTRACTINElectrical103/21/2026
SKYLIFT CONTRACTOR CORPElectrical103/21/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor104/09/2026
MOTTES, STEVEElectrical103/21/2026
CHRISTIANSEN, IElectrical103/21/2026
LG TECH LLCGeneral Contractor107/08/2026
BARGER, JAMESElectrical103/21/2026
PHOENIX SUTTON STR INCGeneral Contractor104/09/2026
ALLEGHENY DESIGN MNGMT INElectrical103/21/2026
AURA PLUMBING INCPlumbing107/08/2026
ALEF ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN INTEGRATIONS LLC7993105/20/2025
HAMANN ENGINEERING, PLLC4949104/23/2025
TECTONIC ENGINEERING CONS106412/11/2023
MJ ENGINEERING & DESIGN5546109/14/2023
Building Lifecycle
All (112)Filed (9)Permit Issued (18)Signed Off (1)Facade (FISP) (12)Violation (60)Inspection (4)Objection (2)Special Inspection (6)
05/21/2026
Violation issued (ECB, open)
Construction
04/20/2026
Violation issued (ECB, open)
Local Law
01/21/2026
Permit issued — Sidewalk Shed
Q00655038-I1-SH
08/20/2025
Permit issued — Sidewalk Shed
Q00655038-I1-SH
07/03/2025
Permit issued — General Construction
Q00854777-I1-GC
05/22/2025
Permit issued — Suspended Scaffold
Q01215633-I1-SC
05/20/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Q01215633-I1
05/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
05/15/2025
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
05/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
04/23/2025
Filed — Alteration
Q01204612-I1
09/25/2024
Permit issued — Sidewalk Shed
Q00655038-I1-SH
03/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2024
Permit issued — Plumbing
Q00551905-I1-PL
01/16/2024
Violation issued (ECB, open)
Local Law
01/11/2024
Permit issued — Structural
Q00551912-I1-ST
01/11/2024
Permit issued — Mechanical Systems
Q00551895-I1-MS
12/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTONIO GUALTIERI
12/11/2023
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Q00551905-P1
09/26/2023
Permit issued — Sidewalk Shed
Q00655038-I1-SH
09/22/2023
Objection resolved — Addressed
09/18/2023
Objection raised — Other
09/14/2023
Filed — Alteration
FACADE REPAIR AND RESTORATION, NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY USE IN THIS APPLICATION.
Q00854777-I1
08/18/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/31/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/09/2023
Permit issued — Mechanical Systems
Q00551895-I1-MS
02/09/2023
Permit issued — Structural
Q00551912-I1-ST
01/13/2023
Permit issued — Plumbing
Q00551905-I1-PL
09/29/2022
Permit issued — Sidewalk Shed
Q00655038-I1-SH
09/12/2022
Signed off — Alteration
Q00566884-I1
02/17/2022
Cycle 9 facade report submitted
02/11/2022
Cycle 9 facade report signed — UNSAFE
01/05/2022
Permit issued — Sidewalk Shed
Q00655038-I1-SH
12/29/2021
Filed — Alteration
Q00655038-I1
12/21/2021
Cycle 9 facade inspection completed
12/21/2021
Violation issued (ECB, closed)
Construction
11/26/2021
Permit issued — Antenna
Q00566884-I1-AN
11/17/2021
Filed — Alteration
Q00566884-I1
10/21/2021
Permit issued — Mechanical Systems
Q00551895-I1-MS
10/21/2021
Permit issued — Plumbing
Q00551905-I1-PL
10/18/2021
Permit issued — Structural
Q00551912-I1-ST
09/08/2021
Filed — Alteration
Installation of non-emergency gas fired generator with related gas booster pump on roof. No change to occupancy, use, or egress.
Q00551895-I1
09/08/2021
Filed — Alteration
Q00551912-I1
09/08/2021
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Q00551905-I1
07/02/2021
Special inspection requirement — Structural Steel - Details
ANTONIO GUALTIERI
07/02/2021
Special inspection requirement — Final
ANTONIO GUALTIERI
08/20/2020
Violation issued (ECB, closed)
Construction
04/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/05/2018
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2017
Cycle 8 facade report signed — SAFE
09/20/2017
Violation issued (ECB, closed)
Construction
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2017
Cycle 8 facade report submitted
05/01/2017
Cycle 8 facade inspection completed
01/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION01/21/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/20/2025
DOB NOWGeneral ConstructionPermit IssuedPHOENIX SUTTON STR INC07/03/2025
DOB NOWSuspended ScaffoldPermit IssuedPHOENIX SUTTON STR, INC05/22/2025
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S09/25/2024
DOB NOWPlumbingSigned-offS.B.A. PLUMBING CORP02/20/2024
DOB NOWStructuralPermit IssuedOVERLAND CONTRACTING INC01/11/2024
DOB NOWMechanical SystemsPermit IssuedOVERLAND CONTRACTING INC01/11/2024
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S09/26/2023
DOB NOWMechanical SystemsPermit IssuedOVERLAND CONTRACTING INC02/09/2023
DOB NOWStructuralPermit IssuedOVERLAND CONTRACTING INC02/09/2023
DOB NOWPlumbingSigned-offS.B.A. PLUMBING CORP01/13/2023
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM INSTALLATION09/29/2022
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM INSTALLATION01/05/2022
DOB NOWAntennaSigned-offLG TECH LLC11/26/2021
DOB NOWMechanical SystemsPermit IssuedRAMAPO COMMUNICATION CORP10/21/2021
DOB NOWPlumbingSigned-offAURA PLUMBING INC10/21/2021
DOB NOWStructuralPermit IssuedRAMAPO COMMUNICATION CORP10/18/2021
BISOTISSUEDDAN & JR CONSTRUCTION COR10/16/2019
BISMHISSUEDBROOKLYN CONSTRUCTION GR*09/13/2019
BISMHISSUEDBROOKLYN CONSTRUCTION GR*08/26/2019
BISMHISSUEDBROOKLYN CONSTRUCTION GR*08/26/2019
BISMHISSUEDBROOKLYN CONSTRUCTION GR*11/13/2017
BISMHISSUEDBROOKLYN CONSTRUCTION GR*10/24/2017
BISEQISSUEDINTERSYSTEM S&S CORP09/25/2017
BISEQISSUEDINTERSYSTEM S&S CORP09/14/2016
BISOTISSUEDRAMAPO COMMUNICATION CORP08/18/2016
BISOTISSUEDRAMAPO COMMUNICATION CORP12/18/2015
BISEQISSUEDINTERSYSTEM S&S CORP09/25/2015
BISEQISSUEDINTERSYSTEM S&S CORP10/03/2014
BISEQISSUEDINTERSYSTEMS CORPORATION05/15/2014
BISOTISSUEDODYSSIA GLOBAL COMM. CORP02/05/2014
BISMHISSUEDHIGH POWER CONSTRUCTION C10/08/2013
BISOTISSUEDSKYFIELD PARTNERS LLC05/27/2011
BISOTISSUEDSKYFIELD PARTNERS LLC12/22/2010
BISEQISSUEDSTAY SECURE CONSTRUCTION08/24/2010
BISMHISSUEDCOMPRESSED AIR & FLUID TRANSFER11/23/2007
BISMHISSUEDKOON YEUNG'S CORP11/09/2007
BISOTISSUEDCOMPRESSED AIR & FLUID TRANSFER11/08/2007
BISSPISSUEDFD FIRE SPRINKLE & PIPING SERV C11/03/2006
+ 21 more permits on file
1 project · most recent 09/08/2021
Generators
FiledStatusContractorScopeMake / Model / Capacity
09/08/2021Permit IssuedOVERLAND CONTRACTING INCGenerators
Generators
Accardi Companies Compac MD101-1/4-UPS-N4 Pump ×1
Cummins C30 N6 Generator ×1
1 project · most recent 12/11/2023
Gas
FiledStatusContractorScope
12/11/2023Signed-offS.B.A. PLUMBING CORPGas
4 projects · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025Permit IssuedCOBRA ELECTRICAL NYC LLCGeneral Wiring
04/29/2024Permit IssuedAURORA ELECL CONTG INC—
12/27/2021CompleteSTEVEN FARKAS—
09/16/2019Permit IssuedALEF ELEC'L CONTR'G INCGeneral Wiring
1 project · most recent 05/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/20/2025Permit IssuedPHOENIX SUTTON STR, INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/15/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
05/15/2025Post-installed AnchorsDANNY TRUJILLOspecial
05/15/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
12/26/2023Fire-Resistant Penetrations and JointsANTONIO GUALTIERIspecial
07/02/2021Structural Steel - DetailsANTONIO GUALTIERIspecial
07/02/2021FinalANTONIO GUALTIERIprogress
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00551905-P1Request digital key ↗
08/27/2026Q00551905-I1Request digital key ↗
08/27/2026Q00551912-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION22
04/29/2025421743215Open ↗
12/22/2023421743215Open ↗
07/28/2021401178426Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION19
10/23/2019421743215Open ↗
09/13/2019440555258Open ↗
06/27/2019440554632Open ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE COMPLIANCE1
02/13/2024421743215Open ↗
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
01/23/2020440555258Open ↗
10/07/2019420855603Open ↗
09/24/2019421743215Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00551905-I1Open ↗
08/27/2026Q00551905-P1Open ↗
08/27/2026Q00566884-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
06/27/2019440554614Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
06/27/2019440554614Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
06/27/2019440554614Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/07/2020440555258Open ↗
01/02/2020440555258Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/10/2026Q00551912-I1Open ↗
09/01/2026Q00551905-I1Open ↗
08/27/2026Q01215633-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/10/2026Q00551912-I1Open ↗
▸Trade Schedules & Equipment23
▸BISEQUIPMENT USE PERMITS16
09/20/2019440554614Open ↗
09/20/2019440554632Open ↗
09/20/2019440554632Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
09/20/2019440554632Open ↗
09/20/2019440554632Open ↗
05/30/2018440443619Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
02/10/2014420855603Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
07/29/2019421743215Open ↗
05/04/2016421321055Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
07/29/2019421743215Open ↗
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00551905-I1Open ↗
08/27/2026Q00551905-P1Open ↗
08/27/2026Q00566884-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
01/23/2020440555258Open ↗
10/07/2019420855603Open ↗
09/24/2019421743215Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
01/23/2020440555258Open ↗
10/07/2019420855603Open ↗
09/20/2019440554614Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/11/2019440555258Open ↗
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
06/27/2019440554614Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/13/2024421743215Open ↗
08/17/2021421210362Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
02/13/2024421743215Open ↗
08/20/2021421210362Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/14/2014440143266Open ↗
▸BISINTERIOR LIGHTING POWER1
02/13/2024421743215Open ↗
▸BISLIGHTING CONTROLS1
02/13/2024421743215Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY12
08/18/2021421210362Open ↗
08/17/2021421210362Open ↗
06/22/2021401178426Open ↗
Showing 3 of 12 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/13/2024421743215Open ↗
▸Approvals, Objections & Sign-offs35
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
03/14/2024421743215Open ↗
08/23/2021421210362Open ↗
08/23/2021421210362Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/13/2017440443619Open ↗
10/03/2017440143266Open ↗
10/03/2016440143266Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL1
02/13/2024421743215Open ↗
▸BISSHED LETTER1
10/16/2014440143266Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT25
01/23/2020440555258Open ↗
10/07/2019420855603Open ↗
09/20/2019440554614Open ↗
Showing 3 of 25 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST5
09/13/2019440555258Open ↗
08/22/2019440554632Open ↗
08/22/2019440554614Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/19/2024421743215Open ↗
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET7
07/29/2019421743215Open ↗
05/04/2016421321055Open ↗
09/09/2015421210362Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
06/30/2019440555258Open ↗
06/27/2019440554632Open ↗
06/27/2019440554614Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
01/09/2024421743215Open ↗
01/07/2020440555258Open ↗
08/22/2019421743215Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
12/26/2017440443600Open ↗
12/13/2017440443619Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/27/2019440554632Open ↗
06/27/2019440554614Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/14/2014440143266Open ↗
▸DOB NOWCalculations1
08/13/2026Q01215633-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01215633-I1Open ↗