| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01180388 ↗ | 304 CARROLL STREET BROOKLYN | Alteration | Permit Issued | 02/13/2025 | 09/24/2026 | Contractor NEW WAVE DESIGN & CONTRAC | INSTALLATION OF THE CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01318490 ↗ | 44 WEST 47 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 09/23/2026 | Contractor A.M.N. CORPORATION | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01444109 ↗ | 656 LEONARD STREET BROOKLYN | Alteration | Permit Issued | 08/18/2026 | 09/16/2026 | Contractor DEVMED CORP | FACADE WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01155305 ↗ | 284 CARLTON AVENUE BROOKLYN | Alteration | Permit Issued | 01/27/2025 | 09/08/2026 | Owner ROBA RENOVATION CORP Contractor ROBA RENOVATION CORP | Interior renovation of apartment #1 only, no change in use, egress or occupancy. |
| B01426120 ↗ | 192 POWERS STREET BROOKLYN | Alteration | Permit Issued | 07/07/2026 | 09/02/2026 | Contractor CORE TECH LLC | RENOVATION OF 2 FAMILY HOUSE, NEW LAYOUT, CONSTRUCTION OF METAL PORCH IN REAR, NO CHANGE IN USE, EGRESS AND OCCUPANCY PROPOSED. |
| Q01410697 ↗ | 68-21 64 PLACE QUEENS | Alteration | Permit Issued | 06/08/2026 | 09/01/2026 | Owner 68-21 64th Place LLC Contractor RIGO MANAGEMENT USA INC | Job filed to show renovation of two family building, change to layouts and other work as per plans filed herewith. No change in use, egress … |
| Person | Filings | Most recent |
|---|---|---|
| CARL HAMANN | 926 | 08/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BITOPI CONSULTANTS LLC | 3 | 08/12/2026 |
| PATH ARCHITECTURE PC | 2 | 08/25/2026 |
| STRUCTURAL ENGINEERING INTEGRATED | 2 | 07/28/2026 |
| ADAL ENGINEERING PLLC | 1 | 05/11/2026 |
| ADG ARCHITECTURE AND DESIGN PC | 1 | 10/07/2022 |
| CSANAD BODNAR ARCHITECT | 1 | 12/20/2022 |
| DELSON OR SHERMAN ARCHITECTS PC | 1 | 12/08/2025 |
| JAMES J. LEONARD, ARCHITECT | 1 | 02/04/2024 |
| JBA | 1 | 08/06/2026 |
| KZ ENGINEERING, P.C | 1 | 08/05/2026 |
| LANG ARCHITECTURE | 1 | 02/05/2024 |
| LI ARCHITECT ASSOCIATE, PLLC | 1 | 06/25/2026 |
| OSPINO ENGINEERING PLLC | 1 | 07/14/2026 |
| REAL ESTATE & ARCHITECTURAL SERVICE | 1 | 05/06/2026 |
| SOHAIL HUMAYUN P E INC | 1 | 05/02/2023 |
| STEVEN MICHAEL PETERSON STUDIOS | 1 | 04/20/2026 |
| Studio Delson Architecture P.C. | 1 | 12/08/2025 |
| TURETT COLLABORATIVE ARCHITECTS | 1 | 10/14/2025 |
| VALENTINO POMPEO ARCHITECT, P.C. | 1 | 05/29/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BIG ORANGE SAFETY FIRST | 69 | 08/26/2026 |
| SUPERB PLUMBING & HEATING | 49 | 09/17/2025 |
| ORBIT PLBG & HTG INC | 44 | 06/30/2026 |
| TOMCHRIS CONTRACTING CORP | 37 | 08/26/2026 |
| NEW YORK PARK PLBG&HTG CO | 25 | 08/18/2026 |
| TRIBUTE RESTORATION INC | 22 | 07/27/2020 |
| BRIDGE ZALE CONSTRUCT COR | 21 | 08/18/2026 |
| ROCK FACE CONSTR INC | 15 | 08/19/2026 |
| A.M.N. CORPORATION | 13 | 04/23/2026 |
| J.K. REMODELING INC | 10 | 04/23/2026 |
| JONAS RENOVATION CORP | 9 | 08/17/2026 |
| TOMEK BUILDERS CORP | 9 | 12/04/2025 |
| MAT ROM LLC | 8 | 08/08/2025 |
| OLIWA CONSTRUCTION INC | 8 | 03/17/2025 |
| HAWK. AA LLC | 7 | 04/23/2026 |
| NEW WAVE DESIGN & CONTRAC | 7 | 08/11/2025 |
| Z.W. PLBG & HTG CORP | 7 | 09/19/2025 |
| 212 RENOVATIONS GROUP LLC | 6 | 02/12/2025 |
| DMA CONTRACTING INC | 6 | 04/21/2025 |
| EXTRESS CONTRACTING INC | 6 | 07/28/2022 |
| TAK PLUMBING & HEATING CO | 6 | 01/31/2023 |
| GW MECHANICAL CORP | 5 | 08/21/2023 |
| MON-RAD INC | 5 | 08/01/2023 |
| ROOFUS RESTORATION LLC | 5 | 08/02/2019 |
| STELLAR INDUSTRIES INC | 5 | 11/11/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BRIDGE ZALE CONSTRUCTION CORP. | 25 | 08/18/2026 |
| 293 HENRY LLC | 20 | 08/19/2026 |
| TOMCHRIS CONTRACTING CORP | 16 | 07/20/2026 |
| HANCOCK ASSOCIATES, LLC | 14 | 04/06/2026 |
| 197 NASSAU AVE LLC | 8 | 11/11/2024 |
| AKAM ASSOCIATES, INC. | 6 | 04/20/2026 |
| Bedford Management Company | 6 | 06/25/2026 |
| OGAMI STUDIOS NYC | 5 | 07/28/2026 |
| AANDB LLC | 4 | 02/09/2024 |
| HALSTEAD MANAGEMENT | 4 | 07/01/2025 |
| 109 NORTH 8TH ST LLC | 3 | 08/26/2026 |
| CHARLES H. GREENTHAL MANAGEMENT\ | 3 | 04/14/2021 |
| GETIR US INC. | 3 | 01/16/2024 |
| Hue Painting Inc. | 3 | 08/06/2026 |
| J.K. REMODELING INC | 3 | 09/11/2025 |
| ROOFUS RESTORATION LLC | 3 | 03/04/2022 |
| TRIBUTE RESTORATION INC | 3 | 03/28/2019 |
| VYNAR REALTY LLC | 3 | 08/21/2023 |
| 10M157Huron LLC | 2 | 06/12/2026 |
| 24 MINETTA LANE REALTY CORP. | 2 | 08/02/2019 |
| 28 Saint Felix LLC | 2 | 06/11/2026 |
| 29 GREENPOINT, LLC | 2 | 03/14/2023 |
| 60-81 MYRTLE AVENUE LLC | 2 | 01/06/2021 |
| 604 MANHATTAN AVE LLC | 2 | 10/06/2022 |
| 706 Manhttan Ave LLC | 2 | 04/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BIG ORANGE EXPEDITING, INC | 346 | 08/26/2026 |
| ACA ASSOCIATES | 3 | 03/28/2019 |
| ADAM MAISER | 1 | 12/08/2025 |
| Hierarch-E LLC | 1 | 07/14/2026 |
| J. CALLAHAN CONSULTING, INC. | 1 | 02/05/2024 |
| KC EXPEDITING INC | 1 | 08/06/2026 |
| PT | 1 | 04/27/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01180388 ↗ | 304 CARROLL STREET BROOKLYN | Alteration | Permit Issued | 02/13/2025 | 09/24/2026 | Contractor NEW WAVE DESIGN & CONTRAC | INSTALLATION OF THE CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01318490 ↗ | 44 WEST 47 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 09/23/2026 | Contractor A.M.N. CORPORATION | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01444109 ↗ | 656 LEONARD STREET BROOKLYN | Alteration | Permit Issued | 08/18/2026 | 09/16/2026 | Contractor DEVMED CORP | FACADE WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01155305 ↗ | 284 CARLTON AVENUE BROOKLYN | Alteration | Permit Issued | 01/27/2025 | 09/08/2026 | Owner ROBA RENOVATION CORP Contractor ROBA RENOVATION CORP | Interior renovation of apartment #1 only, no change in use, egress or occupancy. |
| B01426120 ↗ | 192 POWERS STREET BROOKLYN | Alteration | Permit Issued | 07/07/2026 | 09/02/2026 | Contractor CORE TECH LLC | RENOVATION OF 2 FAMILY HOUSE, NEW LAYOUT, CONSTRUCTION OF METAL PORCH IN REAR, NO CHANGE IN USE, EGRESS AND OCCUPANCY PROPOSED. |
| Q01410697 ↗ | 68-21 64 PLACE QUEENS | Alteration | Permit Issued | 06/08/2026 | 09/01/2026 | Owner 68-21 64th Place LLC Contractor RIGO MANAGEMENT USA INC | Job filed to show renovation of two family building, change to layouts and other work as per plans filed herewith. No change in use, egress … |
| X07994884 ↗ | 4336 CARPENTER AVENUE BRONX | Alteration | Permit Issued | 02/07/2023 | 08/31/2026 | Contractor NY BUILDING ASSOCIATES IN | WORK FILED TO SHOW REMOVAL OF THE DOOR IN THE HALLWAY TO REMOVE VIOLATION #39067025X AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS A… |
| Q00234950 ↗ | 72-32 48 AVENUE QUEENS | Alteration | Permit Issued | 09/27/2019 | 08/27/2026 | Contractor ZARCO CONTRACTING INC | INSTALLATION OF PLYWOOD FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01426284 ↗ | 746 HUMBOLDT STREET BROOKLYN | Alteration | Permit Issued | 07/20/2026 | 08/27/2026 | Contractor TOMCHRIS CONTRACTING CORP | WORK FILED TO SHOW INSTLLATION OF MECHANIVCAL SYSTEM ON CEL, 001-002, ATTIC. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01362394 ↗ | 118-04 91 AVENUE QUEENS | Alteration CO | Permit Issued | 03/26/2026 | 08/25/2026 | Contractor JONAS RENOVATION CORP | CONVERSION OF ONE FAMILY HOUSE TO TWO FAMILY HOUSE AS PER PLANS FILED HEREWITH. MINOR CHANGE TO THE LAYOUT AND NEW CO PROPOSED. |
| B01348426 ↗ | 123 ECKFORD STREET BROOKLYN | Alteration CO | Permit Issued | 03/11/2026 | 08/24/2026 | Contractor I G IMPROVEMENTS INC | RENOVATION OF 3 FAMILY HOUSE AS PER PLANS FILED HEREWITH INCLUDING CONNECTING THE CELLAR WITH 1ST FLOOR, CONSTRUCTION OF THE DECK AT REAR, R… |
| B01444207 ↗ | 159 MILTON STREET BROOKLYN | Alteration | Filed — no permit on record | 08/18/2026 | — | Owner EPPY RESIDENCES LLC | — |
| Q01441604 ↗ | 33-27 208 STREET QUEENS | Alteration | Filed — no permit on record | 08/18/2026 | — | — | |
| B01443476 ↗ | 192 GREENPOINT AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/12/2026 | — | — | — |
| B01428374 ↗ | 237 BOERUM STREET BROOKLYN | Alteration CO | Filed — no permit on record | 08/06/2026 | — | Owner Hue Painting Inc. | — |
| B00661143 ↗ | 248 HENRY STREET BROOKLYN | Alteration | Permit Issued | 05/24/2022 | 08/06/2026 | Owner 293 HENRY LLC Contractor ORBIT PLBG & HTG INC | REPLACEMENT OF THE BOILER AT CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01416473 ↗ | 1367 EAST 7 STREET BROOKLYN | Alteration | Permit Issued | 06/25/2026 | 08/04/2026 | Owner BARUCH BUILDERS CORP Contractor BARUCH BUILDERS CORP | MINOR CHANGES IN LAYOUT OF 4 FAMILY HOUSE ON 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01327577 ↗ | 70 EAST 77 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/29/2026 | — | — | — |
| Q01329354 ↗ | 41 SHORTHILL ROAD QUEENS | Alteration | Permit Issued | 12/05/2025 | 07/16/2026 | Contractor MAREK K CONTRACTING CORP | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01007558 ↗ | 305 EAST 45 STREET MANHATTAN | Alteration | Permit Issued | 07/08/2024 | 07/16/2026 | Contractor CJ RENOVATIONS INC | INTERIOR RENOVATION OF RAISED ALCOVE @ APT#8R AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS AND OCCUPANCY. |
| B00827020 ↗ | 28 ST FELIX STREET BROOKLYN | Alteration | Permit Issued | 03/08/2024 | 07/09/2026 | Owner 28 Saint Felix LLC Contractor DLM CONTRACTORS | MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01139774 ↗ | 69-46 64 STREET QUEENS | Alteration CO | Permit Issued | 01/03/2025 | 07/09/2026 | Contractor TOMCHRIS CONTRACTING CORP | Renovation of 4 family house at cellar and 1st floor to connect 1st floor appartment with the cellar as per plans filed herewith. Job filed … |
| B01311634 ↗ | 87 HERBERT STREET BROOKLYN | Alteration | Permit Issued | 11/04/2025 | 07/09/2026 | Contractor BEST CONTRACTING CORP Filer Hierarch-E LLC | SUPPORTED SCAFFOLD OVER EXISTING SIDEWALK SHED AND GROIUND FLOOR AS PER DWGS FILED HEREWITH. |
| B01162653 ↗ | 39 BROOME STREET BROOKLYN | Alteration | Permit Issued | 02/28/2025 | 07/08/2026 | Contractor HAWK. AA LLC | Work filed to show installation of new beams in the cellar, new concrete placement and changes to the layout as per plans filed herewith, no… |
| Q01426287 ↗ | 20-22 MENAHAN STREET QUEENS | Alteration | Filed — no permit on record | 07/07/2026 | — | — | — |
| Q01245348 ↗ | 1870 GROVE STREET QUEENS | Alteration | Permit Issued | 07/07/2025 | 07/06/2026 | Owner Grove Flats LLC Contractor JONAS RENOVATION CORP | WORK FILED TO SHOW THE BACK WALL FACADE CONSTRUCTION IN CONJUNCTION WITH JN#440639828 AND TO ANSWER THE SWO COMMENTS FROM 05.01.2025. NO CHA… |
| B01386118 ↗ | 164 12 STREET BROOKLYN | Alteration | Permit Issued | 04/22/2026 | 07/06/2026 | Contractor JACK FOX CONSTRUCTION CO | Removal of concrete slab in the rear yard as per plans filed herewith. No change in use, egress and occupancy. |
| B01423429 ↗ | 48 DOBBIN STREET BROOKLYN | Alteration | Filed — no permit on record | 06/29/2026 | — | Owner äTBSPü LLC | — |
| B01422099 ↗ | 511 HICKS STREET BROOKLYN | Alteration | Filed — no permit on record | 06/26/2026 | — | Owner 293 HENRY LLC | — |
| B01205259 ↗ | 499 GRAHAM AVENUE BROOKLYN | Alteration | Permit Issued | 04/24/2025 | 06/24/2026 | Contractor NEW YORK PARK PLBG&HTG CO | WORK FILED TO SHOW THE RENOVATION ON THE CELLAR LEVEL - BOILER ROOM RELOCATION, NEW UTIILTY ROOM, NEW STORAGE AREAS AND OTHER MINOR WORK, RE… |
| B01295349 ↗ | 44 CLAY STREET BROOKLYN | Alteration | Permit Issued | 12/01/2025 | 06/18/2026 | Contractor AJ GREENWICH MANAGEMENT C | Work filed to show the interior renovation and change to layouts in apartment 1L and construction of new porch for 1L and 1R. No change in u… |
| Q00387146 ↗ | 171-17 69 AVENUE QUEENS | Alteration | Permit Issued | 06/09/2021 | 06/17/2026 | Contractor ALL PRO PLBG & HTG INC | PLUMBING WORK FILED IN CONJUNCTION WITH THE ALT 1 FILED UNDER JOB #421630471, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01412718 ↗ | 77-07 64 PLACE QUEENS | New Building | Filed — no permit on record | 06/16/2026 | — | — | — |
| B00774059 ↗ | 372 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 08/06/2024 | 06/15/2026 | Owner 293 HENRY LLC Contractor PREMIER FLOW PLBG AND HTG | Plumbing work as per plans attached herewith. No change in use, egress and occupancy. |
| B01293911 ↗ | 177 KENT STREET BROOKLYN | Alteration | Permit Issued | 10/03/2025 | 06/12/2026 | Owner POLISH AND SLAVIC CENTER Contractor CARPEX INC | MECHANICAL WORK IN CAFETERIA, BATHROOMS BY CAFETERIA AND LOBBY AS PER PLANS FILED HEREWITH , NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01326497 ↗ | 468 STATE STREET BROOKLYN | Alteration | Permit Issued | 12/04/2025 | 06/12/2026 | Owner TOMEK BUILDERS CORP. Contractor TOMEK BUILDERS CORP | CONSTRUCTION OF FENCE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01203602 ↗ | 177 KENT STREET BROOKLYN | Alteration | Permit Issued | 09/02/2025 | 06/11/2026 | Contractor A.M.N. CORPORATION | MECHANICAL WORK AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01305704 ↗ | 258 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/23/2025 | 06/09/2026 | Contractor SUPERB BUILDZ LLC | WORK FILED TO SHOW MINOR INTERIOR RENOVATION OF UNIT 3A. REMOVAL OF NON-BEARING WALLS, CHANGE TO LAYOUTS AS PER PLANS FILED HEREWITH. PLUMBI… |
| B01291448 ↗ | 44 COFFEY STREET BROOKLYN | Alteration | Permit Issued | 10/02/2025 | 06/05/2026 | Contractor ARIANA CONTRACTING INC | RENOVATION OF 1 FAMILY HOUSE ON THE CELLAR AND 1ST FLOOR LEVEL, NEW SHEETROCK ON WALLS, NEW FLOORING AS PER PLANS FILED HEREWITH. NO CHANGE … |
| B01344763 ↗ | 499 GRAHAM AVENUE BROOKLYN | Alteration CO | Permit Issued | 02/09/2026 | 06/04/2026 | Contractor BRIDGE ZALE CONSTRUCT COR | WORK FILED TO RENOVATE APT 1L, 1R AND 2L AND TO CONNECT THE FIRST FLOOR APARTMENT 1L WITH THE CELLAR, CREATE THE ACCESSORY AREA IN CELLAR, N… |
| B01214397 ↗ | 706 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 04/28/2025 | 05/15/2026 | Owner 706 Manhttan Ave LLC Contractor DEVMED CORP | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00829987 ↗ | 106 TERRACE VIEW AVENUE MANHATTAN | Alteration | Permit Issued | 03/01/2023 | 05/11/2026 | Contractor ALLSTATE CONSTRUCTION & R | INSTALLATION OF THE FENCE AROUND THE LOT TO BUILD THE NEW BUILDING AS PER JN#M00707600. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00830000 ↗ | 108 TERRACE VIEW AVENUE MANHATTAN | Alteration | Permit Issued | 03/01/2023 | 05/08/2026 | Contractor ALLSTATE CONSTRUCTION & R | INSTALLATION OF THE FENCE AROUND THE LOT TO BUILD THE NEW BUILDING AS PER JN#M00707600. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01388565 ↗ | 118 KINGSLAND AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/06/2026 | — | — | |
| Q01309561 ↗ | 92-15 ASTORIA BOULEVARD QUEENS | Full Demolition | Signed-off | 10/29/2025 | 05/05/2026 | Contractor J&J DESIGNS INC | FULL DEMOLITION OF WOOD FRAME SHED (35'-2 X 16'-2) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01275798 ↗ | 163 INDIA STREET BROOKLYN | Alteration CO | Permit Issued | 09/11/2025 | 05/04/2026 | Owner J.K. REMODELING INC Contractor J.K. REMODELING INC | ADMINISTRATIVE FILING TO RESPOND TO THE AUDIT FOR THE JOB #B00867373-I1 AND TO ADDRESS THE AUDIT OBJECTIONS. NEW CO REQUESTED. |
| Q01380726 ↗ | BIN 4071903 | Alteration | Permit Issued | 04/03/2026 | 04/30/2026 | Contractor NEW YORK PARK PLBG&HTG CO | WORK FILED TO SHOW RENOVATION OF UNIT# 102 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00556854 ↗ | 947 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 10/08/2021 | 04/30/2026 | — | FACADE ALTERATION FILED HEREWITH AS PER PLANS, POINTING AND MINOR REPAIRS PROPOSED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01290583 ↗ | 331 NASSAU AVENUE BROOKLYN | Alteration | Permit Issued | 11/19/2025 | 04/28/2026 | Contractor ORBIT PLBG & HTG INC | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01105433 ↗ | 423 11 STREET BROOKLYN | Alteration CO | Permit Issued | 09/10/2024 | 04/28/2026 | Contractor XH&RC PLBG AND HTG INC Filer NYC DESIGN FILE | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01058453 ↗ | 180 INDIA STREET BROOKLYN | Alteration | Permit Issued | 10/23/2024 | 04/24/2026 | Contractor TOP ZONE BUILDERS INC | JOB FILED TO REMOVE VIOLATION# 39102176Y AND TO SHOW FACADE REPAIRS AS PER PLANS ATTACHED HEREWITH. NOCHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01150803 ↗ | 450 BERGEN STREET BROOKLYN | Alteration | Permit Issued | 12/14/2024 | 04/10/2026 | Owner MICKWILLI Contractor ADK MAINTENANCE INC | WORK FILED TO SHOW INSTALLATION OF MECHANICAL SYSTEM IN CELLAR, 1,2.3 AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCC… |
| B01053187 ↗ | 450 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 07/11/2024 | 04/10/2026 | Owner MICKWILLI Contractor ADK MAINTENANCE INC | JOB FILED TO REFILE THE BIS JOB#321492149, SHOW THE CONVERSION OF THE BACK OF THE FIRST FLOOR FROM RESIDENTIAL TO COMMERCIAL, 2ND FLOOR 1 AP… |
| Q00750436 ↗ | 6650 69 STREET QUEENS | Alteration | Signed-off | 06/30/2022 | 04/03/2026 | Contractor ROCK FACE CONSTR INC | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01054793 ↗ | 14 SCHERMERHORN STREET BROOKLYN | Alteration CO | Permit Issued | 04/04/2025 | 04/03/2026 | Owner 293 HENRY LLC Contractor ROCK FACE CONSTR INC | JOB FILED TO SHOW INTERIOR RENOVATION TO THE BASEMENET AND 4TH FLOOR AND CONVERSION FROM 10 DWELLING UNITS TO 7 DWELLING UNITS AS PER PLANS … |
| B01070317 ↗ | 293 HENRY STREET BROOKLYN | Alteration | Permit Issued | 06/26/2024 | 04/03/2026 | Owner 293 HENRY LLC Contractor ROCK FACE CONSTR INC | APPLICATION FILED TO SHOW THE REPLACEIWENT OF LINTEL AT FRONT DOORS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00937194 ↗ | 372 CLINTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/13/2023 | 04/03/2026 | Owner 293 HENRY LLC Contractor ROCK FACE CONSTR INC | MODIFICATION OF THE EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS AND OCCUPANCY. |
| B01308890 ↗ | 222 FRANKLIN STREET BROOKLYN | Alteration | Signed-off | 11/06/2025 | 03/31/2026 | Contractor ORBIT PLBG & HTG INC | WORK PROPOSED TO SHOW REPAIRS ON FLOORS 002-004 DUE TO FIRE FIGHTING OPERATIONS: SKYLIGHT REPLACEMENT, REPAIR OF HOLE IN THE ROOF AND MINOR … |
| Q01376026 ↗ | 66-36 58 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 03/27/2026 | — | — | |
| B00846011 ↗ | 28 ST FELIX STREET BROOKLYN | Alteration | Permit Issued | 03/08/2024 | 03/18/2026 | Owner 28 Saint Felix LLC Contractor NOPHIER PLUMBING & HTG IN | PLUMBING WORK AS PER PLAND FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01203759 ↗ | 157 HURON STREET BROOKLYN | Alteration CO | Permit Issued | 07/08/2025 | 02/20/2026 | Owner 10M157Huron LLC Contractor AG CONSTRUCTION GROUP INC | THE CONVERSION OF 1ST FLOOR TO TWO COMMERCIAL SPACE / RETAIL STORES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01114676 ↗ | 146 NORTH 9 STREET BROOKLYN | Alteration | Permit Issued | 11/12/2024 | 02/06/2026 | Contractor TOWN AND COUNTRY RENOVATI | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01335376 ↗ | 237 BOERUM STREET BROOKLYN | Alteration | Filed — no permit on record | 01/28/2026 | — | Owner Hue Painting Inc. | — |
| M01293690 ↗ | 301 WEST 108 STREET MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 01/15/2026 | Owner Blue Woods Management Contractor A B PAINTING CONTRACT | WORK FILED TO SHOW MINOR CHANGES TO THE LAYOUT OF THE KITCHEN AND DINNING ROOM IN APT 2JK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, … |
| Q01228788 ↗ | 53-26 61 STREET QUEENS | Alteration | Signed-off | 05/21/2025 | 01/09/2026 | Contractor AMN PLUMBING CORP | WORK FILED TO REMOVE VIOLATION # 39137369K;39137370H;39137371J;35483259X AS PER PLANS FILED HEREWITH. SPECIFIC PLUMBING VIOLATION IS 3913737… |
| B00897470 ↗ | 142 NORTH 11 STREET BROOKLYN | Alteration | Permit Issued | 08/02/2023 | 01/09/2026 | Contractor JONAS RENOVATION CORP | APPLICATION FILED TO SHOW THE GENERAL CONSTRUCTION IN APT 3R AND 4L AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. PL… |
| B01054509 ↗ | 142 NORTH 11 STREET BROOKLYN | Alteration | Permit Issued | 05/28/2024 | 01/09/2026 | Contractor JONAS RENOVATION CORP | APPLICATION FILED TO SHOW THE GENERAL CONSTRUCTION IN APT 3L AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. NO WORK IN… |
| Q01274597 ↗ | 63-11 CARLTON STREET QUEENS | Alteration | Signed-off | 10/09/2025 | 01/07/2026 | Contractor JONAS RENOVATION CORP | WORK FILED TO ADDRESS VIOLATION #34797639N. REMOVAL OF ENTRY DOOR, 2 WINDOWS & BRICK/MASONRY WALL APPROX 4/5' HIGH BY APPROX 8' WIDE & INSTA… |
| Q00772369 ↗ | 79-14 JUNIPER VALLEY ROAD QUEENS | Alteration | Permit Issued | 08/22/2022 | 01/05/2026 | Contractor KUL MAINTANENCE & RESTORA | STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00820633 ↗ | 570 WASHINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 01/03/2025 | 01/02/2026 | Owner 293 HENRY LLC Contractor ORBIT PLBG & HTG INC | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01281576 ↗ | 53-42 72 PLACE QUEENS | Alteration CO | Filed — no permit on record | 12/31/2025 | — | — | — |
| B01270185 ↗ | 87 GUERNSEY STREET BROOKLYN | Alteration | Signed-off | 08/22/2025 | 12/19/2025 | Owner KEMADO RECORDS Contractor ORBIT PLBG & HTG INC | REPLACEMENT OF GAS BOILER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01179615 ↗ | 634 HUMBOLDT STREET BROOKLYN | Alteration CO | Permit Issued | 02/25/2025 | 12/10/2025 | Contractor BRIDGE ZALE CONSTRUCT COR | 1ST FLOOR INTERIOR RENOVATION 0F APT#1L AND #1R, INCORPORATION OF STAIRS TO THE CELLAR INTO APT#1L. CHANGE TO CERTIFICATE OF OCCUPANCY REQUI… |
| Q01093205 ↗ | 61-39 76 STREET QUEENS | Alteration CO | Permit Issued | 10/11/2024 | 12/09/2025 | Contractor JGN CONSTRUCTION CORP | INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. CONVERT CELLAR TO BASEMENT AND CONNECT IT TO THE 1ST FLOOR TO MEET THE ZR REQUIREMENT AS PE… |
| B01184206 ↗ | 39 BROOME STREET BROOKLYN | Alteration | Permit Issued | 02/21/2025 | 12/05/2025 | Contractor HAWK. AA LLC | CONSTRUCTION OF FENCE AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01307512 ↗ | 49 SIDNEY PLACE BROOKLYN | Alteration | Permit Issued | 10/23/2025 | 11/21/2025 | Owner 293 HENRY LLC Contractor LIYANA CONSTRUCTION | JOB FILED TO SHOW CRACS REPAIRS ON THE 3 LOWEST STEPS OF THE ENTRY STOOP TO THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRE… |
| B00951313 ↗ | 327 NASSAU AVENUE BROOKLYN | Alteration | Signed-off | 10/26/2023 | 11/17/2025 | Owner OGAMI STUDIOS NYC Contractor OAK & STONE DEMOLITION | CONSTRUCTION OF FENCE IN FRONT OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01302403 ↗ | 101-41 75 ROAD QUEENS | Alteration | Filed — no permit on record | 11/15/2025 | — | Owner WINDSOR AR, INC | — |
| B01316010 ↗ | 287 GRAND STREET BROOKLYN | Alteration | Filed — no permit on record | 11/12/2025 | — | — | |
| B01064167 ↗ | 723 HUMBOLDT STREET BROOKLYN | Alteration | Signed-off | 07/18/2024 | 11/10/2025 | Contractor ASG CONSTRUCTION GROUP IN | Work filed to show installation of mechanical system on floors: 001-003 as per plans filed herewith. No change in use, egress and occupancy. |
| M01026866 ↗ | 1209 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/02/2024 | 11/07/2025 | Contractor PALM HOME IMPROVEMENT LLC | CONSTRUCTION OF FENCE AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01237575 ↗ | 306 GRAND STREET BROOKLYN | Alteration | Signed-off | 06/13/2025 | 11/06/2025 | Contractor J & R CONTRACTORS SERVICE | RENOVATION OF THE RETAIL SPACE INCLUDING MINOR CHANGES TO THE LAYOUT AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01264456 ↗ | 160 12 STREET BROOKLYN | Alteration | Signed-off | 08/14/2025 | 11/06/2025 | Contractor BRIDGE ZALE CONSTRUCT COR | INSTALLATION OF THE SCAFFOLDING FOR THE ELEVATOR SHAFT CONSTRUCTION ONLY AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY… |
| M01195632 ↗ | 251 EAST 32 STREET MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 11/05/2025 | Contractor ROYAL HVAC SYSTEMS INC | WORK FILED TO SHOW INSTALLATION OF SPLIT MECHANICAL SYSTEM ON 19TH FL, APT 20EF, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND O… |
| B01309614 ↗ | 711 GREENWOOD AVENUE BROOKLYN | Alteration | Permit Issued | 10/29/2025 | 11/05/2025 | Owner SIMONSAYS CORP Contractor SIMONSAYS CORP | FILING FENCE IN CONJUNCTION WITH : B01164350-1, AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION. |
| M00383387 ↗ | 1172 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 05/27/2021 | 11/03/2025 | Owner HALSTEAD MGMT CO. Contractor PETER MICELI PLUMBING | PLUMBING WORKS IN THE APT 1A ON THE BASEMENT LEVEL, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01277963 ↗ | 462 LINWOOD STREET BROOKLYN | Alteration | Permit Issued | 08/28/2025 | 10/30/2025 | Contractor ESG BUILDERS LLC | RENOVATION ON THE BASEMENT IN THE DUPLEX APARTMENT IN THE 2 FAMILY HOUSE AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01252189 ↗ | 20 BAYARD STREET BROOKLYN | Alteration | Filed — no permit on record | 10/29/2025 | — | — | — |
| B01306292 ↗ | 125 HURON STREET BROOKLYN | Alteration | Filed — no permit on record | 10/27/2025 | — | — | — |
| B01262959 ↗ | 287 GRAND STREET BROOKLYN | Alteration | Permit Issued | 08/08/2025 | 10/24/2025 | Contractor MAT ROM LLC | RECONSTRUCTION OF THE PARAPET WALL, REPOINTING OF THE ENTIRE FRONT FACADE, REPLACEMENT OF THE SEALANT AROUND THE WINDOWS AND OTHER WORK AS P… |
| B01222486 ↗ | 349 LEONARD STREET BROOKLYN | Alteration | Permit Issued | 05/16/2025 | 10/24/2025 | Contractor MCNY CONTRACTING LLC | FILING FENCE IN CONJUNCTION WITH B01110342-I1 (ENLARGEMENT OF THE GARAGE DOOR) AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND … |
| B01110342 ↗ | 349 LEONARD STREET BROOKLYN | Alteration | Permit Issued | 09/19/2024 | 10/23/2025 | Contractor MCNY CONTRACTING LLC | Job filed to to show enlargement of the garage door opening as per plans attached herewith. No change in use, egress and occupancy. |
| B00929051 ↗ | 327 NASSAU AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 09/08/2023 | 10/15/2025 | Owner OGAMI STUDIOS NYC Contractor OAK & STONE DEMOLITION | ENLARGEMENT OF THE EXISTING BUILDING TO BUILD THE MOVIE STUDIOS AS PER PLANS FILED HEREWITH. CHANGE TO CO PROPOSED. |
| M01057427 ↗ | 1009 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 07/30/2025 | 10/07/2025 | Contractor MZZ RENOVATION CORP | Plumbing work as per plans attached herewith. No change in use, egress and occupancy. |
| B01275168 ↗ | 90 GRAHAM AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 10/01/2025 | — | Owner HANCOCK ASSOCIATES, LLC | — |
| B01054725 ↗ | 52 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 06/17/2024 | 09/30/2025 | Contractor TOMCHRIS CONTRACTING CORP Filer ADAM MAISER | RELOCATION OF THE EXISTING STAIRS AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01271369 ↗ | 35 DIAMOND STREET BROOKLYN | Alteration | Signed-off | 08/14/2025 | 09/17/2025 | Contractor BUSKO REALTY CORP | JOB FILED TO SHOW MINOR CHANGES TO THE LAYOUT OF APARTMENT #2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. |
| Q01263939 ↗ | 75-09 60 PLACE QUEENS | Alteration | Signed-off | 08/19/2025 | 09/16/2025 | Contractor ATLANTIS DECORATING | WORK FILED TO REMOVE VIOLATION #34420413K AND SHOW THE RENOVATION ON CELLAR LEVEL TO REMOVE KITCHEN AND LEGALIZE 3 PIECE BATHROOM IN CONJUNC… |
| B01277052 ↗ | 41 DEVOE STREET BROOKLYN | Alteration | Permit Issued | 08/26/2025 | 09/15/2025 | Contractor RST RENOVATION INC | RENOVATION ON THE LOWEST LEVEL OF A DUPLEX IN 2 FAMILY HOUSE AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS AND OCCUPANCY, |
| B01193737 ↗ | 115 BANKER STREET BROOKLYN | Alteration CO | Filed — no permit on record | 09/05/2025 | — | — | — |