← Back
BuildNYC
Multi-story retail building (2+)
11 BOND STREET
MANHATTAN · Greenwich Village · BIN 1008425
💬 Discuss this project
1913Year Built
4Stories
K2Building Class
M1-5/R7XZoning
14,925 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: 350 Lafayette Fee · 3,260 sf lot · 4.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGymshark13p · 1 filing · 20 docs
Floor 4Gymshark12p · 12 filings · 20 docs
Floor 3Gymshark13p · 12 filings · 20 docs
Floor 2Gymshark121p · 12 filings · 20 docs
Floor 1Gymshark13p · 16 filings · 20 docs
CellarGymshark106p · 1 filing · 20 docs
Site & exteriorGymshark13p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
350 Lafayette Owner5003/21/2026
RFR Realty1407/08/2026
350 Lafayette LLC Noho Lafayette203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/16/2015$26.0M—350 LAFAYETTE, LLC → 350 LAFAYETTE OWNER LP$1,742/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Studio Huji710/06/2025
Robert Derector Associates609/25/2025
Ssuperette Design209/15/2025
Severud Associates Consulting Engineering309/12/2025
Marin Architects1412/19/2019
Baileys Engineering305/15/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Signs Cad1403/21/2026
Rizzo Group1003/21/2026
AE Design Solution603/21/2026
Metropolis Group1403/21/2026
KM Associates of New York603/21/2026
Beam Living103/21/2026
Marin Architects203/21/2026
K & M Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Signs CadSign hanger707/08/2026
Empire NY InstallationsScaffold507/08/2026
Clune Construction CoGeneral Contractor304/09/2026
Surepower ElectricElectrical103/22/2026
Aggressive Fire ProtectionFire Protection107/08/2026
Mac FelderPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Engineering6781109/25/2025
Building Lifecycle
All (175)Filed (35)Permit Issued (15)Signed Off (15)Violation (46)Inspection (4)Objection (30)Special Inspection (30)
11/20/2025
Signed off — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-S3
11/20/2025
Signed off — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-S2
11/12/2025
Signed off — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-I1
11/12/2025
Signed off — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY CHANNEL LETTER SET - WALL SIGN 2A
M01285837-I1
11/10/2025
Signed off — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-S1
11/10/2025
Signed off — Alteration
INSTALL A NON-ILLUMINATED, NON-FLASHING, ACCESSORY BLADE SIGN - SIGN 1C
M01285906-I1
11/10/2025
Signed off — Alteration
M01285885-I1
11/10/2025
Signed off — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY WALL SIGN "LOGO" - SIGN 3
M01285921-I1
11/10/2025
Signed off — Alteration
INSTALL A NON-ILLUMINATED, NON-FLASHING, ACCESSORY BLADE SIGN - SIGN 1B
M01285898-I1
11/10/2025
Signed off — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY CHANNEL LETTER SET - WALL SIGN 2C
M01285880-I1
11/10/2025
Signed off — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY CHANNEL LETTER SET - WALL SIGN 2B
M01285877-I1
11/05/2025
Signed off — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-S4
10/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/06/2025
Filed — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY WALL SIGN "LOGO" - SIGN 3
M01285921-I1
10/06/2025
Permit issued — Sign
M01285898-I1-SG
10/06/2025
Permit issued — Sign
M01285885-I1-SG
10/06/2025
Permit issued — Sign
M01285877-I1-SG
10/06/2025
Permit issued — Sign
M01285880-I1-SG
10/06/2025
Permit issued — Sign
M01285837-I1-SG
10/06/2025
Permit issued — Sign
M01285921-I1-SG
10/06/2025
Permit issued — Sign
M01285906-I1-SG
10/03/2025
Filed — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY CHANNEL LETTER SET - WALL SIGN 2A
M01285837-I1
10/03/2025
Filed — Alteration
INSTALL A NON-ILLUMINATED, NON-FLASHING, ACCESSORY BLADE SIGN - SIGN 1C
M01285906-I1
10/03/2025
Filed — Alteration
M01285885-I1
10/03/2025
Filed — Alteration
INSTALL A NON-ILLUMINATED, NON-FLASHING, ACCESSORY BLADE SIGN - SIGN 1B
M01285898-I1
10/03/2025
Filed — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY CHANNEL LETTER SET - WALL SIGN 2C
M01285880-I1
10/03/2025
Filed — Alteration
INSTALL A HALO LIT, NON-FLASHING, ACCESSORY CHANNEL LETTER SET - WALL SIGN 2B
M01285877-I1
10/03/2025
Special inspection requirement — Final
Ryan Hung
10/03/2025
Special inspection requirement — Final
Ryan Hung
10/03/2025
Special inspection requirement — Final
Ryan Hung
10/03/2025
Special inspection requirement — Final
Ryan Hung
10/03/2025
Special inspection requirement — Final
Ryan Hung
10/03/2025
Special inspection requirement — Final
Ryan Hung
09/25/2025
Filed — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-P5
09/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Ari Kamo
09/18/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Ari Kamo
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
09/18/2025
Special inspection requirement — Final
Ari Kamo
09/15/2025
Filed — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-P2
09/12/2025
Filed — Alteration
Filing for Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01156725-P6
09/12/2025
Special inspection requirement — Final
Ari Kamo
09/12/2025
Special inspection requirement — Aluminum Construction
Ari Kamo
09/12/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Ari Kamo
09/12/2025
Special inspection requirement — Structural Steel - Welding
Ari Kamo
09/12/2025
Special inspection requirement — Structural Steel - Details
Ari Kamo
09/10/2025
Special inspection requirement — Lighting controls
Ari Kamo
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
09/10/2025
Special inspection requirement — Heating Systems
Ari Kamo
09/10/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
09/10/2025
Special inspection requirement — Final
Ari Kamo
09/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
09/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
09/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
09/10/2025
Special inspection requirement — Ventilation and air distribution system
Ari Kamo
09/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
09/10/2025
Special inspection requirement — Interior lighting power
Ari Kamo
09/10/2025
Special inspection requirement — Exterior lighting power
Ari Kamo
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSignSigned-offSigns Cad10/06/2025
DOB NOWSprinklersSigned-offAggressive Fire Protection05/06/2025
DOB NOWPlumbingSigned-offMac Felder05/02/2025
DOB NOWMechanical SystemsSigned-offClune Construction Co05/01/2025
DOB NOWStructuralSigned-offClune Construction Co04/30/2025
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/30/2025
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I05/16/2018
DOB NOWConstruction FenceSigned-offEmpire NY Installations I05/11/2018
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I05/09/2018
BIS—ISSUEDSuperette Architecture02/28/2025
BISPLISSUEDTesterman Plumbing & Heating03/12/2020
BISOTISSUEDGalcon Enterprises02/24/2020
BISOTISSUEDGalcon Enterprises02/24/2020
BISMHISSUEDGalcon Enterprises02/24/2020
BISSPISSUEDP & D Mechanical03/07/2019
BISSPISSUEDP & D Mechanical02/27/2019
BIS—ISSUEDNewgrange Construction Co12/24/2018
BISOTISSUEDTop Link Contracting10/12/2018
BISOTRE-ISSUEDNewgrange Construction Co09/13/2018
BISMHISSUEDNewgrange Construction Co09/13/2018
BISOTISSUEDNewgrange Construction Co09/13/2018
BISSPISSUEDAccurate Mechanical07/20/2018
BISPLISSUEDAccurate Mechanical07/09/2018
BIS—ISSUEDNewgrange Construction Co06/22/2018
BISOTISSUEDNewgrange Construction Co06/11/2018
BISOTISSUEDNewgrange Construction Co06/11/2018
BISOTISSUEDL&K Partners04/10/2018
BISOTISSUEDL&K Partners04/10/2018
BISPLISSUEDPar Plumbing Co05/11/2017
BISOTISSUEDL&K Partners05/09/2017
BISOTRE-ISSUEDL&K Partners05/09/2017
BISOTISSUEDBenson Maintenance03/15/2016
BISOTISSUEDNewgrange Construction Co01/08/2016
BISEQISSUEDArsenal Scaffold07/01/2013
+ 16 more permits on file
14 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026CompleteFreedom Electric & DataGeneral Wiring
10/08/2025CompleteSigns Cad—
10/08/2025CompleteSigns Cad—
10/08/2025CompleteSigns Cad—
10/08/2025CompleteSigns Cad—
03/12/2024CompleteSurepower Electric—
09/26/2023CompleteSurepower ElectricGeneral Wiring
09/26/2023CompleteSurepower ElectricGeneral Wiring
02/11/2020CompletePremium ElectricGeneral Wiring
12/31/2019CompletePremium ElectricGeneral Wiring
11/27/2018CompleteBrandl ElectricGeneral Wiring
07/26/2018CompleteJam Electrical—
05/16/2018CompleteSurepower Electric—
04/24/2018Permit IssuedMega Electrical Contracting—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
10/03/2025FinalRyan Hungprogress
10/03/2025FinalRyan Hungprogress
10/03/2025FinalRyan Hungprogress
10/03/2025FinalRyan Hungprogress
10/03/2025FinalRyan Hungprogress
10/03/2025FinalRyan Hungprogress
09/18/2025Fenestration and door U-factor and product ratingsAri Kamoenergy_progress
09/18/2025Mastic and Intumescent Fire-resistant CoatingsAri Kamospecial
09/18/2025Fire-Resistant Penetrations and JointsAri Kamospecial
09/18/2025Fire-Resistance Rated ConstructionAri Kamoprogress
09/18/2025FinalAri Kamoprogress
09/12/2025FinalAri Kamoprogress
09/12/2025Aluminum ConstructionAri Kamospecial
09/12/2025Structural Steel - High Strength BoltingAri Kamospecial
09/12/2025Structural Steel - WeldingAri Kamospecial
09/12/2025Structural Steel - DetailsAri Kamospecial
09/10/2025Lighting controlsAri Kamoenergy_progress
09/10/2025Fire-Resistance Rated ConstructionAri Kamoprogress
09/10/2025Heating SystemsAri Kamospecial
09/10/2025Mechanical SystemsAri Kamospecial
09/10/2025FinalAri Kamoprogress
09/10/2025Duct leakage testing, insulation and designAri Kamoenergy_progress
09/10/2025HVAC-R and service water heating equipmentAri Kamoenergy_progress
09/10/2025HVAC-R and service water heating system controlsAri Kamoenergy_progress
09/10/2025Ventilation and air distribution systemAri Kamoenergy_progress
Latest 25 of 55.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GymsharkRetailCellar, Floors 1–4, Roof
Project M01285921 Alteration · LOC Issued · 10/06/2025
Project M01285837 Alteration · LOC Issued · 10/03/2025
Project M01285877 Alteration · LOC Issued · 10/03/2025
Project M01285880 Alteration · LOC Issued · 10/03/2025
Project M01285885 Alteration · LOC Issued · 10/03/2025
Project M01285898 Alteration · LOC Issued · 10/03/2025
Project M01285906 Alteration · LOC Issued · 10/03/2025
Project M01156725 Alteration · LOC Issued · 04/28/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 684 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch21
09/06/2026M00038249-I1Request digital key ↗
09/06/2026M00038255-I1Request digital key ↗
09/06/2026M00038259-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly14
09/05/2026M00111547-I1Request digital key ↗
09/05/2026M00138171-I1Request digital key ↗
09/05/2026M00149401-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits139
▸BISPLAN / WORK APPROVAL APPLICATION84
08/11/2025124041143Open ↗
11/26/2024124041143Open ↗
11/22/2024124041143Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION37
02/28/2025124041143Open ↗
03/13/2020123481758Open ↗
02/26/2020123481758Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWLPC Approval/Permit16
08/13/2026M01156725-I1Open ↗
08/13/2026M01285898-I1Open ↗
08/13/2026M01285877-I1Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/04/2025124041143Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
11/29/2023122629003Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
08/31/2023122629003Open ↗
▸Seals & Professional Certifications154
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
03/24/2020123742879Open ↗
03/24/2020123742879Open ↗
02/24/2020123481758Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/06/2026M00038249-I1Open ↗
09/06/2026M00038259-I1Open ↗
09/05/2026M00111547-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026M01285906-I1Open ↗
09/01/2026M01156725-S1Open ↗
09/01/2026M01156725-S1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
11/18/2019123742879Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M01156725-S1Open ↗
08/28/2026M01156725-P5Open ↗
08/28/2026M01156725-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
11/18/2019123742879Open ↗
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
11/06/2019122629003Open ↗
Showing 1 of 23 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/31/2020122629003Open ↗
01/31/2020122629003Open ↗
01/31/2020122629003Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
07/23/2021123008280Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/31/2020122629003Open ↗
11/15/2019122629003Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
10/01/2024124041143Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
04/08/2024122629003Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/06/2026M00038259-I1Open ↗
08/24/2026M01156725-S2Open ↗
08/24/2026M01156725-P7Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
02/25/2020123481758Open ↗
Showing 1 of 9 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
01/30/2020123481758Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/22/2024122629003Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/14/2020123481758Open ↗
▸BISEN2 - As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports46
▸BISTECHNICAL REPORT: RESPONSIBILITY28
10/01/2024124041143Open ↗
10/30/2020123061122Open ↗
10/30/2020123061122Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER13
07/24/2024122629003Open ↗
10/15/2019122629003Open ↗
10/15/2019122629003Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
08/21/2023123008280Open ↗
01/13/2021122629003Open ↗
10/30/2020123061122Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
11/26/2024124041143Open ↗
11/22/2024124041143Open ↗
11/15/2024124041143Open ↗
Showing 3 of 21 on file for this type
▸BISLANDMARKS APPROVAL9
11/18/2024124041143Open ↗
01/31/2020123481758Open ↗
10/15/2019122629003Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
10/28/2020123481847Open ↗
09/14/2020123481758Open ↗
08/04/2020123545707Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF3
05/20/2024122629003Open ↗
07/23/2021123008280Open ↗
10/30/2020123061122Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
08/20/2025124041143Open ↗
08/20/2025124041143Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT32
10/01/2024124041143Open ↗
10/30/2020123061122Open ↗
10/28/2020123481847Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/19/2024122629003Open ↗
07/23/2021123008280Open ↗
09/14/2020123565481Open ↗
▸Filing & Intake Forms90
▸BISADDITIONAL INFORMATION31
10/08/2025124041143Open ↗
08/20/2025124041143Open ↗
11/07/2024124041143Open ↗
Showing 3 of 31 on file for this type
▸BISBOROUGH INTAKE FORM31
03/24/2020123742879Open ↗
03/19/2020122629003Open ↗
01/31/2020122629003Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING COVER SHEET28
09/09/2024124041143Open ↗
11/18/2019123742879Open ↗
Showing 2 of 28 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
07/23/2021123008280Open ↗
07/19/2021122629003Open ↗
Showing 2 of 7 on file for this type
▸BISPLOT DIAGRAM3
09/09/2024124041143Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/07/2024124041143Open ↗
Showing 1 of 2 on file for this type
▸BISBSA VARIANCE1
07/19/2021122629003Open ↗