| Owner | Filings | Most Recent |
|---|---|---|
| Rockrose Development | 440 | 10/17/2026 |
| Adams & Co. Real Estate | 327 | 03/21/2026 |
| Adams & Company | 64 | 03/21/2026 |
| East Twenty Sixth Associates | 22 | 03/21/2026 |
| East 26th Street Associates | 17 | 03/21/2026 |
| East 26th St Joint Venture | 4 | 03/21/2026 |
| 11 Madison Square North | 3 | 03/21/2026 |
| Hanscomb | 2 | 03/21/2026 |
| 11 MSN | 1 | 03/22/2026 |
| Hasbro | 1 | 03/22/2026 |
| Humanscale | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/23/2021 | $148.2M | — | Private party → 11 MSN L.L.C | $680/sf building |
| 11/18/2021 | $13.0M | — | JBK 11 EAST 26TH LLC → 11 MSNA1 L.L.C. | $60/sf building |
| 03/18/2019 | $305K | — | Private party → AC 11 E 26 2016 LLC | $1/sf building |
| 12/20/2016 | $1.2M | — | — → — | $5/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| MG Engineering | 3 | 10/16/2026 |
| Vocon | 13 | 10/14/2026 |
| Patti & Anthes Consulting Engineers | 47 | 10/07/2026 |
| John F. Giuseffi, Architect | 14 | 10/06/2026 |
| Tohfaz Uddin PE | 8 | 09/09/2026 |
| Mdeas Architects | 9 | 08/21/2026 |
| Gilsanz Murray Steficek | 6 | 08/12/2026 |
| AE Superlab | 1 | 08/07/2026 |
| George J. Xerakias, PE | 1 | 07/15/2026 |
| AMA Consulting Engineers | 45 | 07/06/2026 |
| Christopher Lyles, PE | 5 | 07/01/2026 |
| Asd/SKY | 2 | 06/30/2026 |
| Thornton Tomasetti | 17 | 01/07/2026 |
| Deceder Group | 3 | 11/25/2025 |
| Leon Skvirsky PE | 1 | 07/16/2025 |
| Crimson | 11 | 02/21/2025 |
| Studio Huji | 2 | 11/21/2024 |
| Capron Design | 1 | 11/21/2024 |
| Bam Architecture Studio | 1 | 09/05/2024 |
| Gensler | 1 | 01/10/2024 |
| Plan B Engineering | 1 | 08/16/2023 |
| Jack Green Associates | 1 | 11/29/2022 |
| Robert Ettinger, P.E | 2 | 11/03/2022 |
| McNamara Salvia | 1 | 11/03/2022 |
| Amm Engineering | 1 | 10/31/2022 |
| FL&M Engineering Design & Inspection | 1 | 08/03/2022 |
| JMV Consulting Engineering | 2 | 03/10/2020 |
| Carl Guinta Associates | 2 | 11/22/2019 |
| Anthony Johnson Architects | 1 | 10/01/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 54 | 03/21/2026 |
| Rizzo Group | 45 | 03/21/2026 |
| Eurocelt Expediting | 22 | 03/21/2026 |
| Outsource Consultants | 54 | 03/21/2026 |
| Building Brothers | 2 | 03/21/2026 |
| AM Expediting | 1 | 03/21/2026 |
| D and L Expediting | 4 | 03/21/2026 |
| Signs Cad | 4 | 03/21/2026 |
| Milrose Consultants | 4 | 03/21/2026 |
| Green Studio | 2 | 03/21/2026 |
| Archetype Consultants | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Core Four Construction | General Contractor | 124 | 08/26/2026 |
| Arsenal Scaffold | Scaffold | 32 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 16 | 07/08/2026 |
| Sean Coakley P & H | Fire Protection | 14 | 08/30/2026 |
| Spring Scaffolding | Scaffold | 13 | 09/12/2026 |
| A&A Plumbing | Plumbing | 10 | 10/10/2026 |
| Reidy Contracting Group | General Contractor | 10 | 07/08/2026 |
| Evergreen Builders & Con* | General Contractor | 10 | 09/26/2026 |
| National Wall | Scaffold | 9 | 07/08/2026 |
| L&K Partners | General Contractor | 5 | 08/26/2026 |
| James E Fitzgerald | General Contractor | 5 | 07/08/2026 |
| Dependable Mechanical | Fire Protection | 5 | 10/14/2026 |
| Bedrock Mechanical | Fire Protection | 3 | 09/07/2026 |
| Benchmark Builders | General Contractor | 3 | 07/08/2026 |
| Elysium Construction | General Contractor | 3 | 07/08/2026 |
| Allcom Electric | Electrical | 2 | 03/21/2026 |
| Transel Elev. & Electric | Electrical | 2 | 03/21/2026 |
| Millar Elevator Industries | Electrical | 2 | 03/21/2026 |
| Trident Air Condi | General Contractor | 2 | 03/21/2026 |
| Signs Cad | Sign hanger | 2 | 07/08/2026 |
| A&H Express Plumbing & Heating | Plumbing | 2 | 08/20/2026 |
| Allstate Sprinkler | Fire Protection | 2 | 06/28/2026 |
| Full Capacity Fire | Fire Protection | 2 | 07/08/2026 |
| Skyline Fire Sprinkler Co | Fire Protection | 2 | 07/08/2026 |
| Active Signs | Sign hanger | 1 | 07/08/2026 |
| Jer Electric | Electrical | 1 | 03/21/2026 |
| Nion Electric | Electrical | 1 | 03/22/2026 |
| Berger Carlos | Electrical | 1 | 03/21/2026 |
| PSI Partners | Fire Protection | 1 | 09/02/2026 |
| Matros Automated Electrical | Electrical | 1 | 03/22/2026 |
| The Grenadier | General Contractor | 1 | 07/08/2026 |
| Creggan Electrial | Electrical | 1 | 03/22/2026 |
| Vanguard Construction and | General Contractor | 1 | 08/14/2026 |
| Idk Cooling | General Contractor | 1 | 07/08/2026 |
| Americon Construction | General Contractor | 1 | 07/08/2026 |
| Wilson Dennis | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MEP Inspections | 1102 | 4 | 10/16/2026 |
| Outsource Special Inspection | 2827 | 53 | 10/07/2026 |
| Codegreen | 510 | 91 | 08/21/2026 |
| Alan Margolin & Associates | 423 | 2 | 08/12/2026 |
| George J. Xerakias, PE | 1658 | 1 | 07/15/2026 |
| Skyline Engineering | 267 | 7 | 12/10/2024 |
| AK Engineering | 678 | 3 | 01/10/2024 |
| Jack Green Associates | 422 | 1 | 11/29/2022 |
| JMV Consulting Engineering | 804 | 2 | 03/10/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 10/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 10/13/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 10/09/2026 |
| DOB NOW | General Construction | Permit Issued | Evergreen Builders & Con* | 09/25/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Spring Scaffolding | 09/10/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Spring Scaffolding | 09/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 09/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 09/03/2026 |
| DOB NOW | Plumbing | Permit Issued | Henry Modell & Co | 09/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI Partners | 09/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI Partners | 09/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | Sean Coakley P & H | 08/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Evergreen Builders & Con* | 08/19/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 08/19/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H Express Plumbing & Heating | 08/18/2026 |
| DOB NOW | General Construction | Permit Issued | Vanguard Construction and | 08/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 08/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K Partners | 08/04/2026 |
| DOB NOW | General Construction | Permit Issued | L&K Partners | 08/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K Partners | 08/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Core Four Construction | 07/30/2026 |
| DOB NOW | General Construction | Permit Issued | Core Four Construction | 07/30/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Spring Scaffolding | 07/28/2026 |
| DOB NOW | Construction Fence | Permit Issued | Spring Scaffolding | 07/24/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Spring Scaffolding | 07/24/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | The Grenadier | 07/21/2026 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 07/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 06/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 06/15/2026 |
| DOB NOW | General Construction | Permit Issued | L&K Partners | 06/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K Partners | 06/11/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H Express Plumbing & Heating | 06/10/2026 |
| DOB NOW | General Construction | Permit Issued | The Grenadier | 05/08/2026 |
| DOB NOW | Plumbing | Permit Issued | Bedrock Plumbing & Heating | 04/23/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 04/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Evergreen Builders & Con* | 04/21/2026 |
| DOB NOW | General Construction | Permit Issued | Evergreen Builders & Con* | 04/21/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Arsenal Scaffold | 03/26/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Spring Scaffolding | 03/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 03/16/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/05/2026 | Permit Issued | Evergreen Builders & Con* | Air Conditioning Systems | Cooling Skypeak SDSVD11802B3MZ VCSC2LBS 5,000 CFM · Packaged Unit ×4 |
| 09/09/2026 | Permit Issued | Core Four Construction | Air Conditioning Systems | Cooling United Cool Air VA15G3AHA-A 6,000 CFM · Packaged Unit ×4 |
| 08/21/2026 | Signed-off | Core Four Construction | Air Conditioning Systems, Generators | Cooling Mitsubishi Electric PUY-A24NHA7 2 tons · Fan Coil Indoor ×4 Generators |
| 08/17/2026 | Permit Issued | Evergreen Builders & Con* | Air Conditioning Systems | Cooling Skypeak SDSVD11802B3MZVCSC2LBS 5,000 CFM · Packaged Unit ×2 |
| 07/13/2026 | Signed-off | Core Four Construction | Air Conditioning Systems | Cooling Skypeak SDSVD11802B3MZVCSC2LBS 5,000 CFM · Packaged Unit ×4 |
| 06/16/2026 | Permit Issued | L&K Partners | Air Conditioning Systems | Cooling Skypeak SKY-SDSV-D.1-180-2-B-3-MZ-V-C-S-C-2-L-B-S-0-0-0-0-0-C 15 tons · Vrf Outdoor ×16 |
| 02/12/2026 | Signed-off | Core Four Construction | Air Conditioning Systems | Cooling Skypeak SDSVD11802B3MZVCSC2LBS 5,000 CFM · Packaged Unit ×2 |
| 02/05/2026 | Permit Issued | Evergreen Builders & Con* | Air Conditioning Systems | Cooling United Cool Air VA15G3AHA-A 6,000 CFM · Condensing Unit ×2 |
| 12/29/2025 | Permit Issued | Evergreen Builders & Con* | Air Conditioning Systems | Cooling Skypeak SDSVD11802B3MZVCSC2LBS 5,000 CFM · Rooftop Unit ×2 |
| 12/09/2025 | Signed-off | Core Four Construction | Air Conditioning Systems | Cooling Skypeak SDSVD11802B3MZ VCSC2LBS 5,000 CFM · Packaged Unit ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | — | — | — |
| 10/07/2026 | Permit Issued | PSI Partners | 141 heads |
| 10/05/2026 | Permit Issued | Bedrock Mechanical | 459 heads |
| 09/09/2026 | Permit Issued | Sean Coakley P & H | 157 heads |
| 08/17/2026 | Permit Issued | Bedrock Mechanical | 174 heads |
| 07/13/2026 | Permit Issued | Sean Coakley P & H | 721 heads |
| 07/06/2026 | Permit Issued | A&H Express Plumbing & Heating | Sprinkler System |
| 05/26/2026 | Signed-off | Sean Coakley P & H | 129 heads |
| 02/12/2026 | Permit Issued | PSI Partners | 155 heads |
| 02/05/2026 | Permit Issued | Allstate Sprinkler | 289 heads |
| 12/29/2025 | Permit Issued | Allstate Sprinkler | 283 heads |
| 12/09/2025 | Signed-off | Sean Coakley P & H | 296 heads |
| 01/10/2025 | Signed-off | Sean Coakley P & H | 136 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | — | — | Water/Sanitary |
| 10/07/2026 | Permit Issued | Bedrock Plumbing & Heating | Water/Sanitary |
| 10/05/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 09/09/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 08/17/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 07/13/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 07/06/2026 | Permit Issued | Dependable Mechanical | Water/Sanitary |
| 06/16/2026 | Permit Issued | Dependable Mechanical | Water/Sanitary |
| 05/26/2026 | — | — | — |
| 02/12/2026 | Permit Issued | Bedrock Plumbing & Heating | Water/Sanitary |
| 02/05/2026 | Permit Issued | A&A Plumbing | — |
| 12/29/2025 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 12/09/2025 | Signed-off | A&A Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/19/2026 | Permit Issued | Nion Electric | General Wiring |
| 09/29/2026 | Permit Issued | Nion Electric | General Wiring |
| 09/23/2026 | Permit Issued | Nion Electric | General Wiring |
| 09/15/2026 | Permit Issued | Denali Electric | — |
| 08/25/2026 | Permit Issued | Avalon Electric | General Wiring |
| 06/01/2026 | Permit Issued | Avalon Electric | General Wiring |
| 05/12/2026 | Permit Issued | Allcom Electric | General Wiring |
| 04/22/2026 | Permit Issued | Nion Electric | General Wiring |
| 03/25/2026 | Complete | Century Electric | General Wiring |
| 03/16/2026 | Complete | Allcom Electric | General Wiring |
| 03/16/2026 | Permit Issued | Allcom Electric | General Wiring |
| 02/23/2026 | Permit Issued | Top Shelf Electric | — |
| 11/14/2025 | Permit Issued | Nion Electric | General Wiring |
| 01/17/2025 | Permit Issued | Freedom Electric & Data | General Wiring |
| 05/22/2024 | Complete | Crosswire Electrical | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/05/2026 | Permit Issued | A&A Plumbing | 1 scope_items |
| 08/21/2026 | Signed-off | Core Four Construction | Steel, Concrete |
| 08/12/2026 | Permit Issued | Vanguard Construction and | Concrete |
| 07/13/2026 | Permit Issued | A&A Plumbing | Steel |
| 01/07/2026 | Permit Issued | The Grenadier | Steel |
| 12/10/2024 | Permit Issued | James E Fitzgerald | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | Spring Scaffolding | Fence, Scaffold, Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | Permit Issued | The Grenadier | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/02/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/18/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/13/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/22/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 10/17/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 10/06/2025 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 09/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/08/2025 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 09/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/14/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/07/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 10/07/2026 | Shutoff dampers | — | energy_progress |
| 10/07/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 10/07/2026 | Permanent certificate | — | energy_progress |
| 10/06/2026 | Interior lighting power | — | energy_progress |
| 10/06/2026 | Sprayed fire-resistant materials | — | special |
| 10/06/2026 | Energy Code Compliance Inspections | — | progress |
| 10/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 10/06/2026 | Lighting controls | — | energy_progress |
| 09/30/2026 | Electrical motors and elevators | — | energy_progress |
| 09/30/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 09/30/2026 | Post-installed Anchors | — | special |
| 09/30/2026 | Maintenance information | — | energy_progress |
| 09/21/2026 | Post-installed Anchors | — | special |
| 09/21/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 09/21/2026 | Final | — | progress |
| 09/21/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/21/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 09/21/2026 | Post-installed Anchors | — | special |
| 09/21/2026 | Energy Code Compliance Inspections | — | progress |
| 09/21/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/17/2026 | Sprinkler Systems | — | special |
| 09/17/2026 | Final | — | progress |
| 09/17/2026 | Mechanical Systems | — | special |
| 09/10/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Dishoom | Restaurant / Food Service | Cellar, Floors 1, 2, Mezzanine | Project M01430035 |
| Sierra | Office | Floors 4–6 | Project M01410792 Project M01375847 Project M01375934 |
| Rockrose | Office | Floors 10, 14, 22 | Project M01365531 Project M00974586 Project M00974593 Project M00973798 Project M00903909 Project M00903896 Project M00903901 Project M00903904 Project M00903895 |
| Jump Trading | Office | Floors 2, 3 | Project M01093955 Project M01093946 Project M01093948 Project M01093951 Project M01093953 |
| Reorg | Office | Floor 9 | Project M01100372 |
| Holocene Advisors | Office | Floor 8 | Project M00975935 Project M00975939 Project M00975941 Project M00975945 |
| Butterfly Network | Office | Floors 7–9 | Project M00917988 Project M00917994 Project M00917984 Project M00917987 Project M00917991 Project M00944247 Project M00943909 Project M00943911 |
| Bluewolf | Office | Floor 21 | Project M00297802 Project M00297795 |