| Date | Filing | heads | System & scope | Plans | Address |
|---|---|---|---|---|---|
| 09/04/2024 | M01065421-S2 | 24 | Wet pipe Relocation 24 | — | 411 5 AVENUE |
| 07/17/2024 | M01071337-I1 | 31 | Wet pipe New 3 · Relocation 28 | — | 1133 6 AVENUE |
| 07/16/2024 | M01061988-I1 | 23 | Wet pipe New 9 · Relocation 14 | — | 1 PENN PLAZA |
| 06/03/2024 | M01048901-I1 | 9 | Wet pipe Relocation 9 | — | 350 PARK AVENUE |
| 05/10/2024 | M00947523-I1 | 8 | Wet pipe Relocation 8 | — | 1 PENN PLAZA |
| 04/02/2024 | M00988302-I1 | 31 | Wet pipe New 1 · Relocation 23 · Replacement 7 | — | 1 PENN PLAZA |
| Name | Projects together | Most recent |
|---|---|---|
| GOLDMAN COPELAND ASSOCIATES | 45 | 08/25/2026 |
| CARL GUINTA ASSOCIATES | 15 | 12/06/2023 |
| GOLDMAN COPELAND ASSOC. | 8 | 07/29/2024 |
| JAROS BAUM & BOLLES | 7 | 03/11/2025 |
| AMA CONSULTING ENGINEERS, PC | 6 | 09/25/2023 |
| MG ENGINEERING D.P.C. | 5 | 07/02/2024 |
| AKF ENGINEERS, LLP | 3 | 10/28/2022 |
| ROBERT DERECTOR ASSOCIATES | 3 | 07/25/2023 |
| STEVEN PAUL HAMMER | 3 | 05/18/2022 |
| ROSINI ENGINEERING, PC | 2 | 03/08/2023 |
| TAN ENGINEERING PC | 2 | 11/01/2022 |
| CHARLES G. MICHEL ENGINEERING, PC. | 1 | 10/01/2021 |
| CONCEPT DESIGN GROUP | 1 | 02/20/2023 |
| ESD | 1 | 09/25/2023 |
| Guth DeConzo Consulting Engineers | 1 | 06/02/2022 |
| HWL ENGINEERING PC | 1 | 07/16/2024 |
| IAQ SYSTEMS INC | 1 | 01/30/2024 |
| JACK GREEN ASSOCIATES | 1 | 05/22/2023 |
| JMV CONSULTING ENGINEERING | 1 | 03/10/2020 |
| RISE PROJECTS | 1 | 07/01/2024 |
| WSP | 1 | 10/28/2020 |
| Z.S. ENGINEERING, D.P.C. | 1 | 08/16/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| S.B.A. PLUMBING CORP | 3 | 07/01/2024 |
| ALLPRO GENERAL CNTRTING C | 1 | 07/16/2024 |
| AMBASSADOR CONSTRUCTION C | 1 | 07/01/2024 |
| ARMON MECHANICAL INC | 1 | 06/25/2024 |
| GREGG NY PLUMBING, INC | 1 | 11/01/2022 |
| LAB PLBG & HTG CO, INC | 1 | 05/11/2022 |
| PAR FIRE PROTECTION LLC | 1 | 03/08/2023 |
| PAR PLUMBING CO., INC | 1 | 06/04/2020 |
| TRISTATE PLBG SVCS CORP | 1 | 07/25/2023 |
| VIP FIRE SPRINKLER INC | 1 | 07/01/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| VORNADO REALTY TRUST | 77 | 08/25/2026 |
| BXP | 2 | 07/25/2023 |
| B.BRO'S BROADWAY REALTY LLC | 1 | 05/26/2022 |
| L&L HOLDING COMPANY LLC | 1 | 09/25/2023 |
| NEW YORK UNIVERSITY | 1 | 06/02/2022 |
| SVF PARK NEW YORK, LLC | 1 | 09/25/2023 |
| THE DURST ORGANIZATION | 1 | 07/02/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| ARCHETYPE CONSULTANTS, INC. | 44 | 08/25/2026 |
| RIZZO GROUP | 11 | 03/11/2025 |
| A1 EXPEDITING SERVICE CORP. | 5 | 01/30/2024 |
| ADAM MAISER | 1 | 03/08/2023 |
| AEC CONSULTING & EXPEDITING, INC | 1 | 06/02/2022 |
| BROOKBRIDGE CONSULTING | 1 | 09/25/2023 |
| JAM CONSULTANTS, INC. | 1 | 07/02/2024 |
| NYCCODE LLC | 1 | 07/01/2024 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 11/04/2021 |
| RIP CC INC | 1 | 11/01/2022 |
| WILLIAM VITACCO ASSOCIATES | 1 | 03/21/2023 |
| Z.S. ENGINEERING, D.P.C. | 1 | 08/16/2019 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01061988 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 06/25/2024 | 03/10/2026 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings. |
| M01065421 ↗ | 411 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/16/2024 | 09/04/2024 | Design HWL ENGINEERING PC | Modification of existing sprinkler system on the 5th floor. |
| M01071337 ↗ | 1133 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/02/2024 | 07/17/2024 | Design MG ENGINEERING D.P.C. Owner THE DURST ORGANIZATION Filer JAM CONSULTANTS, INC. | Sprinkler work for Interactive Brokers on 35th floor construction (36th floor marketing) |
| M01048901 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/28/2024 | 06/03/2024 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | SPRINKLER WORK ON THE 14TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00947523 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 03/27/2024 | 05/10/2024 | Design GOLDMAN COPELAND ASSOC. | Restrooms - Sprinkler work on the 51st floor as indicated on drawings. |
| M00988302 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 01/30/2024 | 04/02/2024 | Design IAQ SYSTEMS INC Owner VORNADO REALTY TRUST | Modification to existing sprinkler and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy. |
| M08036574 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 11/29/2022 | 03/27/2024 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 3RD, 11TH AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M08048167 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2023 | 03/26/2024 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 7TH, 8TH AND 12TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00777454 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 09/02/2022 | 03/25/2024 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 42nd floor (restrooms/corridors) as indicated on drawings |
| M00867775 ↗ | 1 WORTH STREET MANHATTAN | Alteration | Signed-off | 05/15/2023 | 03/11/2024 | Design MG ENGINEERING D.P.C. Filer NYCCODE LLC | plumbing and sprinkler work associated with the renovation of the existing commercial space as shown on plans filed herewith. no change to u… |
| M00923751 ↗ | 770 BROADWAY MANHATTAN | Alteration | Signed-off | 01/25/2024 | 03/04/2024 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | Removal of sprinkler heads and installation of temporary sprinkler loop on the 6th floor as indicated on drawings. |
| M00968996 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/06/2023 | 12/14/2023 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Removal of sprinkler heads and installation of temporary sprinkler loop on the 34th floor as indicated on drawings. |
| M00932665 ↗ | 770 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/14/2023 | 12/07/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Removal of sprinkler heads and installation of temporary sprinkler loop on the 4th floors as indicated on drawings. |
| M00921764 ↗ | 425 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/25/2023 | 11/02/2023 | Design ESD Owner L&L HOLDING COMPANY LLC Filer RIZZO GROUP | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR… |
| M00934678 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/12/2023 | 10/13/2023 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | SPRINKLER WORK ON THE 5TH, 6TH AND 9TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| M00920521 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/14/2023 | 09/19/2023 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | SPRINKLER WORK ON THE 5TH, 6TH AND 9TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00886914 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2023 | 08/31/2023 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | Restrooms - Sprinkler work on the 28th floor as indicated on drawings. |
| M00888176 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 08/01/2023 | 08/29/2023 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | Restrooms & corridor - Sprinkler work on the 48th floor as indicated on drawings. |
| M00820750 ↗ | 770 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/18/2023 | 08/22/2023 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | Removal of sprinkler heads and installation of temporary sprinkler loop on the 5th floors as indicated on drawings. |
| M00878212 ↗ | 909 3 AVENUE MANHATTAN | Alteration | Signed-off | 07/11/2023 | 07/26/2023 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | Cohen Weiss & Simon - Sprinkler work on the 12th floor as indicated on drawings |
| M00849671 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/19/2023 | 06/06/2023 | Design GOLDMAN COPELAND ASSOC. Owner VORNADO REALTY TRUST | NF Smith - Sprinkler work on the 45th floor as indicated on drawings. No change in use egress or occupancy. |
| M00834677 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 04/29/2023 | Design ROSINI ENGINEERING, PC Filer ADAM MAISER | INTERIOR RENOVATION OF FIRST FLOOR RETAIL & ASSOCIATED CELLAR SPACE |
| M08053942 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/24/2023 | 03/24/2023 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | STANDPIPE WORK ON THE 7TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00832657 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 03/17/2023 | 03/21/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 14th floor for emergency generator upgrade as indicated on drawings. |
| M08041861 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/10/2023 | 03/20/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Kotak - Sprinkler work and install temporary sprinkler loop on the 17th floor as indicated on drawings. |
| M08041619 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/11/2023 | 03/17/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 19th floor (restrooms) as indicated on drawings. No change in use egress or occupancy |
| M08040967 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/27/2023 | 03/14/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Ownership Works - Sprinkler work on the 17th floor as indicated on drawings. No change in use egress or occupancy. |
| M00812094 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/07/2023 | 03/10/2023 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | CUT & CAP EXISITING SPRINKLER SYSTEMS SCHEDULED TO BE REMOVED. INSTALL TEMPORARY SPRINKLER LOOP ON 21ST & 22ND FLOOR AS INDICATED ON DRAWING… |
| M08020429 ↗ | 1115 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/08/2023 | 02/24/2023 | Design AMA CONSULTING ENGINEERS, PC | Removal of sprinkler heads and installation of temporary sprinkler loop on the 6th floor (7th floor tenant) as indicated on drawings |
| M08036761 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/06/2023 | 02/09/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 45th floor (core restrooms/public corridor) as indicated on drawings. No change in use egress or occupancy. |
| M08030984 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/12/2022 | 01/18/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 55th floor (core restrooms) as indicated on drawings. No change in use egress or occupancy |
| M08046599 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/12/2022 | 01/10/2023 | Design ROBERT DERECTOR ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler changes on the 6th floor as indicated on drawings. |
| M08015388 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/09/2022 | 01/05/2023 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 45th floor (Gibbons Turnkey) as indicated on drawings. No change in use egress or occupancy. |
| M00776508 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/15/2022 | 12/19/2022 | Design MG ENGINEERING D.P.C. Owner VORNADO REALTY TRUST | Minor sprinkler work on part of 41st floor. |
| M08052092 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/09/2022 | 12/17/2022 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Temporary sprinkler loop installation on the 55th floor (whitebox) as indicated on drawings. No change in use egress or occupancy. |
| M08033834 ↗ | 499 PARK AVENUE MANHATTAN | Alteration | Signed-off | 11/18/2022 | 12/02/2022 | Design AMA CONSULTING ENGINEERS, PC Owner SVF PARK NEW YORK, LLC Filer RIZZO GROUP | Modifications to the existing sprinkler system on the 16th floor as per plans. No change to use, egress or occupancy. |
| M08030384 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2022 | 11/28/2022 | Design JAROS BAUM & BOLLES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M08031393 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2022 | 11/16/2022 | Design ROBERT DERECTOR ASSOCIATES Owner BXP | Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under th… |
| M08031397 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2022 | 11/16/2022 | Design ROBERT DERECTOR ASSOCIATES Owner BXP | Modification to existing standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| M08019669 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 10/20/2022 | 11/15/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 22nd floor; install temporary sprinkler loop (Fivesky LLC) as indicated on drawings |
| M00777878 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 09/22/2022 | 09/28/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 34th floor (Dell) as indicated on drawings |
| M00783325 ↗ | 244 11 AVENUE MANHATTAN | Alteration | Signed-off | 09/09/2022 | 09/15/2022 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 2nd floor (bathrooms) as indicated on drawings |
| M00777336 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 08/23/2022 | 09/08/2022 | Design MG ENGINEERING D.P.C. Owner VORNADO REALTY TRUST | Minor sprinkler work on part of 28th floor. |
| 110438768BIS | 150 EAST 58 STREET MANHATTAN | — | ISSUED | 05/08/2009 | 08/25/2022 | — | SP |
| M00770381 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/29/2022 | 08/09/2022 | Design AMA CONSULTING ENGINEERS, PC | ADDITIONS/MODIFICATIONS TO EXISTING SPRINKLER/STANDPIPE. EXISTING SP TEMP LOOP IN PLACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00735334 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 06/17/2022 | 08/02/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 11th and 12th floor (corridors) as indicated on drawings |
| M00699465 ↗ | 321 EAST 34 STREET MANHATTAN | Alteration | Signed-off | 07/15/2022 | 07/20/2022 | Design CONCEPT DESIGN GROUP | Modifications to the existing sprinkler system, replace relocate heads and piping. |
| M00763961 ↗ | 909 3 AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2022 | 07/19/2022 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Removal of sprinkler heads and installation of temporary sprinkler loop to be installed on the 10th and 12th floor as indicated on drawings. |
| M00736367 ↗ | 1 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/27/2022 | 07/13/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Removal of sprinkler heads on the 19th & 20th floors as indicated on drawings. |
| M00758807 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 06/21/2022 | 07/06/2022 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Removal of sprinkler heads and installation of temporary sprinkler loop on the 26th, 27th, 28th and 29th floor as indicated on drawings |
| 104475587BIS | 150 EAST 58 STREET MANHATTAN | — | ISSUED | 05/07/2007 | 06/28/2022 | — | SP |
| M00727957 ↗ | 280 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/06/2022 | 06/14/2022 | Design AKF ENGINEERS, LLP | Additions / Modifications to existing plumbing and sprinkler system as per plans filed herewith. No change in use, egress or occupancy unde… |
| M00745834 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 06/09/2022 | 06/14/2022 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Temporary loop installation on the 6th floor as indicated on drawings. |
| M00746531 ↗ | 5 UNIVERSITY PLACE MANHATTAN | Alteration | Signed-off | 06/02/2022 | 06/14/2022 | Owner NEW YORK UNIVERSITY | Installation of new sprinkler heads, relocation and cap/remove existing heads on 1st floor as per plans. |
| M00728024 ↗ | 280 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/26/2022 | 06/02/2022 | Design AKF ENGINEERS, LLP | Removal of the existing sprinkler system and installation of temp loop as per plans filed herewith. NO CHANGE IN USE, EGRESS OR OCCUPANCY U… |
| M00715576 ↗ | 1385 BROADWAY MANHATTAN | Alteration | Signed-off | 05/26/2022 | 05/31/2022 | Design CARL GUINTA ASSOCIATES | Modification to existing sprinkler system on the 17th floor as indicated on drawings. This application will supersede old application BIS 12… |
| M00721707 ↗ | 44 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 05/18/2022 | 05/25/2022 | Design STEVEN PAUL HAMMER Owner VORNADO REALTY TRUST | Removal of sprinkler heads and install temporary sprinkler loop on the 1st floor as indicated on drawings |
| M00716230 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/11/2022 | 05/23/2022 | Design AMA CONSULTING ENGINEERS, PC | PLUMBING AND SPRINKLER FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00704030 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 05/02/2022 | 05/17/2022 | Design GOLDMAN COPELAND ASSOCIATES | Sprinkler work on the 19th floor (MTA relocation) as indicated on drawings |
| M00678989 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 03/25/2022 | 05/02/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 20th floor (Datatec) as indicated on drawings |
| M00583848 ↗ | 463 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/24/2021 | 04/15/2022 | Design JACK GREEN ASSOCIATES | Sprinkler work on the 8th and 9th floor (In Mocean) as indicated on drawings |
| M00522614 ↗ | 47 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 10/01/2021 | 04/14/2022 | Modify existing Sprinkler System as indicated on 9th floor. No change to egress, occupancy or use. | |
| M00575638 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 01/25/2022 | 04/13/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 41st floor (prebuild space/restrooms) as indicated on drawings |
| M00668004 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/17/2022 | 04/13/2022 | Design GOLDMAN COPELAND ASSOCIATES | Sprinkler work on the 14th , 33rd and 42nd floor; install temporary sprinkler loop as indicated on drawings |
| 121855402BIS | 463 7 AVENUE MANHATTAN | — | ISSUED | 02/11/2014 | 02/10/2022 | — | SP |
| 121955553BIS | 463 7 AVENUE MANHATTAN | — | ISSUED | 05/20/2014 | 02/10/2022 | — | EQ, MH, OT, SP |
| M00621973 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/02/2021 | 01/14/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 18th floor (VNO building office) as indicated on drawings |
| M00600187 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/26/2021 | 10/28/2021 | Design GOLDMAN COPELAND ASSOCIATES | Sprinkler work on part of 28th floor (Joho) as indicated on drawings. |
| M00601721 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/11/2021 | 10/14/2021 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Removal of sprinkler heads and install temporary sprinkler loop on the 16th and 17th floor as indicated on drawings |
| M00587042 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2021 | 10/06/2021 | Design GOLDMAN COPELAND ASSOCIATES | Sprinkler work on part of 16th floor (DSC) as indicated on drawings. |
| M00550827 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 09/20/2021 | 09/22/2021 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 34th floor as indicated on drawings. |
| 121805724BIS | 1131 3 AVENUE MANHATTAN | — | ISSUED | 10/09/2013 | 09/13/2021 | — | SP |
| M00580490 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/02/2021 | 09/10/2021 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 22nd floor as indicated on drawings |
| M00371956 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 08/25/2020 | 09/07/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the mezzanine, 1st and 2nd floor as indicated on drawings |
| M00565540 ↗ | 110 WEST 40 STREET MANHATTAN | Alteration | Permit Issued | 08/27/2021 | 09/02/2021 | Design TAN ENGINEERING PC Filer RIP CC INC | Removal and Installation of new plumbing fixtures and sprinkler heads as per plan. No change to use, egress or occupancy proposed under this… |
| M00586406 ↗ | 29 WEST 32 STREET MANHATTAN | Alteration | Signed-off | 09/01/2021 | 09/02/2021 | Design CARL GUINTA ASSOCIATES | Installation of temporary sprinkler loop on the 12th floor as indicated on drawings |
| M00540577 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/21/2021 | 07/30/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on part of 41st floor (Hein Park). |
| M00265983 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/16/2019 | 07/12/2021 | Design TAN ENGINEERING PC | INSTALL NEW AND RELOCATE EXISTING SPRINKLER HEADS FOR NEW TENANT BUILD OUT ON GROUND FLOOR RESTAURANT. |
| M00519000 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 06/11/2021 | 06/24/2021 | Design MG ENGINEERING D.P.C. Owner VORNADO REALTY TRUST | Sprinkler work on 42nd floor and part of 41st floor as indicated on drawings. |
| M00351961 ↗ | 392 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2021 | 05/05/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 15th floor (MSG) as indicated on drawings |
| M00354038 ↗ | 392 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2021 | 04/30/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on part of the 26th floor as indicated on drawings. |
| M00481155 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/05/2021 | 04/08/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler changes in core toilets and corridor on 41st floor. |
| M00458460 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/12/2021 | 03/16/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 28th floor (prebuild space); install temporary sprinkler loop as indicated on drawings |
| M00459866 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/18/2021 | 03/01/2021 | Design ROSINI ENGINEERING, PC Owner VORNADO REALTY TRUST | STORE RENOVATION (FENDI) WORK TO INCLUDE SPRINKLER MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY. |
| M00434681 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 02/17/2021 | 02/24/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 24th floor (prebuild) as indicated on drawings. |
| M00432941 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/22/2021 | 02/23/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 39th floor (prebuild space) as indicated on drawings. |
| M00465556 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 02/12/2021 | 02/23/2021 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 12th floor (suite B) as indicated on drawings |
| M00255790 ↗ | 715 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 09/08/2020 | 01/05/2021 | Design STEVEN PAUL HAMMER Owner VORNADO REALTY TRUST | Sprinkler work on the 3rd floor and penthouse as indicated on drawings. |
| M00389271 ↗ | 650 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2020 | 12/22/2020 | Design WSP | SPRINKLER WORK ON THE 24TH FLOOR (LLW CHINA ORIENT) AS INDICATED ON DRAWINGS. |
| M00433942 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 12/18/2020 | 12/22/2020 | Design CARL GUINTA ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler modifications on the 1st floor, mezzanine and 2nd floor (Interiors by Royale) as indicated on drawings |
| M00402223 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 12/11/2020 | 12/21/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | Sprinkler modifications taking place on the 24th Floor (Construction)/25th Floor (Marketing) as per plans filed herewith. No change in Use, … |
| M00346438 ↗ | 715 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 06/02/2020 | 12/01/2020 | Design STEVEN PAUL HAMMER Owner VORNADO REALTY TRUST | Sprinkler modifications on the 1st thru 3rd floors for new bathrooms, janitor's closets, and ground floor lobby work; related work as per pl… |
| 123821524BIS | 715 LEXINGTON AVENUE MANHATTAN | — | ISSUED | 11/20/2019 | 11/30/2020 | — | SP |
| M00399212 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 10/30/2020 | 11/23/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | Sprinkler modifications taking place on the 11th Floor as per plans filed herewith. No change in Use, Egress, or Occupancy. |
| M00405236 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 11/12/2020 | 11/23/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 52nd floor as indicated on drawings. |
| M00407099 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 11/04/2020 | 11/16/2020 | Design GOLDMAN COPELAND ASSOCIATES | Installation of temporary sprinkler loop on the 52nd floor as indicated on drawings. |
| M00385899 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 10/06/2020 | 10/22/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on t he 24th floor (Morsly) as indicated on drawings |
| M00404066 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 10/06/2020 | 10/13/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST Filer RIZZO GROUP | Sprinkler work taking place on the 23rd floor (24th floor marketing) as per plans filed herewith. No change in use, egress or occupancy. |
| M00372632 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 09/25/2020 | 10/07/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on part of the 39th floor (Hill International) as indicated on drawings |
| M00345392 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 06/29/2020 | 07/29/2020 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Sprinkler work on the 14th floor (Veritiv relocation ) as indicated on drawings. |
| Permit history | Filing | heads | System & scope | Plans | Address | Building |
|---|---|---|---|---|---|---|
Sep '24 single permit | M01065421-S2 | 24 | Wet pipe Relocation 24 | — | 411 5 AVENUE | Office · 11 fl |
Jul '24 single permit | M01071337-I1 | 31 | Wet pipe New 3 · Relocation 28 | — | 1133 6 AVENUE | Office · 44 fl |
Jul '24 ↻ 2 permits · latest Mar '26 · active | M01061988-I1 | 23 | Wet pipe New 9 · Relocation 14 | — | 1 PENN PLAZA | Office · 57 fl |
Jun '24 single permit | M01048901-I1 | 9 | Wet pipe Relocation 9 | — | 350 PARK AVENUE | Office · 31 fl |
May '24 single permit | M00947523-I1 | 8 | Wet pipe Relocation 8 | — | 1 PENN PLAZA | Office · 57 fl |
Apr '24 single permit | M00988302-I1 | 31 | Wet pipe New 1 · Relocation 23 · Replacement 7 | — | 1 PENN PLAZA | Office · 57 fl |
Dec '22 ↻ 2 permits · latest Mar '24 | M08036574-I1 | 98 | Wet pipe New 98 | — | 350 PARK AVENUE | Office · 31 fl |
Dec '22 ↻ 2 permits · latest Mar '24 | M00777454-I1 | 20 | Wet pipe New 3 · Relocation 16 | — | 1 PENN PLAZA | Office · 57 fl |
Mar '24 single permit | M00923751-I1 | 57 | Wet pipe New 57 | — | 770 BROADWAY | Office · 15 fl |
Dec '23 single permit | M00968996-I1 | 1 | Wet pipe New 1 | — | 90 PARK AVENUE | Office · 41 fl |
Dec '23 single permit | M00932665-I1 | 57 | Wet pipe New 57 | — | 770 BROADWAY | Office · 15 fl |
Nov '23 single permit | M00921764-I1 | 1 | Wet pipeJockey pumpBooster pump New 1 | — | 425 PARK AVENUE | Office · 43 fl |
Oct '23 single permit | M00934678-I1 | 354 | Wet pipe New 354 | — | 350 PARK AVENUE | Office · 31 fl |
Sep '23 single permit | M00920521-I1 | 28 | Wet pipe New 28 | — | 350 PARK AVENUE | Office · 31 fl |
Aug '23 single permit | M00888176-I1 | 39 | Wet pipe New 31 · Relocation 8 | — | 1 PENN PLAZA | Office · 57 fl |
Aug '23 single permit | M00820750-I1 | 57 | Wet pipe New 57 | — | 770 BROADWAY | Office · 15 fl |
Jul '23 ↻ 2 permits · latest Mar '24 | M00867775-S2 | 86 | Wet pipe New 55 · Relocation 11 · Replacement 20 | — | 1 WORTH STREET | Residential · 6 fl |
Jun '23 single permit | M00849671-I1 | 95 | Wet pipe New 95 | — | 1 PENN PLAZA | Office · 57 fl |
Mar '23 ↻ 2 permits · latest Apr '23 | M00834677-I1 | 88 | Wet pipeBooster pump New 88 | — | 730 5 AVENUE | Residential · 26 fl |
Mar '23 single permit | M08053942-I1 | 1 | Relocation 1 | — | 350 PARK AVENUE | Office · 31 fl |
Mar '23 single permit | M00832657-I1 | 12 | Wet pipe New 11 · Relocation 1 | — | 888 SEVENTH AVENUE | Office · 45 fl |
Mar '23 single permit | M08041861-I1 | 26 | Wet pipe New 24 · Relocation 2 | — | 1 PENN PLAZA | Office · 57 fl |
Mar '23 single permit | M08041619-I1 | 8 | Wet pipe Relocation 8 | — | 1 PENN PLAZA | Office · 57 fl |
Mar '23 single permit | M08040967-I1 | 39 | Wet pipe New 38 · Relocation 1 | — | 1 PENN PLAZA | Office · 57 fl |
Mar '23 single permit | M00812094-I1 | 24 | Wet pipe New 24 | — | 90 PARK AVENUE | Office · 41 fl |
Feb '23 single permit | M08020429-I1 | 22 | Wet pipe New 22 | — | 16 MADISON SQUARE WEST | Office · 12 fl |
Feb '23 single permit | M08036761-I1 | 95 | Wet pipe New 95 | — | 1 PENN PLAZA | Office · 57 fl |
Jan '23 single permit | M08030984-I1 | 11 | Wet pipe New 3 · Relocation 8 | — | 1 PENN PLAZA | Office · 57 fl |
Jan '23 single permit | M08046599-I1 | 52 | Wet pipe New 36 · Relocation 16 | — | 90 PARK AVENUE | Office · 41 fl |
Jan '23 single permit | M08015388-I1 | 197 | Wet pipe New 197 | — | 1 PENN PLAZA | Office · 57 fl |
Dec '22 single permit | M00776508-I1 | 24 | Wet pipe Relocation 24 | — | 888 SEVENTH AVENUE | Office · 45 fl |
Dec '22 single permit | M08052092-I1 | 9 | New 9 | — | 1 PENN PLAZA | Office · 57 fl |
Dec '22 single permit | M08033834-I1 | 103 | Wet pipe New 103 | — | 499 PARK AVENUE | Office · 27 fl |
Nov '22 single permit | M08030384-I1 | 10 | Wet pipe New 10 | — | 350 PARK AVENUE | Office · 31 fl |
Nov '22 single permit | M08031397-I1 | 2 | New 1Replacement 1 | — | 767 FIFTH AVENUE | Office · 50 fl |
Nov '22 single permit | M08031393-I1 | 363 | Wet pipe New 344 | — | 767 FIFTH AVENUE | Office · 50 fl |
Nov '22 single permit | M08019669-I1 | 26 | Wet pipe New 26 | — | 1 PENN PLAZA | Office · 57 fl |
Sep '22 single permit | M00777878-I1 | 130 | Wet pipe New 123 · Relocation 7 | — | 1 PENN PLAZA | Office · 57 fl |
Sep '22 single permit | M00783325-I1 | 12 | Wet pipe New 12 | — | 260 ELEVENTH AVENUE | Office · 7 fl |
Sep '22 single permit | M00777336-I1 | 93 | Wet pipe New 93 | — | 888 SEVENTH AVENUE | Office · 45 fl |
Aug '22 single permit | M00770381-I1 | 253 | Wet pipe New 253 | — | 320 PARK AVENUE | Office · 33 fl |
Aug '22 single permit | M00735334-I1 | 22 | Wet pipe New 4 · Relocation 18 | — | 150 EAST 58 STREET | Office · 39 fl |
Jul '22 single permit | M00699465-I1 | 57 | Wet pipe Alteration 57 | — | 317 EAST 34 STREET | Office · 12 fl |
Jul '22 single permit | M00763961-I1 | 15 | Wet pipe New 15 | — | 909 THIRD AVENUE | Office · 32 fl |
Jul '22 single permit | M00736367-I1 | 17 | Wet pipe New 17 | — | 1 PARK AVENUE | Commercial · 18 fl |
Jul '22 single permit | M00758807-I1 | 76 | Wet pipe New 76 | — | 1 PENN PLAZA | Office · 57 fl |
Jun '22 single permit | M00746531-I1 | 55 | Wet pipe New 4 · Relocation 51 | — | 5 UNIVERSITY PLACE | Hotel · 9 fl |
Jun '22 single permit | M00745834-I1 | 27 | Wet pipe New 27 | — | 330 WEST 34 STREET | Office · 18 fl |
Jun '22 single permit | M00727957-I1 | 75 | Wet pipe New 75 | — | 280 PARK AVENUE | Office · 28 fl |
Jun '22 single permit | M00728024-I1 | 7 | Wet pipe New 7 | — | 280 PARK AVENUE | Office · 28 fl |
May '22 single permit | M00715576-I1 | 35 | Wet pipe New 24 · Relocation 11 | — | 1385 BROADWAY | Office · 23 fl |
May '22 single permit | M00721707-I1 | 5 | Wet pipe New 5 | — | 40 EAST 14 STREET | Mercantile · 7 fl |
May '22 single permit | M00678989-I1 | 56 | Wet pipe New 55 · Relocation 1 | — | 1 PENN PLAZA | Office · 57 fl |
Feb '22 ↻ 2 permits · latest Apr '22 | M00575638-I1 | 129 | Wet pipe New 101 · Relocation 28 | — | 1 PENN PLAZA | Office · 57 fl |
Jan '22 single permit | M00621973-I1 | 17 | Wet pipe New 2 · Relocation 15 | — | 1 PENN PLAZA | Office · 57 fl |
Oct '21 ↻ 2 permits · latest Apr '22 | M00522614-I1 | 55 | Wet pipe Relocation 55 | — | 44 WEST 18 STREET | Office · 12 fl |
Oct '21 single permit | M00601721-I1 | 4 | Wet pipe New 4 | — | 595 MADISON AVENUE | Office · 42 fl |
Oct '21 ↻ 2 permits · latest Apr '22 | M00583848-I1 | 23 | Wet pipe New 9 · Relocation 14 | — | 463 SEVENTH AVENUE | Office · 22 fl |
Sep '21 single permit | M00550827-I1 | 72 | Wet pipe New 3 · Relocation 2 · Replacement 67 | — | 150 EAST 58 STREET | Office · 39 fl |
Sep '21 single permit | M00580490-I1 | 42 | Wet pipe New 42 | — | 595 MADISON AVENUE | Office · 42 fl |
Sep '20 ↻ 2 permits · latest Sep '21 | M00371956-I1 | 67 | Wet pipe New 67 | — | 150 EAST 58 STREET | Office · 39 fl |
Sep '21 single permit | M00586406-I1 | 7 | Wet pipe New 7 | — | 34 WEST 33 STREET | Office · 12 fl |
Sep '21 single permit | M00565540-I1 | 5 | Wet pipe New 5 | — | 110 WEST 40 STREET | Office · 25 fl |
Jul '21 single permit | M00540577-I1 | 56 | Wet pipe New 56 | — | 888 SEVENTH AVENUE | Office · 45 fl |
Jun '21 single permit | M00519000-I1 | 333 | Wet pipe New 330 · Relocation 1 · Replacement 2 | — | 888 SEVENTH AVENUE | Office · 45 fl |
May '21 single permit | M00351961-I1 | 62 | Wet pipe New 60 · Relocation 2 | — | 2 PENN PLAZA | Mass Transit / Utlities |
Apr '21 single permit | M00354038-I1 | 63 | Wet pipe New 63 | — | 2 PENN PLAZA | Mass Transit / Utlities |
Apr '21 single permit | M00481155-I1 | 22 | Wet pipe New 22 | — | 888 SEVENTH AVENUE | Office · 45 fl |
Mar '21 single permit | M00458460-I1 | 87 | Wet pipe New 87 | — | 350 PARK AVENUE | Office · 31 fl |
Mar '21 single permit | M00459866-I1 | 121 | Wet pipe New 95 · Relocation 26 | — | 595 MADISON AVENUE | Office · 42 fl |
Feb '21 single permit | M00434681-I1 | 37 | Wet pipe New 19 · Relocation 18 | — | 1 PENN PLAZA | Office · 57 fl |
Feb '21 single permit | M00432941-I1 | 24 | Wet pipe New 24 | — | 1 PENN PLAZA | Office · 57 fl |
Feb '21 single permit | M00465556-I1 | 9 | New 9 | — | 150 EAST 58 STREET | Office · 39 fl |
Jan '21 single permit | M00255790-I1 | 15 | Wet pipe Alteration 15 | — | 715 LEXINGTON AVENUE | Mercantile · 3 fl |
Dec '20 single permit | M00433942-I1 | 38 | Wet pipe New 38 | — | 150 EAST 58 STREET | Office · 39 fl |
Dec '20 single permit | M00402223-I1 | 65 | Wet pipe New 65 | — | 40 FULTON STREET | Office · 28 fl |
Dec '20 single permit | M00346438-I1 | 12 | Wet pipeJockey pumpBooster pump Alteration 12 | — | 715 LEXINGTON AVENUE | Mercantile · 3 fl |
Nov '20 single permit | M00405236-I1 | 19 | Wet pipe New 7 · Relocation 12 | — | 1 PENN PLAZA | Office · 57 fl |
Nov '20 single permit | M00399212-I1 | 72 | Wet pipeBooster pump New 72 | — | 40 FULTON STREET | Office · 28 fl |
Oct '20 single permit | M00385899-I1 | 11 | Wet pipe New 11 | — | 150 EAST 58 STREET | Office · 39 fl |
Oct '20 single permit | M00404066-I1 | 80 | Wet pipeBooster pump New 80 | — | 40 FULTON STREET | Office · 28 fl |
Oct '20 single permit | M00372632-I1 | 57 | Wet pipe New 55 · Relocation 2 | — | 1 PENN PLAZA | Office · 57 fl |
Jul '20 single permit | M00345392-I1 | 52 | Wet pipe New 50 · Relocation 2 | — | 1 PENN PLAZA | Office · 57 fl |
Jun '20 single permit | M00353071-I1 | 88 | Wet pipe New 88 | — | 280 PARK AVENUE | Office · 28 fl |
Mar '20 single permit | M00297802-I1 | 6 | New 3Relocation 3 | — | 11 EAST 26 STREET | Office · 21 fl |
Mar '20 single permit | M00310507-I1 | 10 | Wet pipe New 10 | — | 888 7 AVENUE | Office · 45 fl |
Feb '20 single permit | M00292177-I1 | 156 | Wet pipe Alteration 156 | — | 888 7 AVENUE | Office · 45 fl |
Jan '20 single permit | M00258393-I1 | 227 | Wet pipe Alteration 227 | — | 330 WEST 34 STREET | Office · 18 fl |
Jan '20 single permit | M00268398-I1 | 22 | Wet pipe New 3 · Relocation 19 | — | 1 PENN PLAZA | Office · 57 fl |
Jan '20 single permit | M00199870-I1 | 49 | Wet pipe New 45 · Relocation 4 | — | 1 PENN PLAZA | Office · 57 fl |
Jan '20 single permit | M00228048-I1 | 38 | Wet pipe New 13 · Relocation 25 | — | 1 PENN PLAZA | Office · 57 fl |
Dec '19 single permit | M00243865-I1 | 29 | Wet pipe New 28 · Relocation 1 | — | 595 MADISON AVENUE | Office · 42 fl |
Dec '19 single permit | M00255084-I1 | 64 | Wet pipe New 64 | — | 2 PENN PLAZA | Mass Transit / Utlities |
Oct '19 single permit | M00206139-I1 | 6 | Wet pipe New 6 | — | 40 FULTON STREET | Office · 28 fl |
Oct '19 single permit | M00226647-I1 | 36 | Wet pipe New 27 · Relocation 6 · Replacement 3 | — | 11 MADISON SQUARE NORTH | Office · 21 fl |