11 FIFTH AVENUE · Greenwich Village · BIN 1009222
💬 Discuss this project
1953Year Built
20Stories
D4Building Class
R10Zoning
392,071 sfGross Floor Area
273Units
LL97 CoveredRent Stabilized2 Active Violations 0 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: The 3rd Brevoort · 37,566 sf lot · 10.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsDouglas Elliman Property Management1 filing
RoofDouglas Elliman Property Management1p · 2 filings · 20 docs
Floor 19Unit 19B, Unit 19L, Unit 19M +11p · 4 filings · 20 docs
Floor 18Unit 18C, Unit 18K, Unit 18N2 filings · 11 docs
Floor 17Unit 17C
Floor 16Unit 16N1 filing · 16 docs
Floor 15Unit 15G1 filing · 11 docs
Floor 14Unit 14K1 filing · 8 docs
Floor 13
Floor 12Unit 12F, Unit 12G, Unit 12P +4Under Construction4 filings · 13 docs
Floor 11Unit 11E, Unit 11N, Unit 11P +2Under Construction3p · 8 filings · 20 docs
Floor 10Unit 10C, Unit 10E1p · 4 filings · 11 docs
Floor 9Unit 9M, Unit 9V4p · 4 filings · 20 docs
Floor 8Unit 8M, Unit 8U, Unit 9M3 filings · 11 docs
Floor 7Unit 7E, Unit 7GUnder Construction1p · 2 filings · 20 docs
Floor 6Unit 6U3p · 2 filings · 9 docs
Floor 5Unit 5T, Unit 5U, Unit 5LWUnder Construction4 filings · 20 docs
Floor 4Unit 4G, Unit 4JH, Unit 4UV2p · 3 filings · 20 docs
Floor 3Unit 3A, Unit 3J, Unit 3L +4Under Construction4p · 6 filings · 20 docs
Floor 2Unit 2H, Unit 2K1p · 4 filings · 20 docs
Floor 1Greenwich Tower Owners CORP2 filings · 11 docs
CellarDouglas Elliman Property Management6 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Third Brevort28703/22/2026
Greenwich Tower Owners10508/25/2026
8th Street Associates1103/21/2026
11th Fifth Avenue Trust403/21/2026
Dmna-Mnfe304/09/2026
Brevoort Realty303/21/2026
Mercer Square Owners203/21/2026
Third Brevoort Co -Resident MGM203/21/2026
Third203/21/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI Dio Architecture803/21/2026
Oams Architectural Design803/21/2026
Municipal Building Consultants3203/21/2026
Jeffrey Kamen Architect2103/21/2026
Green Light Expediting603/21/2026
MGJM603/21/2026
CCBS Consultants2403/21/2026
Socotec603/21/2026
Nexus Consulting NYC303/21/2026
J A Expediting203/21/2026
Cypher Design103/21/2026
DJL Architect103/21/2026
Maryclare Nepogoda103/21/2026
Self Employed103/21/2026
SKY Rise Restoration203/21/2026
GC Expediting303/21/2026
Oef Consultants203/21/2026
YBL NY203/21/2026
Rigid Structural Design303/21/2026
Expedition NYC603/21/2026
Adsspecial Inspections203/21/2026
Robert R Bisaccia203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Goldstone Home ImprovemenGeneral Contractor1908/25/2026
Bek Plumbing & HeatingPlumbing1307/10/2026
NYC Design & RenoGeneral Contractor1307/08/2026
G.bassolino PlumbingPlumbing907/08/2026
Kings Group NYScaffold903/21/2026
V.A.N. ConstructionGeneral Contractor603/21/2026
Intersystems Installation S&SScaffold603/21/2026
Niall J ByrneGeneral Contractor603/21/2026
PLRS Restorationspecialty_contractor507/08/2026
MC Team ConstructionGeneral Contractor407/08/2026
Hydrokinetic Plumbing & Heating IPlumbing407/08/2026
Rama Construction Group*General Contractor303/21/2026
Ruben Refrigeration & ACspecialty_contractor303/21/2026
Big Apple Designs and EnvironmentalGeneral Contractor303/21/2026
Asido SolutionsGeneral Contractor207/08/2026
Elray ConstructionGeneral Contractor207/08/2026
Rockhill Construction CoGeneral Contractor210/02/2026
SKY Rise Restorationspecialty_contractor203/21/2026
Interiors by AJGeneral Contractor207/08/2026
MGJM CoGeneral Contractor207/08/2026
Authentic PlumbingPlumbing207/08/2026
New Tech Mechan Systems IGeneral Contractor207/08/2026
K.N.C. ElectricElectrical203/21/2026
N.P. Classic ConstructionGeneral Contractor204/09/2026
American Standard P&H CororpPlumbing207/08/2026
John Fitzgerald Plumbing & HeatingPlumbing210/04/2026
Park Slope Painting Servicesspecialty_contractor107/08/2026
Rakshan Malek AssociatesGeneral Contractor107/08/2026
S & T ConstructionGeneral Contractor107/08/2026
Intersystem InstallationScaffold107/08/2026
Apollo Plumbing & HeatingPlumbing107/08/2026
Aspect Plumbing & Heating CoPlumbing107/08/2026
BK Plumbing & Heating CoPlumbing107/08/2026
Fernandez Heating & MechanicalPlumbing107/08/2026
HI-Tech Plumbing & HeatingPlumbing107/08/2026
Hudson Plumbing & MCHPlumbing107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
Just Plumbing & HeatingPlumbing107/08/2026
Mega PlumbingPlumbing107/08/2026
Nice PlumbingPlumbing107/08/2026
Paul Quinn Plumbing & HeatingPlumbing107/08/2026
Premier Pipe SolutionsPlumbing107/08/2026
Signore & Sons PlumbingPlumbing107/08/2026
S & J IndustrialPlumbing107/08/2026
So Plumbing & HeatingPlumbing107/08/2026
Xpress Plumbing and HeatingPlumbing107/08/2026
Upper Restorationspecialty_contractor108/27/2026
Deluca JohnElectrical103/21/2026
Delco ElectricalElectrical103/21/2026
Kwong Ming ElectricElectrical103/22/2026
Lens ElectricElectrical103/22/2026
Power Surge ElectricElectrical103/21/2026
CMY ElectricalElectrical103/21/2026
Nelson & Tom Maintenance Inc DBElectrical103/22/2026
New Century Electrical ContractingElectrical103/22/2026
New Century Electrical ContractingElectrical103/21/2026
Omas ElectricElectrical103/22/2026
Pet-Con ElectricalElectrical103/21/2026
Power Surge ElectricElectrical103/22/2026
Centennial Elevator IndustriesElectrical103/21/2026
P.S. Marcato Elev. CoElectrical103/21/2026
S.A.L. Electric CoElectrical103/22/2026
SNB Electrical ContngElectrical103/22/2026
Titanium ElectricalElectrical103/22/2026
AJ Michaels ContractingGeneral Contractor104/08/2026
Bluetec Cabinetryspecialty_contractor104/09/2026
Elite Home InteriorsGeneral Contractor107/08/2026
EuroremontGeneral Contractor107/08/2026
G&K ConstructionGeneral Contractor107/08/2026
Hard Rock BuildersGeneral Contractor104/09/2026
Lux Construction NYCGeneral Contractor107/08/2026
Orchester Management Com*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jeffrey Kamen Architect39012910/13/2026
LL Engineering1618709/01/2026
Munyc Architecture5224106/23/2026
Crosscheck Inspection Services544505/26/2026
B Space8036105/21/2026
Orsar Engineering8338105/19/2026
Niza Works of Architects6101204/09/2026
Gary Bennett Architecture6976204/09/2026
A2 Architect2504102/06/2026
Jaj Engineering930301/13/2026
Esnyc Consulting4099108/08/2025
ADS Special Inspections1270108/08/2025
Saharat Surattanont Architects1779707/25/2025
Lane Engineering Consulting29671007/16/2025
Ace Structural Engineering496707/16/2025
Arco Engineering3769107/16/2025
Dario Architecture & Desig6878106/17/2025
Durodeco Architecture and8584102/05/2025
Gee2000 Architect691102/03/2025
AK Engineering678101/28/2025
Kris Kozlowski Architect3955112/16/2024
IP Concrete Testing and I6252212/13/2024
A&B World Consulting5704104/22/2024
PCS Engineering3745104/10/2024
Napach Architectu2945611/28/2023
Richard H. Balser Engineering3028409/09/2022
Kinetic Services Engineering58072207/23/2021
Vincent J. Liotta P. E1974103/30/2020
Rakshan Malek Associates3352112/12/2019
Buildtech Engineering6369108/09/2019
Building Lifecycle
All (300)Filed (61)Permit Issued (54)Signed Off (30)Facade (FISP) (3)Violation (3)Inspection (39)Objection (80)Special Inspection (30)
10/16/2026
Signed off — Alteration
M01346131-I1
10/13/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH M01213188-S1, INCLUDING BATHROOM, KITCHEN AND LAUNDRY FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01213188-P1
10/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
JEFFREY KAMEN
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFFREY KAMEN
10/02/2026
Signed off — Alteration
Removing, relocating and adding partitions for revised apartment layout. New paint, spackle to accommodate new finishes.
M01238918-S1
10/02/2026
Signed off — Alteration
Removing, relocating and adding partitions for revised apartment layout. New paint, spackle to accommodate new finishes.
M01238918-I1
10/01/2026
Permit issued — General Construction
M01402929-I1-GC
10/01/2026
Permit issued — Mechanical Systems
M01402929-S2-MS
09/30/2026
Signed off — Alteration
Installing 5 ton condenser with 3 relater air handlers and ductwork
M01238985-I1
09/28/2026
Signed off — Alteration
Renovation to an existing one-bedroom apartment. Alteration includes kitchen, bathroom and flooring updates. No change is use or egress.
M01303391-S1
09/24/2026
Permit issued — Plumbing
M01405083-S1-PL
09/19/2026
Filed — Alteration
PLUMBING MODIFICATIONS FOR APT. 3L AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01405083-P1
09/18/2026
Special inspection requirement — Mechanical Systems
LOUIS LEE
09/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
09/18/2026
Special inspection requirement — Final
LOUIS LEE
09/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/01/2026
Filed — Alteration
Installing 5 ton condenser with 3 relater air handlers and ductwork
M01238985-P1
08/26/2026
Permit issued — General Construction
M01405083-I1-GC
08/24/2026
Permit issued — General Construction
M01383059-I1-GC
08/24/2026
Special inspection requirement — Final
LOUIS LEE
08/24/2026
Special inspection requirement — Mechanical Systems
LOUIS LEE
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/21/2026
Objection resolved — Addressed
07/20/2026
Objection raised — Scope
07/09/2026
Permit issued — Plumbing
M01383059-S1-PL
06/30/2026
Filed — Alteration
COMBINING EXISTING APTS. 3R AND 3S AS PER TPPN #3/97. PARTITION WORK, NEW DOORS, FINISHES, LIGHTING, CABINETRY. PL WORK UNDER SUBSEQUENT APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01383059-S1
06/25/2026
Signed off — Alteration
Renovation to an existing one-bedroom apartment. Alteration includes kitchen, bathroom and flooring updates. No change is use or egress.
M01303391-I1
06/23/2026
Filed — Alteration
General construction work in unit 20M including limited demolition/relocation of interior non-structural partitions, reframing of interior door openings, finish work, and window replacement. No change to use, egress, or occupancy.
M01413469-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthias Mueller
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Matthias Mueller
06/10/2026
Permit issued — General Construction
M01383059-I1-GC
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/08/2026
Special inspection requirement — Final
Matthias Mueller
06/05/2026
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES IN APARTMENT #15O; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00200974-I1
06/05/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Scope
06/02/2026
Permit issued — Mechanical Systems
M01235359-I1-GC-CX
06/02/2026
Objection resolved — Addressed
06/01/2026
Objection raised — Scope
05/29/2026
Permit issued — Plumbing
M01363966-S1-PL
05/29/2026
Objection raised — Scope
05/29/2026
Objection raised — Scope
05/29/2026
Objection raised — Scope
05/28/2026
Permit issued — General Construction
M01363966-I1-GC
05/28/2026
Permit issued — General Construction
M01263495-I1-GC
05/26/2026
Filed — Alteration
Installing two bathroom exhaust fan and relocate the existing kitchen exhsutd grille and duct
M01402929-S1
05/21/2026
Filed — Alteration
PLUMBING MODIFICATIONS FOR APT. 3L AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01405083-I1
05/21/2026
Filed — Alteration
PLUMBING MODIFICATIONS FOR APT. 3L AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01405083-S1
05/21/2026
Special inspection requirement — Interior lighting power
Blake Goble
05/20/2026
Special inspection requirement — Post-installed Anchors
Blake Goble
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
05/20/2026
Special inspection requirement — Final
Blake Goble
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Blake Goble
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Blake Goble
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Blake Goble
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedRockhill Construction Co10/01/2026
DOB NOWGeneral ConstructionPermit IssuedRockhill Construction Co10/01/2026
DOB NOWPlumbingPermit IssuedJohn Fitzgerald Plumbing & Heating09/24/2026
DOB NOWGeneral ConstructionPermit IssuedUpper Restoration08/26/2026
DOB NOWGeneral ConstructionPermit IssuedGoldstone Home Improvemen08/24/2026
DOB NOWPlumbingPermit IssuedBek Plumbing & Heating07/09/2026
DOB NOWGeneral ConstructionPermit IssuedGoldstone Home Improvemen06/10/2026
DOB NOWMechanical SystemsPermit IssuedMC Team Construction06/02/2026
DOB NOWPlumbingPermit IssuedApollo Plumbing & Heating05/29/2026
DOB NOWGeneral ConstructionPermit IssuedInteriors by AJ05/28/2026
DOB NOWGeneral ConstructionPermit IssuedElray Construction05/28/2026
DOB NOWGeneral ConstructionPermit IssuedElray Construction04/16/2026
DOB NOWPlumbingPermit IssuedBek Plumbing & Heating03/31/2026
DOB NOWGeneral ConstructionSigned-offHard Rock Builders03/17/2026
DOB NOWPlumbingSigned-offMega Plumbing03/02/2026
DOB NOWGeneral ConstructionPermit IssuedGoldstone Home Improvemen01/20/2026
DOB NOWGeneral ConstructionSigned-offEuroremont01/05/2026
DOB NOWMechanical SystemsSigned-offGoldstone Home Improvemen12/22/2025
DOB NOWPlumbingSigned-offBek Plumbing & Heating12/22/2025
DOB NOWGeneral ConstructionSigned-offGoldstone Home Improvemen11/18/2025
DOB NOWMechanical SystemsSigned-offN.P. Classic Construction11/17/2025
DOB NOWPlumbingSigned-offNice Plumbing11/14/2025
DOB NOWGeneral ConstructionSigned-offN.P. Classic Construction11/12/2025
DOB NOWPlumbingSigned-offBek Plumbing & Heating10/20/2025
DOB NOWGeneral ConstructionPermit IssuedInteriors by AJ10/10/2025
DOB NOWGeneral ConstructionSigned-offNYC Design & Reno09/25/2025
DOB NOWPlumbingSigned-offBK Plumbing & Heating Co08/22/2025
DOB NOWGeneral ConstructionPermit IssuedMC Team Construction07/22/2025
DOB NOWGeneral ConstructionSigned-offMGJM Co07/16/2025
DOB NOWPlumbingSigned-offAspect Plumbing & Heating Co06/10/2025
DOB NOWGeneral ConstructionSigned-offMGJM Co06/09/2025
DOB NOWGeneral ConstructionSigned-offNYC Design & Reno06/02/2025
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I04/07/2025
DOB NOWGeneral ConstructionSigned-offBluetec Cabinetry04/07/2025
DOB NOWGeneral ConstructionSigned-offAsido Solutions04/01/2025
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating03/25/2025
DOB NOWGeneral ConstructionSigned-offOrchester Management Com*03/19/2025
DOB NOWGeneral ConstructionSigned-offAJ Michaels Contracting03/18/2025
DOB NOWGeneral ConstructionSigned-offG&K Construction02/18/2025
DOB NOWGeneral ConstructionPermit IssuedPLRS Restoration02/12/2025
+ 60 more permits on file
5 projects · most recent 09/01/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/01/2026Signed-offN.P. Classic ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NL-U1 60,000 BTU · Vrf Outdoor ×1
MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×1
05/26/2026Permit IssuedRockhill Construction CoVentilation Systems
Ventilation
Greenheck SP-L80 50 CFM · Exhaust Fan ×2
04/23/2026Signed-offGoldstone Home ImprovemenHeating and Air Conditioning Systems
Heat / Cool
General Electric ZONELINE HEAT PUMP AZ65H12DAB 144 BTU · Ptac ×3
ZONELINE HEAT PUMP AZ65H09DAB 97 BTU · Ptac ×1
06/17/2025Permit IssuedMC Team ConstructionHeating and Air Conditioning Systems
Heat / Cool
General Electric Model: GE AZ65H15DAB and GE AZ65H12DAB 15,000 BTU ×2
12/22/2022Permit IssuedNYC Design & RenoHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUMY-P36NHMU-BS 40,000 BTU · Vrf Outdoor ×1
13 projects · most recent 10/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/13/2026Permit IssuedBek Plumbing & HeatingGas, Water/Sanitary
09/19/2026Permit IssuedJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
06/30/2026Permit IssuedBek Plumbing & HeatingGas, Water/Sanitary
05/26/2026——Gas, Water/Sanitary
04/23/2026Signed-offBek Plumbing & HeatingGas, Water/Sanitary
04/09/2026Permit IssuedApollo Plumbing & HeatingGas, Water/Sanitary
04/02/2026Signed-offNice PlumbingGas, Water/Sanitary
07/25/2025Signed-offBK Plumbing & Heating CoGas, Water/Sanitary
12/13/2024Permit IssuedFernandez Heating & MechanicalGas, Water/Sanitary
05/25/2023Signed-offS.O.S. Plumbing & HeatingWater/Sanitary
06/17/2021Signed-offBek Plumbing & HeatingGas, Water/Sanitary
03/30/2020——Gas, Water/Sanitary
11/18/2019Signed-offBek Plumbing & HeatingGas, Water/Sanitary
25 projects · most recent 09/20/2026
General Wiring
FiledStatusContractorScope
09/20/2026Permit IssuedGauge Tech ElectricGeneral Wiring
09/17/2026CompleteJoseph Weinstein Electric—
08/30/2026Permit IssuedGramar ElectricGeneral Wiring
06/10/2026CompleteAscuatech Electrical—
06/09/2026Permit IssuedBrandl ElectricGeneral Wiring
04/15/2026Permit IssuedSezekcol ElectricGeneral Wiring
04/13/2026Permit IssuedAmor ElectricGeneral Wiring
01/21/2026CompleteKings Electric Co—
12/24/2025CompleteKwong Ming ElectricGeneral Wiring
12/24/2025CompleteKwong Ming ElectricGeneral Wiring
11/13/2025Permit IssuedLens ElectricGeneral Wiring
11/12/2025CompleteTesta Electric CoGeneral Wiring
10/12/2025Permit IssuedNY City ElectricGeneral Wiring
10/07/2025Permit IssuedSNB Electrical ContngGeneral Wiring
10/03/2025CompleteEclipse ElectricGeneral Wiring
1 project · most recent 04/23/2026
Masonry
FiledStatusContractorScope
04/23/2026Signed-offBek Plumbing & HeatingMasonry
1 project · most recent 12/08/2021
Scaffold
FiledStatusContractorScope
12/08/2021Permit IssuedIntersystem InstallationScaffold
1 project · most recent 04/23/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/23/2026Signed-offGoldstone Home ImprovemenTenant Protection Plan 72 Hour
1 project · most recent 04/10/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/10/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 68
DateTypeResultReport
09/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/14/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 68.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/05/2026Tenant Protection Plan ComplianceJEFFREY KAMENspecial
10/05/2026Fire-Resistant Penetrations and JointsJEFFREY KAMENspecial
09/18/2026Mechanical SystemsLOUIS LEEspecial
09/18/2026Fire-Resistant Penetrations and JointsLOUIS LEEspecial
09/18/2026FinalLOUIS LEEprogress
08/24/2026Fire-Resistant Penetrations and JointsLOUIS LEEspecial
08/24/2026FinalLOUIS LEEprogress
08/24/2026Mechanical SystemsLOUIS LEEspecial
06/22/2026Fire-Resistance Rated ConstructionMatthias Muellerprogress
06/22/2026Fire-Resistant Penetrations and JointsMatthias Muellerspecial
06/08/2026FinalMatthias Muellerprogress
05/21/2026Interior lighting powerBlake Gobleenergy_progress
05/20/2026Lighting controlsBlake Gobleenergy_progress
05/20/2026FinalBlake Gobleprogress
05/20/2026Fire-Resistance Rated ConstructionBlake Gobleprogress
05/20/2026Fire-Resistant Penetrations and JointsBlake Goblespecial
05/20/2026Post-installed AnchorsBlake Goblespecial
05/20/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/20/2026Energy Code Compliance InspectionsBlake Gobleprogress
05/19/2026Maintenance informationEUGENE BIFULCOenergy_progress
05/19/2026Interior lighting powerEUGENE BIFULCOenergy_progress
05/18/2026Post-installed AnchorsEUGENE BIFULCOspecial
05/18/2026Maintenance informationLiad Itzhakyenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsLiad Itzhakyspecial
05/15/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
Latest 25 of 150.
▾Documents — 3,158 on file (BIS + DOB NOW)
▸Plans & Drawings140
▸DOB NOWPlans/Sketch95
09/04/2026M00450866-S1Request digital key ↗
09/04/2026M00450866-P3Request digital key ↗
09/04/2026M00450866-P4Request digital key ↗
Showing 3 of 95 on file for this type
▸DOB NOWPlans/Sketch - Plumbing19
09/05/2026M00197085-I1Request digital key ↗
09/05/2026M00236351-I1Request digital key ↗
09/05/2026M00200974-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment12
09/04/2026M00345809-I1Request digital key ↗
09/04/2026M00427737-I1Request digital key ↗
09/04/2026M00427737-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00279013-I1Request digital key ↗
09/04/2026M00345813-I1Request digital key ↗
09/04/2026M00407015-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction5
09/04/2026M00450866-P1Request digital key ↗
09/04/2026M00450866-I1Request digital key ↗
09/04/2026M00449234-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00236314-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00365615-I1Request digital key ↗
▸Applications & Permits637
▸BISPLAN / WORK APPROVAL APPLICATION275
01/14/2026102347961Open ↗
01/13/2026102347961Open ↗
11/17/2025102347961Open ↗
Showing 3 of 275 on file for this type
▸BISWORK PERMIT APPLICATION236
01/20/2026102347961Open ↗
02/24/2023123036080Open ↗
09/23/2021140945761Open ↗
Showing 3 of 236 on file for this type
▸DOB NOWLPC Approval/Permit122
10/15/2026M01213188-P1Open ↗
10/05/2026M01405083-P1Open ↗
09/15/2026M01238985-P1Open ↗
Showing 3 of 122 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications770
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION215
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 215 on file for this type
▸DOB NOWProgress Inspector Seal & Signature183
10/08/2026M00345813-P1Open ↗
10/08/2026M00345813-P1Open ↗
10/08/2026M00345813-P1Open ↗
Showing 3 of 183 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature142
10/15/2026M01213188-P1Open ↗
10/05/2026M01405083-P1Open ↗
09/15/2026M01238985-P1Open ↗
Showing 3 of 142 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature117
10/15/2026M01213188-P1Open ↗
10/08/2026M00345813-P1Open ↗
10/08/2026M00345813-P1Open ↗
Showing 3 of 117 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT34
10/20/2020140966998Open ↗
Showing 1 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY13
10/20/2020140966998Open ↗
Showing 1 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION12
10/20/2020140966998Open ↗
Showing 1 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment211
▸BISSELF-CERT PLUMBING NOTICE82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISSCHEDULE B - PLUMBING62
01/14/2026102347961Open ↗
01/13/2026102347961Open ↗
Showing 2 of 62 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISEQUIPMENT USE PERMITS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
03/18/2021140925300Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection84
▸BISTenant Protection Plan and Notes47
03/09/2023103810164Open ↗
10/20/2020140966998Open ↗
Showing 2 of 47 on file for this type
▸DOB NOWTenant Protection Plan37
09/05/2026M00236351-I1Open ↗
09/04/2026M00345809-I1Open ↗
09/04/2026M00368750-I1Open ↗
Showing 3 of 37 on file for this type
▸Environmental & Asbestos241
▸DOB NOWDEP ACP-5: Asbestos Assessment Report130
10/15/2026M01213188-P1Open ↗
10/05/2026M01405083-P1Open ↗
09/15/2026M01238985-P1Open ↗
Showing 3 of 130 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance195
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS92
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 92 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS37
08/09/2022140861093Open ↗
03/18/2021140925300Open ↗
03/01/2021123767316Open ↗
Showing 3 of 37 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY18
08/09/2022140861093Open ↗
09/08/2021140934158Open ↗
03/18/2021140925300Open ↗
Showing 3 of 18 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS9
10/20/2020140966998Open ↗
Showing 1 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)8
10/02/2023123037980Open ↗
01/27/2023123036080Open ↗
01/25/2022123132528Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
09/02/2026M00702702-I1Open ↗
09/04/2026M00449234-I1Open ↗
Showing 2 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
10/02/2023123037980Open ↗
01/27/2023123036080Open ↗
01/25/2022123132528Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING IN DWELLING UNITS4
10/02/2023123037980Open ↗
01/27/2023123036080Open ↗
01/25/2022123132528Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
09/04/2026M00427737-I1Open ↗
09/03/2026M00428982-I1Open ↗
Showing 2 of 3 on file for this type
▸BISLIGHTING CONTROLS2
01/25/2022123132528Open ↗
12/15/2021122849007Open ↗
▸Inspections & Test Reports47
▸BISTECHNICAL REPORT: RESPONSIBILITY36
03/09/2023103810164Open ↗
03/06/2023103810164Open ↗
03/06/2023103810164Open ↗
Showing 3 of 36 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
10/02/2023123037980Open ↗
01/27/2023123036080Open ↗
01/25/2022123132528Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
01/27/2023123036080Open ↗
01/25/2022123132528Open ↗
12/15/2021122849007Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs321
▸BISLANDMARKS APPROVAL130
10/20/2020140966998Open ↗
Showing 1 of 130 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST85
04/11/2023123036080Open ↗
03/10/2023103810164Open ↗
08/10/2022140861093Open ↗
Showing 3 of 85 on file for this type
▸BISADMINISTRATIVE OBJECTIONS37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE22
01/14/2022120395205Open ↗
01/12/2022120395205Open ↗
07/19/2021120395205Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION22
10/14/2020122756133Open ↗
Showing 1 of 22 on file for this type
▸BISLANDMARKS SIGNOFF13
10/05/2023123037980Open ↗
03/10/2023103810164Open ↗
01/30/2023123036080Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL7
10/02/2023123037980Open ↗
01/27/2023123036080Open ↗
01/25/2022123132528Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER5
01/20/2026102347961Open ↗
09/23/2021140945761Open ↗
Showing 2 of 5 on file for this type
▸Cost, Insurance & Ownership200
▸BISCOST AFFIDAVIT183
08/09/2022140861093Open ↗
03/18/2021140925300Open ↗
03/01/2021123767316Open ↗
Showing 3 of 183 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
10/06/2023123037980Open ↗
04/11/2023123036080Open ↗
01/25/2022123132528Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms242
▸BISEFILING COVER SHEET104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 104 on file for this type
▸BISADDITIONAL INFORMATION72
03/08/2023103810164Open ↗
01/25/2022123132528Open ↗
01/25/2022123132528Open ↗
Showing 3 of 72 on file for this type
▸BISBOROUGH INTAKE FORM50
09/23/2021140945761Open ↗
Showing 1 of 50 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET16
10/20/2020140966998Open ↗
Showing 1 of 16 on file for this type
▸Other Documents40
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
10/14/2020122756133Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWProof of Historic Building11
09/15/2026M01238985-P1Open ↗
Showing 1 of 11 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDHCR Document3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type