| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00620263 ↗ | 522 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 11/23/2021 | 10/29/2024 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | GENERAL CONSTRUCTION WORK ASSOCIATED WITH AN INTERIOR RENOVATION TO COMBINE UNIT NOS. 3CD AND 4C USING TPPN #3/97. NO CHANGE IN OCCUPANCY, U… |
| M00790923 ↗ | 377 RECTOR PLACE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 10/10/2024 | Design CRAFTED ARCHITECTURE PLLC Contractor ASTORIA P & H CORP | PLUMBING WORK ASSOCIATED WITH AN INTERIOR RENOVATION OF PENTHOUSE A. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00790354 ↗ | 377 RECTOR PLACE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 03/05/2024 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | GENERAL CONSTRUCTION WORK ASSOCIATED WITH AN INTERIOR RENOVATION OF PENTHOUSE A. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| B00757326 ↗ | 605 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 06/24/2022 | 10/02/2023 | Design SERMAN ENGINEERING Contractor B & D CONSTRUCTION SA INC | NEW STEEL LINTEL FOR ENLARGED OPENING IN REAR WALL TO NEW REAR TERRACE STRUCTURE AS PER STRUCTURAL DRAWINGS |
| M00800732 ↗ | 9 5 AVENUE MANHATTAN | Alteration | Permit Issued | 12/22/2022 | 09/21/2023 | Design LL ENGINEERING PC Contractor NYC DESIGN & RENO LLC | HVAC system for Apt. 11E as per plans filed herewith. No change in use, occupancy, or means of egress. |
| M00695403 ↗ | 526 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 03/21/2022 | 05/10/2023 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | Plumbing work to combine apt nos. 4FGH & 5GH using TPPN #3/97 in conjunction with job nos. M00695402 and M00695404. No change in use, occupa… |
| Person | Filings | Most recent |
|---|---|---|
| AMAD UDDIN | 50 | 11/27/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| SSA+D | 19 | 01/02/2024 |
| CRAFTED ARCHITECTURE PLLC | 17 | 11/28/2024 |
| AZA ENGINEERING LLC | 2 | 04/20/2022 |
| BATLIBOI STUDIO/ ARCHITECTURE, PLLC | 2 | 02/19/2020 |
| COOKFOX ARCHITECTS | 2 | 12/20/2022 |
| LAUFS ENGINEERING DESIGN | 2 | 03/21/2022 |
| MLA ARCHITECTS | 2 | 06/04/2021 |
| TEODORO SIGUENZA | 2 | 10/02/2020 |
| WESKETCH ARCHITECTURE | 2 | 06/14/2022 |
| WSJS ARCHITECTS | 2 | 05/26/2021 |
| ANAND J. SOLANKI, P.E. | 1 | 01/14/2022 |
| JACK GREEN ASSOCIATES | 1 | 11/18/2021 |
| LL ENGINEERING PC | 1 | 12/22/2022 |
| NEW YORK ENGINEERS LLC | 1 | 08/20/2019 |
| OPTIMIZED ENGINEERING ASSOCIATES | 1 | 08/28/2023 |
| RICHARD ALLON, ARCHITECT | 1 | 09/12/2019 |
| SERMAN ENGINEERING | 1 | 01/02/2024 |
| STAMP ARCHITECTURE DPC | 1 | 01/25/2022 |
| WSP | 1 | 11/10/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| CRAFTED INTERIORS DESIGN | 12 | 11/28/2024 |
| ASTORIA P & H CORP | 11 | 11/06/2024 |
| NYC DESIGN & RENO LLC | 3 | 12/22/2022 |
| S.O.S. PLBG & HTG LTD | 3 | 08/22/2022 |
| 3-RT'S GENERAL CONTRACTOR | 2 | 05/26/2021 |
| H BRONNER & SON PLBG & HT | 2 | 05/26/2021 |
| P.R. PLUMBING & HTG INC | 2 | 06/23/2021 |
| TOKA HOME, LLC | 2 | 12/20/2022 |
| 2M MECHANICAL LLC | 1 | 03/26/2021 |
| ALL HOUR SEWER SERVICE CO | 1 | 09/09/2020 |
| AMM GEN'L CONTRACTING INC | 1 | 03/26/2021 |
| APEX REMODELING LLC | 1 | 12/21/2021 |
| B & D CONSTRUCTION SA INC | 1 | 01/02/2024 |
| BR CONSTRUCTION GROUP INC | 1 | 02/19/2020 |
| BUDGET CONSTRUCTION INC | 1 | 01/24/2022 |
| BUILTECH ASSOCIATES INC | 1 | 01/25/2022 |
| BYPASS MECHANICAL CORP | 1 | 02/14/2020 |
| CAM ENERGY HEATING AND ME | 1 | 02/02/2021 |
| CROWN PLUMBING INC | 1 | 01/29/2021 |
| DPH PLUMBING & HTG CORP | 1 | 01/14/2022 |
| HP SERVICES INC | 1 | 10/11/2022 |
| IA CONSTRUCTION MGMT | 1 | 09/12/2019 |
| JOHN FITZGERALD PLBG &HTG | 1 | 09/26/2022 |
| KITCHENBARN INC | 1 | 01/21/2021 |
| M&G PLUMBING AND HEATING | 1 | 10/24/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 2 | 05/26/2021 |
| TRAFALGAR | 2 | 11/18/2021 |
| 100 UNITED NATIONS PLAZA CONDOMINIU | 1 | 04/19/2022 |
| 225 EAST 74TH APARTMENTS CORP | 1 | 08/19/2022 |
| 365 West 20 Street Apartments Corp. | 1 | 12/21/2021 |
| 682 TENANT CORPORATION | 1 | 10/11/2022 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 1 | 08/22/2022 |
| GREENWICH TOWER OWNERS CORP | 1 | 12/22/2022 |
| JMA CONSULTANTS & ENGINEERS, P.C. | 1 | 07/07/2021 |
| MQ PROPERTY MGMT LTD | 1 | 01/25/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| SAHARAT SURATTANONT | 1 | 01/02/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00620263 ↗ | 522 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 11/23/2021 | 10/29/2024 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | GENERAL CONSTRUCTION WORK ASSOCIATED WITH AN INTERIOR RENOVATION TO COMBINE UNIT NOS. 3CD AND 4C USING TPPN #3/97. NO CHANGE IN OCCUPANCY, U… |
| M00790923 ↗ | 377 RECTOR PLACE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 10/10/2024 | Design CRAFTED ARCHITECTURE PLLC Contractor ASTORIA P & H CORP | PLUMBING WORK ASSOCIATED WITH AN INTERIOR RENOVATION OF PENTHOUSE A. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00790354 ↗ | 377 RECTOR PLACE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 03/05/2024 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | GENERAL CONSTRUCTION WORK ASSOCIATED WITH AN INTERIOR RENOVATION OF PENTHOUSE A. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| B00757326 ↗ | 605 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 06/24/2022 | 10/02/2023 | Design SERMAN ENGINEERING Contractor B & D CONSTRUCTION SA INC | NEW STEEL LINTEL FOR ENLARGED OPENING IN REAR WALL TO NEW REAR TERRACE STRUCTURE AS PER STRUCTURAL DRAWINGS |
| M00800732 ↗ | 9 5 AVENUE MANHATTAN | Alteration | Permit Issued | 12/22/2022 | 09/21/2023 | Design LL ENGINEERING PC Contractor NYC DESIGN & RENO LLC | HVAC system for Apt. 11E as per plans filed herewith. No change in use, occupancy, or means of egress. |
| M00695403 ↗ | 526 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 03/21/2022 | 05/10/2023 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | Plumbing work to combine apt nos. 4FGH & 5GH using TPPN #3/97 in conjunction with job nos. M00695402 and M00695404. No change in use, occupa… |
| M00695402 ↗ | 526 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 03/21/2022 | 05/05/2023 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | Interior renovation to combine unit nos. 4FGH & 5GH as per TPPN #3/97. No change in use, occupancy, or means of egress. |
| M08019921 ↗ | 25 PARK ROW MANHATTAN | Alteration | Signed-off | 10/24/2022 | 03/21/2023 | Design COOKFOX ARCHITECTS Contractor M&G PLUMBING AND HEATING | PLUMBING WORK RELATED TO AN INTERIOR RENOVATION TO COMBINE UNIT NOS. PH41A & PH42A USING TPPN #3/97. NO CHANGE IN USE, OCCUPANCY, OR MEANS O… |
| M08022228 ↗ | 25 PARK ROW MANHATTAN | Alteration | Signed-off | 11/10/2022 | 02/20/2023 | Design WSP Contractor TOKA HOME, LLC | STRUCTURAL WORK RELATED TO AN INTERIOR RENOVATION TO COMBINE UNIT NOS. PH41A & PH42A USING TPPN #3/97. NO CHANGE IN USE, OCCUPANCY, OR MEANS… |
| M00459662 ↗ | 541 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 02/02/2021 | 02/07/2023 | Design MLA ARCHITECTS Contractor SUPERB PLUMBING & HEATING | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FOR UNIT #9F. |
| M08019871 ↗ | 25 PARK ROW MANHATTAN | Alteration | Signed-off | 10/24/2022 | 01/30/2023 | Design COOKFOX ARCHITECTS Contractor TOKA HOME, LLC | GENERAL CONSTRUCTION WORK RELATED TO AN INTERIOR RENOVATION TO COMBINE UNIT NOS. PH41A & PH42A USING TPPN #3/97. NO CHANGE IN USE, OCCUPANCY… |
| M07994323 ↗ | 682 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/11/2022 | 12/28/2022 | Design SSA+D Owner 682 TENANT CORPORATION Contractor HP SERVICES INC | PLUMBING WORK ASSOCIATED WITH AN INTERIOR RENOVATION FOR APT #8. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00621140 ↗ | 522 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 11/23/2021 | 12/21/2022 | Design CRAFTED ARCHITECTURE PLLC Contractor ASTORIA P & H CORP | PLUMBING WORK IN CONJUNCTION WITH JOB #M00620263. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00631114 ↗ | 522 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2021 | 11/09/2022 | Contractor CRAFTED INTERIORS DESIGN | INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M08000562 ↗ | 250 WEST 27 STREET MANHATTAN | Alteration | Signed-off | 09/26/2022 | 10/11/2022 | Contractor JOHN FITZGERALD PLBG &HTG | Plumbing work associated with an interior renovation of Apt. 3C. No change in use, occupancy, or means of egress. |
| M00788622 ↗ | 9 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/22/2022 | 09/20/2022 | Design SSA+D Contractor AUTHENTIC PLBG CORP | PLUMBING WORK RELATED TO AN INTERIOR RENOVATION OF APT. 11E. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00785891 ↗ | 225 EAST 74 STREET MANHATTAN | Alteration | Signed-off | 08/19/2022 | 09/15/2022 | Design SSA+D Contractor NYC DESIGN & RENO LLC | GENERAL CONSTRUCTION WORK ASSOCIATED WITH AN INTERIOR RENOVATION OF APT. 5E. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00772229 ↗ | 345 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 07/14/2022 | 07/26/2022 | Design SSA+D Contractor NYC DESIGN & RENO LLC | INTERIOR RENOVATION OF UNIT #2AB AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00710227 ↗ | 353 CENTRAL PARK WEST MANHATTAN | Alteration | Filed — no permit on record | 06/14/2022 | — | Design WESKETCH ARCHITECTURE | — |
| M00710271 ↗ | 353 CENTRAL PARK WEST MANHATTAN | Alteration | Filed — no permit on record | 06/14/2022 | — | Design WESKETCH ARCHITECTURE | — |
| M00711567 ↗ | 411 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2022 | 05/28/2022 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | General construction work related to an interior renovation of the basement unit. No change in occupancy, use, or means of egress. |
| M00714561 ↗ | 261 BROADWAY MANHATTAN | Alteration | Signed-off | 04/19/2022 | 05/26/2022 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | General construction work associated with the renovation of unit #9D. No change in occupancy, use, or means of egress. |
| M00715758 ↗ | 261 BROADWAY MANHATTAN | Alteration | Signed-off | 04/20/2022 | 05/26/2022 | Design AZA ENGINEERING LLC Contractor CRAFTED INTERIORS DESIGN | Installation of AC system in Apt. 9D in conjunction with job nos. M00714561 & M00714620. No change in use, occupancy, or means of egress. |
| M00695404 ↗ | 526 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 03/21/2022 | 04/15/2022 | Design LAUFS ENGINEERING DESIGN Contractor CRAFTED INTERIORS DESIGN | Structural work to combine unit nos. 4FGH & 5GH using TPPN #3/97 in conjunction with job nos. M00695402 and M00695403. No change in use, occ… |
| M00607355 ↗ | 322 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 12/22/2021 | 03/11/2022 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK FOR APT. #13B IN CONJUNCTION WITH JOB #M00607302. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00650034 ↗ | 130 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 01/24/2022 | 02/09/2022 | Design SSA+D Contractor BUDGET CONSTRUCTION INC | GENERAL CONSTRUCTION WORK FOR AN INTERIOR RENOVATION OF APT. 5C AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH PLUMBING JOB #M00650948. NO… |
| M00658516 ↗ | 403 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 01/25/2022 | 02/03/2022 | Design STAMP ARCHITECTURE DPC Owner MQ PROPERTY MGMT LTD Contractor BUILTECH ASSOCIATES | GENERAL CONSTRUCTION WORK ON THE 6TH AND 7TH FLOORS FOR UNIT #PH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00628577 ↗ | 188 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 11/18/2021 | 01/26/2022 | Design JACK GREEN ASSOCIATES Owner TRAFALGAR Contractor TOLLOCAN SHEET METAL INC | INSTALLING NEW HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00636444 ↗ | 188 EAST 70 STREET MANHATTAN | Alteration | Signed-off | 12/14/2021 | 01/25/2022 | Design SSA+D Contractor AUTHENTIC PLBG CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #M00636415. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS… |
| M00636650 ↗ | 225 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 11/30/2021 | 01/03/2022 | Design CRAFTED ARCHITECTURE PLLC Contractor CRAFTED INTERIORS DESIGN | INTERIOR RENOVATION TO COMBINE UNIT NOS. 418 & 518 USING TPPN #3/97 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EG… |
| M00636685 ↗ | 225 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 11/30/2021 | 01/03/2022 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK IN CONJUNCTION WITH JOB NOS. M00636650 & . NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00637281 ↗ | 225 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 11/30/2021 | 01/03/2022 | Design LAUFS ENGINEERING DESIGN Contractor CRAFTED INTERIORS DESIGN | STRUCTURAL WORK TO INSTALL A STAIRCASE BETWEEN THE 4TH AND 5TH FLOORS. WORK IN CONJUNCTION WITH JOB NOS. M00636650 & M00636685. NO CHANGE IN… |
| M00650366 ↗ | 363 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 12/21/2021 | 12/27/2021 | Design SSA+D Contractor APEX REMODELING LLC | GENERAL CONSTRUCTION WORK ASSOCIATED WITH AN INTERIOR RENOVATION OF UNIT #14B. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00313943 ↗ | 345 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 02/14/2020 | 12/15/2021 | Contractor BYPASS MECHANICAL CORP | PLUMBING WORK RELATED TO THE COMBINATION OF UNIT NOS. 3C & 3D. GENERAL CONSTRUCTION WORK FILED UNDER JOB #140881972. |
| M00515742 ↗ | 267 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/26/2021 | 09/10/2021 | Design WSJS ARCHITECTS Owner AKAM ASSOCIATES, INC. Contractor 3-RT'S GENERAL CONTRACTOR | INTERIOR RENOVATION OF UNIT #7E AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00515754 ↗ | 267 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/26/2021 | 08/24/2021 | Design WSJS ARCHITECTS Owner AKAM ASSOCIATES, INC. Contractor H BRONNER & SON PLBG & HT | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER JOB #M00515742. |
| M00547646 ↗ | 504 EAST 90 STREET MANHATTAN | Alteration | Signed-off | 07/07/2021 | 08/24/2021 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #M00547585. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS… |
| M00543007 ↗ | 188 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 06/23/2021 | 08/18/2021 | Design SSA+D Owner TRAFALGAR Contractor CAM ENERGY HTG&MECH CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #M00542978. NO CHANGE IN OCCUPANCY, USE, OR MEANS OF EGRESS… |
| M00473254 ↗ | 1498 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/25/2021 | 06/21/2021 | Design SSA+D Contractor H BRONNER & SON PLBG & HT | PLUMBING WORK RELATED TO COMBINATION OF UNIT NOS. 5A & 5B PER TPPN #3/97. |
| M00260210 ↗ | 721 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/07/2019 | 04/16/2021 | Design SSA+D Contractor CAM ENERGY HTG&MECH CORP | PLUMBING WORK ASSOCIATED WITH AN INTERIOR RENOVATION IN UNIT #37D. |
| M00451665 ↗ | 541 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 01/21/2021 | 04/08/2021 | Design MLA ARCHITECTS Contractor KITCHENBARN INC | INTERIOR RENOVATION OF UNIT #9F AS PER PLANS FILED HEREWITH. |
| M00471127 ↗ | 1498 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/19/2021 | 04/05/2021 | Design SSA+D Contractor 3-RT'S GENERAL CONTRACTOR | INTERIOR RENOVATION TO COMBINE APARTMENT NOS. 5A AND 5B AS PER TPPN #3/97. |
| M00480519 ↗ | 200 RIVERSIDE BOULEVARD MANHATTAN | Alteration | Signed-off | 03/11/2021 | 03/22/2021 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #M00480428. NO CHANGE IN OCCUPANCY, USE, OR MEANS OF EGRESS… |
| M00317667 ↗ | 345 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 02/19/2020 | 03/19/2021 | Contractor BR CONSTRUCTION GROUP INC | INSTALLATION OF EXHAUST GRILLES RELATED TO JOB #140881972. |
| M00373079 ↗ | 130 EAST 17 STREET MANHATTAN | Alteration | Signed-off | 07/22/2020 | 03/15/2021 | Design SSA+D Contractor ZEFI MECHANICAL INC | PLUMBING WORK IN CONJUNCTION WITH DOB JOB #140915384. |
| M00187327 ↗ | 33 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 08/20/2019 | 03/12/2021 | Design NEW YORK ENGINEERS LLC Contractor CRAFTED INTERIORS DESIGN | INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00439840 ↗ | 40 WEST 77 STREET MANHATTAN | Alteration | Signed-off | 12/18/2020 | 03/01/2021 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK IN CONJUNCTION WITH JOB #140989633. |
| M00381538 ↗ | 1250 3 AVENUE MANHATTAN | Alteration | Signed-off | 08/17/2020 | 02/10/2021 | Design SSA+D Contractor T & T PLUMBING INC | PLUMBING WORK IN CONJUNCTION WITH JOB #140931605. |
| M00393286 ↗ | 532 WEST 111 STREET MANHATTAN | Alteration | Signed-off | 09/30/2020 | 01/28/2021 | Design ANAND J. SOLANKI, P.E. Contractor DPH PLUMBING & HTG CORP | PLUMBING WORK IN CONJUNCTION WITH BIS JOB #140937217. |
| M00341214 ↗ | 670 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 04/16/2020 | 01/27/2021 | Design SSA+D Contractor AMM GEN'L CONTRACTING INC | PLUMBING WORK IN CONJUNCTION WITH AN INTERIOR RENOVATION. GC WORK FILED UNDER JOB #140893451. |
| M00405273 ↗ | 2 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 10/02/2020 | 11/24/2020 | Design TEODORO SIGUENZA Contractor WILLIAM L. RUMSEY CONSTRUCTION | MECHANICAL EXHAUST FOR NEW POWDER ROOM. IN CONJUNCTION WITH BISJOB #140923017. |
| M00347113 ↗ | 114 EAST 90 STREET MANHATTAN | Alteration | Signed-off | 05/26/2020 | 10/13/2020 | Design AZA ENGINEERING LLC Contractor CRAFTED INTERIORS DESIGN | INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. |
| M00374131 ↗ | 2 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 09/09/2020 | 10/06/2020 | Design TEODORO SIGUENZA Contractor MEGA PLBG CORP | PLUMBING WORK IN CONJUNCTION WITH JOB #140923017. |
| M00372926 ↗ | 200 EAST END AVENUE MANHATTAN | Alteration | Signed-off | 07/22/2020 | 09/14/2020 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION BEING DONE UNDER JOB #140923259. |
| M00351503 ↗ | 112 EAST 81 STREET MANHATTAN | Alteration | Signed-off | 05/28/2020 | 08/13/2020 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #140896797. |
| M00325257 ↗ | 1659 2 AVENUE MANHATTAN | Alteration | Signed-off | 03/05/2020 | 08/07/2020 | Design SSA+D Contractor CROWN PLUMBING INC | PLUMBING WORK IN CONJUNCTION WITH BIS JOB #140887967. |
| Q00350808 ↗ | 11-02 49 AVENUE QUEENS | Alteration | Signed-off | 05/29/2020 | 08/07/2020 | Design CRAFTED ARCHITECTURE PLLC Contractor PROTO P & H SERVICES CORP | PLUMBING WORK ASSOCIATED WITH THE COMBINATION OF UNIT NOS. 7C & 7D. |
| M00353799 ↗ | 114 WEST 80 STREET MANHATTAN | Alteration | Signed-off | 06/05/2020 | 07/17/2020 | Design SSA+D Contractor CAM ENERGY HEATING AND ME | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK BEING DONE UNDER JOB #140903690. |
| M00258356 ↗ | 60 PARK TERRACE WEST MANHATTAN | Alteration | Signed-off | 11/14/2019 | 02/12/2020 | Design SSA+D Contractor PRIME PIPING & HEATING IN | PLUMBING WORK RELATED TO AN INTERIOR RENOVATION OF TWO APARTMENTS. |
| M00250555 ↗ | 22 WEST 26 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/29/2019 | — | Design SSA+D | — |
| M00219568 ↗ | 270 WEST 73 STREET MANHATTAN | Alteration | Signed-off | 09/12/2019 | 10/21/2019 | Design RICHARD ALLON, ARCHITECT Contractor IA CONSTRUCTION MGMT, INC | TEMPORARY WOOD CONSTRUCTION FENCE. |