| Owner | Filings | Most Recent |
|---|---|---|
| SL GREEN | 9 | 09/16/2026 |
| KONE, INC | 1 | 03/22/2026 |
| OWNER OF 33 WEST 24 ST | 1 | 03/22/2026 |
| CHUSHORAN & WAKEFIELD INC | 1 | 03/22/2026 |
| METROPOLITAN LIFE INC | 5 | 03/22/2026 |
| METROLIFE INSURANCE | 1 | 03/22/2026 |
| 11 MADISON AVE, LLC SL GREEN | 1 | 03/22/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| MOORE | 1 | 03/21/2026 |
| CUSHMAN WAKEFIELD INC GLOBAL | 8 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LOFFREDO BROOKS ARCHITECTS P.C. | 19 | 08/05/2026 |
| COSENTINI ASSOCIATES | 18 | 08/05/2026 |
| CANY ARCHITECTURE & ENGINEERING DPC | 5 | 08/05/2026 |
| MG ENGINEERING D.P.C. | 16 | 08/04/2026 |
| PCS ENGINEERING | 2 | 07/22/2026 |
| GENSLER | 19 | 07/15/2026 |
| ROBERT DERECTOR ASSOCIATES | 9 | 07/09/2026 |
| CONAPAC SERVICES, DBA | 2 | 07/09/2026 |
| POWER CONTINUUM ENGINEERING, DPC | 14 | 07/07/2026 |
| HLW INTERNATIONAL | 2 | 06/23/2026 |
| DERIVE ENGINEERS | 5 | 04/28/2026 |
| HIGHLAND ASSOCIATES | 7 | 04/09/2026 |
| MDEAS ARCHITECTS | 1 | 01/27/2026 |
| JAROS BAUM & BOLLES | 1 | 12/23/2025 |
| THORNTON TOMASETTI | 8 | 12/02/2025 |
| STANTEC | 3 | 09/24/2025 |
| ROBERT STEPHENSON | 1 | 09/23/2025 |
| RICHARD PUSWALD PE | 7 | 08/07/2025 |
| AMA CONSULTING ENGINEERS, PC | 26 | 05/09/2025 |
| SILMAN | 1 | 05/01/2024 |
| ALLIED WORKS ARCHITECTURE | 1 | 04/29/2024 |
| SYNC ARCHITECTURE P.C | 1 | 08/31/2023 |
| WB ENGINEERS & CONSULTANTS PLLC | 11 | 08/23/2023 |
| WALTER CHATHAM ARCHITECT | 7 | 01/17/2023 |
| TOHFAZ UDDIN PE PC | 14 | 06/14/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 80 | 03/21/2026 |
| RIZZO GROUP | 73 | 03/21/2026 |
| AE DESIGN SOLUTION | 14 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 28 | 03/21/2026 |
| SKYLINE ACCESS | 1 | 03/21/2026 |
| LLOYD NOEL BUILDING CONSULTANT | 1 | 03/21/2026 |
| CATAPANO ENGINEERING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRM CONSTRUCTION MGMT LLC | General Contractor | 28 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 24 | 08/26/2026 |
| EAGLE SCAFFOLDING SVCS INC | General Contractor | 16 | 08/04/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 16 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 14 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 13 | 07/08/2026 |
| FINALY GENL CONTR CORP | General Contractor | 11 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 8 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 8 | 07/08/2026 |
| TISHMAN INTERIORS CORP | General Contractor | 8 | 03/21/2026 |
| COLGATE RESTORATION CORP | General Contractor | 8 | 09/16/2026 |
| VERSATILE SERVICES LLC | General Contractor | 7 | 04/09/2026 |
| TEMA BUILDERS GROUP CORP | General Contractor | 6 | 07/08/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 6 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 6 | 08/26/2026 |
| JOHN AHRENS | Electrical | 5 | 03/21/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 4 | 07/08/2026 |
| ELEPHANTS CUSTOM FURNITUR | General Contractor | 4 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 4 | 07/02/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 4 | 07/08/2026 |
| WOLF CONSTRUCTION CORP 20 | General Contractor | 4 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 3 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 3 | 07/08/2026 |
| ACC CONSTRUCTION CORP | General Contractor | 3 | 07/08/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 22 | 08/05/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 67 | 08/05/2026 |
| AK ENGINEERING PC | 678 | 10 | 07/09/2026 |
| JOSEPH MARTINES PE, PLLC | 1428 | 7 | 04/28/2026 |
| CODEGREEN | 510 | 4 | 09/24/2025 |
| SOCOTEC ENGINEERING | 4983 | 6 | 03/19/2024 |
| DNA CONTROLLED INSPECTION | 554 | 15 | 02/27/2024 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 2 | 06/16/2023 |
| CATAPANO ENGINEERING & AR | 3235 | 1 | 05/03/2021 |
| GOLDMAN COPELAND ASSOCIAT | 2826 | 1 | 03/31/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | COLGATE RESTORATION CORP | 09/15/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | COLGATE RESTORATION CORP | 08/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 08/14/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 08/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 08/12/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | COLGATE RESTORATION CORP | 08/06/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 08/05/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 08/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 07/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 07/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | COLGATE RESTORATION CORP | 07/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | A&A PLUMBING CORP | 07/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI PARTNERS, LLC | 06/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ICON INTERIORS INC | 06/30/2026 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 06/30/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | COLGATE RESTORATION CORP | 06/08/2026 |
| DOB NOW | Plumbing | Permit Issued | PSI PARTNERS, LLC | 05/29/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | FINALY GENL CONTR CORP | 05/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ICON INTERIORS INC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 05/14/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 05/06/2026 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 04/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | M & S MECHANICAL SERVICES | 04/17/2026 |
| DOB NOW | General Construction | Permit Issued | NATIONS ROOF EAST, LLC | 04/16/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 04/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 04/15/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | EAGLE SCAFFOLDING SVCS INC | 04/15/2026 |
| DOB NOW | Plumbing | Signed-off | LAWRENCE J. LEVINE | 04/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR PLUMBING CO., INC | 04/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | EAGLE SCAFFOLDING SVCS IN | 04/06/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 04/06/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 04/02/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | VERSATILE SERVICES LLC | 03/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VERSATILE SERVICES LLC | 03/27/2026 |
| DOB NOW | General Construction | Permit Issued | VERSATILE SERVICES LLC | 03/27/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | COLGATE RESTORATION CORP | 03/09/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 02/24/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EAGLE SCAFFOLDING SVCS IN | 02/06/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/01/2026 | Permit Issued | STRUCTURE TONE, LLC | Heating Systems | Heating Indeeco QUA 1 kW · Electric Heater ×2 |
| 06/25/2026 | Permit Issued | ICON INTERIORS INC | Air Conditioning Systems, Ventilation Systems | Cooling Ventilation |
| 04/09/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Air Conditioning Systems, Ventilation Systems | |
| 12/23/2025 | Permit Issued | M & S MECHANICAL SERVICES | Air Conditioning Systems | Cooling Nortek Custom Unit 8,300 CFM · Ahu ×1 |
| 09/30/2025 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | Heat / Cool Climatemaster MODEL - SC-018 / UNIT - AC-13-10 18 BTU · Wshp ×1 MODEL SC-018 / UNIT AC-13-13 18 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-1 33 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-2 33 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-3 33 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-4 33 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-5 33 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-6 33 BTU · Wshp ×1 MODEL SC-036 / UNIT AC-13-9 33 BTU · Wshp ×1 MODEL SC-048 / UNIT AC-13-7 45 BTU · Wshp ×1 MODEL SC-048 / UNIT AC-13-8 45 BTU · Wshp ×1 Vertiv MMD24E / Unit CRAC-13-2 1,000 CFM · Crac Unit ×1 MMD24E / Unit CRAC-13-3 1,000 CFM · Crac Unit ×1 MMD24E / Unit CRAC-13-4 1,000 CFM · Crac Unit ×1 MMD24E / Unit Numbers CRAC-13-1 1,000 CFM · Crac Unit ×1 |
| 06/10/2024 | Signed-off | SCHIMENTI CONSTRUCTION CO | Air Conditioning Systems, Ventilation Systems | Cooling Ventilation Titus DESV-10 1,200 CFM · Vav Box ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Signed-off | PAR FIRE PROTECTION LLC | 158 heads |
| 07/09/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 4 outlets |
| 07/07/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 1 heads |
| 07/01/2026 | Permit Issued | PAR FIRE PROTECTION LLC | — |
| 06/25/2026 | Permit Issued | PSI PARTNERS, LLC | — |
| 04/28/2026 | Signed-off | NYC FIRE SPRINKLER CORP | 89 heads |
| 04/09/2026 | — | — | 45 heads, 2 outlets |
| 11/21/2025 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 10 heads |
| 09/23/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 854 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 07/09/2026 | — | — | — |
| 07/07/2026 | — | — | — |
| 06/25/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 04/28/2026 | Permit Issued | SHAW MECHANICAL INC | Gas, Water/Sanitary |
| 04/09/2026 | — | — | Water/Sanitary |
| 01/21/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 11/26/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 11/21/2025 | — | — | — |
| 09/24/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 09/23/2025 | — | — | — |
| 05/08/2021 | Signed-off | DOVAL PLBG & HTG CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 06/20/2026 | Permit Issued | METROPOLIS ELECTRIC CORP | General Wiring |
| 06/06/2026 | Permit Issued | METROPOLIS ELECTRIC CORP | — |
| 05/27/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 1 meters |
| 05/05/2026 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 04/14/2026 | Complete | CPL ELECTRICAL SERVICES | General Wiring |
| 04/01/2026 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 03/02/2026 | Permit Issued | MRD ELEC'L SERVICES, INC | General Wiring |
| 02/18/2026 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 12/01/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 10/27/2025 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 10/27/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | — |
| 09/24/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 09/24/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 09/23/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/02/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| 02/18/2025 | Permit Issued | TURNER CONSTRUCTION COMPA | Steel |
| 05/01/2024 | Signed-off | SCHIMENTI CONSTRUCTION CO | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/09/2026 | Permit Issued | COLGATE RESTORATION CORP | Scaffold, Sidewalk Shed |
| 04/21/2025 | Permit Issued | EAGLE SCAFFOLDING SVCS IN | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/22/2026 | Permit Issued | COLGATE RESTORATION CORP | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/22/2026 | Permit Issued | COLGATE RESTORATION CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/28/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/22/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/20/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/13/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 04/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/03/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 03/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/13/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/11/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 08/11/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 07/23/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 07/14/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 07/09/2026 | Standpipe Systems | Ari Kamo | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/09/2026 | Post-installed Anchors | Ari Kamo | special |
| 05/13/2026 | Energy Code Compliance Inspections | Christopher Drutjons | progress |
| 05/12/2026 | Interior lighting power | Benjamin Plotnick | energy_progress |
| 05/12/2026 | Final | Sandra Joslyn | progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Benjamin Plotnick | special |
| 05/12/2026 | HVAC-R and service water heating equipment | Christopher Drutjons | energy_progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 05/12/2026 | HVAC-R and service water heating system controls | Christopher Drutjons | energy_progress |
| 05/12/2026 | Mechanical Systems | Christopher Drutjons | special |
| 05/12/2026 | Lighting controls | Benjamin Plotnick | energy_progress |
| 05/12/2026 | Final | Justin Redmond | progress |
| 05/12/2026 | Sprayed fire-resistant materials | Christopher Drutjons | special |
| 05/12/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 05/12/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 05/12/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 05/12/2026 | Duct leakage testing, insulation and design | Christopher Drutjons | energy_progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 05/12/2026 | Post-installed Anchors | Benjamin Plotnick | special |
| 05/12/2026 | Maintenance information | Christopher Drutjons | energy_progress |