← Back
Miscellaneous two family
11 PAERDEGAT 6 STREET
BROOKLYN · Canarsie · BIN 3225892
💬 Discuss this project
1965Year Built
2Stories
B9Building Class
R5Zoning
2,310 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,000 sf lot · 1.16 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 9 docs
Floor 25p · 2 filings · 7 docs
Floor 15p · 2 filings · 7 docs
Cellar14p · 2 filings · 7 docs
Sub-Basement5p · 2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC110/03/2025
ROBERT JOHN HILLS ARCHITECT204/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING403/21/2026
KAMTECH RESTORATION CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&J NY CONSTRUCTION INCGeneral Contractor603/21/2026
KAMTECH RESTORATION CORPGeneral Contractor104/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802110/03/2025
AM DESIGN STUDIO LLC4413204/05/2022
Building Lifecycle
All (22)Filed (3)Permit Issued (4)Signed Off (2)Violation (3)Inspection (4)Special Inspection (6)
10/21/2025
Permit issued — Solar
B01296044-I1-SL
10/03/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01296044-I1
10/02/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Kaijin Liang
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
10/01/2025
Special inspection requirement — Final
Kaijin Liang
10/01/2025
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
10/16/2024
Signed off — Alteration
B00695581-I1
10/08/2024
Signed off — Alteration
Modification of plumbing fixtures as shown on plans. No change in occupancy, use or egress.
B00695608-I1
05/21/2024
Permit issued — Mechanical Systems
B00695581-I1-GC-CX
12/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/02/2023
Permit issued — Plumbing
B00695608-I1-PL
03/15/2023
Permit issued — General Construction
B00695581-I1-GC-CX
04/05/2022
Filed — Alteration
B00695581-I1
04/05/2022
Filed — Alteration
Modification of plumbing fixtures as shown on plans. No change in occupancy, use or egress.
B00695608-I1
02/27/2007
Violation issued (ECB, closed)
Construction
02/27/2007
Violation issued (ECB, closed)
Quality of Life
02/27/2007
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedKAMTECH RESTORATION CORP10/21/2025
DOB NOWMechanical SystemsSigned-offS&J NY CONSTRUCTION INC05/21/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/02/2023
DOB NOWGeneral ConstructionSigned-offS&J NY CONSTRUCTION INC03/15/2023
1 project · most recent 09/28/2025
FiledStatusContractorScope
09/28/2025Permit IssuedBERGER QUALITY ELEC'L CON—
1 project · most recent 10/03/2025
FiledStatusContractorScope
10/03/2025Permit IssuedKAMTECH RESTORATION CORP42 panels, 19.12 kw, 705 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/02/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Kaijin Liangspecial
10/01/2025Fire-Resistant Penetrations and JointsKaijin Liangspecial
10/01/2025Structural Stability – Alterations of existing buildingsKaijin Liangspecial
10/01/2025Energy Code Compliance InspectionsKaijin Liangprogress
10/01/2025FinalKaijin Liangprogress
10/01/2025Air barrier - visual inspectionKaijin Liangenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/30/2026B00695581-I1Request digital key ↗
08/30/2026B00695608-I1Request digital key ↗
08/20/2026B01296044-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/30/2026B00695581-I1Open ↗
08/20/2026B01296044-I1Open ↗
08/13/2026B00695608-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026B01296044-I1Open ↗
08/26/2026B01296044-I1Open ↗
08/26/2026B01296044-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B01296044-I1Open ↗
08/26/2026B01296044-I1Open ↗
08/26/2026B01296044-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/30/2026B00695581-I1Open ↗
08/20/2026B01296044-I1Open ↗
08/13/2026B00695608-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00695581-I1Open ↗