| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01373814 ↗ | 133-21 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 05/13/2026 | 06/03/2026 | Design PETER CHO ARCHITECTS, PLLC | EXISTING 2-STORY FRAME BUILDING FACADE RESURFACING AT ALL EXPOSURES. PROPOSED WORK IS TO RESURFACE THE EXISTING FACADE WITH MASONRY BRICK. N… |
| Q01156960 ↗ | 111-41 77 AVENUE QUEENS | Alteration | Signed-off | 06/25/2025 | 11/12/2025 | Design A&A CONSULTING ENGINEERS PC | NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILING TO LEGALIZE CONCRETE PAD IN THE FRONT YARD, & INTERIOR WORK AS SHOWN IN PLANS. WORK IN RESPON… |
| B00705198 ↗ | 78 SOUTH 6 STREET BROOKLYN | Alteration CO | Permit Issued | 04/05/2022 | 07/10/2025 | Design LESTER KATZ, NCARB Owner SECURE REALTY 1LLC Filer M.W. EXPEDITING INC | INSTALLATION OF PARTIAL SPRINKLER SYSTEM AS PER NFPA13-2007(APPX.Q)ALT 1 # B00705198. |
| Q01113364 ↗ | 64-18 60 PLACE QUEENS | Alteration | Signed-off | 10/09/2024 | 10/18/2024 | Design PETER CHO ARCHITECTS, PLLC Owner ALAIA WINGS, INC. | FACADE REPAIR, LINTEL REPLACEMENT AND BRICK REPLACEMENT AROUND 5 WINDOWS AND 1 DOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. |
| B00695581 ↗ | 11 PAERDEGAT 6 STREET BROOKLYN | Alteration | Signed-off | 04/05/2022 | 05/21/2024 | Design WQB ARCHITECTURE PLLC | Interior renovation of extg.2nd fl. apartment. Repair water damaged ceilings with new sheetrock/fireproofing. Restore cellar and first flo… |
| Q08018543 ↗ | 71-34 72 STREET QUEENS | Alteration | Signed-off | 10/18/2022 | 11/10/2022 | Design ARQUITECTURA VARELA | REPLACE CENTER BLOCKS AT THE REAR WALL OF THE GARAGE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. |
| Name | Projects together | Most recent |
|---|---|---|
| ARQUITECTURA VARELA | 2 | 11/16/2022 |
| PETER CHO ARCHITECTS, PLLC | 2 | 05/13/2026 |
| A&A CONSULTING ENGINEERS PC | 1 | 06/25/2025 |
| CHOSEN MEP, CORP. | 1 | 06/17/2025 |
| LESTER KATZ, NCARB | 1 | 06/17/2025 |
| MDG DESIGN GROUP | 1 | 06/06/2022 |
| SYED ENGINEERING, P.C. | 1 | 11/26/2021 |
| WQB ARCHITECTURE PLLC | 1 | 04/05/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| PRECISION SPKLR SVCS LLC | 1 | 06/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| 355 BLEECKER REALTY INC | 1 | 06/06/2022 |
| ALAIA WINGS, INC. | 1 | 10/09/2024 |
| SECURE REALTY 1LLC | 1 | 06/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BAC Developers Group | 1 | 06/17/2025 |
| M-DIS DESIGN GROUP | 1 | 06/06/2022 |
| M.W. EXPEDITING INC | 1 | 06/17/2025 |
| METRO DESIGN CONSULTANTS INC | 1 | 10/09/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01373814 ↗ | 133-21 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 05/13/2026 | 06/03/2026 | Design PETER CHO ARCHITECTS, PLLC | EXISTING 2-STORY FRAME BUILDING FACADE RESURFACING AT ALL EXPOSURES. PROPOSED WORK IS TO RESURFACE THE EXISTING FACADE WITH MASONRY BRICK. N… |
| Q01156960 ↗ | 111-41 77 AVENUE QUEENS | Alteration | Signed-off | 06/25/2025 | 11/12/2025 | Design A&A CONSULTING ENGINEERS PC | NO CHANGE IN USE, EGRESS, OR OCCUPANCY. FILING TO LEGALIZE CONCRETE PAD IN THE FRONT YARD, & INTERIOR WORK AS SHOWN IN PLANS. WORK IN RESPON… |
| B00705198 ↗ | 78 SOUTH 6 STREET BROOKLYN | Alteration CO | Permit Issued | 04/05/2022 | 07/10/2025 | Design LESTER KATZ, NCARB Owner SECURE REALTY 1LLC Filer M.W. EXPEDITING INC | INSTALLATION OF PARTIAL SPRINKLER SYSTEM AS PER NFPA13-2007(APPX.Q)ALT 1 # B00705198. |
| Q01113364 ↗ | 64-18 60 PLACE QUEENS | Alteration | Signed-off | 10/09/2024 | 10/18/2024 | Design PETER CHO ARCHITECTS, PLLC Owner ALAIA WINGS, INC. | FACADE REPAIR, LINTEL REPLACEMENT AND BRICK REPLACEMENT AROUND 5 WINDOWS AND 1 DOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. |
| B00695581 ↗ | 11 PAERDEGAT 6 STREET BROOKLYN | Alteration | Signed-off | 04/05/2022 | 05/21/2024 | Design WQB ARCHITECTURE PLLC | Interior renovation of extg.2nd fl. apartment. Repair water damaged ceilings with new sheetrock/fireproofing. Restore cellar and first flo… |
| Q08018543 ↗ | 71-34 72 STREET QUEENS | Alteration | Signed-off | 10/18/2022 | 11/10/2022 | Design ARQUITECTURA VARELA | REPLACE CENTER BLOCKS AT THE REAR WALL OF THE GARAGE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. |
| Q00738266 ↗ | 71-17 72 STREET QUEENS | Alteration | Signed-off | 07/06/2022 | 08/01/2022 | Design ARQUITECTURA VARELA | BRICK REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION |
| M00730122 ↗ | 355 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 06/06/2022 | 06/15/2022 | Design MDG DESIGN GROUP Owner 355 BLEECKER REALTY INC Filer M-DIS DESIGN GROUP | HEREWITH FILE TO REPAINT OF WATER-DAMAGED BUILDING FACADE WINDOW AND DOOR CROSSHEAD MOULDING, CORNICE, WINDOW SILL, AND SIDEWALL REPAINT WIT… |
| Q00633370 ↗ | 64-12 60 PLACE QUEENS | Alteration | Signed-off | 11/26/2021 | 12/06/2021 | Design SYED ENGINEERING, P.C. | PROPOSED CRACKS REPAIRE AS SHOWN IN PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION |
| Building | Filings | Most Recent |
|---|---|---|
| 248-04 SOUTH CONDUIT AVENUE ↗ | 1 | 08/26/2026 |
| 133-21 ROCKAWAY BOULEVARD ↗ | 1 | 07/08/2026 |
| 71-34 72 STREET ↗ | 1 | 07/08/2026 |
| 71-17 72 STREET ↗ | 1 | 07/08/2026 |
| 355 BLEECKER STREET ↗ | 1 | 07/08/2026 |
| 111-41 77 AVENUE ↗ | 1 | 04/09/2026 |
| 11 PAERDEGAT 6 STREET ↗ | 6 | 03/21/2026 |
| 64-18 60 PLACE ↗ | 3 | 03/21/2026 |
| 78 SOUTH 6 STREET ↗ | 3 | 03/21/2026 |
| 64-12 60 PLACE ↗ | 3 | 03/21/2026 |