RoofUnder Construction29p · 4 filings · 20 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
General Construction · Structural
THE REPLACEMENT OF FOUR COOLING TOWERS, FIVE EXHAUST AIR AND TWO SUPPLY AIR FANS ON THE ROOF (16TH FLOOR). A VAV AIR TERMINAL UNIT ADDITION TO SERVE NEW ELECTRICAL ROOM ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
43 documents · 5 drawing sheets
MOMA, Roof repairs at floors 4, 6, 7 & 8 as per the plans filed including: Removal and replacement of the existing roof membrane and flashing at roof. Installation of new roof guard rails.
On file for this project
29 documents · 14 drawing sheets
INSTALLATION OF A TEMPORARY ROOF PROTECTION SYSTEM OVER EXISTING ROOF & OCCUPIED DECKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 16Under Construction12p · 1 filing · 20 docs
Mechanical
Issued Permit Scope
Mechanical Systems
THE REPLACEMENT OF FOUR COOLING TOWERS, FIVE EXHAUST AIR AND TWO SUPPLY AIR FANS ON THE ROOF (16TH FLOOR). A VAV AIR TERMINAL UNIT ADDITION TO SERVE NEW ELECTRICAL ROOM ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
43 documents · 1 drawing sheet
Floor 15Under Construction21p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
THE REPLACEMENT OF FOUR COOLING TOWERS, FIVE EXHAUST AIR AND TWO SUPPLY AIR FANS ON THE ROOF (16TH FLOOR). A VAV AIR TERMINAL UNIT ADDITION TO SERVE NEW ELECTRICAL ROOM ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
43 documents · 2 drawing sheets
Floor 142p · 2 filings · 11 docs
Fire ProtectionMechanical
Modification to existing sprinkler system. No change in use, egress or occupancy under this application.
On file for this project
5 documents · 1 drawing sheet
Modification to existing HVAC ductwork as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 1 drawing sheet
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 75p · 1 filing · 18 docs
ArchitectureFire ProtectionGeneralMechanical
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
18 documents · 5 drawing sheets
Floor 68p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 6TH FLOOR FOUNDERS ROOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
28 documents
No filed description on record for this project.
On file for this project
8 documents · 1 drawing sheet
Floor 5
Floor 42p · 2 filings · 10 docs
GeneralMechanical
Modification to existing HVAC ductwork as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 3
Floor 23p · 3 filings · 9 docs
ArchitectureStructural
Temporary structures for a fashion show inside the MoMA. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
4 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 1Under Construction6p · 4 filings · 13 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Temporary structures for MoMA events. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
4 documents
Temporary structures for a fashion show inside the MoMA. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
4 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
CellarUnder Construction37p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS/FRAMES, CEILING/LIGHTING AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
22 documents
Minor mechanical modifications to existing HVAC ductwork. No change in use, egress or occupancy under this application.
On file for this project
16 documents · 1 drawing sheet
Interior renovations to provide accessible routes to stage for existing Titus theaters. No change in use, egress or occupancy under this application. Refer to comments for additional information.
On file for this project
22 documents · 10 drawing sheets
Latest 3 of 4 filings on this floor.