| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q08030223 ↗ | 108-18 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 10/31/2022 | 09/11/2026 | Contractor AQUEDUCT MECHANICAL CORP | HEREWITHIN FILING FOR PLUMBING FIXTURES ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TOUSE, EGRESS OR OCCUPANCY. |
| B00741808 ↗ | 1482 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 05/23/2022 | 09/03/2026 | Contractor TRI STATE PLBG & HTG INC | INSTALL GAS FIRED EQUIPMENTS ON 1ST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01446951 ↗ | 119 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/27/2026 | Owner ZAR PROPERTY NY Contractor TOP BUILD CONTRACTORS INC | HEREWITH FILING FOR INTERIOR PARTITIONS REMOVAL OF EXISTING OFFICE SPACES AND INFILL STAIR OPENING AS SHOWN ON PLANS. NO CHANGE TO USE, EGRE… |
| Q01288558 ↗ | 90-44 55 AVENUE QUEENS | Alteration | Permit Issued | 09/25/2025 | 08/27/2026 | Contractor MKSSKR CONSULTING SERVICE | INSTALL FENCE IN CONJUNCTION Q01288558. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01412249 ↗ | 118 WEST 22 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 08/25/2026 | Owner ZAR PROPERTY NY Contractor CERTIFIED SERVICES AND | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACES. WORK TO BE PLUMBING MODIFICATION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR… |
| M01418631 ↗ | 1133 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/19/2026 | Owner R.E.M. RESIDENTIAL Contractor EAST SIDE DESIGN & BUILD* | MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Person | Filings | Most recent |
|---|---|---|
| Yao Guo | 352 | 08/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| IVAN DESIGN ENG. ANALYSIS, PLLC | 2 | 05/28/2026 |
| C&P DESIGN CONSULTANTS | 1 | 07/11/2026 |
| CORPORATE DESIGN OF AMERICA, P.C. | 1 | 01/14/2025 |
| DOUGLAS MUIR ARCHITECT | 1 | 02/18/2025 |
| GEIGER E&A GROUP CORP. | 1 | 03/02/2026 |
| KENDALL ENGINEERING PC | 1 | 03/24/2026 |
| M C STRUCTURAL ENGINEERING | 1 | 05/23/2025 |
| RHL ENGINEERING, LLC | 1 | 03/28/2024 |
| RICHARD BOYD ARCHITECT | 1 | 06/24/2026 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 1 | 05/28/2026 |
| VICTOR K. HAN ARCHITECT, PC | 1 | 05/07/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| GLOBAL DESIGN CONCEPT COR | 43 | 07/31/2026 |
| QMB PLUMBING & HEATING IN | 24 | 07/21/2025 |
| ASTORIA P & H CORP | 16 | 07/08/2026 |
| EAST SIDE DESIGN & BUILD* | 13 | 07/08/2026 |
| BRIGGS SERVICES LLC | 11 | 07/28/2026 |
| MKSSKR CONSULTING SERVICE | 11 | 07/15/2026 |
| LEX INTERIORS LTD | 7 | 12/22/2022 |
| AATZ CONTRACTING INC | 6 | 02/19/2025 |
| CMP CONTRACTING INC | 6 | 04/16/2025 |
| VMC PLUMBING & HEATING IN | 6 | 07/31/2026 |
| ZARA PLUMBING CORP | 5 | 03/04/2026 |
| ALL PRO PLBG & HTG INC | 4 | 06/24/2026 |
| BILT/DFI INC | 4 | 10/23/2025 |
| BURA CONSTRUCTION CORP | 4 | 08/07/2023 |
| DDP ROOFING SERVICES LLC | 4 | 12/05/2023 |
| G.B. & SON, INC | 4 | 10/23/2025 |
| PEGASUS P&H CORP | 4 | 05/06/2025 |
| AMC PLBG, HTG & CLNG, INC | 3 | 03/01/2024 |
| AMERICAN STANDARD P&H COR | 3 | 08/15/2025 |
| BUDDY WARREN HOME INC | 3 | 05/19/2025 |
| CERTIFIED SVCS & RPRS | 3 | 08/13/2026 |
| DCGC CONTRACTING INC | 3 | 02/24/2025 |
| EMILIANO CONSTRUCTION COR | 3 | 02/18/2025 |
| IMPACT PLUMBING INC | 3 | 08/07/2023 |
| METRO STAR CONTRACTING C | 3 | 12/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 18 | 07/10/2026 |
| KAUFMAN MANAGEMENT COMPANY, LLC | 11 | 07/28/2026 |
| 260 APARTMENTS CORP | 7 | 07/21/2025 |
| ZAR PROPERTY NY | 6 | 08/24/2026 |
| FirstService Residential | 4 | 01/05/2026 |
| HUDSON EAST NETWORK LLC | 3 | 04/23/2026 |
| ASTOR TERRACE CONDOMINIUM | 2 | 02/25/2022 |
| C/O RESOLUTION REAL ESTATE | 2 | 01/26/2026 |
| LEX 54 CONDOMINIUM | 2 | 06/03/2025 |
| LINDSAY PARK HOUSING CORP. | 2 | 10/10/2023 |
| STUDIO METAMORPHOSIS | 2 | 07/15/2022 |
| SULLIVAN GROUP DESIGN LLC | 2 | 06/11/2024 |
| 122 EAST 42ND ST., LLC. | 1 | 01/09/2020 |
| 150 WEST END AVENUE OWNERS CORP. | 1 | 01/13/2020 |
| 155 PERRY ST CONDOMINIUM | 1 | 08/10/2023 |
| 210 EAST 15TH STREET TENANTS CORP | 1 | 04/05/2023 |
| 360 West 55th ST LP. | 1 | 10/17/2022 |
| 41 EAST 11TH STREET LLC | 1 | 01/20/2020 |
| 467 FOREST PROPERTY INC | 1 | 06/24/2024 |
| 60 GUILDERS, LLC | 1 | 08/07/2023 |
| 720-730 FORT WASHINGTON AVE OWNERS | 1 | 04/24/2026 |
| 79TH STREET RESIDENCE CORP. | 1 | 10/23/2025 |
| ALLIED PARTNERS | 1 | 03/02/2026 |
| CMP CONTRACTING INC | 1 | 05/02/2022 |
| COURT-WRIGHT GROUP | 1 | 01/28/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 11 | 07/28/2026 |
| DDP ROOFING SERVICES, LLC | 4 | 12/05/2023 |
| A1 EXPEDITING SERVICE CORP. | 2 | 01/26/2026 |
| PROPERTY INTERVENTION CONSULTANTS, | 2 | 05/12/2021 |
| A & D BUILDING SOLUTIONS | 1 | 05/07/2025 |
| BRIGGS SERVICES | 1 | 05/15/2025 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 07/21/2025 |
| FWD Partners | 1 | 07/15/2026 |
| GLOBAL DESIGN CONCEPT CORP | 1 | 06/22/2021 |
| I & L CONSULTING, INC. | 1 | 03/02/2026 |
| JME BUILDING CONSULTING, LLC | 1 | 03/24/2026 |
| METROPOLIS GROUP INC | 1 | 07/11/2026 |
| NEXT STEP BUILDING SOLUTIONS, INC | 1 | 12/12/2023 |
| WALTER T. GORMAN, PE, PC | 1 | 12/05/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q08030223 ↗ | 108-18 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 10/31/2022 | 09/11/2026 | Contractor AQUEDUCT MECHANICAL CORP | HEREWITHIN FILING FOR PLUMBING FIXTURES ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TOUSE, EGRESS OR OCCUPANCY. |
| B00741808 ↗ | 1482 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 05/23/2022 | 09/03/2026 | Contractor TRI STATE PLBG & HTG INC | INSTALL GAS FIRED EQUIPMENTS ON 1ST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01446951 ↗ | 119 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/27/2026 | Owner ZAR PROPERTY NY Contractor TOP BUILD CONTRACTORS INC | HEREWITH FILING FOR INTERIOR PARTITIONS REMOVAL OF EXISTING OFFICE SPACES AND INFILL STAIR OPENING AS SHOWN ON PLANS. NO CHANGE TO USE, EGRE… |
| Q01288558 ↗ | 90-44 55 AVENUE QUEENS | Alteration | Permit Issued | 09/25/2025 | 08/27/2026 | Contractor MKSSKR CONSULTING SERVICE | INSTALL FENCE IN CONJUNCTION Q01288558. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01412249 ↗ | 118 WEST 22 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 08/25/2026 | Owner ZAR PROPERTY NY Contractor CERTIFIED SERVICES AND | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACES. WORK TO BE PLUMBING MODIFICATION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR… |
| M01418631 ↗ | 1133 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/19/2026 | Owner R.E.M. RESIDENTIAL Contractor EAST SIDE DESIGN & BUILD* | MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01446686 ↗ | 64-28 METROPOLITAN AVENUE QUEENS | Alteration | Filed — no permit on record | 08/19/2026 | — | — | — |
| M01400700 ↗ | 866 UNITED NATIONS PLAZA MANHATTAN | Alteration | Permit Issued | 06/11/2026 | 08/14/2026 | Owner ST. TROPEZ CONDOMINIUM Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION IN APT. 29D AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01359504 ↗ | 138 EAST 36 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 08/13/2026 | Contractor Y.L. AND SONS INC | HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01431459 ↗ | 24 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/13/2026 | Contractor BRIGGS SERVICES LLC | INTERIOR DEMO TO 5TH, 6TH AND 11TH FLOOR NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01097297 ↗ | 165 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/19/2024 | 07/31/2026 | Contractor FULL CIRCLE PLUMBING CORP | MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 1ST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01439210 ↗ | 353 EAST 72 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/31/2026 | — | — | — |
| M01432730 ↗ | 40 WEST 25 STREET MANHATTAN | Alteration | Signed-off | 07/27/2026 | 07/29/2026 | Contractor BRIGGS SERVICES LLC | MINOR DEMOLITION OF EXISTING NON-LOAD BEARING PARTITIONS ON THE 6TH FL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B01125048 ↗ | 8871 18 AVENUE BROOKLYN | Alteration | Permit Issued | 10/10/2024 | 07/28/2026 | Contractor MKSSKR CONSULTING SERVICE Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR STRUCTURAL WORK FOR HORIZONTAL EXTENSION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01431450 ↗ | 24 WEST 25 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/28/2026 | — | — | |
| Q01424348 ↗ | 90-44 55 AVENUE QUEENS | Alteration | Permit Issued | 07/01/2026 | 07/16/2026 | Contractor MKSSKR CONSULTING SERVICE | INSTALL FENCE IN CONJUNCTION Q01424348. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01316316 ↗ | 132 EAST 35 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/15/2026 | — | Filer FWD Partners | — |
| M01332682 ↗ | 23 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 01/21/2026 | 07/14/2026 | Contractor TUB CONSTRUCTION CORP | REMOVAL OF PLUMBING FIXTURES AS PER PLANS FILED HEREIWTH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01293321 ↗ | 166 7 AVENUE BROOKLYN | Alteration | Permit Issued | 09/29/2025 | 06/29/2026 | Owner DNA Contractor HONOR CONSTRUCTION INC | INSTALLTION OF SPLIT UNIT AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01420508 ↗ | 8 UNION SQUARE SOUTH MANHATTAN | Alteration | Permit Issued | 06/23/2026 | 06/25/2026 | Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR APARTMENT RENOVATION. MODIFICATION OF INTERIOR PARTITION, DOOR AND CEILING AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS O… |
| B01420452 ↗ | 376 STERLING PLACE BROOKLYN | Alteration | Filed — no permit on record | 06/23/2026 | — | — | — |
| M01004559 ↗ | 213 WEST 11 STREET MANHATTAN | Alteration CO | Permit Issued | 02/26/2024 | 06/17/2026 | Contractor PROJEX CONSTRUCTION CORP Filer YAO W GUO ARCHITECT, PC | Underpin rear yard wall as shown on drawing. No change to use, egress or occupancy. |
| M01384615 ↗ | 720 FT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 06/05/2026 | Contractor GLOBAL DESIGN CONCEPT COR | INTERIOR RENOVATION OF UNIT 2X INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01387333 ↗ | 525 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 04/23/2026 | 05/21/2026 | Owner AKAM ASSOCIATES, INC. Contractor EUROPE PAINT CORP | HEREWITH FILING FOR INTERIOR RENOVATION OF APT. 6A AS PER PLANS FILED HEREWITH. WORK TO BE PLUMBING FIXTURES MODIFICATION. NO CHANGE IN USE,… |
| M01365875 ↗ | 1 EAST BROADWAY MANHATTAN | Alteration | Permit Issued | 03/03/2026 | 05/13/2026 | Contractor STUDIO WOODMAN LLC Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR INTERIOR RENOVATION OF RESTAURANT ON FIRST FLOOR AS SHOWN ON DRAWINGS. WORK TO BE INTERIOR PARTITION AND DOOR MODIFICATI… |
| M01355993 ↗ | 299 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 03/02/2026 | 05/12/2026 | Owner ALLIED PARTNERS | INSTALLATION OF MECHANICAL UNIT OPENINGS, AND HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01329117 ↗ | 34 WEST 76 STREET MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 05/11/2026 | Contractor PASHA USA CONSTRUCTION IN | HEREWITH FILING FOR INTERIOR RENOVATION OF APT. 5 AS PER PLANS FILED HEREWITH. wORK TO BE INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE… |
| M01267977 ↗ | 308 EAST 79 STREET MANHATTAN | Alteration | Permit Issued | 04/07/2026 | 05/08/2026 | Contractor EVERYDAY MECHANICAL CORP | Modification of plumbing fixtures as hown on drawings. No change to use, egress or occupancy. |
| M01392612 ↗ | 40 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 05/05/2026 | 05/08/2026 | Contractor BRIGGS SERVICES LLC | INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS AS PER PLANS FILED HEREWITH. |
| M01245865 ↗ | 61 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/22/2025 | 05/07/2026 | Owner GUMLEY HAFT Contractor ALL PRO PLBG & HTG INC Filer YAO W GUO ARCHITECT, PC | REPLACE PLUMBING FIXTURES IN APT 25 AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01354391 ↗ | 1213 3 AVENUE MANHATTAN | Alteration | Signed-off | 02/18/2026 | 05/06/2026 | Owner First & 73 LLC Contractor JK NY INTERIOR INC Filer I & L CONSULTING, INC. | INTERIOR RENOVATION TO EXISTING RETAIL SPACE ON THE FIRST FLOOR, CONSTRUCT NEW NON BEARING PARTITIONS, ALL AS PER PLAN. NO CHANGE IN USE … |
| M01334845 ↗ | 1235 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 04/24/2026 | Contractor ASTORIA P & H CORP | HEREWITH FILING FOR APT 3A INTERIOR RENOVATION. WORK IS TO MODIFY PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY… |
| M00995919 ↗ | 213 WEST 11 STREET MANHATTAN | Alteration | Permit Issued | 02/01/2024 | 04/10/2026 | Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR REMOVAL OF INTERIOR NON LOAD BEARING PARTITIONS AND DOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS… |
| M01343741 ↗ | 125 CENTRAL PARK NORTH MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 03/12/2026 | Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01366860 ↗ | 401 WEST 25 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/04/2026 | — | Owner K & R REALTY MANAGEMENT | — |
| M01258978 ↗ | 145 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 08/15/2025 | 03/02/2026 | Contractor AMERICAN STANDARD P&H CORORP. | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| Q01071179 ↗ | 41-50 47 STREET QUEENS | Alteration CO | Permit Issued | 07/30/2024 | 02/11/2026 | Contractor VISION BLDG AND RESTORAT* | STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. |
| M01305863 | 185 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 01/05/2026 | 02/03/2026 | Owner FIRSTSERVICE RESIDENTIAL Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| Q01046705 ↗ | 18-07 MOTT AVENUE QUEENS | Alteration | Permit Issued | 03/03/2025 | 12/18/2025 | Owner TARIK EQUITY CORP Contractor MKSSKR CONSULTING SERVICE Filer A & D BUILDING SOLUTIONS | FILING FOR 8' HIGH TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY. |
| B01260946 ↗ | 196 LINCOLN ROAD BROOKLYN | Alteration | Signed-off | 07/25/2025 | 12/15/2025 | Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR A NEW DECK AND OPENING IN REAR YARD. REPAIR BAY WINDOW AS PER PLANS. NOCHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APP… |
| M01194051 ↗ | 32 UNION SQUARE MANHATTAN | Alteration CO | Permit Issued | 04/22/2025 | 11/06/2025 | Contractor REMI INTERIORS INC | HEREWITH FILING FOR CREATION OF NEW ENTRANCE AND VESTIBULE AFFECTING EGRESS WITH CHANGE OF USE AND OCCUPANCY TO ESTABLISH A PLACE OF ASSEMBL… |
| B01282564 ↗ | 357 GRAND STREET BROOKLYN | Alteration | Signed-off | 09/09/2025 | 10/22/2025 | Owner PATOMA INC Contractor G.B. & SON, INC | HEREWITH FILING FOR PLUMBING MODIFICATION IN CELLAR AND 1ST FLOOR AS PER PLANSFILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01254444 ↗ | 415 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 08/01/2025 | 10/21/2025 | Contractor MKSSKR CONSULTING SERVICE | INSTALLATION OF MECHANICAL UNIT OPENING, AND HVAC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01244873 ↗ | 66 OVERLOOK TERRACE MANHATTAN | Alteration | Signed-off | 06/27/2025 | 09/04/2025 | Owner Rudd Realty Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING APT. 1B. WORK TO INCLUDE PARTITION MODIFICATION AND INSTALLATION OF MECHANICAL VENT AS SHOWN ON DRAWINGS. NO CHANGE TO USE… |
| M01220534 ↗ | 160 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2025 | 09/03/2025 | Owner FIRSTSERVICE RESIDENTIAL Contractor DEDE K CONTRACTING GRP LL | HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01196219 ↗ | 404 3 STREET BROOKLYN | Alteration | Signed-off | 05/05/2025 | 08/07/2025 | Contractor M. SPINELLI PLB & HTG INC | Modification of plumbing fixtures as shown on drawings. No change to use, egress or occupancy. |
| M01024376 ↗ | 22 EAST 29TH STREET MANHATTAN | Alteration | Signed-off | 04/08/2024 | 08/01/2025 | Contractor BROADWAY CONSTRUCTION GRO | REPLACE CHILLER AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00749963 ↗ | 525 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 07/05/2022 | 07/16/2025 | Contractor JVR PLBG AND HEATING INC | INSTALL PLUMBING FIXTURES IN APT. 4H AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OROCCUPANCY. |
| M01223137 ↗ | 231 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 05/15/2025 | 06/24/2025 | Contractor SHASHI CONSTRUCTION CORP Filer BRIGGS SERVICES | Respectfully filing for renovation of existing office on 9th floor. General construction of work to be interior partition removal as shown o… |
| M01218999 ↗ | 165 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 05/07/2025 | 06/12/2025 | Contractor M. SPINELLI PLB & HTG INC | HEREWITH FILING FOR PLUMBING MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01158070 ↗ | 345 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 05/19/2025 | 06/03/2025 | Contractor BUDDY WARREN HOME INC | HEREWITH FILING FOR RENOVATION OF BATHROOM WITH MINOR PARTIITON AND FINISHES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS … |
| M01222381 ↗ | 135 EAST 54 STREET MANHATTAN | Alteration | Filed — no permit on record | 06/03/2025 | — | Owner LEX 54 CONDOMINIUM | — |
| B01224616 ↗ | 196 LINCOLN ROAD BROOKLYN | Alteration | Filed — no permit on record | 05/29/2025 | — | — | — |
| M01141902 ↗ | 148 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 02/13/2025 | 05/22/2025 | Owner AKAM ASSOCIATES, INC. Contractor KBRNY, INC | RENOVATE APT 5A. WORK TO REMOVE AND INSTALL INTERIOR PARTITIONS AS SHOWN ON DRAWINGS . NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01212071 ↗ | 67-37 73 PLACE QUEENS | Alteration | Signed-off | 04/21/2025 | 05/16/2025 | Contractor AMERICAN STANDARD P&H CORORP. | HEREWITH FILING TO REMOVE PLUMBING FIXTURES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01225766 ↗ | 712 60 STREET BROOKLYN | Alteration CO | Filed — no permit on record | 05/14/2025 | — | — | — |
| M01168290 ↗ | 119 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 02/06/2025 | 05/07/2025 | Contractor FAIRMONT INDUSTRIES CORP | HEREWITH FILING FOR REMOVAL OF INTERIOR PARTITIONS, HUNG CEILING AND DOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS AP… |
| B01063899 ↗ | 186 5 AVENUE BROOKLYN | Alteration | Signed-off | 06/11/2024 | 05/01/2025 | Contractor NEW WORLD EURO CONSTRUCTI | HEREWITH FILING FOR INTERIOR PARTITIONS AND STOREFRONT MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATI… |
| M01139227 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/09/2024 | 04/24/2025 | Owner 260 APARTMENTS CORP Contractor GLOBAL DESIGN CONCEPT COR | PLUMBING FIXTURES IN APT 3B FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B01190291 ↗ | 700 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 03/11/2025 | 04/22/2025 | Owner NEWSWALK CONDOMINIUM Contractor BUDDY WARREN HOME INC | HEREWITH FILING FOR PLUMBING MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01184864 ↗ | 185 PARK ROW MANHATTAN | Alteration | Signed-off | 02/24/2025 | 04/01/2025 | Contractor DCGC CONTRACTING INC | RENOVATE EXISTING APT 8C. WORK TO BE INTERIOR PARTITIONS AND DOORS AS SHOW ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01059189 ↗ | 51 EAST 90 STREET MANHATTAN | Alteration | Permit Issued | 07/12/2024 | 03/31/2025 | Owner AKAM ASSOCIATES, INC. Contractor EAST SIDE DESIGN & BUILD* | MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. |
| M01192029 ↗ | 32 UNION SQUARE MANHATTAN | Alteration | Signed-off | 03/14/2025 | 03/25/2025 | Contractor REMI INTERIORS INC | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACES. WORK TO INCLUDE STOREFRONT MODIFICATIONS AND CREATION OF VESTIBULE AS SHOWN ON DRA… |
| M01176117 ↗ | 32 UNION SQUARE MANHATTAN | Alteration | Signed-off | 02/28/2025 | 03/20/2025 | Contractor REMI INTERIORS INC | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACES. WORK TO BE INTERIOR INTERIOR STAIR REMOVAL AND INFILL AS SHOWN ON DRAWINGS. NO CHA… |
| M01175640 ↗ | 150 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 02/20/2025 | 03/04/2025 | Owner AKAM ASSOCIATES, INC. Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR INTERIOR PARTITIONS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01183702 ↗ | 196 LINCOLN ROAD BROOKLYN | Alteration | Filed — no permit on record | 03/03/2025 | — | — | — |
| B00789829 ↗ | 358 TOMPKINS AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/11/2022 | 02/19/2025 | Owner HUDSON EAST NETWORK LLC Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR MECHANCIAL SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01086580 ↗ | 345 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 07/29/2024 | 02/13/2025 | Contractor AQUEDUCT MECHANICAL CORP | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08009319 ↗ | 327 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 02/07/2025 | Contractor CMP CONTRACTING | FILING FOR INTERIOR RENOVATION OF APARTMENT 1B ON 1ST FLOOR. WORK TO INCLUDE SOUNDPROOFING OF 2HR RATED WALL, NEW WINDOWS, NEW LIGHTING, AN… |
| M01154182 ↗ | 135 WEST 79 STREET MANHATTAN | Alteration | Signed-off | 12/16/2024 | 02/03/2025 | Contractor BILT/DFI INC | HEREWITH FILING FOR PLUMBING MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01112233 ↗ | 51 CLARK STREET BROOKLYN | Alteration | Signed-off | 10/01/2024 | 12/26/2024 | Owner Ferrane Bakery Contractor HONOR CONSTRUCTION INC | HEREWITH FILING TO REMOVE INTERIOR INTERIOR PARTITIONS AND DOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00956547 ↗ | 64 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 12/12/2023 | 11/21/2024 | Owner ZAR PROPERTY NY Contractor METRO STAR CONTRACTING C | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACE ON 4TH FLOOR. WORK TO BE GENERAL CONSTRUCTION OF INTERIOR PARTITIONS AND MECHANICAL … |
| Q00456959 ↗ | 85-60 118 STREET QUEENS | Alteration | Signed-off | 06/16/2022 | 11/18/2024 | Contractor AMERICAN STANDARD P&H CORORP. | Remove Natco boiler # 109248 and Replace with AO Smith HW-300, 300,000 btu as show on drawings. No change to use, egress or occupancy. |
| M01122242 ↗ | 135 EAST 54 STREET MANHATTAN | Alteration | Signed-off | 10/23/2024 | 11/06/2024 | Owner LEX 54 CONDOMINIUM Contractor BEKGLOBAL INC | HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| Q01084603 ↗ | 35-13 76 STREET QUEENS | Alteration | Permit Issued | 07/26/2024 | 10/31/2024 | Contractor EMILIANO CONSTRUCTION COR | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01117663 ↗ | 417 GRAND STREET BROOKLYN | Alteration | Permit Issued | 10/01/2024 | 10/09/2024 | Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01106504 ↗ | 1523 2 AVENUE MANHATTAN | Alteration | Signed-off | 09/06/2024 | 09/27/2024 | Contractor EAST SIDE DESIGN & BUILD* | RENOVATE EXISTING APT. 16K. WORK TO INCLUDE PARTITION MODIFICATION AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00992633 ↗ | 224 BEACH 131 STREET QUEENS | Alteration CO | Permit Issued | 01/22/2024 | 09/13/2024 | Contractor EXPERT CONSTRUCTION & RE* | SUSEQUENT PLUMBING FILING IN CONJUNCTION WITH ALT 1 APPLICATION # Q00992633. |
| B00903455 ↗ | 312 BLEECKER STREET BROOKLYN | Alteration | Signed-off | 07/13/2023 | 09/10/2024 | Contractor QMB PLUMBING & HEATING INC | MODIFICATION OF EXISTING PLUMBING ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01100197 ↗ | 504 EAST 90 STREET MANHATTAN | Alteration | Permit Issued | 08/26/2024 | 09/06/2024 | Contractor EAST SIDE DESIGN & BUILD* | RENOVATE EXISTING APT. 4A. WORK TO INCLUDE PARTITION MODIFICATION AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01050616 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/29/2024 | 08/08/2024 | Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01059522 ↗ | 100 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 06/23/2024 | 07/22/2024 | Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION AS PER PLANS. NO CHANGE TOUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01057605 ↗ | 342 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 06/10/2024 | 07/12/2024 | Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING MODIFICATION IN APT. 7S AS PER PLANS. NO CHANGE TOUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| S01068078 ↗ | 467 FOREST AVENUE STATEN ISLAND | Alteration | Signed-off | 06/24/2024 | 07/09/2024 | Owner 467 FOREST PROPERTY INC Contractor GLOBAL DESIGN CONCEPT COR | INSTALLATION OF SPLIT UNITS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01063946 ↗ | 186 5 AVENUE BROOKLYN | Alteration | Signed-off | 06/10/2024 | 06/24/2024 | Contractor NEW WORLD EURO CONSTRUCTI | HEREWITH FILING FOR CONSTRUCTION FENCE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01049321 ↗ | 203 MOTT STREET MANHATTAN | Alteration | Signed-off | 05/31/2024 | 06/24/2024 | Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01052751 ↗ | 185 PARK ROW MANHATTAN | Alteration | Signed-off | 05/20/2024 | 06/24/2024 | Contractor DCGC CONTRACTING INC | RENOVATE EXISTING APT 8G. WORK TO BE INTERIOR PARTITIONS AND DOORS AS SHOW ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. |
| B00922126 ↗ | 627 WILSON AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2023 | 06/21/2024 | Owner YAO W. GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING STORE. GENERAL CONSTRUCTION OF INTERIOR CABINETS AND INSTALLATION OF MECHANICAL SYSTEM, RANGEHOOD AND FAN ON EXISTING DUCT… |
| M01049325 ↗ | 203 MOTT STREET MANHATTAN | Alteration | Permit Issued | 05/31/2024 | 06/18/2024 | Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR CONSTRUCTION FENCE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01054465 ↗ | 8871 18 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/28/2024 | — | — | — |
| B01054369 ↗ | 4111 HIGHLAND AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/23/2024 | — | — | — |
| M00808541 ↗ | 1230 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/23/2023 | 05/21/2024 | Contractor ASTORIA P & H CORP | HEREWITH FILING FOR MODIFICATIN OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01024593 ↗ | 1-17 57 AVENUE QUEENS | Alteration | Signed-off | 04/30/2024 | 05/21/2024 | Owner GO HPS LLC Contractor OMNI BUILD INC | TO PROVIDE INTERIOR ARCHITECTURAL PARTITIONS AND CEILINGS FOR NEW CLASSROOMS, TOILETS AND ACCESSORY AREAS AT 1st AND 2nd FLOORS OF PREMISE… |
| M00839252 ↗ | 401 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 07/20/2023 | 05/16/2024 | Contractor MBW CONSTRUCTION INC | THIS APPLICATION IS FILED TO LEGALIZE VIOLATION # 39073402N FOR MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANC… |
| M00730649 ↗ | 1 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 05/23/2022 | 05/08/2024 | Contractor BURA CONSTRUCTION | GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, DOORS, AND CEILING ON 2ND AND 3RD FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUP… |
| B01043603 ↗ | 184 KENT AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/06/2024 | — | — | — |
| M01015641 ↗ | 2280 BROADWAY MANHATTAN | Alteration | Signed-off | 04/29/2024 | 05/02/2024 | Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION IN APT. 9A AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00998625 ↗ | 124 EAST 79 STREET MANHATTAN | Alteration | Permit Issued | 02/01/2024 | 04/30/2024 | Owner AKAM ASSOCIATES Contractor CARBONE CONTRACTING INC | COMBINE APT 2A AND 2B. MODIFY PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00226212 ↗ | 525 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 11/08/2019 | 04/02/2024 | Contractor L&J PLG & HTG CO OF NY IN | install plumbing in apt 4L as shown on drawings. no change to use, egress or occupancy. |
| M00962137 ↗ | 1435 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2023 | 02/21/2024 | Contractor EAST SIDE DESIGN & BUILD* | UPGRADE ELCTRICAL PANEL FOR APT. 6B AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |