RoofUnder Construction43p · 8 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
REPLACEMENT OF HVAC EQUIPMENT AS SHOWN ON PLANS.
On file for this project
4 documents · 1 drawing sheet
application filed for facade and roof repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
On file for this project
7 documents
CD5 AMENDMENT FOR ADDING PLATFORM AS SHOWN ON THE PLANS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
PenthouseUnder Construction170p · 14 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
REPLACEMENT OF HVAC EQUIPMENT AS SHOWN ON PLANS.
On file for this project
4 documents
application filed for facade and roof repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
On file for this project
7 documents · 1 drawing sheet
Replacement of 1 bathtub, 1 shower, 2 lavatories, 1 sink, 1 dishwasher on new rough-in.
On file for this project
11 documents
Latest 3 of 14 filings on this floor.
Floor 16Under Construction3p · 1 filing · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
New, replaced, relocated and capped plumbing fixtures and/or appliances as per Plumbing Drawings.
On file for this project
11 documents
Floor 15Under Construction4p · 1 filing · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
New, replaced, relocated and capped plumbing fixtures and/or appliances as per Plumbing Drawings.
On file for this project
11 documents · 1 drawing sheet
Floor 14
Floor 13
Floor 121p · 1 filing · 20 docs
Mechanical
Plumbing work related to General interior renovation of existing apartment. Under general renovation Units 800 & 812 to be combined under this application as per local law 77 of 1968 &TPPN 3/97. No change to use egress or occupancy.
On file for this project
26 documents · 1 drawing sheet
Floor 11
Floor 10
Floor 997p · 10 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Architectural changes on the 9th floor as indicated on drawings.
On file for this project
12 documents
Plumbing work related to General interior renovation of existing apartment. Under general renovation Units 800 & 812 to be combined under this application as per local law 77 of 1968 &TPPN 3/97. No change to use egress or occupancy.
On file for this project
26 documents
New low-pressure gas meter and gas line installation for new generator & range on the Cellar, 1st Floor, 2nd Floor, 3rd - 8th Floors, 9th Floor, 9th Floor Mezzanine, 9th Floor Penthouse & Roof as indicated on drawings.
On file for this project
8 documents
Latest 3 of 10 filings on this floor.
Floor 89p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing work related to General interior renovation of existing apartment. Under general renovation Units 800 & 812 to be combined under this application as per local law 77 of 1968 &TPPN 3/97. No change to use egress or occupancy.
On file for this project
26 documents
Floor 737p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Subsequent filing to modify mechanical system in apt # 701/702 on 007 floor. Exterior work to install Condenser unit on exterior wall.
On file for this project
25 documents · 2 drawing sheets
Floor 6
Floor 512p · 3 filings · 20 docs
ArchitectureElectricalMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INSTALLATION OF FUJITSU MULTI ZONE SYSTEM INVERTED DRIVEN HEAR PUMP AND 2 BRAON EXHAUST FANS IN BATHROOMS. NO CHANGE OF USE, EGREESS OR OCCUPANCY.
On file for this project
5 documents
INTERIOR RENOVATION AT 5HT FLOOR AND MEZZANINE APARTMENT. PROPOSED NEW PARTITIONS FOR BEDROOMS. RELOCATE STAIRS TO MEZZANINE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
27 documents · 1 drawing sheet
REPLACE & RELOCATE LAVATORY, TUB & TOILET, PROPOSED (1) LAVATORY, (1) TOILET, (1) SHOWER AT 5TH FL MEZZANINE.REPLACE (1) KITCHEN SINK AND (1) RANGE. PROPOSED (1) DISHWASHER, (1) ELECTRIC WASHER/DRYER COMBO, REMOVE, CAP & SEAL TOILET, LAV AT 5TH FLOOR.
On file for this project
13 documents
Floor 411p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PROPOSED PLUMBING WORK AT APT#4E & APT#403 IN CONJUNCTION WITH GENERCAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
10 documents
PROPOSE INTERIOR RENOVATION FOR TWO EXISTING APPARTMENTS (APT#4E & #403) ON THE 4TH FLOOR, WORK INCLUDES MINOR PARTITIONS AND FINSH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
18 documents
PROPOSED HVAC SYSTEM CONSISTING OF 1 OUTDOOR UNIT AND 3 AIR HANDLERS AT 4TH FLOOR APT#4E & 403 IN ADJUCTION TO GENERCAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
18 documents
Floor 3Under Construction9p · 5 filings · 20 docs
ElectricalMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
REPLACEMENT OF HVAC EQUIPMENT AS SHOWN ON PLANS.
On file for this project
4 documents · 1 drawing sheet
New low-pressure gas meter and gas line installation for new generator & range on the Cellar, 1st Floor, 2nd Floor, 3rd - 8th Floors, 9th Floor, 9th Floor Mezzanine, 9th Floor Penthouse & Roof as indicated on drawings.
On file for this project
8 documents
Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2Under Construction15p · 6 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
REPLACEMENT OF HVAC EQUIPMENT AS SHOWN ON PLANS.
On file for this project
4 documents · 1 drawing sheet
Plumbing work related to General interior renovation of existing apartment. Under general renovation Units 800 & 812 to be combined under this application as per local law 77 of 1968 &TPPN 3/97. No change to use egress or occupancy.
On file for this project
26 documents · 1 drawing sheet
New low-pressure gas meter and gas line installation for new generator & range on the Cellar, 1st Floor, 2nd Floor, 3rd - 8th Floors, 9th Floor, 9th Floor Mezzanine, 9th Floor Penthouse & Roof as indicated on drawings.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Floor 1Under Construction12p · 6 filings · 20 docs
ArchitectureDMElectricalEquipmentMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sidewalk Shed
Plumbing work at 1st floor of existing eating and drinking establishment indicated on drawings file herewith. No change to use egress or occupancy under this application
On file for this project
5 documents · 1 drawing sheet
General construction for the interior demolition throughout existing eating and drinking establishment at the 1st floor and basement indicated on drawing filed herewith No change in use egress or occupancy under this application
On file for this project
6 documents · 1 drawing sheet
Plumbing work related to General interior renovation of existing apartment. Under general renovation Units 800 & 812 to be combined under this application as per local law 77 of 1968 &TPPN 3/97. No change to use egress or occupancy.
On file for this project
26 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Mezzanine111p · 8 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
PROPOSED PLUMBING WORK AT APT#4E & APT#403 IN CONJUNCTION WITH GENERCAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
10 documents
PROPOSE INTERIOR RENOVATION FOR TWO EXISTING APPARTMENTS (APT#4E & #403) ON THE 4TH FLOOR, WORK INCLUDES MINOR PARTITIONS AND FINSH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
18 documents
New low-pressure gas meter and gas line installation for new generator & range on the Cellar, 1st Floor, 2nd Floor, 3rd - 8th Floors, 9th Floor, 9th Floor Mezzanine, 9th Floor Penthouse & Roof as indicated on drawings.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Cellar4p · 1 filing · 8 docs
Plumbing
Issued Permit Scope
Plumbing
New low-pressure gas meter and gas line installation for new generator & range on the Cellar, 1st Floor, 2nd Floor, 3rd - 8th Floors, 9th Floor, 9th Floor Mezzanine, 9th Floor Penthouse & Roof as indicated on drawings.
On file for this project
8 documents
Sub-BasementUnder Construction1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
General construction for the interior demolition throughout existing eating and drinking establishment at the 1st floor and basement indicated on drawing filed herewith No change in use egress or occupancy under this application
On file for this project
6 documents
Site & exteriorUnder Construction72p · 15 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents
application filed for facade and roof repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
On file for this project
7 documents · 9 drawing sheets
Latest 3 of 15 filings on this floor.
Filed — no permit issued20p · 2 filings · 8 docs
ArchitectureDMGeneralOther
PROPOSE PARTITAL RENOVATION ON THE 11TH FLOOR FOR UNIT 909. MINOR PARTITION WORK, FINISH WORK, AND REPLACEMENT OF AN EXISTING WINDOW IN KIND EXACTLY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
6 documents · 12 drawing sheets