Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLife Time, NYC Midtown Lifetime +113p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
RENOVATION OF AN EXISTING STOREFRONT, NEW WINDOW AS PER PLANS. NO CHANGE OFUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
9 documents · 2 drawing sheets
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 1 drawing sheet
FILING TO EXTEND EXISTING CHIMNEY NEXT TO NEIGHBORING BUILDING. BRACKETS FILED UNDER SEPARATE APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 20Unit 21S18p · 1 filing · 15 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (3 LAV, 3 WC, 1 TUB, 1 SINK, 1 DW); INSTALL NEW PLUMBING FIXTURES (1 SHOWER); CAP & REMOVE (1 TUB) AT APT 21S AT THE 20TH FLOOR.
On file for this project
15 documents · 7 drawing sheets
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15Unit 15S3p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
Application filed to renovate apartment 15S that includes modification of non bearing partitions and finishes as per the plans filed herewith. No change to Use, Egress of Occupancy
On file for this project
6 documents
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 81p · 1 filing · 3 docs
MechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
3 documents
Floor 71p · 1 filing · 3 docs
MechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
3 documents
Floor 61p · 1 filing · 3 docs
MechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
3 documents
Floor 5NYC Midtown Lifetime46p · 3 filings · 19 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sprinklers
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
3 documents
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 3 drawing sheets
Sprinkler modifications throughout health club space (Life Time Fitness) as indicated on the attached drawings. No change in egress, use or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 4Life Time, NYC Midtown Lifetime83p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
3 documents
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3Life Time, NYC Midtown Lifetime81p · 3 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 3 drawing sheets
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 5 drawing sheets
Sprinkler modifications throughout health club space (Life Time Fitness) as indicated on the attached drawings. No change in egress, use or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 2Life Time, NYC Midtown Lifetime83p · 3 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 4 drawing sheets
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 6 drawing sheets
Sprinkler modifications throughout health club space (Life Time Fitness) as indicated on the attached drawings. No change in egress, use or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 1Life Time, NYC Midtown Lifetime81p · 3 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 3 drawing sheets
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 5 drawing sheets
Sprinkler modifications throughout health club space (Life Time Fitness) as indicated on the attached drawings. No change in egress, use or occupancy.
On file for this project
3 documents · 1 drawing sheet
MezzanineLife Time, NYC Midtown Lifetime92p · 3 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 10 drawing sheets
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 8 drawing sheets
Sprinkler modifications throughout health club space (Life Time Fitness) as indicated on the attached drawings. No change in egress, use or occupancy.
On file for this project
3 documents · 2 drawing sheets
CellarLife Time, NYC Midtown Lifetime103p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents · 9 drawing sheets
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 9 drawing sheets
Replacement of existing dual fired boiler/burner with new dual fired boiler/burner and related piping. No change in use, egress or occupancy under this application. Related gas piping scope filed under separate DOB NOW plumbing application.
On file for this project
16 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
BasementNYC Midtown Lifetime4p · 1 filing · 13 docs
Plumbing
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
13 documents · 4 drawing sheets
Sub-BasementLife Time37p · 1 filing · 20 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
On file for this project
36 documents
Site & exteriorPan Am Equities32p · 5 filings · 20 docs
ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Supported Scaffold
RENOVATION OF AN EXISTING STOREFRONT, NEW WINDOW AS PER PLANS. NO CHANGE OFUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
9 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.