← Back
Primarily 2 family with 1 store or office
1107 MANHATTAN AVENUE
BROOKLYN · BIN 3063743
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R7AZoning
3,376 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,500 sf lot · 1.35 FAR built · Flood zone X500
Locations of Work
Cellar1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS210/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AQUEDUCT MECHANICAL CORPPlumbing507/08/2026
VINCENT VERDEROSAElectrical203/21/2026
SMR CRAFTWORKS INCGeneral Contractor203/21/2026
A. M. PLUMBING COMPANYPlumbing203/22/2026
SUPER CHARGED ELEC. INC.Electrical103/22/2026
SUPER CHARGED ELEC INC 001698General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474210/13/2021
Building Lifecycle
All (35)Filed (2)Permit Issued (2)Signed Off (2)Violation (11)Inspection (3)Special Inspection (15)
11/24/2025
Violation issued (HPD, closed)
I
12/10/2021
Signed off — Alteration
FILING FOR MINOR PLUMBING WORK IN CONJUNCTION WITH STORE BUILD-OUT AT FIRST AND CELLAR FLOORS FILED UNDER SUFFIX-I1 OF THIS APPLICATION. REMOVAL, RELOCATION, AND NEW INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00593538-I1
12/10/2021
Signed off — Alteration
FILING FOR MINOR PLUMBING WORK IN CONJUNCTION WITH STORE BUILD-OUT AT FIRST AND CELLAR FLOORS FILED UNDER SUFFIX-I1 OF THIS APPLICATION. REMOVAL, RELOCATION, AND NEW INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00593538-S1
11/22/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/22/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2021
Permit issued — Plumbing
B00593538-S1-PL
11/04/2021
Permit issued — Mechanical Systems
B00593538-I1-GC-CX
10/13/2021
Filed — Alteration
FILING FOR MINOR PLUMBING WORK IN CONJUNCTION WITH STORE BUILD-OUT AT FIRST AND CELLAR FLOORS FILED UNDER SUFFIX-I1 OF THIS APPLICATION. REMOVAL, RELOCATION, AND NEW INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00593538-S1
10/11/2021
Filed — Alteration
FILING FOR MINOR PLUMBING WORK IN CONJUNCTION WITH STORE BUILD-OUT AT FIRST AND CELLAR FLOORS FILED UNDER SUFFIX-I1 OF THIS APPLICATION. REMOVAL, RELOCATION, AND NEW INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00593538-I1
10/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
10/11/2021
Special inspection requirement — HVAC-R and service water heating equipment
PHILIP TOSCANO
10/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
10/11/2021
Special inspection requirement — HVAC-R and service water heating system controls
PHILIP TOSCANO
10/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
10/11/2021
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
10/11/2021
Special inspection requirement — Air barrier - visual inspection
PHILIP TOSCANO
10/11/2021
Special inspection requirement — Fenestration areas
PHILIP TOSCANO
10/11/2021
Special inspection requirement — Fenestration air leakage
PHILIP TOSCANO
10/11/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
PHILIP TOSCANO
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
09/15/2021
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
09/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
09/14/2021
Special inspection requirement — Final
PHILIP TOSCANO
09/14/2021
Special inspection requirement — Mechanical Systems
PHILIP TOSCANO
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2009
Violation issued (HPD, open)
B
10/26/2009
Violation issued (HPD, open)
B
10/26/2009
Violation issued (HPD, open)
B
10/26/2009
Violation issued (HPD, open)
B
10/26/2009
Violation issued (HPD, open)
B
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP11/08/2021
DOB NOWMechanical SystemsSigned-offTAP METRO ELECTRIC, LLC11/04/2021
1 project · most recent 11/24/2021
General Wiring
FiledStatusContractorScope
11/24/2021CompleteSUPER CHARGED ELEC. INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/22/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/22/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/11/2021HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
10/11/2021HVAC-R and service water heating equipmentPHILIP TOSCANOenergy_progress
10/11/2021HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
10/11/2021HVAC-R and service water heating system controlsPHILIP TOSCANOenergy_progress
10/11/2021Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
10/11/2021Energy Code Compliance InspectionsPHILIP TOSCANOprogress
10/11/2021Air barrier - visual inspectionPHILIP TOSCANOenergy_progress
10/11/2021Fenestration areasPHILIP TOSCANOenergy_progress
10/11/2021Fenestration air leakagePHILIP TOSCANOenergy_progress
10/11/2021Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
09/15/2021Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
09/15/2021Energy Code Compliance InspectionsPHILIP TOSCANOprogress
09/15/2021Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
09/14/2021FinalPHILIP TOSCANOprogress
09/14/2021Mechanical SystemsPHILIP TOSCANOspecial
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00593538-I1Request digital key ↗
09/01/2026B00593538-S1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00593538-S1Open ↗
09/01/2026B00593538-S1Open ↗
08/23/2026B00593538-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00593538-S1Open ↗
08/23/2026B00593538-I1Open ↗
08/23/2026B00593538-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00593538-S1Open ↗
09/01/2026B00593538-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00593538-S1Open ↗
09/01/2026B00593538-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
09/01/2026B00593538-S1Open ↗
08/13/2026B00593538-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
09/01/2026B00593538-S1Open ↗
08/13/2026B00593538-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00593538-S1Open ↗
08/13/2026B00593538-I1Open ↗