BuildNYC
Co-op within a condominium
Forester Condominium
111-20 73RD AVENUE · Forest Hills · BIN 4307915
💬 Discuss this project
1966Year Built
14Stories
R9Building Class
R7-1Zoning
225,529 sfGross Floor Area
120Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMPFDNY Report ↗
Co-op within a condominium · Owner of record: Forester Condominium · 13,327 sf lot · 16.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMedex Diagnostics Treatment CenterUnder Construction7p · 2 filings · 19 docs
Floor 14Unit 14H, Unit 14J, Unit PH74p · 2 filings · 15 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9C4p · 1 filing · 6 docs
Floor 8Unit 8G10p · 2 filings · 14 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Forest Hills Obgyn, Northwell Health46p · 4 filings · 20 docs
Floor 1Northwell HealthUnder Construction30p · 5 filings · 20 docs
CellarMedex Diagnostics Treatment CenterUnder Construction39p · 4 filings · 20 docs
Sub-CellarThe Forester7p · 3 filings · 20 docs
Site & exteriorNorthwell HealthUnder Construction21p · 5 filings · 20 docs
Filed — no permit issuedHands of Hope4p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Forester Company7203/21/2026
11101 Queens4706/28/2026
MCO1103/21/2026
Cord Meyer Development603/21/2026
Cord Meyer/McO/Citizens Development407/08/2026
Phoenix103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York503/21/2026
Paul Fusco Consulting203/21/2026
J A Expediting603/21/2026
VAA403/21/2026
Gregory Ralph Architect403/21/2026
City Expediting203/21/2026
AE Design Solution803/21/2026
W J Professional Expediting203/21/2026
West Aze403/21/2026
Arcx Design203/21/2026
K & M Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Adi ContractingGeneral Contractor604/09/2026
Hakka ContractingGeneral Contractor407/08/2026
Empire NY InstallationsScaffold407/08/2026
Rapid Response RemdiationGeneral Contractor303/21/2026
Alma DesignGeneral Contractor307/11/2026
Crystal ComfortGeneral Contractor307/08/2026
D'Alco ElectricalElectrical203/22/2026
CC Controlled Plumbing CoPlumbing207/08/2026
Paramount PipingPlumbing207/08/2026
GGP Construction MgtmentGeneral Contractor203/21/2026
Hudson Contracting GroupGeneral Contractor204/09/2026
Alma Plumbing SprinklerPlumbing107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Cutolo SalvatoreElectrical103/21/2026
Universal PlumbingPlumbing106/28/2026
Romero ElectricElectrical103/22/2026
Safetech Electrical ContngElectrical103/21/2026
Demari ServicesGeneral Contractor104/09/2026
Lakewood GroupGeneral Contractor107/08/2026
Meiqiju ConstuctionGeneral Contractor107/08/2026
Metropolitan Mechanicalspecialty_contractor104/08/2026
Tower ServicesGeneral Contractor107/08/2026
J&C BoinimScaffold107/08/2026
National MaintenanceSign hanger106/28/2026
N.Y. Sign ArtSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vertical8740105/28/2026
Crosscheck Inspection Services544502/12/2026
Steel Core Engineering PL1098310/30/2025
MJ Engineering & Design5546307/11/2025
Metropolitan Mechanical2277105/14/2025
NY Restoration Technology6187107/18/2024
Robert F. Germain Jr. PE5100506/29/2023
A2 Architect2504306/29/2023
Katz Engineering238101/31/2022
O'Rourke Engineering5873110/22/2021
Building Lifecycle
All (225)Filed (38)Permit Issued (35)Signed Off (19)Facade (FISP) (6)Violation (60)Inspection (15)Objection (22)Special Inspection (30)
09/10/2026
Signed off — Alteration
Additions/Modifications to existing mechanical system in medical office space. No change to use, egress, or occupancy.
Q01326689-I1
08/26/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/21/2026
Signed off — Alteration
Additions/modifications to medical office plumbing as per plans herewith. No change to use, egress, or occupancy.
Q01326841-I1
07/15/2026
Signed off — Alteration
INTERIOR FIT-OUT OF DENTAL OFFICE IN EXISTING COMMERCIAL SPACE. NO CHANGE IN ZONING USE GROUP, EGRESS OR OCCUPANCY
Q01212223-S1
07/15/2026
Signed off — Alteration
INTERIOR FIT-OUT OF DENTAL OFFICE IN EXISTING COMMERCIAL SPACE. NO CHANGE IN ZONING USE GROUP, EGRESS OR OCCUPANCY
Q01212223-I1
07/10/2026
Permit issued — General Construction
Q01400074-I1-GC
06/30/2026
Signed off — Alteration
Q01326649-I1
05/28/2026
Filed — Alteration
Q01400074-I1
05/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
MUHAMMAD HUQ
05/11/2026
Special inspection requirement — Final
William Ryan
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Permit issued — Sign
Q01366802-I1-SG
04/28/2026
Filed — Alteration
ERECT AND INSTALL ILLUMIATED WALL SIGN TO READ "NORTHWELL HEALTH" WITH LOGO. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
Q01366802-I1
04/22/2026
Filed — Alteration
Q01324031-I1
04/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2026
Signed off — Alteration
ILLUMINATED ACCESSORY NON ADVERTISING BUSINESS SIGN ON WALL. SIGN WORDING: DENTAL RENAISSANCE SPA
Q01344507-I1
03/18/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/06/2026
Permit issued — Plumbing
Q01160327-S2-PL
03/05/2026
Permit issued — General Construction
Q01160327-I1-GC
03/03/2026
Special inspection requirement — Final
ARIEL GOLSHAN
02/27/2026
Signed off — Alteration
INTERIOR FIT-OUT OF DENTAL OFFICE IN EXISTING COMMERCIAL SPACE. NO CHANGE IN ZONING USE GROUP, EGRESS OR OCCUPANCY
Q01212223-S2
02/17/2026
Signed off — Alteration
Facade repairs as per plans filed herewith. No change in use occupancy or egress.
Q00994554-I1
02/12/2026
Filed — Alteration
Q01326649-P1
02/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/10/2026
Special inspection requirement — Final
EUGENE BIFULCO
02/10/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
02/10/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
02/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2026
Special inspection requirement — Final
ADITYA DESAI
02/02/2026
Permit issued — Mechanical Systems
Q01160327-S1-MS
01/09/2026
Filed — Alteration
ILLUMINATED ACCESSORY NON ADVERTISING BUSINESS SIGN ON WALL. SIGN WORDING: DENTAL RENAISSANCE SPA
Q01344507-I1
01/09/2026
Permit issued — Sign
Q01344507-I1-SG
01/09/2026
Permit issued — General Construction
Q01326649-I1-GC
01/09/2026
Permit issued — Mechanical Systems
Q01326689-I1-MS
01/09/2026
Special inspection requirement — Final
Volodymyr Chervoniuk
12/22/2025
Permit issued — Plumbing
Q01326841-I1-PL
12/22/2025
Permit issued — Mechanical Systems
Q01326689-I1-MS
12/22/2025
Permit issued — General Construction
Q01326649-I1-GC
12/16/2025
Filed — Alteration
Q01326649-I1
12/10/2025
Filed — Alteration
Additions/Modifications to existing mechanical system in medical office space. No change to use, egress, or occupancy.
Q01326689-I1
12/10/2025
Filed — Alteration
Additions/modifications to medical office plumbing as per plans herewith. No change to use, egress, or occupancy.
Q01326841-I1
12/09/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Ventilation and air distribution system
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
12/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
12/03/2025
Permit issued — Mechanical Systems
Q01212223-S2-MS
12/01/2025
Special inspection requirement — Final
EUGENE BIFULCO
12/01/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
11/30/2025
Filed — Alteration
INSTALLATION OF NEW BUSINESS ACCESSORY ILLUMINATED WALL SIGN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01323501-I1
11/20/2025
Objection resolved — Addressed
11/19/2025
Objection raised — Admin
11/13/2025
Objection resolved — Addressed
Latest 60 of 225 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAlma Design07/10/2026
DOB NOWSignPermit IssuedNational Maintenance04/29/2026
DOB NOWPlumbingPermit IssuedSmart Plumbing & Heating03/06/2026
DOB NOWGeneral ConstructionPermit IssuedAlma Design03/05/2026
DOB NOWMechanical SystemsPermit IssuedAlma Design02/02/2026
DOB NOWSignSigned-offSkanska Building01/09/2026
DOB NOWGeneral ConstructionSigned-offAdi Contracting01/09/2026
DOB NOWMechanical SystemsSigned-offAdi Contracting01/09/2026
DOB NOWPlumbingSigned-offUniversal Plumbing12/22/2025
DOB NOWMechanical SystemsSigned-offAdi Contracting12/22/2025
DOB NOWGeneral ConstructionSigned-offAdi Contracting12/22/2025
DOB NOWMechanical SystemsSigned-offHudson Contracting Group12/03/2025
DOB NOWMechanical SystemsPermit IssuedRapid Response Remdiation10/27/2025
DOB NOWPlumbingSigned-offGregg NY Plumbing07/16/2025
DOB NOWGeneral ConstructionSigned-offHudson Contracting Group07/03/2025
DOB NOWMechanical SystemsSigned-offMetropolitan Mechanical06/30/2025
DOB NOWSuspended ScaffoldPermit IssuedDemari Services06/03/2025
DOB NOWGeneral ConstructionSigned-offLakewood Group05/02/2025
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I04/29/2025
DOB NOWGeneral ConstructionSigned-offTower Services03/27/2025
DOB NOWGeneral ConstructionSigned-offMeiqiju Constuction12/13/2024
DOB NOWGeneral ConstructionSigned-offDemari Services09/17/2024
DOB NOWSuspended ScaffoldPermit IssuedDemari Services05/21/2024
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I04/29/2024
DOB NOWPlumbingSigned-offSurpass Plumbing & Heating12/13/2022
DOB NOWPlumbingSigned-offSurpass Plumbing & Heating11/09/2022
DOB NOWGeneral ConstructionSigned-offHakka Contracting10/25/2022
DOB NOWGeneral ConstructionSigned-offHakka Contracting10/17/2022
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co07/25/2022
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co06/07/2022
DOB NOWBoiler EquipmentSigned-offC C Controlled Combustion06/07/2022
DOB NOWMechanical SystemsSigned-offCrystal Comfort01/28/2022
DOB NOWMechanical SystemsSigned-offCrystal Comfort12/03/2021
DOB NOWGeneral ConstructionSigned-offGGP Construction Mgtment06/22/2021
DOB NOWConstruction FenceSigned-offJ&C Boinim07/09/2019
BIS—ISSUEDJ&C Boinim07/06/2020
BIS—ISSUEDJ&C Boinim02/12/2020
BIS—ISSUEDJ&C Boinim05/22/2019
BISPLISSUEDWNW & Sons Plumbing & Heating05/22/2019
BISPLISSUEDWilliam G Iafe04/11/2019
+ 45 more permits on file
4 projects · most recent 12/10/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2025Signed-offAdi ContractingAir Conditioning Systems, Heating Systems
Cooling
Daikin FXMQ36TBVJU 36,000 BTU · Vrf Indoor ×4
FXMQ12TBVJU 13,000 BTU · Vrf Indoor ×2
FXMQ18TBVJU 19,000 BTU · Vrf Indoor ×2
FXMQ48TBVJU 42,000 BTU · Vrf Indoor ×2
REYQ264AATJB (A - REYQ120AATJB, B- REYQ144AATJB) 264,000 BTU · Condensing Unit ×2
FTKF24BVJU9 22,000 BTU · Split System ×1
RKF24BVJU9 22,000 BTU · Condensing Unit ×1
Heating
Daikin FXMQ36TBVJU 40,000 BTU · Vrf Indoor ×4
FXMQ18TBVJU 21,500 BTU · Vrf Indoor ×2
FXMQ48TBVJU 47,000 BTU · Vrf Indoor ×2
10/30/2025Signed-offHudson Contracting GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUZ-AK36NLHZ 3 tons · Condensing Unit ×1
Ventilation
Barry Blower C36JVS 210 CFM · Exhaust Fan ×3
07/11/2025Permit IssuedAlma DesignAir Conditioning Systems
Cooling
Daikin CAH008GDQM 3,000 CFM · Ahu ×1
Multistack ASP010YNAB 11 tons · Chiller ×1
05/14/2025Signed-offMetropolitan MechanicalHeating and Air Conditioning Systems
Heat / Cool
Trane M#: WSC120H3R0B2F 118,000 BTU · Condensing Unit ×1
4 projects · most recent 12/10/2025
Water/Sanitary Gas
FiledStatusContractorScope
12/10/2025Signed-offUniversal PlumbingWater/Sanitary
10/30/2025Signed-offGregg NY PlumbingWater/Sanitary
07/11/2025Permit IssuedAlma Plumbing SprinklerWater/Sanitary
08/31/2023Signed-offParamount PipingGas, Water/Sanitary
20 projects · most recent 03/30/2026
General Wiring HVAC Wiring Boiler Controls
FiledStatusContractorScope
03/30/2026CompleteA.L. ElectricalGeneral Wiring
03/11/2026CompleteKaylee ElectricGeneral Wiring
02/11/2026Permit IssuedSpectrum on Broadway-Electric—
01/28/2026CompleteAtmos Electric Svce—
01/09/2026CompleteDouble "R" Electrical ContractingGeneral Wiring
11/15/2025CompleteJong Hyun Kim—
09/22/2025CompleteThe Metro Group ElectricGeneral Wiring
09/02/2025Permit IssuedD'Alco ElectricalGeneral Wiring
07/16/2025Permit IssuedTaking Care of Bus ElectricHVAC Wiring
05/14/2025Permit IssuedTaking Care of Bus Electric—
02/25/2025CompleteDaven ElectricGeneral Wiring
01/06/2025CompleteR & T ElectricalGeneral Wiring
04/15/2024CompleteMega Electrical Contracting—
06/21/2023CompleteAtmos Electric SvceGeneral Wiring
06/08/2023CompleteKraft ElectricBoiler Controls
2 projects · most recent 12/10/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/10/2025Signed-offAdi ContractingTenant Protection Plan 72 Hour
10/30/2025Signed-offHudson Contracting GroupTenant Protection Plan 72 Hour
1 project · most recent 04/29/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2024Permit IssuedDemari ServicesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/26/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
05/27/2026Tenant Protection Plan ComplianceMUHAMMAD HUQspecial
05/11/2026FinalWilliam Ryanprogress
03/03/2026FinalARIEL GOLSHANprogress
02/11/2026Tenant Protection Plan Compliance—special
02/10/2026Interior lighting powerEUGENE BIFULCOenergy_progress
02/10/2026Lighting controlsEUGENE BIFULCOenergy_progress
02/10/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
02/10/2026FinalEUGENE BIFULCOprogress
02/05/2026FinalADITYA DESAIprogress
01/09/2026FinalVolodymyr Chervoniukprogress
12/09/2025Ventilation and air distribution systemEUGENE BIFULCOenergy_progress
12/09/2025Maintenance informationEUGENE BIFULCOenergy_progress
12/09/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
12/09/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
12/09/2025Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
12/09/2025Post-installed AnchorsEUGENE BIFULCOspecial
12/09/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
12/09/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
12/09/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
12/09/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
12/09/2025Maintenance informationEUGENE BIFULCOenergy_progress
12/01/2025FinalEUGENE BIFULCOprogress
12/01/2025Mechanical SystemsEUGENE BIFULCOspecial
10/21/2025Maintenance informationAlexander Sheymanenergy_progress
10/21/2025Shutoff dampersAlexander Sheymanenergy_progress
Latest 25 of 88.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Northwell HealthMedical / HealthcareFloors 1, 2
Project Q01366802 Alteration · Permit Entire · 04/28/2026
Project Q01326689 Alteration · LOC Issued · 12/10/2025
Project Q01326841 Alteration · LOC Issued · 12/10/2025
Hands of HopeCommunity Facility—
Project Q01324031 Alteration · Approved · 04/22/2026
Forest Hills ObgynMedical / HealthcareFloor 2
Project Q01326649 Alteration · LOC Issued · 12/16/2025
Medex Diagnostics Treatment CenterMedical / HealthcareCellar, Roof
Project Q01160327 Alteration · Permit Entire · 06/11/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 628 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch38
08/29/2026Q01344071-I1Request digital key ↗
08/27/2026Q00501183-I1Request digital key ↗
08/27/2026Q00591219-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00184915-I1Request digital key ↗
▸Applications & Permits84
▸BISPLAN / WORK APPROVAL APPLICATION45
03/14/2025421589800Open ↗
05/04/2022421269969Open ↗
03/11/2022421269969Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION35
02/13/2020421589800Open ↗
07/17/2019421589819Open ↗
05/30/2019421589800Open ↗
Showing 3 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/18/2019421589800Open ↗
11/01/2019421589800Open ↗
▸BISIntent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications200
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
01/27/2020421589819Open ↗
01/15/2020421891867Open ↗
01/15/2020421891867Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/28/2026Q00184915-I1Open ↗
08/27/2026Q00501183-I1Open ↗
08/27/2026Q00591219-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/28/2026Q00724828-P1Open ↗
09/28/2026Q00724828-P1Open ↗
09/28/2026Q00724828-P1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
02/03/2017421401931Open ↗
02/03/2017421401815Open ↗
Showing 2 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
07/24/2017440421429Open ↗
02/03/2017421401815Open ↗
02/03/2017421401931Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/28/2026Q00724828-P1Open ↗
09/25/2026Q00724812-P2Open ↗
09/23/2026Q01326689-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/24/2017440421429Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/24/2017440421429Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
01/21/2020421589819Open ↗
12/20/2019421589819Open ↗
05/10/2019421589800Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
06/24/2021421589800Open ↗
05/20/2021421589800Open ↗
01/18/2018440421429Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS4
10/19/2021421589800Open ↗
01/18/2018440421429Open ↗
01/18/2018440421429Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/23/2018421589800Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/25/2021421589828Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes7
05/17/2018421589819Open ↗
04/23/2018421589800Open ↗
01/10/2018421589800Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
01/09/2018421589800Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos51
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
08/27/2026Q00501183-I1Open ↗
08/26/2026Q00759287-P1Open ↗
08/26/2026Q00759287-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
01/09/2018421589800Open ↗
01/09/2018421589819Open ↗
02/03/2017421401815Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/27/2026Q00591219-I1Open ↗
08/26/2026Q00724828-I1Open ↗
08/24/2026Q00724812-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
04/02/2019421891867Open ↗
06/12/2018421589800Open ↗
04/23/2018421589800Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
01/15/2020421891867Open ↗
01/16/2018440421429Open ↗
10/24/2017421361056Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00591219-I1Open ↗
08/13/2026Q00501183-I1Open ↗
08/13/2026Q00724828-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/11/2021421269969Open ↗
07/24/2017440421429Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/24/2017440421429Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/11/2021421269969Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00724828-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/11/2021421269969Open ↗
07/24/2017440421429Open ↗
Showing 2 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
04/24/2018421589819Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/08/2021421269969Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/24/2018421589819Open ↗
▸Approvals, Objections & Sign-offs52
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
05/05/2022421269969Open ↗
02/01/2021421589828Open ↗
03/16/2020421589819Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/23/2018421589800Open ↗
10/24/2017421361056Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026Q01036119-I1Open ↗
08/13/2026Q01036119-P2Open ↗
08/13/2026Q01036119-P1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
01/09/2018421589800Open ↗
▸BISFINAL1
11/08/2021421269969Open ↗
▸Cost, Insurance & Ownership53
▸BISCOST AFFIDAVIT50
02/01/2021421589828Open ↗
03/16/2020421589819Open ↗
02/27/2020421589819Open ↗
Showing 3 of 50 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/09/2021421269969Open ↗
▸Filing & Intake Forms55
▸BISEFILING COVER SHEET26
04/11/2018421589800Open ↗
01/09/2018421589828Open ↗
01/09/2018421589800Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM16
01/21/2020421891867Open ↗
06/12/2018421401968Open ↗
01/18/2018440421429Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION10
01/27/2020421589819Open ↗
11/18/2019421589800Open ↗
07/18/2019421589819Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/24/2017440421429Open ↗
Showing 1 of 3 on file for this type
▸Other Documents7
▸BISGAS WELDER ANNUAL CERT : GAS-WELD3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM1
01/09/2018421589800Open ↗
▸DOB NOWDHCR Document1
08/17/2026Q01324031-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01042965-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01042965-I1Open ↗