BuildNYC
Elevator cooperative
St. George Tower & Grill CAMPUS
111 HICKS STREET · Brooklyn Heights · BIN 3001726
💬 Discuss this project
1929Year Built
30Stories
D4Building Class
R7-1Zoning
441,063 sfGross Floor Area
275Units
LL97 CoveredRent Stabilized6 Active Violations 4 unresolved · 2 paperwork only 2 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Stgeorge Tower & Grill Owners · 23,325 sf lot · 18.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofST. George Tower And Grill Owners CUnder Construction78p · 12 filings · 20 docs
Floor 30Unit PHUnder Construction11p · 5 filings · 20 docs
Floor 29ST. George Tower And Grill Owners C9p · 4 filings · 20 docs
Floor 28Unit 28BUnder Construction11p · 4 filings · 20 docs
Floor 27ST. George Tower And Grill Owners CUnder Construction8p · 2 filings · 15 docs
Floor 26ST. George Tower And Grill Owners C3p · 2 filings · 13 docs
Floor 25Unit 27J4p · 3 filings · 20 docs
Floor 24Unit 24E, Unit 24ABUnder Construction13p · 4 filings · 20 docs
Floor 23Unit 23B2 filings · 5 docs
Floor 22
Floor 21Unit 21F1p · 1 filing · 5 docs
Floor 20Unit 20F, Unit 20J4p · 3 filings · 15 docs
Floor 191p · 1 filing · 4 docs
Floor 18Unit 17M, Unit 18H, Unit 18K +111p · 5 filings · 20 docs
Floor 176p · 1 filing · 11 docs
Floor 16Unit 16D, Unit 16F, Unit 16G +1Under Construction24p · 4 filings · 20 docs
Floor 15Unit 15E5p · 2 filings · 11 docs
Floor 14Unit 14EUnder Construction4p · 1 filing · 8 docs
Floor 13
Floor 12Unit 11M2p · 1 filing · 6 docs
Floor 11
Floor 10Unit 10C, Unit 10E13p · 3 filings · 18 docs
Floor 9Unit 9E3p · 2 filings · 12 docs
Floor 8ST. George Tower And Grill Owners C4p · 2 filings · 13 docs
Floor 7Unit 7E, Unit 7L, Unit 7M +2Under Construction10p · 5 filings · 20 docs
Floor 6Unit 6A, Unit 6K, Unit 6P +1Under Construction20p · 3 filings · 20 docs
Floor 5Unit 5F, Unit 5BC, Unit 5MNUnder Construction14p · 4 filings · 20 docs
Floor 4ST. George Tower And Grill Owners CUnder Construction26p · 4 filings · 20 docs
Floor 33p · 1 filing · 13 docs
Floor 2St. George Hotel - Kings Club fire protectionUnder Construction86p · 6 filings · 20 docs
Floor 1St. George Hotel - Kings Club fire protectionUnder Construction88p · 8 filings · 20 docs
CellarST. George Tower And Grill Owners CUnder Construction88p · 8 filings · 20 docs
Sub-CellarSt. George TennisUnder Construction40p · 5 filings · 20 docs
BasementSt. George TennisUnder Construction12p · 2 filings · 20 docs
Sub-BasementST. George Tower And Grill Owners CUnder Construction82p · 6 filings · 20 docs
Site & exteriorST. George Tower And Grill Owners CUnder Construction58p · 6 filings · 20 docs
Filed — no permit issuedSuspended scaffold for facade work7p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St George Tower Grill Buildin46810/13/2026
St George Tower Owners2303/21/2026
St George Tower/Akam Associates203/21/2026
JMPB Enterprises103/22/2026
279 Troutman103/22/2026
18 Mercer Equity103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Malcon ConstructionGeneral Contractor2707/08/2026
Ceprine ConstructionScaffold1408/07/2026
Nice PlumbingPlumbing907/08/2026
SpireplastGeneral Contractor907/08/2026
DHS FracoScaffold707/08/2026
Adelphi Restorationspecialty_contractor707/08/2026
L.V. RemodelingGeneral Contractor507/08/2026
Cara Plumbing GroupPlumbing509/03/2026
G&B Plumbing & HeatingPlumbing407/08/2026
Wilman Custom DesignGeneral Contractor407/08/2026
Ajet ContractingGeneral Contractor407/08/2026
Mike's Custom InstallationGeneral Contractor407/08/2026
M.N.C. General ContractorsGeneral Contractor407/08/2026
Quality Building ConstrutionGeneral Contractor404/09/2026
Homepro General ContractingGeneral Contractor303/21/2026
Budget ConstructionGeneral Contractor303/21/2026
Construction XpertGeneral Contractor303/21/2026
Gild RenovationGeneral Contractor303/21/2026
A&M Building RemodelingGeneral Contractor206/28/2026
GJ PlumbingPlumbing207/08/2026
Diamond Era ConstructionGeneral Contractor203/21/2026
Redline ElectricElectrical203/22/2026
C.E. ElectricalElectrical203/21/2026
R & S Plumbing & HeatingPlumbing210/04/2026
MLZ General ConstructionGeneral Contractor107/01/2026
Morell BuildersGeneral Contractor104/09/2026
Overall RenovationGeneral Contractor107/08/2026
SHL BuildersGeneral Contractor107/04/2026
Star Renovations NYGeneral Contractor107/08/2026
Z S NY ImprovementGeneral Contractor109/19/2026
Dynamic Hoisting ScaffScaffold104/09/2026
All Hour Sewer Service CoPlumbing107/08/2026
Alma Plumbing SprinklerPlumbing108/20/2026
Arco Plumbing and HeatingFire Protection107/08/2026
A.R.L. Plumbing & HeatingPlumbing107/08/2026
G. Rollins Plumbing & HeatingPlumbing107/08/2026
Grushinsky Pipng & HeatingFire Protection110/01/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
Just Plumbing & HeatingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
PFL MechanicalPlumbing106/27/2026
Ascuatech ElectricalElectrical103/22/2026
Top Plumbing and HeatingPlumbing109/18/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Joey Electrical CoElectrical103/21/2026
Borrelli ElectricElectrical103/21/2026
CL ElectricalElectrical103/22/2026
Cresco ElectricalElectrical103/22/2026
Deluca JohnElectrical103/21/2026
Dennison ElectricElectrical103/22/2026
Emco Electric ServicesElectrical103/22/2026
Enterprise Electrical SystemsElectrical103/22/2026
Inter Connection ElectricElectrical103/21/2026
Delco ElectricalElectrical103/21/2026
MLS ElectricElectrical103/22/2026
NGM ElectricElectrical103/22/2026
Skowronski JeffElectrical103/21/2026
Spectrum ElectricElectrical103/22/2026
V&B Electrical ContngElectrical103/22/2026
Napstar ElectricElectrical103/21/2026
Blackstone Heating & ACGeneral Contractor107/08/2026
Foundations Interior DesignGeneral Contractor104/09/2026
G.A.M.C.N.YGeneral Contractor106/28/2026
GN Home ImprovementGeneral Contractor109/01/2026
Iceberg Mechanicalspecialty_contractor107/08/2026
JD InteriorsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sia Inspections73061310/15/2026
Soni Engineering Consulting9819110/09/2026
Outsource Special Inspection2827107/31/2026
H. A. Bader Consultants2332306/15/2026
Bealin Groups9869106/03/2026
Special Testing & Consulting16881005/27/2026
Michael House Architect7910105/13/2026
Jspecs9429105/04/2026
Lombardo Prof Engineering8566102/04/2026
Autographic Co1579310/23/2025
Piro Studio7503410/15/2025
Quality Testing7344107/31/2025
Saharat Surattanont Architects1779203/03/2025
Sanark Consulting Engineering6824107/23/2024
March Chadwick, Architect2253107/11/2024
Forum Engineering, P907306/19/2024
Francisco D. Perez PE3306205/24/2024
Buildtech Engineering6369201/25/2024
Catalpa Special Inspectio2004204/20/2023
Christian L. Martos Engineering5965102/27/2023
Integrity Consulting Service666108/16/2022
Munyc Architecture5224105/24/2022
Ageloff & Associates1085104/18/2022
Hamann Engineering4949103/15/2022
Iva Filipovic Architect3142102/15/2022
Joseph Martines PE1428201/03/2022
HRF Services5616206/15/2021
David Jhee Architect7860102/23/2021
D'Antonio Consulting Engineering931111/06/2020
Collado Engineering3432210/25/2020
Building Lifecycle
All (300)Filed (44)Permit Issued (62)Signed Off (26)Facade (FISP) (14)Violation (13)Inspection (32)Objection (79)Special Inspection (30)
10/15/2026
Filed — Alteration
Application filed for the modification and installation of existing HVAC system. Filed in conjunction with both ALT CO DOB NOW # B00820529-I1 and B01195242-I1 (GC). No change in use, egress or occupancy.
B01202528-P5
10/14/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
10/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOFIA KAPELYAN
10/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOFIA KAPELYAN
10/14/2026
Special inspection requirement — Heating Systems
SOFIA KAPELYAN
10/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOFIA KAPELYAN
10/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOFIA KAPELYAN
10/14/2026
Special inspection requirement — Maintenance information
SOFIA KAPELYAN
10/09/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
B01470760-I1
10/09/2026
Filed — Alteration
B01433984-I1
10/08/2026
Violation issued (ECB, open)
Construction
10/07/2026
Special inspection requirement — Post-installed Anchors
nayan soni
10/07/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
10/02/2026
Filed — Alteration
Application filed for the modification and installation of existing HVAC system. Filed in conjunction with both ALT CO DOB NOW # B00820529-I1 and B01195242-I1 (GC). No change in use, egress or occupancy.
B01202528-P3
09/30/2026
Permit issued — Sprinklers
B01203255-I1-EW-SP
09/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2026
Special inspection requirement — Final
SOFIA KAPELYAN
09/30/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SOFIA KAPELYAN
09/30/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SOFIA KAPELYAN
09/30/2026
Special inspection requirement — Mechanical Systems
SOFIA KAPELYAN
09/18/2026
Permit issued — General Construction
B01412148-I1-GC
09/17/2026
Filed — Alteration
Application filed for the modification and installation of existing HVAC system. Filed in conjunction with both ALT CO DOB NOW # B00820529-I1 and B01195242-I1 (GC). No change in use, egress or occupancy.
B01202528-P2
09/17/2026
Permit issued — Plumbing
B01412148-S1-PL
09/10/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00861009-I1
09/04/2026
Permit issued — Boiler Equipment
B01202528-S1-BE
09/02/2026
Permit issued — Plumbing
B00317440-I1-PL
09/02/2026
Permit issued — Plumbing
B00323053-I1-PL
08/31/2026
Permit issued — General Construction
B01408758-I1-GC
08/31/2026
Objection resolved — Addressed
08/25/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
B01345678-I1
08/19/2026
Permit issued — Plumbing
B01358320-S1-PL
08/14/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SOFIA KAPELYAN
08/14/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SOFIA KAPELYAN
08/14/2026
Special inspection requirement — Mechanical Systems
SOFIA KAPELYAN
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Special inspection requirement — Final
SOFIA KAPELYAN
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Permit issued — Sidewalk Shed
B00861009-I1-SH
07/31/2026
Filed — Alteration
INTERIOR PLUMBING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCCUPANCY OR USE.
B01412148-S1
07/31/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2026
Filed — Alteration
INTERIOR PLUMBING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCCUPANCY OR USE.
B01412148-I1
07/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/21/2026
Special inspection requirement — Lighting in dwelling units
Megan Doran
07/21/2026
Special inspection requirement — Lighting controls
Megan Doran
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Megan Doran
07/21/2026
Special inspection requirement — Final
Megan Doran
07/16/2026
Cycle 9 facade report signed — SWARMP
07/16/2026
Special inspection requirement — Final
07/15/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SOFIA KAPELYAN
07/14/2026
Special inspection requirement — Final
SOFIA KAPELYAN
07/14/2026
Special inspection requirement — Mechanical Systems
SOFIA KAPELYAN
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedGrushinsky Pipng & Heating09/30/2026
DOB NOWGeneral ConstructionPermit IssuedZ S NY Improvement09/18/2026
DOB NOWPlumbingPermit IssuedTop Plumbing and Heating09/17/2026
DOB NOWBoiler EquipmentPermit IssuedR & S Plumbing & Heating09/04/2026
DOB NOWPlumbingPermit IssuedCara Plumbing Group09/02/2026
DOB NOWPlumbingPermit IssuedCara Plumbing Group09/02/2026
DOB NOWGeneral ConstructionPermit IssuedGN Home Improvement08/31/2026
DOB NOWPlumbingPermit IssuedAlma Plumbing Sprinkler08/19/2026
DOB NOWSidewalk ShedSigned-offCeprine Construction08/06/2026
DOB NOWGeneral ConstructionPermit IssuedSHL Builders07/02/2026
DOB NOWGeneral ConstructionPermit IssuedMLZ General Construction06/29/2026
DOB NOWGeneral ConstructionPermit IssuedA&M Building Remodeling06/22/2026
DOB NOWGeneral ConstructionPermit IssuedM.N.C. General Contractors06/18/2026
DOB NOWPlumbingSigned-offPFL Mechanical05/27/2026
DOB NOWGeneral ConstructionPermit IssuedOverall Renovation05/20/2026
DOB NOWSidewalk ShedSigned-offCeprine Construction05/12/2026
DOB NOWGeneral ConstructionPermit IssuedA&M Building Remodeling04/24/2026
DOB NOWPlumbingPermit IssuedNice Plumbing04/10/2026
DOB NOWGeneral ConstructionPermit IssuedSpireplast04/02/2026
DOB NOWGeneral ConstructionSigned-offQuality Building Construt03/23/2026
DOB NOWSupported ScaffoldPermit IssuedDynamic Hoisting Scaff02/19/2026
DOB NOWSuspended ScaffoldSigned-offQuality Building Construction02/05/2026
DOB NOWGeneral ConstructionPermit IssuedMNC General Contracting01/28/2026
DOB NOWGeneral ConstructionPermit IssuedMorell Builders01/23/2026
DOB NOWPlumbingSigned-offG. Rollins Plumbing & Heating01/20/2026
DOB NOWStructuralPermit IssuedMNC General Contracting11/13/2025
DOB NOWSupported ScaffoldPermit IssuedDHS Fraco11/06/2025
DOB NOWPlumbingPermit IssuedR & S Plumbing & Heating10/22/2025
DOB NOWMechanical SystemsPermit IssuedGamcny10/22/2025
DOB NOWMechanical SystemsPermit IssuedFoundations Interior Desi09/09/2025
DOB NOWPlumbingSigned-offNice Plumbing09/05/2025
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY09/05/2025
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY09/05/2025
DOB NOWGeneral ConstructionSigned-offSpireplast08/25/2025
DOB NOWStructuralSigned-offMalcon Construction08/05/2025
DOB NOWPlumbingSigned-offTVS Mechanical07/16/2025
DOB NOWSupported ScaffoldPermit IssuedCeprine Construction07/15/2025
DOB NOWSuspended ScaffoldPermit IssuedQuality Building Construction06/17/2025
DOB NOWGeneral ConstructionPermit IssuedMNC General Contracting06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offDHS Fraco05/29/2025
+ 60 more permits on file
3 projects · most recent 10/15/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2026Permit IssuedG.A.M.C.N.YHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PVFY-P24NAMU-E1,PEFY-P48NMHU-E2,PLFY-P05NFMU-E,PEFY-P72NMHSU-E, PKFY-P118NLMU-ER1.TH,PLFY-P18NFMU-E 4 BTU ×82
PUHY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×8
PURY-EP168TNU-A1 168,000 BTU · Vrf Outdoor ×6
PURY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×4
PUHY-EP72TNU-A1 72,000 BTU · Vrf Outdoor ×2
PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×2
PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×2
PURY-EP168TNU-A4 168,000 BTU ×2
PURY-EP336TSNU-A1 336,000 BTU · Vrf Outdoor ×2
PUHY-EP288TSNU-A1 288,000 CFM · Vrf Outdoor ×1
PUHY-EP360TSNU-A1 360,000 BTU · Vrf Outdoor ×1
PURY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×1
PURY-EP240TSNU-A1 240,000 BTU · Vrf Outdoor ×1
Dectron DS-020-NS-I-G3NB1302N0C3BN3H 48,000 BTU ×2
DS-025-NS-I-G3NT1182N0C3BN3H 12,000 BTU · Condensing Unit ×2
DS-020-NS-I-G3NB1302N0C3BN3H / NG-V-01 48,000 BTU · Other ×1
DS-025-NS-I-G3NT1182N0C3BN3H / NG-V-01 60,000 BTU · Other ×1
Ventilation
Mitsubishi Electric HE20INH 1,200 CFM · Erv ×2
LGH-F1200RVX2-E 1,200 CFM · Erv ×3
LGH-F940RVX2-E 940 CFM · Erv ×3
10/15/2025Signed-offSpireplastAir Conditioning Systems
Cooling
Lg LG type floor console unit Model #LQN-090-HV4 300 CFM · Vrf Indoor ×1
LG type floor console unit Model #LQN-120-HV4 400 CFM · Vrf Indoor ×1
LG type multi "F" max heat pump Model #LMU-24-3HV 900 CFM · Split System ×1
11/06/2020——Air Conditioning Systems
Cooling
M3 Air Products VCU-C-030-1-LX 30,000 BTU · Condensing Unit ×1
1 project · most recent 07/01/2025
FiledStatusContractorScope
07/01/2025Permit IssuedGrushinsky Pipng & Heating582 heads
7 projects · most recent 07/31/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/31/2026Permit IssuedTop Plumbing and HeatingGas, Water/Sanitary
06/15/2026Permit IssuedNice PlumbingGas, Water/Sanitary
05/26/2026Permit IssuedR & S Plumbing & HeatingGas, Water/Sanitary
03/19/2026Permit IssuedAlma Plumbing SprinklerWater/Sanitary
11/10/2025Signed-offAmw PlumbingGas, Water/Sanitary
10/15/2025Signed-offNice PlumbingGas, Water/Sanitary
07/01/2025———
25 projects · most recent 10/13/2026
General Wiring
FiledStatusContractorScope
10/13/2026Permit IssuedLCJ Electrical ContractorsGeneral Wiring
09/30/2026Permit IssuedA+ Electric of Greater NY275 meters, 1 new_meters
09/28/2026Permit IssuedStability Electric EnterprisesGeneral Wiring
09/16/2026Permit IssuedDenmar ElectricGeneral Wiring
08/20/2026CompleteHigh Quality Electric of NYC—
07/22/2026CompleteA+ Electric of Greater NYGeneral Wiring
07/15/2026Permit IssuedCMY ElectricalGeneral Wiring
05/18/2026CompleteKJK ElectricGeneral Wiring
05/12/2026Permit IssuedSuper Charged ElectricGeneral Wiring
05/01/2026Permit IssuedA+ Electric of Greater NYGeneral Wiring
03/21/2026Permit IssuedRedline ElectricGeneral Wiring
02/19/2026CompleteAscuatech Electrical—
01/07/2026Permit IssuedNet Power ElectricGeneral Wiring
12/05/2025Permit IssuedN.Z. Pilgrim ElectricGeneral Wiring
10/16/2025Permit IssuedPdi NYC ElectricGeneral Wiring
3 projects · most recent 07/31/2026
Steel
FiledStatusContractorScope
07/31/2026Permit IssuedZ S NY Improvement1 scope_items
10/16/2025Permit IssuedMNC General ContractingSteel
04/23/2025Signed-offMalcon ConstructionSteel
3 projects · most recent 02/19/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/19/2026Permit IssuedDynamic Hoisting ScaffScaffold
12/29/2025Permit IssuedDHS FracoScaffold
08/01/2023Signed-offCeprine ConstructionSidewalk Shed
2 projects · most recent 07/31/2026
Tenant Protection Plan 72 Hour Suspended Scaffold
FiledStatusContractorScope
07/31/2026Permit IssuedZ S NY ImprovementTenant Protection Plan 72 Hour
02/04/2026Signed-offQuality Building ConstructionSuspended Scaffold
3 projects · most recent 10/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/09/2026——Suspended Scaffold (SC)
02/04/2026Signed-offQuality Building ConstructionSuspended Scaffold (SC)
05/20/2024Permit IssuedQuality Building ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 49
DateTypeResultReport
10/14/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 49.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/14/2026Maintenance informationSOFIA KAPELYANenergy_progress
10/14/2026HVAC-R and service water heating equipmentSOFIA KAPELYANenergy_progress
10/14/2026Heating SystemsSOFIA KAPELYANspecial
10/14/2026Fire-Resistant Penetrations and JointsSOFIA KAPELYANspecial
10/14/2026HVAC-R and service water piping design and insulationSOFIA KAPELYANenergy_progress
10/14/2026Tenant Protection Plan Compliance—special
10/14/2026HVAC-R and service water heating system controlsSOFIA KAPELYANenergy_progress
10/07/2026Post-installed Anchorsnayan sonispecial
10/07/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
09/30/2026High Temperature Hot Water Piping (Welding)SOFIA KAPELYANspecial
09/30/2026Exhaust and Vent Systems in Plenums and DuctsSOFIA KAPELYANspecial
09/30/2026Tenant Protection Plan Compliance—special
09/30/2026Mechanical SystemsSOFIA KAPELYANspecial
09/30/2026FinalSOFIA KAPELYANprogress
08/14/2026High Temperature Hot Water Piping (Welding)SOFIA KAPELYANspecial
08/14/2026Mechanical SystemsSOFIA KAPELYANspecial
08/14/2026Tenant Protection Plan Compliance—special
08/14/2026FinalSOFIA KAPELYANprogress
08/14/2026Exhaust and Vent Systems in Plenums and DuctsSOFIA KAPELYANspecial
07/21/2026FinalMegan Doranprogress
07/21/2026Lighting controlsMegan Doranenergy_progress
07/21/2026Energy Code Compliance InspectionsMegan Doranprogress
07/21/2026Lighting in dwelling unitsMegan Doranenergy_progress
07/16/2026Final—progress
07/14/2026High Temperature Hot Water Piping (Welding)SOFIA KAPELYANspecial
Latest 25 of 150.
▾Documents — 2,444 on file (BIS + DOB NOW)
▸Plans & Drawings103
▸DOB NOWPlans/Sketch90
09/03/2026B01402242-I1Request digital key ↗
09/01/2026B00472631-I1Request digital key ↗
09/01/2026B00513178-I1Request digital key ↗
Showing 3 of 90 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00187496-I1Request digital key ↗
09/02/2026B00297423-I1Request digital key ↗
09/02/2026B00317440-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00348130-I1Request digital key ↗
09/02/2026B00323046-I1Request digital key ↗
09/02/2026B00410347-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00472631-I1Request digital key ↗
09/01/2026B00470422-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00323057-I1Request digital key ↗
▸Applications & Permits481
▸BISWORK PERMIT APPLICATION198
07/09/2025321589438Open ↗
07/17/2023340724808Open ↗
06/12/2023340721776Open ↗
Showing 3 of 198 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION178
08/04/2023340721776Open ↗
08/02/2023340721776Open ↗
08/01/2023321589438Open ↗
Showing 3 of 178 on file for this type
▸DOB NOWLPC Approval/Permit84
10/17/2026B01202528-P5Open ↗
10/05/2026B01202528-P3Open ↗
09/03/2026B01402242-I1Open ↗
Showing 3 of 84 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPLACE OF ASSEMBLY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications560
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION219
10/07/2021321444932Open ↗
Showing 1 of 219 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature101
10/17/2026B01202528-P5Open ↗
10/05/2026B01202528-P3Open ↗
09/02/2026B00410347-I1Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWProgress Inspector Seal & Signature75
10/17/2026B01202528-P5Open ↗
10/17/2026B01202528-P5Open ↗
10/17/2026B01202528-P5Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature70
10/17/2026B01202528-P5Open ↗
10/17/2026B01202528-P5Open ↗
10/14/2026B01470760-I1Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment110
▸BISSELF-CERT PLUMBING NOTICE40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISSCHEDULE B - PLUMBING33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS7
11/26/2021321444932Open ↗
11/26/2021321444932Open ↗
11/26/2021321444932Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
11/26/2021321444932Open ↗
11/10/2021321444932Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection46
▸BISTenant Protection Plan and Notes31
06/14/2023321749355Open ↗
11/05/2021320492301Open ↗
Showing 2 of 31 on file for this type
▸DOB NOWTenant Protection Plan11
09/02/2026B00410347-I1Open ↗
Showing 1 of 11 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
08/27/2026B00820529-P1Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos175
▸DOB NOWDEP ACP-5: Asbestos Assessment Report78
10/17/2026B01202528-P5Open ↗
10/05/2026B01202528-P3Open ↗
09/30/2026B01412148-I1Open ↗
Showing 3 of 78 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
07/13/2023340724808Open ↗
04/06/2023340721776Open ↗
Showing 2 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance162
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS70
10/07/2021321444932Open ↗
Showing 1 of 70 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS34
05/25/2022321731060Open ↗
12/14/2021321731060Open ↗
11/12/2021321444932Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
11/30/2022322037461Open ↗
06/16/2022321731060Open ↗
05/25/2022321731060Open ↗
Showing 3 of 25 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
08/31/2026B00677641-I1Open ↗
Showing 1 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC EXEMPTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports56
▸BISTECHNICAL REPORT: RESPONSIBILITY50
06/23/2025321589438Open ↗
07/13/2023340724808Open ↗
04/06/2023340721776Open ↗
Showing 3 of 50 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
06/23/2025321589438Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
▸Approvals, Objections & Sign-offs311
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST100
12/09/2022322037461Open ↗
06/17/2022321731060Open ↗
04/12/2022321999931Open ↗
Showing 3 of 100 on file for this type
▸BISLANDMARKS APPROVAL94
12/18/2020340724808Open ↗
Showing 1 of 94 on file for this type
▸BISADMINISTRATIVE OBJECTIONS52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION41
11/08/2021321731060Open ↗
Showing 1 of 41 on file for this type
▸BISLANDMARKS SIGNOFF10
12/02/2022322037461Open ↗
04/12/2022321999931Open ↗
03/21/2022321789178Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL4
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
10/14/2026B01470760-I1Open ↗
▸Cost, Insurance & Ownership162
▸BISCOST AFFIDAVIT155
12/06/2022322037461Open ↗
12/06/2022322037461Open ↗
11/30/2022322037461Open ↗
Showing 3 of 155 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
11/30/2022322037461Open ↗
04/11/2022321999931Open ↗
03/18/2022321789178Open ↗
Showing 3 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms178
▸BISEFILING COVER SHEET75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISADDITIONAL INFORMATION62
07/26/2023340721776Open ↗
10/20/2022322037461Open ↗
02/16/2022340724808Open ↗
Showing 3 of 62 on file for this type
▸BISBOROUGH INTAKE FORM30
03/03/2021322037461Open ↗
03/03/2021322037461Open ↗
Showing 2 of 30 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Other Documents50
▸DOB NOWProof of Historic Building20
10/05/2026B01202528-P3Open ↗
08/29/2026B00736849-I1Open ↗
08/27/2026B00820529-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDHCR Document7
08/29/2026B00736849-I1Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWManufacturer's Specifications6
10/14/2026B01470760-I1Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWCalculations6
10/14/2026B01470760-I1Open ↗
Showing 1 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/17/2022321589438Open ↗
02/03/2021302185427Open ↗
Showing 2 of 5 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
08/27/2026B00820529-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHydrostatic Pressure Test1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type