← Back
Three families
111 MAC DONOUGH STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3053392
💬 Discuss this project
1872Year Built
3Stories
C0Building Class
R6BZoning
3,780 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 3,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
Architecture
Floor 31 filing · 5 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXCELLENT CONTRACTING1007/08/2026
J G CONSTRUCTION SRVCS1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENITH HOME INSPECTIONS111/08/2023
MAZ DESIGN LLC102/17/2022
ASHRAF CORP111/03/2021
MOHAMMAD AHEAD, PE109/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC403/21/2026
MA ENGINEERING P C203/21/2026
MAZ DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCELLENT CONTRACTING LLCGeneral Contractor707/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor707/08/2026
Building Lifecycle
All (33)Filed (4)Permit Issued (6)Signed Off (3)Violation (18)Special Inspection (2)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
03/03/2025
Signed off — Alteration
APPLICATION FILING TO REPLACE EXISTING ROOF CORNICE AND REPAIR EXISTING BROWNSTON FRONT FACADE AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00613460-I1
11/27/2024
Violation issued (HPD, closed)
I
04/11/2024
Violation issued (HPD, closed)
A
03/15/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00950505-I1
11/09/2023
Permit issued — Supported Scaffold
B00950505-I1-SF
11/08/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00950505-I1
10/13/2023
Permit issued — General Construction
B00650529-I1-GC
08/31/2023
Signed off — Alteration
B00595678-I1
03/23/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
07/08/2022
Violation issued (ECB, closed)
Construction
04/18/2022
Permit issued — General Construction
B00650529-I1-GC
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
02/17/2022
Filed — Alteration
APPLICATION FILING FOR MINOR REPAIR AT 3RD FLOOR APARTMENT IN CONNECTION WITH LPC DOCKET#LPC-22-04981 & DOB NOW JOB# B00613460 AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
B00650529-I1
12/19/2021
Special inspection requirement — Final
MD SHAHJADA
11/15/2021
Permit issued — General Construction
B00613460-I1-GC
11/03/2021
Filed — Alteration
APPLICATION FILING TO REPLACE EXISTING ROOF CORNICE AND REPAIR EXISTING BROWNSTON FRONT FACADE AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00613460-I1
10/17/2021
Special inspection requirement — Final
MOATEZ ALI
09/20/2021
Filed — Alteration
B00595678-I1
09/20/2021
Permit issued — Sidewalk Shed
B00595678-I1-SH
09/20/2021
Permit issued — Sidewalk Shed
B00595678-I1-SF
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
08/04/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2019
Violation issued (HPD, closed)
I
10/18/2018
Violation issued (HPD, closed)
I
11/27/2017
Violation issued (HPD, closed)
I
11/10/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
02/23/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS11/09/2023
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT CONTRACTING LLC10/13/2023
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT CONTRACTING LLC04/18/2022
DOB NOWGeneral ConstructionSigned-offEXCELLENT CONTRACTING LLC11/15/2021
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS09/20/2021
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS09/20/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
12/19/2021FinalMD SHAHJADAprogress
10/17/2021FinalMOATEZ ALIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00595678-I1Request digital key ↗
08/31/2026B00613460-I1Request digital key ↗
08/31/2026B00650529-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/31/2026B00613460-I1Open ↗
08/13/2026B00650529-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00595678-I1Open ↗
08/31/2026B00613460-I1Open ↗
08/13/2026B00650529-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00650529-I1Open ↗
08/23/2026B00613460-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00613460-I1Open ↗
08/13/2026B00650529-I1Open ↗