← Back
BuildNYC
Public elementary, junior or senior high
Morris High School
1110 BOSTON ROAD · BIN 2004526
💬 Discuss this project
1901Year Built
5Stories
W1Building Class
R6Zoning
150,000 sfGross Floor Area
1Units
LL97 Covered31 Active Violations 1 unresolved · 30 paperwork only 7 likely answered 2 old, status unconfirmed ▸FISP: No Report Filed
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 144,682 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMorris HS, Bronx International (morris) H.S.Under Construction3p · 2 filings · 19 docs
AtticSupplemental cooling system for elevator machine room1 filing · 6 docs
Floor 5Morris Collab HS Tech & Human-X, HS for Violin and Dance +1Under Construction47p · 3 filings · 18 docs
Floor 4
Floor 3Bronx International (morris) H.S.32p · 2 filings · 20 docs
Floor 2Morris Collab HS Tech & Human-X, Bronx International (morrisUnder Construction36p · 2 filings · 18 docs
Floor 1Bronx International (morris) H.S.Under Construction33p · 4 filings · 20 docs
Sub-BasementMorris High School3 filings · 14 docs
Site & exteriorP.S -403x, Morris HSUnder Construction49p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority24409/13/2026
New York City Public School310/16/2026
NYC Department of Education203/22/2026
Skanska103/21/2026
NYC School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Precision 3Sixty NYC7203/21/2026
Caso Associates2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.T.J. Electrical Cospecialty_contractor1207/08/2026
WDFGeneral Contractor1107/08/2026
Bagiana ConstructionGeneral Contractor809/12/2026
Bagiana ConstructionScaffold409/10/2026
Varsity Plumbing and HeatingPlumbing407/08/2026
Thermo Tech Mechanical I*specialty_contractor304/09/2026
WDFFire Protection307/08/2026
WDFPlumbing207/08/2026
Major ContractingGeneral Contractor207/08/2026
Kel-Tech ConstructionScaffold207/08/2026
A&H Express Plumbing & HeatingPlumbing207/04/2026
Panili Plumbing & HeatingPlumbing207/08/2026
RNH Electric CompanyElectrical103/21/2026
JK ElectricalElectrical103/22/2026
J&H Electrical ContElectrical103/22/2026
Core Electric & CommunicationElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Prince ElectricElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/21/2026
Cad Electrical ContractingElectrical103/21/2026
Alex & Bernhard ElectricElectrical103/21/2026
Levinson & Santoro ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351408/25/2026
Tectonic Engineering Cons1061105/07/2026
MP Engineers & Architects1438104/04/2023
Twin Peaks3172909/02/2022
Building Lifecycle
All (228)Filed (54)Permit Issued (43)Facade (FISP) (9)Violation (60)Objection (32)Special Inspection (30)
10/15/2026
Filed — Alteration
The scope of work includes all labor, materials, and equipment necessary to complete installation of air handling units in basement mechanical rooms, outside of auditorium on the east side and first floor Auditorium.
X01474529-I1
10/14/2026
Special inspection requirement — Ventilation and air distribution system
Asma Hashmi
10/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
10/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
10/14/2026
Special inspection requirement — Final
10/14/2026
Special inspection requirement — Post-installed Anchors
10/14/2026
Special inspection requirement — Shutoff dampers
Asma Hashmi
10/14/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
10/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
10/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
10/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
10/14/2026
Special inspection requirement — Mechanical Systems
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/14/2026
Special inspection requirement — Maintenance information
Asma Hashmi
10/14/2026
Special inspection requirement — Electrical motors and elevators
Asma Hashmi
09/10/2026
Permit issued — General Construction
X00838353-I1-GC
09/09/2026
Permit issued — General Construction
X00838353-S3-GC
09/09/2026
Permit issued — Construction Fence
X01135705-I1-FN
08/25/2026
Filed — Alteration
Installation of Supplemental Cooling Split Ac for Kitchen Space in Basement Along with Outdoor Condensing unit outside fenced area near Jackson Avenue.
X01317442-P1
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/07/2026
Special inspection requirement — Final
Asma Hashmi
08/07/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/07/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Construction
06/26/2026
Filed — Alteration
Installation of fan coil units for basement, first floor and second floor offices.
X01410804-I1
05/18/2026
Permit issued — Supported Scaffold
X01394694-I1-SF
05/15/2026
Permit issued — Construction Fence
X01394686-I1-FN
05/13/2026
Objection resolved — Addressed
05/11/2026
Permit issued — Plumbing
X00846765-S2-PL
05/11/2026
Permit issued — General Construction
X00846765-S1-GC
05/08/2026
Objection raised — Other
05/07/2026
Filed — Alteration
FN/PS400X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY FENCE)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW#145886, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01394686-I1
05/07/2026
Filed — Alteration
SF/PS400X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY SCAFFOLD)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW#145886, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01394694-I1
05/06/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
04/02/2026
Permit issued — Mechanical Systems
X00846765-I1-MS
03/03/2026
Permit issued — Construction Fence
X01135705-I1-FN
02/19/2026
Permit issued — Plumbing
X00838353-S2-PL
02/10/2026
Permit issued — Mechanical Systems
X00846765-I1-MS
01/23/2026
Permit issued — General Construction
X00838353-S3-GC
01/23/2026
Permit issued — General Construction
X00838353-I1-GC
11/26/2025
Objection raised — Other
11/26/2025
Objection resolved — Addressed
11/26/2025
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
11/25/2025
Objection raised — Other
11/25/2025
Objection resolved — Addressed
11/24/2025
Filed — Alteration
Reconstruction concrete retaining wall segment damaged during construction. Replace wall cap. Provide new concrete pier for fence posts.
X00838353-P5
11/17/2025
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Filed — Alteration
Installation of Supplemental Cooling Split Ac for Kitchen Space in Basement Along with Outdoor Condensing unit outside fenced area near Jackson Avenue.
X01317442-I1
11/11/2025
Special inspection requirement — Final
Asma Hashmi
11/11/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
Latest 60 of 228 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBagiana Construction09/10/2026
DOB NOWGeneral ConstructionPermit IssuedBagiana Construction09/09/2026
DOB NOWConstruction FencePermit IssuedBagiana Construction09/09/2026
DOB NOWSupported ScaffoldPermit IssuedKel-Tech Construction05/18/2026
DOB NOWConstruction FencePermit IssuedKel-Tech Construction05/15/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating05/11/2026
DOB NOWGeneral ConstructionPermit IssuedMajor Contracting05/11/2026
DOB NOWMechanical SystemsPermit IssuedThermo Tech Mechanical I*04/02/2026
DOB NOWConstruction FencePermit IssuedBagiana Construction03/03/2026
DOB NOWPlumbingPermit IssuedPanili Plumbing & Heating02/19/2026
DOB NOWMechanical SystemsPermit IssuedThermo Tech Mechanical I*02/10/2026
DOB NOWGeneral ConstructionPermit IssuedBagiana Construction01/23/2026
DOB NOWGeneral ConstructionPermit IssuedBagiana Construction01/23/2026
DOB NOWMechanical SystemsPermit IssuedThermo Tech Mechanical I*05/30/2025
DOB NOWGeneral ConstructionPermit IssuedMajor Contracting05/16/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating05/16/2025
DOB NOWPlumbingPermit IssuedPanili Plumbing & Heating02/05/2025
DOB NOWGeneral ConstructionPermit IssuedBagiana Construction01/21/2025
DOB NOWGeneral ConstructionPermit IssuedBagiana Construction01/21/2025
DOB NOWConstruction FencePermit IssuedBagiana Construction01/21/2025
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating07/14/2023
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating07/10/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. Electrical Co02/01/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. Electrical Co02/01/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. Electrical Co02/01/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. Electrical Co02/01/2023
DOB NOWMechanical SystemsPermit IssuedWDF08/16/2022
DOB NOWMechanical SystemsPermit IssuedWDF08/16/2022
DOB NOWSprinklersPermit IssuedWDF08/16/2022
DOB NOWPlumbingPermit IssuedWDF08/15/2022
DOB NOWMechanical SystemsPermit IssuedWDF08/10/2022
DOB NOWGeneral ConstructionPermit IssuedA.T.J. Electrical Co08/08/2022
DOB NOWSprinklersPermit IssuedWDF08/05/2022
DOB NOWMechanical SystemsPermit IssuedWDF08/05/2022
DOB NOWGeneral ConstructionPermit IssuedA.T.J. Electrical Co08/03/2022
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating07/22/2022
DOB NOWPlumbingPermit IssuedWDF07/21/2022
DOB NOWSprinklersPermit IssuedWDF07/21/2022
DOB NOWMechanical SystemsPermit IssuedWDF07/14/2022
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating07/08/2022
+ 53 more permits on file
3 projects · most recent 10/15/2026
Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2026——Air Conditioning Systems, Refrigeration Systems
Cooling
Daikin CAH024GDCM 10,000 CFM · Ahu ×2
Refrigeration
Daikin DCSA025 275,510 BTU · Condensing Unit ×2
08/25/2026——Air Conditioning Systems
Cooling
Lg ZRNU363SRAA 3 tons · Vrf Indoor ×4
ZRNU243SKSA 2 tons · Vrf Outdoor ×2
LG Multi V I Model #: ZRUM192BTE6 16 tons · Vrf Outdoor ×1
06/26/2026——Air Conditioning Systems
Cooling
Daikin DAIKIN FCHC102A 5,100 BTU · Vrf Indoor ×5
DAIKIN FCHH102A 5,100 BTU · Vrf Indoor ×3
DAIKIN FCHH106A 14,900 BTU · Fan Coil Indoor ×1
3 projects · most recent 07/28/2022
Sprinkler System
FiledStatusContractorScope
07/28/2022Permit IssuedWDF5 heads
07/28/2022Permit IssuedWDFSprinkler System
07/14/2022Permit IssuedWDF—
6 projects · most recent 11/24/2025
Water/Sanitary Storm Gas
FiledStatusContractorScope
11/24/2025Permit IssuedPanili Plumbing & HeatingStorm, Water/Sanitary
04/05/2023Permit IssuedA&H Express Plumbing & HeatingGas, Water/Sanitary
09/02/2022Permit IssuedWDFWater/Sanitary
07/28/2022Permit IssuedWDFWater/Sanitary
07/12/2022Permit IssuedVarsity Plumbing and HeatingWater/Sanitary
02/15/2022Permit IssuedVarsity Plumbing and HeatingWater/Sanitary
25 projects · most recent 07/02/2026
General Wiring Lighting
FiledStatusContractorScope
07/02/2026Permit IssuedA & S ElectricGeneral Wiring
05/09/2026Permit IssuedTelecommunication Electric CoGeneral Wiring
11/17/2025Permit IssuedCharan Electrical Enterp'sGeneral Wiring
07/20/2025CompleteJK ElectricalLighting
05/21/2025Permit IssuedLabco Eletrt ContngGeneral Wiring
04/29/2025CompleteJamcob ElectricGeneral Wiring
04/21/2025Permit IssuedJ&H Electrical ContGeneral Wiring
01/13/2025Permit IssuedDorion Norton Electrical ContGeneral Wiring
11/19/2024Permit IssuedSezekcol ElectricLighting
11/02/2024CompleteCore Electric MEP IndsLighting
10/18/2023CompleteKatco ElectricGeneral Wiring
01/09/2023CompleteMNBC ElectricalGeneral Wiring
08/05/2022CompleteCore Electric MEP IndsGeneral Wiring
06/29/2022CompleteA.T.J. Electrical CoGeneral Wiring
05/26/2022CompleteA.T.J. Electrical CoGeneral Wiring
2 projects · most recent 11/24/2025
Concrete
FiledStatusContractorScope
11/24/2025Permit IssuedBagiana ConstructionConcrete
07/28/2022Permit IssuedA.T.J. Electrical Co2 scope_items
3 projects · most recent 05/07/2026
Fence Scaffold
FiledStatusContractorScope
05/07/2026Permit IssuedKel-Tech ConstructionScaffold
05/07/2026Permit IssuedKel-Tech ConstructionFence
11/19/2024Permit IssuedBagiana ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
10/14/2026Exhaust and Vent Systems in Plenums and Ducts—special
10/14/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
10/14/2026Final—progress
10/14/2026Energy Code Compliance InspectionsAsma Hashmiprogress
10/14/2026Mechanical Systems—special
10/14/2026Post-installed Anchors—special
10/14/2026Fire-Resistant Penetrations and Joints—special
10/14/2026Maintenance informationAsma Hashmienergy_progress
10/14/2026Electrical motors and elevatorsAsma Hashmienergy_progress
10/14/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
10/14/2026Ventilation and air distribution systemAsma Hashmienergy_progress
10/14/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
10/14/2026Duct leakage testing, insulation and designAsma Hashmienergy_progress
10/14/2026Shutoff dampersAsma Hashmienergy_progress
08/07/2026FinalAsma Hashmiprogress
08/07/2026Post-installed AnchorsAsma Hashmispecial
08/07/2026Mechanical SystemsAsma Hashmispecial
08/07/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
05/06/2026Post-installed AnchorsGEORGE GHEBRYALspecial
11/26/2025Subgrade InspectionsGEORGE GHEBRYALspecial
11/17/2025Subgrade InspectionsGEORGE GHEBRYALspecial
11/11/2025Mechanical SystemsAsma Hashmispecial
11/11/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
11/11/2025Post-installed AnchorsAsma Hashmispecial
11/11/2025FinalAsma Hashmiprogress
Latest 25 of 87.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Morris High SchoolEducationSub-basement
Project X01410804 Alteration · Approved · 06/26/2026
Project X01317442 Alteration · Approved · 11/13/2025
Morris HSEducationFloor 5
Project X01394686 Alteration · Permit Entire · 05/07/2026
Project X00701523 Alteration · Permit Entire · 03/24/2022
P.S -403xEducation—
Project X01135705 Alteration · Permit Entire · 11/19/2024
Morris Collab HS Tech & Human-XEducationFloors 2, 5
Project X00846765 Alteration · Permit Entire · 04/04/2023
Bronx International (morris) H.SEducationFloors 1–3
Project X00717037 Alteration · Permit Entire · 04/20/2022
Project X00701614 Alteration · Permit Entire · 03/24/2022
Project X00648132 Alteration · Permit Entire · 12/16/2021
Project X00648144 Alteration · Permit Entire · 12/16/2021
Project X00648154 Alteration · Permit Entire · 12/16/2021
HS for Violin and DanceEducationFloor 5
Project X00672850 Alteration · Permit Entire · 02/03/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 493 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch54
10/16/2026X01474529-I1Request digital key ↗
08/24/2026X00648144-S2Request digital key ↗
08/24/2026X00648144-S1Request digital key ↗
Showing 3 of 54 on file for this type
▸Applications & Permits50
▸DOB NOWLPC Approval/Permit43
10/16/2026X01474529-I1Open ↗
08/24/2026X00648132-S1Open ↗
08/24/2026X00648132-S2Open ↗
Showing 3 of 43 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/21/2009220021358Open ↗
08/21/2009220021349Open ↗
08/01/2009220021349Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications113
▸DOB NOWDPL-1: Design Professional Seal & Signature55
10/16/2026X01474529-I1Open ↗
08/24/2026X00648144-S1Open ↗
08/24/2026X00648144-I1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
10/19/2026X00717037-S2Open ↗
09/02/2026X00838353-P3Open ↗
09/01/2026X00838353-S2Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/30/2026X00648154-S1Open ↗
08/27/2026X00717037-S1Open ↗
08/27/2026X00648132-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/15/2008210073560Open ↗
10/15/2008210073579Open ↗
09/19/2008210069245Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/16/2026X01394694-I1Open ↗
Showing 1 of 4 on file for this type
▸Environmental & Asbestos46
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
08/24/2026X00701523-P1Open ↗
08/24/2026X00648132-I1Open ↗
08/24/2026X00648132-S2Open ↗
Showing 3 of 38 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
08/01/2009220021349Open ↗
08/01/2009220021358Open ↗
10/15/2008210073560Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/24/2026X00648144-S2Open ↗
08/24/2026X00648144-S1Open ↗
Showing 2 of 3 on file for this type
▸Approvals, Objections & Sign-offs143
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)55
10/16/2026X01474529-I1Open ↗
08/24/2026X00648132-S1Open ↗
08/24/2026X00648132-S2Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter54
10/16/2026X01474529-I1Open ↗
08/24/2026X00648144-S1Open ↗
08/24/2026X00648144-S2Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)25
10/16/2026X01474529-I1Open ↗
Showing 1 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/01/2009220021349Open ↗
08/01/2009220021358Open ↗
10/15/2008210073560Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/01/2009220021349Open ↗
08/01/2009220021358Open ↗
10/15/2008210073560Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET7
08/21/2009220021358Open ↗
08/21/2009220021349Open ↗
08/01/2009220021349Open ↗
Showing 3 of 7 on file for this type
▸Other Documents71
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal51
08/24/2026X00648132-S2Open ↗
08/24/2026X00648132-I1Open ↗
08/24/2026X00648132-S1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWProof of Historic Building18
08/24/2026X00648132-I1Open ↗
08/17/2026X01317442-P1Open ↗
Showing 2 of 18 on file for this type
▸DOB NOWNYCSCA Exhibit 21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type