112 2 PLACE
BROOKLYN · BIN 3007932
💬 Discuss this project
1920Year Built
3Stories
C3Building Class
R6BZoning
5,000 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸
Four families · Owner of record: STOOP ACQUISITION LLC · 2,500 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof4p · 2 filings · 16 docs
Floor 34p · 2 filings · 16 docs
Floor 2
Floor 11p · 1 filing · 12 docs
Cellar6p · 2 filings · 16 docs
Basement1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STOOP ACQUISITION LLC2307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2018$4.1M—Private party → STOOP ACQUISITION LLC$820/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EVAN CHAN ARCHITECT, PC509/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EVAN CHAN ARCHITECT P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABDUL CONSTRUCTION INCGeneral Contractor1203/21/2026
JOSEPH FERRIGNO P&H COPlumbing507/08/2026
JOSEPH FERRIGNO P HGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EVAN CHAN ARCHITECT, P.C.5605204/23/2021
Building Lifecycle
All (32)Filed (5)Permit Issued (6)Signed Off (2)Violation (8)Inspection (3)Objection (8)
04/03/2024
Violation issued (HPD, closed)
A
11/02/2023
Signed off — Alteration
New bathroom plumbing fixtures at Basement, 1st, 2nd and 3rd floor. And new kitchen plumbing fixtures at, 1st, 2nd and 3rd floor. New sink at cellar floor
B00505038-I1
09/14/2023
Objection raised — Scope
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Energy
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Other
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Other
09/14/2023
Objection resolved — Addressed
09/11/2023
Filed — Alteration
New bathroom plumbing fixtures at Basement, 1st, 2nd and 3rd floor. And new kitchen plumbing fixtures at, 1st, 2nd and 3rd floor. New sink at cellar floor
B00505038-P3
05/19/2023
Filed — Alteration
New bathroom plumbing fixtures at Basement, 1st, 2nd and 3rd floor. And new kitchen plumbing fixtures at, 1st, 2nd and 3rd floor. New sink at cellar floor
B00505038-P2
04/20/2023
Filed — Alteration
New bathroom plumbing fixtures at Basement, 1st, 2nd and 3rd floor. And new kitchen plumbing fixtures at, 1st, 2nd and 3rd floor. New sink at cellar floor
B00505038-P1
04/18/2023
Permit issued — Plumbing
B00505038-I1-PL
02/22/2023
Signed off — Alteration
B00489799-I1
01/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2022
Permit issued — Mechanical Systems
B00489799-I1-MS
08/03/2022
Permit issued — Mechanical Systems
B00489799-I1-GC
02/18/2022
Violation issued (HPD, closed)
A
02/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/20/2021
Permit issued — Plumbing
B00505038-I1-PL
08/10/2021
Permit issued — Mechanical Systems
B00489799-I1-MS
08/10/2021
Permit issued — General Construction
B00489799-I1-GC
04/26/2021
Filed — Alteration
New bathroom plumbing fixtures at Basement, 1st, 2nd and 3rd floor. And new kitchen plumbing fixtures at, 1st, 2nd and 3rd floor. New sink at cellar floor
B00505038-I1
04/23/2021
Filed — Alteration
B00489799-I1
11/15/2017
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
08/21/1987
Violation issued (HPD, open)
B
08/21/1987
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOSEPH FERRIGNO P&H CO04/18/2023
DOB NOWMechanical SystemsSigned-offABDUL CONSTRUCTION INC08/03/2022
DOB NOWMechanical SystemsSigned-offABDUL CONSTRUCTION INC08/03/2022
DOB NOWPlumbingSigned-offJOSEPH FERRIGNO P&H CO09/20/2021
DOB NOWMechanical SystemsSigned-offABDUL CONSTRUCTION INC08/10/2021
DOB NOWGeneral ConstructionSigned-offABDUL CONSTRUCTION INC08/10/2021
2 projects · most recent 04/30/2022
General Wiring
FiledStatusContractorScope
04/30/2022CompleteTESTA ELECTRIC CO., INCGeneral Wiring
08/27/2021Permit IssuedPAUL VERARDIGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00489799-I1Request digital key ↗
09/01/2026B00505038-P2Request digital key ↗
09/01/2026B00505038-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00489799-I1Open ↗
09/01/2026B00505038-P2Open ↗
09/01/2026B00505038-P3Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00489799-I1Open ↗
09/01/2026B00505038-P1Open ↗
09/01/2026B00505038-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00489799-I1Open ↗