← Back
BuildNYC
Two family frame
112 KINGSLAND AVENUE
BROOKLYN · BIN 3069917
💬 Discuss this project
1920Year Built
1Stories
B2Building Class
M1-1Zoning
450 sfGross Floor Area
2Units
Two family frame · Owner of record: 112 Kingsland Ave · 2,525 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstallation of Solar Panels on Existing Roof of Storage Bui3p · 2 filings · 19 docs
Floor 1Proposed curb cut7p · 3 filings · 20 docs
Site & exteriorHeavy-duty sidewalk shed installation8p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
112 Kingsland Avenue403/21/2026
3L Brothers103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2019$1.3M—Private party → 112 KINGSLAND AVE LLC$2,833/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kataria203/21/2026
S R Solar Design203/21/2026
Merritt Engineering Consultant403/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3 L. BrothersGeneral Contractor1007/08/2026
3 L. BrothersScaffold307/08/2026
Liquid Plumbing & Heating SCSPlumbing207/08/2026
M.A.C. ElectricElectrical103/22/2026
Intersystems Installation S&SScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR Architect1171510/08/2026
NKM Engineering6244110/28/2025
Mullen Palandrani Architects4022210/07/2025
Building Lifecycle
10/08/2026
Filed — Alteration CO
FILING HEREWITH PLANS AND APPLICATION FOR NEW VERTICAL AND HORIZONTAL ENLARGEMENT OF EXISTING GARAGE FOR STORAGE AS PER CO # 3341. REPAIR EXISTING MASONRY WALLS AND FRAMING ON FIRST FLOOR. PLUMBING FILED UNDER B00483487. REQUESTING NEW C OF O.
B08050928-P3
10/08/2026
Special inspection requirement — Concrete - Cast-In-Place
ANGEL ROJAS
10/08/2026
Special inspection requirement — Insulation placement and R values
ANGEL ROJAS
10/08/2026
Special inspection requirement — Air barrier - visual inspection
ANGEL ROJAS
10/08/2026
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
77 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued3 L Brothers03/26/2026
DOB NOWSolarSigned-off3 L Brothers03/23/2026
DOB NOWSolarSigned-off3 L Brothers02/26/2026
DOB NOWPlumbingSigned-offLiquid Plumbing & Heating SCS06/18/2025
DOB NOWGeneral ConstructionPermit Issued3 L Brothers04/21/2025
DOB NOWGeneral ConstructionPermit Issued3 L Brothers04/08/2025
DOB NOWGeneral ConstructionPermit Issued3 L Brothers01/02/2025
DOB NOWPlumbingSigned-offLiquid Plumbing & Heating SCS08/05/2024
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S07/16/2024
DOB NOWGeneral ConstructionPermit Issued3 L Brothers05/29/2024
DOB NOWGeneral ConstructionPermit Issued3 L Brothers03/28/2024
DOB NOWConstruction FenceSigned-off3 L Brothers03/07/2024
DOB NOWConstruction FenceSigned-off3 L Brothers04/10/2023
4 projects · most recent 09/29/2025
General Wiring
FiledStatusContractorScope
09/29/2025CompleteElectrical PowerGeneral Wiring
07/24/2025CompleteElectrical Power—
07/29/2024CompleteM.A.C. Electric—
07/16/2024CompleteAurora Electrical Contg—
1 project · most recent 10/28/2025
FiledStatusContractorScope
10/28/2025Signed-off3 L. Brothers—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
10/08/2026Concrete - Cast-In-PlaceANGEL ROJASspecial
10/08/2026Construction Operations Influencing Adjacent StructuresANGEL ROJASspecial
10/08/2026Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/08/2026Lighting controlsANGEL ROJASenergy_progress
10/08/2026MasonryANGEL ROJASspecial
10/08/2026Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
10/08/2026Protection of exposed foundation insulationANGEL ROJASenergy_progress
10/08/2026Fenestration areasANGEL ROJASenergy_progress
10/08/2026Interior lighting powerANGEL ROJASenergy_progress
10/08/2026Insulation placement and R valuesANGEL ROJASenergy_progress
10/08/2026Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
10/08/2026Fenestration air leakageANGEL ROJASenergy_progress
10/08/2026Air barrier - visual inspectionANGEL ROJASenergy_progress
10/08/2026Fire-Resistance Rated ConstructionANGEL ROJASprogress
10/08/2026Energy Code Compliance InspectionsANGEL ROJASprogress
07/23/2026Lighting controlsANGEL ROJASenergy_progress
07/23/2026Concrete - Cast-In-PlaceANGEL ROJASspecial
07/23/2026Construction Operations Influencing Adjacent StructuresANGEL ROJASspecial
07/23/2026Fire-Resistant Penetrations and JointsANGEL ROJASspecial
07/23/2026MasonryANGEL ROJASspecial
07/23/2026Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
07/23/2026Energy Code Compliance InspectionsANGEL ROJASprogress
07/23/2026Fire-Resistance Rated ConstructionANGEL ROJASprogress
07/23/2026Fenestration areasANGEL ROJASenergy_progress
07/23/2026Interior lighting powerANGEL ROJASenergy_progress
Latest 25 of 66.
164 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account