Condo, residential tower (mixed-use, multi-family elevator) [derived]
Le Premier Condominium
112 WEST 56 STREET · BIN 1023398
💬 Discuss this project
1982Year Built
32Stories
RMBuilding Class
C6-6Zoning
106,502 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: LE PREMIER CONDOMINIUM LTD · 7,531 sf lot · 14.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof10p · 6 filings · 20 docs
Floor 20Under Construction16p · 1 filing · 6 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 58p · 3 filings · 20 docs
Floor 410p · 3 filings · 20 docs
Floor 38p · 3 filings · 20 docs
Floor 29p · 3 filings · 20 docs
Floor 16p · 3 filings · 20 docs
Mezzanine20p · 3 filings · 20 docs
Cellar20p · 5 filings · 20 docs
Basement4p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAN AM EQUITIES3307/08/2026
BHS807/08/2026
SLYLINE RESTORATION INC103/22/2026
PAMELA EQUITIES1003/21/2026
LE PREMIER CONDOMINIUM2303/21/2026
WHITEHALL PROPERTIES LLC C/O PAN103/21/2026
MGMNYC203/21/2026
LEPREMIER CONDO C O BHS503/21/2026
BROWN HARRIS STEVENS103/21/2026
TRANSAMERICA INTERNTL HOLDINGS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2203/21/2026
SPRING SCAFFOLDING LLC603/21/2026
J CALLAHAN CONSULTING403/21/2026
NEW YORK ENGINEERING103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
GREEN STUDIO203/21/2026
TRIBECA CONST CONSULTING203/21/2026
GILLMAN CONSULTING803/21/2026
A+ EXPEDITING203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor807/08/2026
EMG INDUSTRIAL CHIMNEY INGeneral Contractor607/08/2026
CONSIGLI CONSTRUCTION COGeneral Contractor403/21/2026
LTF CONSTRUCTION CO LLCGeneral Contractor407/08/2026
DJC CORPPlumbing307/08/2026
A & C HTG SERVICES, INCPlumbing207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
CLOVER AIR LLCGeneral Contractor107/08/2026
EVEREST REALTY HOLDINGS IGeneral Contractor107/08/2026
MTK CONTRACTING INCGeneral Contractor107/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
LIQUID PLBG & HTNG SCS INPlumbing106/28/2026
CARSTENS, KLAUSElectrical103/21/2026
CERTIFICATE ONLYElectrical103/21/2026
MOJICA, MONTEElectrical103/21/2026
RICHARD GRIMAElectrical103/21/2026
TITAN ELEC'L & ELEV CONTRElectrical103/22/2026
DJC CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404105/14/2026
JOCK DEBOER, AIA - SIA7008106/29/2023
SOCOTEC ENGINEERING4983406/10/2022
IP GROUP2542203/30/2022
NEW YORK ENGINEERING ASSO851103/24/2022
JOEL PHAGOO ,PE, PLLC2416108/04/2021
Building Lifecycle
All (147)Filed (31)Permit Issued (26)Signed Off (15)Facade (FISP) (15)Violation (60)
06/08/2026
Permit issued — Plumbing
M01346792-S1-PL
05/27/2026
Permit issued — General Construction
M01346792-I1-GC
05/14/2026
Filed — Alteration
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (3 LAV, 3 WC, 1 TUB, 1 SINK, 1 DW); INSTALL NEW PLUMBING FIXTURES (1 SHOWER); CAP & REMOVE (1 TUB) AT APT 21S AT THE 20TH FLOOR.
M01346792-S1
05/14/2026
Filed — Alteration
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (3 LAV, 3 WC, 1 TUB, 1 SINK, 1 DW); INSTALL NEW PLUMBING FIXTURES (1 SHOWER); CAP & REMOVE (1 TUB) AT APT 21S AT THE 20TH FLOOR.
M01346792-I1
07/16/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/08/2024
Signed off — Alteration
Application filed to renovate apartment 15S that includes modification of non bearing partitions and finishes as per the plans filed herewith. No change to Use, Egress of Occupancy
M00875532-I1
09/06/2023
Permit issued — General Construction
M00875532-I1-GC
06/29/2023
Filed — Alteration
Application filed to renovate apartment 15S that includes modification of non bearing partitions and finishes as per the plans filed herewith. No change to Use, Egress of Occupancy
M00875532-I1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2023
Signed off — Alteration
RENOVATION OF AN EXISTING STOREFRONT, NEW WINDOW AS PER PLANS. NO CHANGE OFUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00702888-I1
01/18/2023
Permit issued — General Construction
M00702888-I1-GC
01/12/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00756137-I1
01/12/2023
Signed off — Alteration
M00756161-I1
01/12/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00666873-I1
01/12/2023
Signed off — Alteration
M00666881-I1
01/11/2023
Filed — Alteration
RENOVATION OF AN EXISTING STOREFRONT, NEW WINDOW AS PER PLANS. NO CHANGE OFUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00702888-P1
11/17/2022
Signed off — Alteration
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00313955-I1
11/16/2022
Signed off — Alteration
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00314108-S1
11/16/2022
Signed off — Alteration
M00608311-I1
11/16/2022
Signed off — Alteration
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00314108-I1
11/04/2022
Filed — Alteration
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00314108-P7
11/02/2022
Filed — Alteration
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00314108-P6
11/02/2022
Violation issued (HPD, closed)
I
10/11/2022
Cycle 9 facade report submitted
09/29/2022
Cycle 9 facade report signed — SAFE
08/25/2022
Permit issued — General Construction
M00702888-I1-GC
08/17/2022
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00666873-P1
08/16/2022
Cycle 9 facade inspection completed
08/03/2022
Signed off — Alteration
M00565153-I1
07/12/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00756137-P1
06/27/2022
Permit issued — Boiler Equipment
M00314108-S1-BE
06/16/2022
Filed — Alteration
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00314108-S1
06/15/2022
Filed — Alteration
M00756161-I1
06/15/2022
Signed off — Alteration
Replacement of existing dual fired boiler/burner with new dual fired boiler/burner and related piping. No change in use, egress or occupancy under this application. Related gas piping scope filed under separate DOB NOW plumbing application.
M00523170-I1
06/15/2022
Permit issued — Protection and Mechanical Methods
M00756161-I1-PM
06/15/2022
Permit issued — Supported Scaffold
M00756137-I1-SF
06/14/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00756137-I1
06/10/2022
Filed — Alteration
Mechanical modifications on the Cellar, 1st thru 5th floor, 4th Floor Mezzanine and 5th floor Mezzanine (Life Time Fitness) as indicated on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00314108-P2
06/10/2022
Filed — Alteration
Plumbing modifications on the Cellar, 1st thru 5th floors, 4th Floor Mezzanine, and 5th Floor mezzanine (Life Time Fitness) as indicate on the attached drawings. In conjunction with Alt-1 110199268. No change in egress, use or occupancy.
M00313955-P3
05/17/2022
Permit issued — Mechanical Systems
M00681749-I1-MS
05/16/2022
Filed — Alteration
RENOVATION OF AN EXISTING STOREFRONT, NEW WINDOW AS PER PLANS. NO CHANGE OFUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00702888-I1
05/12/2022
Signed off — Alteration
Gas Booster replacement and gas piping modifications associated with boiler replacement. No change in use, egress or occupancy under this application. Boiler scope filed under separate DOB NOW Boiler Equipment application.
M00523114-I1
04/19/2022
Permit issued — Mechanical Systems
M00681749-I1-MS
04/02/2022
Permit issued — Mechanical Systems
M00681749-I1-MS
03/30/2022
Filed — Alteration
Gas Booster replacement and gas piping modifications associated with boiler replacement. No change in use, egress or occupancy under this application. Boiler scope filed under separate DOB NOW Boiler Equipment application.
M00523114-P1
03/30/2022
Filed — Alteration
Replacement of existing dual fired boiler/burner with new dual fired boiler/burner and related piping. No change in use, egress or occupancy under this application. Related gas piping scope filed under separate DOB NOW plumbing application.
M00523170-P2
03/30/2022
Permit issued — Plumbing
M00313955-I1-PL
03/24/2022
Filed — Alteration
FILING TO EXTEND EXISTING CHIMNEY NEXT TO NEIGHBORING BUILDING. BRACKETS FILED UNDER SEPARATE APPLICATION.
M00681749-I1
02/22/2022
Permit issued — Boiler Equipment
M00523170-I1-BE
02/18/2022
Permit issued — Supported Scaffold
M00679879-I1-SF
02/17/2022
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00679879-I1
01/27/2022
Permit issued — Plumbing
M00523114-I1-PL
01/25/2022
Permit issued — Construction Fence
M00666873-I1-FN
01/25/2022
Permit issued — Sidewalk Shed
M00666881-I1-SH
01/24/2022
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00666873-I1
01/24/2022
Filed — Alteration
M00666881-I1
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLIQUID PLBG & HTNG SCS IN06/08/2026
DOB NOWGeneral ConstructionPermit IssuedMTK CONTRACTING INC05/27/2026
DOB NOWGeneral ConstructionSigned-offPRESTON NYC LLC09/06/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO01/18/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO08/25/2022
DOB NOWBoiler EquipmentSigned-offDJC CORP06/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC06/15/2022
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/15/2022
DOB NOWMechanical SystemsPermit IssuedEMG INDUSTRIAL CHIMNEY IN05/17/2022
DOB NOWMechanical SystemsPermit IssuedEMG INDUSTRIAL CHIMNEY IN04/19/2022
DOB NOWMechanical SystemsPermit IssuedEMG INDUSTRIAL CHIMNEY IN04/02/2022
DOB NOWPlumbingSigned-offDJC CORP03/30/2022
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC02/22/2022
DOB NOWSupported ScaffoldPermit IssuedEMG INDUSTRIAL CHIMNEY IN02/18/2022
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP01/27/2022
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC01/25/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/25/2022
DOB NOWMechanical SystemsSigned-offLTF CONSTRUCTION CO LLC01/10/2022
DOB NOWSprinklersSigned-offDJC CORP11/23/2021
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC10/21/2021
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP10/18/2021
DOB NOWGeneral ConstructionSigned-offCLOVER AIR LLC09/23/2021
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP08/25/2021
DOB NOWMechanical SystemsSigned-offLTF CONSTRUCTION CO LLC04/01/2021
DOB NOWPlumbingSigned-offDJC CORP03/30/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC06/25/2020
BISOTISSUEDLTF CONSTRUCTION CO LLC01/10/2022
BISOTISSUEDLTF CONSTRUCTION CO LLC08/06/2021
BISOTISSUEDSKYLINE RESTORATION INC03/01/2021
BISOTISSUEDLTF CONSTRUCTION CO LLC02/17/2021
BISOTISSUEDLTF CONSTRUCTION CO LLC01/26/2021
BISOTISSUEDSKYLINE RESTORATION INC08/26/2020
BISEQISSUEDEVEREST SCAFFOLDING INC07/01/2020
BISOTISSUEDLTF CONSTRUCTION CO LLC02/24/2020
BISOTISSUEDLE PREMIER CONDOMINIUM12/24/2018
BISOTISSUEDLE PREMIER CONDOMINIUM12/21/2018
BISOTISSUEDSHAMROCK CONCRETE AND MAS12/27/2017
BISPLISSUEDPOWER PLUMBING & HEATING12/07/2017
BISOTISSUEDDKT CONTRACTORS LLC12/06/2017
BISOTISSUEDLE PREMIER AVENUE09/12/2017
+ 36 more permits on file
1 project · most recent 03/24/2022
Others
FiledStatusContractorScope
03/24/2022Permit IssuedEMG INDUSTRIAL CHIMNEY INOthers
1 project · most recent 05/14/2026
Water/Sanitary
FiledStatusContractorScope
05/14/2026Permit IssuedLIQUID PLBG & HTNG SCS INWater/Sanitary
12 projects · most recent 05/12/2026
General Wiring Lighting
FiledStatusContractorScope
05/12/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/07/2023CompleteDELCO ELECTRICAL CORP.General Wiring
12/06/2022CompleteRE-CON ELECTRIC INCGeneral Wiring
01/21/2022CompleteTOP SHELF ELECTRIC CORP—
11/11/2021CompleteTITAN ELEC'L & ELEV CONTR—
10/07/2021CompleteROME ELECTRICAL CONTS INC—
01/13/2021CompleteRE-CON ELECTRIC INC—
11/17/2020Permit IssuedJTE ELECTRICAL SERVICES—
06/18/2020CompleteBOROWIDE ELECT'L CONTR'S—
06/27/2018Permit IssuedK & G ELECTRIC CO., INC.—
04/20/2018CompleteASKO ELEC CONST & MAIN INGeneral Wiring
12/12/2017CompleteASKO ELEC CONST & MAIN INGeneral Wiring, Lighting
1 project · most recent 02/17/2022
Scaffold
FiledStatusContractorScope
02/17/2022Permit IssuedEMG INDUSTRIAL CHIMNEY INScaffold
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2022Pass-Final Boiler Equipment InspectionPassView ↗
06/20/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
05/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
05/16/2023Fire-Resistant Penetrations and JointsJock deBoerspecial
05/16/2023Fire-Resistance Rated ConstructionJock deBoerprogress
05/16/2023FinalJock deBoerprogress
05/16/2023Energy Code Compliance InspectionsJock deBoerprogress
05/16/2023Lighting in dwelling unitsJock deBoerenergy_progress
05/16/2023Lighting controlsJock deBoerenergy_progress
11/01/2022Energy Code Compliance InspectionsLuigi Ciacciaprogress
08/25/2022Fenestration air leakageLuigi Ciacciaenergy_progress
08/25/2022FinalLuigi Ciacciaprogress
08/25/2022Fenestration areasLuigi Ciacciaenergy_progress
08/25/2022Exterior lighting powerLuigi Ciacciaenergy_progress
06/14/2022Duct leakage testing ALEXIS SCHLESSINGERMANenergy_progress
06/14/2022Mechanical SystemsALEXIS SCHLESSINGERMANspecial
06/14/2022FinalALEXIS SCHLESSINGERMANprogress
06/14/2022Electrical motorsALEXIS SCHLESSINGERMANenergy_progress
06/14/2022Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
06/14/2022HVAC and service water heating equipment ALEXIS SCHLESSINGERMANenergy_progress
06/14/2022HVAC and service water heating system controls ALEXIS SCHLESSINGERMANenergy_progress
06/14/2022HVAC insulation and sealing ALEXIS SCHLESSINGERMANenergy_progress
04/07/2022Heating SystemsIVAN POLLAKspecial
04/07/2022HVAC-R and service water heating system controlsIVAN POLLAKenergy_progress
04/07/2022HVAC-R and service water heating equipmentIVAN POLLAKenergy_progress
04/07/2022Maintenance informationIVAN POLLAKenergy_progress
04/07/2022Energy Code Compliance InspectionsIVAN POLLAKprogress
04/07/2022HVAC-R and service water piping design and insulationIVAN POLLAKenergy_progress
Latest 25 of 43.
▾Documents — 711 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch23
09/03/2026M00565153-I1Request digital key ↗
09/03/2026M00591966-I1Request digital key ↗
09/03/2026M00608311-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026M00313955-I1Request digital key ↗
09/02/2026M00313955-P3Request digital key ↗
08/15/2026M00313955-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026M00314108-I1Request digital key ↗
09/01/2026M00314108-P1Request digital key ↗
08/15/2026M00314108-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00359630-I1Request digital key ↗
▸Applications & Permits117
▸BISPLAN / WORK APPROVAL APPLICATION69
12/15/2022110199268Open ↗
07/07/2022120818393Open ↗
05/26/2022110199268Open ↗
Showing 3 of 69 on file for this type
▸BISWORK PERMIT APPLICATION39
08/06/2021140883596Open ↗
02/17/2021140883596Open ↗
08/26/2020123827831Open ↗
Showing 3 of 39 on file for this type
▸BISPLACE OF ASSEMBLY6
05/12/2022104725264Open ↗
06/23/2021104725264Open ↗
06/18/2021104725264Open ↗
Showing 3 of 6 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
12/17/2021140883596Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/26/2020123827831Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM4
07/25/2018123161461Open ↗
Showing 1 of 4 on file for this type
▸Seals & Professional Certifications147
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
07/18/2019123827831Open ↗
05/01/2019123827831Open ↗
04/26/2019123258893Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/23/2026M00523170-I1Open ↗
09/23/2026M00523170-I1Open ↗
09/23/2026M00523170-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/03/2026M00565153-I1Open ↗
09/03/2026M00608311-I1Open ↗
09/03/2026M00666873-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00523170-I1Open ↗
09/05/2026M00523170-P2Open ↗
09/01/2026M00681749-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/21/2020140942620Open ↗
06/23/2020140916588Open ↗
02/21/2020140883596Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/21/2020140942620Open ↗
06/23/2020140916588Open ↗
02/21/2020140883596Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/21/2020140942620Open ↗
06/23/2020140916588Open ↗
02/21/2020140883596Open ↗
▸Trade Schedules & Equipment39
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS6
12/06/2022110199268Open ↗
Showing 1 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
03/17/2023110199268Open ↗
Showing 1 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
12/06/2022110199268Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes12
03/12/2020140883596Open ↗
05/01/2019123827831Open ↗
07/24/2018123161461Open ↗
Showing 3 of 12 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00359630-I1Open ↗
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/03/2026M00608311-I1Open ↗
09/02/2026M00523170-P2Open ↗
09/02/2026M00523170-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
02/21/2020140883596Open ↗
05/01/2019123827831Open ↗
Showing 2 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
05/01/2019123827831Open ↗
Showing 1 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
12/06/2022110199268Open ↗
07/12/2022120705754Open ↗
05/21/2020123161461Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/06/2022110199268Open ↗
07/12/2022120705754Open ↗
10/14/2021140883596Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/02/2026M00523170-I1Open ↗
08/13/2026M00523114-I1Open ↗
08/13/2026M00314108-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/03/2022123827831Open ↗
10/28/2022140883596Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/03/2022123827831Open ↗
10/28/2022140883596Open ↗
▸BISLIGHTING CONTROLS1
10/28/2022140883596Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/02/2026M00523170-I1Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY18
12/06/2022110199268Open ↗
12/06/2022110199268Open ↗
11/21/2022104725264Open ↗
Showing 3 of 18 on file for this type
▸BISMASONRY2
01/19/2023123827831Open ↗
10/28/2022140883596Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/21/2020140883596Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/28/2022140883596Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
10/28/2022140883596Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/19/2023123827831Open ↗
▸Approvals, Objections & Sign-offs83
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
01/20/2023123827831Open ↗
01/11/2023140883596Open ↗
11/21/2022104725264Open ↗
Showing 3 of 34 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
02/02/2022110199268Open ↗
10/13/2021110199268Open ↗
06/28/2021110199268Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/05/2019110199268Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/03/2026M00666873-I1Open ↗
09/03/2026M00666881-I1Open ↗
09/02/2026M00756137-P1Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
11/03/2022123827831Open ↗
10/28/2022140883596Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
12/06/2022110199268Open ↗
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT39
07/12/2022120818393Open ↗
07/12/2022120705754Open ↗
08/21/2020140942620Open ↗
Showing 3 of 39 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/10/2023140883596Open ↗
11/03/2022123827831Open ↗
▸Filing & Intake Forms90
▸BISBOROUGH INTAKE FORM33
08/24/2022110199268Open ↗
10/21/2021110199268Open ↗
10/14/2021110199268Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION29
06/16/2022104725264Open ↗
06/12/2022110199268Open ↗
12/17/2021140883596Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING COVER SHEET25
05/01/2019123827831Open ↗
Showing 1 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/21/2020140942620Open ↗
06/23/2020140916588Open ↗
02/21/2020140883596Open ↗
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTCO - Supporting Documents2
01/04/2023110199268Open ↗
01/04/2023110199268Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/18/2021140916588Open ↗
Showing 1 of 2 on file for this type