| Owner | Filings | Most Recent |
|---|---|---|
| HIPPODROME | 538 | 03/21/2026 |
| 1120 AVE OF THE AMERCIAS ASSOC | 220 | 03/21/2026 |
| 1120 AVENUE OF AMERICAS LL | 117 | 03/21/2026 |
| EDISON PROPERTIES | 17 | 03/21/2026 |
| 1120 AVE O | 10 | 03/21/2026 |
| INDEED | 4 | 03/21/2026 |
| HIPPODROME LAND COMPANY, LLC | 1 | 03/22/2026 |
| RW DAKEAND CO, INC | 1 | 03/22/2026 |
| LSL CONSTRUCTION | 1 | 03/21/2026 |
| GALIS COMPANY | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EDG | 4 | 03/31/2026 |
| AKFENGINEERS LLP | 21 | 01/16/2026 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 7 | 01/16/2026 |
| BHK ENGINEERING | 1 | 09/11/2025 |
| CFS ENGINEERING, DPC | 2 | 11/20/2024 |
| KAHN ARCHITECTURE & DESIGN PC | 1 | 11/20/2024 |
| DAVID CHAGNON ARCHITECTURAL DESIGN | 1 | 01/02/2024 |
| JRS ARCHITECT, PC | 2 | 12/01/2023 |
| TWIG NJ ENGINEERS | 2 | 06/27/2023 |
| A-SQUARED | 1 | 06/26/2023 |
| JOSEPH K. BLUM CO. LLP | 2 | 06/23/2023 |
| COSENTINI ASSOCIATES | 2 | 11/21/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 11/11/2022 |
| FORMAT ARCHITECTURE OFFICE, PLLC | 1 | 08/23/2022 |
| AMA CONSULTING ENGINEERS, PC | 6 | 08/02/2022 |
| INTERIOR ARCHITECTS | 1 | 08/01/2022 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 08/01/2022 |
| KMB DESIGN GROUP, LLC | 1 | 10/28/2020 |
| COM-EX ENGINEERING OF NY, PLLC | 1 | 02/14/2020 |
| NB&C | 1 | 02/10/2020 |
| RDK ENGINEER PC | 3 | 09/12/2019 |
| LEON SKVIRSKY PE | 6 | 08/28/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| AE DESIGN SOLUTION | 6 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 64 | 03/21/2026 |
| RIZZO GROUP | 9 | 03/21/2026 |
| LMS-ACE SERVICES | 2 | 03/21/2026 |
| D D EXPEDITORS | 4 | 03/21/2026 |
| CCM CONSULTING GROUP, INC. | 2 | 03/21/2026 |
| EA DESIGN GROUP | 16 | 03/21/2026 |
| PROJECT EXPEDITERS CONSULTING CO. | 4 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PETRETTI & ASSOCIATES LLC | General Contractor | 39 | 10/02/2026 |
| PRECISION BUILDING & CONS | General Contractor | 9 | 07/08/2026 |
| BALATON CONSULTING LLC | Scaffold | 6 | 07/08/2026 |
| R.W. DAKE & CO.,INC | General Contractor | 4 | 07/08/2026 |
| EMPIRE NY INSTALLATIONS INC | General Contractor | 4 | 07/08/2026 |
| OVERLAND CONTRACTING INC | General Contractor | 4 | 07/08/2026 |
| RELIABLE PLBG & HTG CORP | Plumbing | 4 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 4 | 03/21/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 3 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 3 | 07/08/2026 |
| FIVE BOROUGH NYC LLC | Fire Protection | 3 | 07/08/2026 |
| ARDNORE CONSTRUCTION INC | General Contractor | 3 | 03/21/2026 |
| ELYSIUM CONSTRUCTION INC | General Contractor | 3 | 07/08/2026 |
| JACOBS TELECOMMUN. INC | General Contractor | 3 | 03/21/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 3 | 07/08/2026 |
| BRAUNSTEIN, HOWARD | Electrical | 2 | 03/21/2026 |
| BROOK PLUMBING & HTG CORP | Fire Protection | 2 | 07/08/2026 |
| DEMARI SERVICES INC | General Contractor | 2 | 03/21/2026 |
| CURRENT FIRE PROTECTION INC | Fire Protection | 2 | 07/08/2026 |
| M & C IMPACT IRON WORK | Electrical | 2 | 03/21/2026 |
| BROOK PLUMBING & HTG CORP | Plumbing | 1 | 07/08/2026 |
| GEOFFREY A. LAGAS & ASSOC | Plumbing | 1 | 07/08/2026 |
| INFRASTRUCTURE REPAIR SERVICE | General Contractor | 1 | 07/08/2026 |
| DEGENNARO III, CHARLES | Electrical | 1 | 03/21/2026 |
| LSL CONSTRUCT SERV INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| EDG | 2578 | 6 | 03/31/2026 |
| CONSULTING AND TESTING SE | 6152 | 2 | 01/16/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 11 | 09/11/2025 |
| JOSEPH K. BLUM CO. LLP | 1741 | 3 | 09/11/2025 |
| LEO Y LEE ASSOCIATES | 2481 | 1 | 03/18/2025 |
| DNA CONTROLLED INSPECTION | 554 | 3 | 11/20/2024 |
| SOCOTEC ENGINEERING | 4983 | 4 | 11/20/2024 |
| WHITESTONE ASSOCIATES ENG | 8144 | 1 | 12/01/2023 |
| ATLAS ATC ENGINEERING INC | 8011 | 4 | 11/15/2023 |
| AKF ENGINEERS, LLP | 2751 | 6 | 11/15/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | PETRETTI & ASSOCIATES LLC | 10/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 06/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PETRETTI & ASSOCIATES LLC | 03/25/2026 |
| DOB NOW | General Construction | Permit Issued | PETRETTI & ASSOCIATES LLC | 01/20/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 09/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 09/22/2025 |
| DOB NOW | General Construction | Permit Issued | PETRETTI & ASSOCIATES LLC | 09/17/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PETRETTI & ASSOCIATES LLC | 09/17/2025 |
| DOB NOW | Structural | Permit Issued | PETRETTI & ASSOCIATES LLC | 09/12/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/22/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 05/22/2025 |
| DOB NOW | Structural | Signed-off | TOWER SERVICES INC | 05/20/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DEMARI SERVICES INC | 03/27/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 02/10/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 02/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PETRETTI & ASSOCIATES LLC | 02/06/2025 |
| DOB NOW | General Construction | Signed-off | PETRETTI & ASSOCIATES LLC | 02/06/2025 |
| DOB NOW | General Construction | Permit Issued | PETRETTI & ASSOCIATES LLC | 11/26/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | PETRETTI & ASSOCIATES LLC | 11/25/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | PETRETTI & ASSOCIATES LLC | 09/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PETRETTI & ASSOCIATES LLC | 03/14/2024 |
| DOB NOW | Plumbing | Signed-off | RELIABLE PLBG & HTG CORP | 03/14/2024 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 03/14/2024 |
| DOB NOW | General Construction | Signed-off | PETRETTI & ASSOCIATES LLC | 03/12/2024 |
| DOB NOW | General Construction | Signed-off | ARDNORE CONSTRUCTION INC | 01/05/2024 |
| DOB NOW | General Construction | Signed-off | R.W. DAKE & CO.,INC | 12/11/2023 |
| DOB NOW | Mechanical Systems | Signed-off | R.W. DAKE & CO.,INC | 12/07/2023 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 12/01/2023 |
| DOB NOW | Plumbing | Signed-off | RELIABLE PLBG & HTG CORP | 12/01/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PETRETTI & ASSOCIATES LLC | 11/21/2023 |
| DOB NOW | General Construction | Signed-off | PETRETTI & ASSOCIATES LLC | 11/21/2023 |
| DOB NOW | General Construction | Signed-off | INFRASTRUCTURE REPAIR SER | 07/25/2023 |
| DOB NOW | Sprinklers | Permit Issued | SHARP PLUMBING CORP | 07/12/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PRECISION BUILDING & CONS | 06/30/2023 |
| DOB NOW | General Construction | Permit Issued | PRECISION BUILDING & CONS | 06/29/2023 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 06/05/2023 |
| DOB NOW | Plumbing | Signed-off | RELIABLE PLBG & HTG CORP | 05/18/2023 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 05/16/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PETRETTI & ASSOCIATES LLC | 04/22/2023 |
| DOB NOW | General Construction | Signed-off | PETRETTI & ASSOCIATES LLC | 04/21/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/16/2026 | Permit Issued | PETRETTI & ASSOCIATES LLC | Ventilation Systems | Ventilation Anemostat N/A 2,150 CFM · Ductwork ×6 |
| 11/20/2024 | Permit Issued | PETRETTI & ASSOCIATES LLC | Ventilation Systems | Ventilation Anemostat N/A 7,050 CFM · Vav Box ×11 |
| 06/27/2023 | Permit Issued | PRECISION BUILDING & CONS | Associated Ducts and Piping | Ducts & Piping N/A N/A Ductwork ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/16/2026 | Permit Issued | BEDROCK MECHANICAL INC | 25 heads |
| 09/11/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 106 heads |
| 11/20/2024 | — | — | 15 heads |
| 06/27/2023 | Permit Issued | BROOK PLUMBING & HTG CORP | 3 heads |
| 09/02/2020 | Signed-off | SKH MECHANICAL CORP | 78 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/16/2026 | — | — | — |
| 09/11/2025 | — | — | — |
| 09/11/2025 | Permit Issued | DEPENDABLE MECH CORP | Water/Sanitary |
| 11/26/2019 | Signed-off | RELIABLE PLBG & HTG CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/26/2025 | Complete | LIPPOLIS ELECTRIC, INC. | General Wiring |
| 02/22/2025 | Complete | KENNETH ELECTRIC INC | General Wiring |
| 10/05/2024 | Complete | KENNETH ELECTRIC INC | General Wiring |
| 03/21/2024 | Complete | ECS ELEC'L CONTG SERV INC | General Wiring |
| 12/17/2023 | Permit Issued | SRM ELECTRICAL SVC INC | General Wiring |
| 06/30/2023 | Complete | TWINTECH ELECTRIC INC | General Wiring |
| 05/22/2023 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| 02/28/2023 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 01/03/2023 | Permit Issued | UNI-LITE ELECTRIC, LLC | — |
| 08/04/2022 | Complete | TWINTECH ELECTRIC INC | General Wiring |
| 04/01/2022 | Complete | MEGA ELEC'L CONTR'G, INC | — |
| 10/21/2020 | Complete | HESO ELECTRICAL INC | General Wiring |
| 06/08/2020 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 03/19/2020 | Complete | ECS ELEC'L CONTG SERV INC | General Wiring |
| 12/24/2019 | Complete | HESO ELECTRICAL INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/31/2026 | Signed-off | TOWER SERVICES INC | Concrete |
| 08/01/2022 | Permit Issued | PRECISION BUILDING & CONS | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/02/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/18/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/16/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/11/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/14/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/10/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/05/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/05/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/23/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/21/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/30/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/16/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/25/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/19/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/14/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/09/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 12/23/2025 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 12/23/2025 | Duct leakage testing, insulation and design | DANIEL CREIGHTON | energy_progress |
| 12/18/2025 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 12/18/2025 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 12/18/2025 | Mechanical Systems | DANIEL CREIGHTON | special |
| 12/18/2025 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 12/18/2025 | Lighting controls | DANIEL CREIGHTON | energy_progress |
| 12/18/2025 | Interior lighting power | DANIEL CREIGHTON | energy_progress |
| 12/18/2025 | Energy Code Compliance Inspections | DANIEL CREIGHTON | progress |
| 12/18/2025 | Final | DANIEL CREIGHTON | progress |
| 09/11/2025 | Fire-Resistant Penetrations and Joints | Matthew Wavro | special |
| 09/11/2025 | Post-installed Anchors | Matthew Wavro | special |
| 06/18/2025 | Sprinkler Systems | Matthew Wavro | special |
| 01/31/2025 | Energy Code Compliance Inspections | Matthew Wavro | progress |
| 01/30/2025 | Post-installed Anchors | Matthew Wavro | special |
| 01/29/2025 | HVAC-R and service water heating system controls | Matthew Wavro | energy_progress |
| 01/29/2025 | Metering | Matthew Wavro | energy_progress |
| 01/29/2025 | Interior lighting power | Matthew Wavro | energy_progress |
| 01/29/2025 | HVAC-R and service water heating equipment | Matthew Wavro | energy_progress |
| 01/29/2025 | Lighting controls | Matthew Wavro | energy_progress |
| 01/29/2025 | Duct leakage testing, insulation and design | Matthew Wavro | energy_progress |
| 01/29/2025 | HVAC-R and service water piping design and insulation | Matthew Wavro | energy_progress |
| 01/23/2025 | Final | Matthew Wavro | progress |
| 01/23/2025 | Final | Matthew Wavro | progress |
| 01/23/2025 | Mechanical Systems | Matthew Wavro | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Squire Patton Boggs | Office | Floors 13, 21 | Project M01337039 Project M01337059 Project M01337065 Project M01243288 Project M01243296 Project M01243299 Project M01125380 Project M01125385 Project M01125390 |
| BBC Offices | Office | Floor 5 | Project M00985852 Project M00985856 |
| Cambridge in America | Office | Floor 7 | Project M00845949 Project M00845954 Project M00845925 Project M00845965 |
| Indeed Temp Space | Office | Floor 6 | Project M00788297 |
| Perry Ellis | Office | Floor 7 | Project M00770278 |
| Fidelity Investments | Office | Floors 1, 18 | Project M00189815 |
| Fidelity NGIC: Bryant Park Fidelity Investments | Office | Floors 1, 18 | Project M00189674 Project M00189823 |