← Back
Office, 20+ stories, with or without commercial
1120 AVENUE OF THE AMER
MANHATTAN · Midtown-Times Square · BIN 1034202
💬 Discuss this project
1962Year Built
21Stories
O4Building Class
C6-6Zoning
615,000 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FISP: SAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: HIPPODROME LAND COMPANY, LLC · 48,199 sf lot · 12.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 16 docs
Floor 221p · 1 filing · 3 docs
Floor 21Under Construction37p · 7 filings · 20 docs
Floor 20
Floor 19
Floor 184p · 3 filings · 20 docs
Floor 17
Floor 16
Floor 15
Floor 1430p · 8 filings · 20 docs
Floor 13Under Construction28p · 5 filings · 20 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 81p · 1 filing · 5 docs
Floor 772p · 11 filings · 20 docs
Floor 616p · 2 filings · 10 docs
Floor 539p · 11 filings · 20 docs
Floor 4
Floor 38p · 1 filing · 6 docs
Floor 29p · 3 filings · 20 docs
Floor 129p · 7 filings · 20 docs
Cellar12p · 3 filings · 20 docs
Sub-Basement1 filing · 3 docs
Site & exterior19p · 9 filings · 20 docs
Filed — no permit issued5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIPPODROME53803/21/2026
1120 AVE OF THE AMERCIAS ASSOC22003/21/2026
1120 AVENUE OF AMERICAS LL11703/21/2026
EDISON PROPERTIES1703/21/2026
1120 AVE O1003/21/2026
INDEED403/21/2026
HIPPODROME LAND COMPANY, LLC103/22/2026
RW DAKEAND CO, INC103/22/2026
LSL CONSTRUCTION103/21/2026
GALIS COMPANY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
EMPIRE CITY CONSULTANTS, INC.6403/21/2026
RIZZO GROUP903/21/2026
LMS-ACE SERVICES203/21/2026
D D EXPEDITORS403/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
EA DESIGN GROUP1603/21/2026
PROJECT EXPEDITERS CONSULTING CO.403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETRETTI & ASSOCIATES LLCGeneral Contractor3910/02/2026
PRECISION BUILDING & CONSGeneral Contractor907/08/2026
BALATON CONSULTING LLCScaffold607/08/2026
R.W. DAKE & CO.,INCGeneral Contractor407/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor407/08/2026
OVERLAND CONTRACTING INCGeneral Contractor407/08/2026
RELIABLE PLBG & HTG CORPPlumbing407/08/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor403/21/2026
BEDROCK MECHANICAL INCFire Protection307/08/2026
DEPENDABLE MECHANICAL CORFire Protection307/08/2026
FIVE BOROUGH NYC LLCFire Protection307/08/2026
ARDNORE CONSTRUCTION INCGeneral Contractor303/21/2026
ELYSIUM CONSTRUCTION INCGeneral Contractor307/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing307/08/2026
BRAUNSTEIN, HOWARDElectrical203/21/2026
BROOK PLUMBING & HTG CORPFire Protection207/08/2026
DEMARI SERVICES INCGeneral Contractor203/21/2026
CURRENT FIRE PROTECTION INCFire Protection207/08/2026
M & C IMPACT IRON WORKElectrical203/21/2026
BROOK PLUMBING & HTG CORPPlumbing107/08/2026
GEOFFREY A. LAGAS & ASSOCPlumbing107/08/2026
INFRASTRUCTURE REPAIR SERVICEGeneral Contractor107/08/2026
DEGENNARO III, CHARLESElectrical103/21/2026
LSL CONSTRUCT SERV INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578603/31/2026
CONSULTING AND TESTING SE6152201/16/2026
SKYLINE ENGINEERING, PLLC2671109/11/2025
JOSEPH K. BLUM CO. LLP1741309/11/2025
LEO Y LEE ASSOCIATES2481103/18/2025
DNA CONTROLLED INSPECTION554311/20/2024
SOCOTEC ENGINEERING4983411/20/2024
WHITESTONE ASSOCIATES ENG8144112/01/2023
ATLAS ATC ENGINEERING INC8011411/15/2023
AKF ENGINEERS, LLP2751611/15/2023
Building Lifecycle
All (300)Filed (70)Permit Issued (71)Signed Off (40)Facade (FISP) (11)Violation (37)Inspection (27)Objection (14)Special Inspection (30)
10/01/2026
Permit issued — General Construction
M01243281-I1-GC
08/13/2026
Cycle 10 facade report submitted
08/13/2026
Cycle 10 facade report signed — SWARMP
07/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2026
Signed off — Alteration
MISCELLANEOUS LOADING DOCK AND VAULT REPAIRS AS PER THE PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01185287-I1
07/07/2026
Cycle 10 facade inspection completed
06/10/2026
Permit issued — Sprinklers
M01337065-I1-EW-SP
04/15/2026
Objection raised — Inspections
04/15/2026
Objection raised — Cost
04/15/2026
Objection raised — Structural
04/15/2026
Objection raised — Structural
04/15/2026
Objection raised — Scope
04/15/2026
Objection raised — Inspections
03/31/2026
Filed — Alteration
MISCELLANEOUS LOADING DOCK AND VAULT REPAIRS AS PER THE PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01185287-P1
03/25/2026
Permit issued — Mechanical Systems
M01337059-I1-MS
03/04/2026
Violation issued (FDNY_ORDER, closed)
01/20/2026
Permit issued — General Construction
M01337039-I1-GC
01/16/2026
Filed — Alteration
Filing herewith interior demolition and renovation to the 13th FL. as per plans filed herewith. No change to use, egress occupancy.
M01337039-I1
01/16/2026
Filed — Alteration
Filing herewith Mechanical work on the 13th FL. as per plans filed herewith. No change to use, egress or occupancy.
M01337059-I1
01/16/2026
Filed — Alteration
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
M01337065-I1
12/23/2025
Special inspection requirement — Duct leakage testing, insulation and design
DANIEL CREIGHTON
12/23/2025
Special inspection requirement — Post-installed Anchors
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Sprinkler Systems
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Post-installed Anchors
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Mechanical Systems
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Final
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Interior lighting power
DANIEL CREIGHTON
12/18/2025
Special inspection requirement — Lighting controls
DANIEL CREIGHTON
12/01/2025
Signed off — Alteration
Filling herewith sprinkler work in existing 14th floor space. No change in use, egress or occupancy.
M01170948-I1
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Signed off — Alteration
Filing herewith interior renovations of existing 14th floor space. No change in use, egress or occupancy.
M01170882-I1
10/28/2025
Signed off — Alteration
M01170937-I1
10/28/2025
Signed off — Alteration
Filling herewith mechanical work in existing 14th floor space. No change in use, egress or occupancy.
M01170929-I1
10/24/2025
Violation issued (FDNY_ORDER, closed)
09/24/2025
Violation issued (FDNY_ORDER, closed)
09/22/2025
Permit issued — Plumbing
M01243296-I1-PL
09/22/2025
Permit issued — Sprinklers
M01243299-I1-EW-SP
09/17/2025
Permit issued — General Construction
M01243281-I1-GC
09/17/2025
Permit issued — Mechanical Systems
M01243288-I1-MS
09/12/2025
Permit issued — Structural
M01262194-I1-ST
09/11/2025
Filed — Alteration
M01243288-I1
09/11/2025
Filed — Alteration
Filling herewith plumbing work in existing 21st floor space. No change in use, egress or occupancy.
M01243296-I1
09/11/2025
Filed — Alteration
Filling herewith sprinkler work in existing 21st floor space. No change in use, egress or occupancy.
M01243299-I1
09/11/2025
Filed — Alteration
Filing herewith interior renovations of existing 21st floor space. No change in use, egress or occupancy.
M01243281-I1
09/11/2025
Filed — Alteration
M01262194-I1
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
09/11/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
06/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
06/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/22/2025
Permit issued — Plumbing
M01170937-I1-PL
05/22/2025
Permit issued — Sprinklers
M01170948-I1-EW-SP
05/20/2025
Permit issued — Structural
M01185287-I1-GC-CX
04/21/2025
Filed — Alteration
MISCELLANEOUS LOADING DOCK AND VAULT REPAIRS AS PER THE PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01185287-I1
04/21/2025
Violation issued (FDNY_ORDER, closed)
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPETRETTI & ASSOCIATES LLC10/01/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC06/10/2026
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC03/25/2026
DOB NOWGeneral ConstructionPermit IssuedPETRETTI & ASSOCIATES LLC01/20/2026
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP09/22/2025
DOB NOWSprinklersPermit IssuedDEPENDABLE MECHANICAL COR09/22/2025
DOB NOWGeneral ConstructionPermit IssuedPETRETTI & ASSOCIATES LLC09/17/2025
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC09/17/2025
DOB NOWStructuralPermit IssuedPETRETTI & ASSOCIATES LLC09/12/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP05/22/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR05/22/2025
DOB NOWStructuralSigned-offTOWER SERVICES INC05/20/2025
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC03/27/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR02/10/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP02/10/2025
DOB NOWMechanical SystemsSigned-offPETRETTI & ASSOCIATES LLC02/06/2025
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC02/06/2025
DOB NOWGeneral ConstructionPermit IssuedPETRETTI & ASSOCIATES LLC11/26/2024
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC11/25/2024
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC09/12/2024
DOB NOWMechanical SystemsSigned-offPETRETTI & ASSOCIATES LLC03/14/2024
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP03/14/2024
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC03/14/2024
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC03/12/2024
DOB NOWGeneral ConstructionSigned-offARDNORE CONSTRUCTION INC01/05/2024
DOB NOWGeneral ConstructionSigned-offR.W. DAKE & CO.,INC12/11/2023
DOB NOWMechanical SystemsSigned-offR.W. DAKE & CO.,INC12/07/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC12/01/2023
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP12/01/2023
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC11/21/2023
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC11/21/2023
DOB NOWGeneral ConstructionSigned-offINFRASTRUCTURE REPAIR SER07/25/2023
DOB NOWSprinklersPermit IssuedSHARP PLUMBING CORP07/12/2023
DOB NOWMechanical SystemsPermit IssuedPRECISION BUILDING & CONS06/30/2023
DOB NOWGeneral ConstructionPermit IssuedPRECISION BUILDING & CONS06/29/2023
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC06/05/2023
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP05/18/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC05/16/2023
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC04/22/2023
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC04/21/2023
+ 60 more permits on file
3 projects · most recent 01/16/2026
Ventilation Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
01/16/2026Permit IssuedPETRETTI & ASSOCIATES LLCVentilation Systems
Ventilation
Anemostat N/A 2,150 CFM · Ductwork ×6
11/20/2024Permit IssuedPETRETTI & ASSOCIATES LLCVentilation Systems
Ventilation
Anemostat N/A 7,050 CFM · Vav Box ×11
06/27/2023Permit IssuedPRECISION BUILDING & CONSAssociated Ducts and Piping
Ducts & Piping
N/A N/A Ductwork ×1
5 projects · most recent 01/16/2026
FiledStatusContractorScope
01/16/2026Permit IssuedBEDROCK MECHANICAL INC25 heads
09/11/2025Permit IssuedA&H EXPRESS PLBG&HTG CORP106 heads
11/20/2024——15 heads
06/27/2023Permit IssuedBROOK PLUMBING & HTG CORP3 heads
09/02/2020Signed-offSKH MECHANICAL CORP78 heads
4 projects · most recent 01/16/2026
Water/Sanitary
FiledStatusContractorScope
01/16/2026———
09/11/2025———
09/11/2025Permit IssuedDEPENDABLE MECH CORPWater/Sanitary
11/26/2019Signed-offRELIABLE PLBG & HTG CORPWater/Sanitary
25 projects · most recent 09/26/2025
General Wiring
FiledStatusContractorScope
09/26/2025CompleteLIPPOLIS ELECTRIC, INC.General Wiring
02/22/2025CompleteKENNETH ELECTRIC INCGeneral Wiring
10/05/2024CompleteKENNETH ELECTRIC INCGeneral Wiring
03/21/2024CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
12/17/2023Permit IssuedSRM ELECTRICAL SVC INCGeneral Wiring
06/30/2023CompleteTWINTECH ELECTRIC INCGeneral Wiring
05/22/2023CompleteUNI-LITE ELECTRIC, LLCGeneral Wiring
02/28/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
01/03/2023Permit IssuedUNI-LITE ELECTRIC, LLC—
08/04/2022CompleteTWINTECH ELECTRIC INCGeneral Wiring
04/01/2022CompleteMEGA ELEC'L CONTR'G, INC—
10/21/2020CompleteHESO ELECTRICAL INCGeneral Wiring
06/08/2020CompleteTEAM ELECTRIC, INCGeneral Wiring
03/19/2020CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
12/24/2019CompleteHESO ELECTRICAL INCGeneral Wiring
2 projects · most recent 03/31/2026
Concrete
FiledStatusContractorScope
03/31/2026Signed-offTOWER SERVICES INCConcrete
08/01/2022Permit IssuedPRECISION BUILDING & CONS1 scope_items
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
07/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 122
DateRequirementInspectorRole
12/23/2025Post-installed AnchorsDANIEL CREIGHTONspecial
12/23/2025Duct leakage testing, insulation and designDANIEL CREIGHTONenergy_progress
12/18/2025Post-installed AnchorsDANIEL CREIGHTONspecial
12/18/2025Sprinkler SystemsDANIEL CREIGHTONspecial
12/18/2025Mechanical SystemsDANIEL CREIGHTONspecial
12/18/2025Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
12/18/2025Lighting controlsDANIEL CREIGHTONenergy_progress
12/18/2025Interior lighting powerDANIEL CREIGHTONenergy_progress
12/18/2025Energy Code Compliance InspectionsDANIEL CREIGHTONprogress
12/18/2025FinalDANIEL CREIGHTONprogress
09/11/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
09/11/2025Post-installed AnchorsMatthew Wavrospecial
06/18/2025Sprinkler SystemsMatthew Wavrospecial
01/31/2025Energy Code Compliance InspectionsMatthew Wavroprogress
01/30/2025Post-installed AnchorsMatthew Wavrospecial
01/29/2025HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
01/29/2025MeteringMatthew Wavroenergy_progress
01/29/2025Interior lighting powerMatthew Wavroenergy_progress
01/29/2025HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
01/29/2025Lighting controlsMatthew Wavroenergy_progress
01/29/2025Duct leakage testing, insulation and designMatthew Wavroenergy_progress
01/29/2025HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
01/23/2025FinalMatthew Wavroprogress
01/23/2025FinalMatthew Wavroprogress
01/23/2025Mechanical SystemsMatthew Wavrospecial
Latest 25 of 122.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Squire Patton BoggsOfficeFloors 13, 21
Project M01337039 Alteration · Permit Entire · 01/16/2026
Project M01337059 Alteration · Permit Entire · 01/16/2026
Project M01337065 Alteration · Permit Entire · 01/16/2026
Project M01243288 Alteration · Permit Entire · 09/11/2025
Project M01243296 Alteration · Permit Entire · 09/11/2025
Project M01243299 Alteration · Permit Entire · 09/11/2025
Project M01125380 Alteration · Permit Entire · 11/20/2024
Project M01125385 Alteration · Permit Entire · 11/20/2024
Project M01125390 Alteration · Approved · 11/20/2024
BBC OfficesOfficeFloor 5
Project M00985852 Alteration · LOC Issued · 03/08/2024
Project M00985856 Alteration · LOC Issued · 03/08/2024
Cambridge in AmericaOfficeFloor 7
Project M00845949 Alteration · LOC Issued · 04/20/2023
Project M00845954 Alteration · LOC Issued · 04/20/2023
Project M00845925 Alteration · LOC Issued · 04/19/2023
Project M00845965 Alteration · LOC Issued · 04/19/2023
Indeed Temp SpaceOfficeFloor 6
Project M00788297 Alteration · LOC Issued · 08/23/2022
Perry EllisOfficeFloor 7
Project M00770278 Alteration · Permit Entire · 08/02/2022
Fidelity InvestmentsOfficeFloors 1, 18
Project M00189815 Alteration · LOC Issued · 09/12/2019
Fidelity NGIC: Bryant Park Fidelity InvestmentsOfficeFloors 1, 18
Project M00189674 Alteration · LOC Issued · 09/12/2019
Project M00189823 Alteration · LOC Issued · 09/12/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 4,006 on file (BIS + DOB NOW)
▸Plans & Drawings71
▸DOB NOWPlans/Sketch54
09/02/2026M00686371-I1Request digital key ↗
09/02/2026M00686371-P1Request digital key ↗
09/02/2026M00770373-I1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Sign6
09/05/2026M00213530-I1Request digital key ↗
09/05/2026M00213477-I1Request digital key ↗
09/05/2026M00213520-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00189815-I1Request digital key ↗
09/05/2026M00259438-P1Request digital key ↗
09/05/2026M00259438-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00189823-I1Request digital key ↗
09/04/2026M00259496-I1Request digital key ↗
09/04/2026M00259496-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna3
09/05/2026M00211526-I1Request digital key ↗
09/04/2026M00344219-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00189674-I1Request digital key ↗
09/05/2026M00259327-I1Request digital key ↗
▸Applications & Permits713
▸BISPLAN / WORK APPROVAL APPLICATION375
03/04/2024123738349Open ↗
03/04/2024123675120Open ↗
01/12/2021123370725Open ↗
Showing 3 of 375 on file for this type
▸BISWORK PERMIT APPLICATION335
11/26/2019123743823Open ↗
11/01/2019123779795Open ↗
09/30/2019123892467Open ↗
Showing 3 of 335 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWState DEC Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications1,107
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION635
02/12/2020123893108Open ↗
02/12/2020123893108Open ↗
02/11/2020123705240Open ↗
Showing 3 of 635 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST149
01/12/2021123370725Open ↗
11/22/2019123743823Open ↗
10/25/2019123892467Open ↗
Showing 3 of 149 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT109
11/22/2019123743823Open ↗
08/28/2019123779795Open ↗
Showing 2 of 109 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature70
09/05/2026M00213520-I1Open ↗
09/05/2026M00213570-I1Open ↗
09/05/2026M00259438-P1Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/23/2026M01337059-I1Open ↗
09/23/2026M01337059-I1Open ↗
09/23/2026M08021434-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/23/2026M01337059-I1Open ↗
09/23/2026M01337059-I1Open ↗
09/23/2026M01243299-I1Open ↗
Showing 3 of 37 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment382
▸BISSELF-CERT PLUMBING NOTICE91
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 91 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE78
12/03/2019123893108Open ↗
12/02/2019123893108Open ↗
10/11/2019123892467Open ↗
Showing 3 of 78 on file for this type
▸BISSCHEDULE B - PLUMBING68
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 68 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA53
07/12/2021123370716Open ↗
06/07/2021123523437Open ↗
07/06/2020123266189Open ↗
Showing 3 of 53 on file for this type
▸BISEQUIPMENT USE PERMITS42
09/23/2020123601227Open ↗
09/23/2020123601227Open ↗
09/23/2020123601227Open ↗
Showing 3 of 42 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT29
09/23/2020123601227Open ↗
09/14/2020123601227Open ↗
08/21/2020123601227Open ↗
Showing 3 of 29 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8520
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos328
▸BISASBESTOS: CERTIFICATION (DEP ACP5)158
11/22/2019123743823Open ↗
08/28/2019123779795Open ↗
Showing 2 of 158 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'89
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 89 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report62
09/05/2026M00259438-I1Open ↗
09/05/2026M00259438-P1Open ↗
09/04/2026M00259496-P1Open ↗
Showing 3 of 62 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Energy Compliance233
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS131
12/13/2019123763132Open ↗
12/13/2019123763132Open ↗
12/12/2019123484684Open ↗
Showing 3 of 131 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS50
04/08/2021123743823Open ↗
06/17/2020123892467Open ↗
12/13/2019123763132Open ↗
Showing 3 of 50 on file for this type
▸BISTR8: Energy Code Progress Inspections16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
04/08/2021123743823Open ↗
09/24/2020123708942Open ↗
09/03/2020123779795Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
01/19/2021123370725Open ↗
09/24/2020123708942Open ↗
09/03/2020123779795Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/19/2021123370725Open ↗
09/24/2020123708942Open ↗
▸BISINTERIOR LIGHTING POWER2
01/19/2021123370725Open ↗
09/03/2020123779795Open ↗
▸BISLIGHTING CONTROLS2
01/19/2021123370725Open ↗
09/03/2020123779795Open ↗
▸BIS* HVAC INSULATION AND SEALING2
01/19/2021123370725Open ↗
09/24/2020123708942Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00686371-I1Open ↗
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY17
04/08/2021123743823Open ↗
04/08/2021123743823Open ↗
01/19/2021123370725Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/24/2020123708942Open ↗
09/03/2020123779795Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
01/19/2021123370725Open ↗
09/24/2020123708942Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs267
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST148
07/27/2022123601236Open ↗
07/22/2021123523437Open ↗
04/08/2021123743823Open ↗
Showing 3 of 148 on file for this type
▸BISADMINISTRATIVE OBJECTIONS82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL3
01/19/2021123370725Open ↗
09/24/2020123708942Open ↗
09/03/2020123779795Open ↗
▸Cost, Insurance & Ownership464
▸BISCOST AFFIDAVIT458
04/08/2021123743823Open ↗
09/25/2020123705240Open ↗
09/24/2020123708942Open ↗
Showing 3 of 458 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
07/26/2022123601236Open ↗
07/22/2021123523437Open ↗
12/14/2020123370734Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms360
▸BISEFILING COVER SHEET259
11/22/2019123743823Open ↗
08/28/2019123779795Open ↗
Showing 2 of 259 on file for this type
▸BISBOROUGH INTAKE FORM48
02/13/2020123601227Open ↗
02/12/2020123893108Open ↗
02/03/2020123484835Open ↗
Showing 3 of 48 on file for this type
▸BISADDITIONAL INFORMATION43
07/29/2020123601227Open ↗
12/02/2019123893108Open ↗
10/11/2019123892467Open ↗
Showing 3 of 43 on file for this type
▸BISeFiling Job Application Cover Sheet10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type